A UK solar quote turns on an export rate the installer does not set: under Ofgem’s Smart Export Guarantee the customer’s chosen licensee does. OpenSolar’s core app is free. Aurora Solar lists design, financing integrations and proposal tracking. Pylon charges per project. SurgePV lists roof modeling, bill of materials and proposals in one product, priced per user in US dollars. None of the vendor pages we read gives a UK-specific tariff or subsidy rule, or a price in pounds, so run each tool on a real UK project.
Vendor facts come from each vendor’s own pages, read in November 2026 and subject to change. No tool was run side by side. SurgePV publishes this page and is one of the 4 tools on it. Manual spreadsheets are not compared because they have no vendor page.
Methodology: tools are listed alphabetically and are not ranked. Criteria used: design link, price and what the vendor says it covers. See How We Ordered These Tools.
Want to see SurgePV on your own UK project?
Book a guided demo and bring a real site. We walk through design, yield, finance and the proposal in one platform.
Book a Free DemoChecking cost first? See the SurgePV pricing page.
Best-For Picks for the UK
- A residential job with financing integrations and a hand-entered SEG rate: Aurora Solar. Its pricing page lists tablet-friendly proposals, integrated financing and proposal activity tracking, and its help article sets an export rate and compensation policy.
- A free core app with a custom tariff for one customer’s SEG offer: OpenSolar. Its tariff article builds flat, tiered and demand-charge rates, and the core app is free. API Access and connectors are charged from 16 April 2026.
- Many small jobs, paid per project: Pylon. Standard is $4.00 per project and Pro is $10.00, with unlimited users. Standard caps at 30 kW DC, which sits well inside the 5 MW SEG ceiling for solar PV.
- A proposal from the roof model, priced per user: SurgePV. It lists 3D roof modeling, shading, yield, financial modeling, bill of materials and proposal generation. Ask in a guided demo whether export income can be set per quote.
Comparison Table
Listed alphabetically. This is not a ranking; pick by the situation above. Prices checked November 2026 on each vendor’s own page.
| Tool | Best for | Price | Free or paid | Decisive scope fact |
|---|---|---|---|---|
| Aurora Solar | Design and sales proposals, per user | Basic $159 per user per month; $135 per user per month billed annually | Paid | Contract Manager and e-signature tools only on Enterprise |
| OpenSolar | Free core app with proposals | Core app free; API Access and connectors charged from 16 April 2026 | Free core app, paid API and connectors | Proposal formats are for residential workflows |
| Pylon | Pay-per-project quoting | Standard $4.00 per project; Pro $10.00 per project | Pay per project, free credits for five Standard projects | Standard size cap of 30 kW DC |
| SurgePV | Roof model to proposal in one product | $1,899 per user per year (1 user) | Paid, guided demo | Proposal built from the design model; no the UK-specific output stated |
What to Check for the UK
Ask each vendor to model one real UK project, and look for five things. First, the proposal in pounds sterling. Second, an export rate you can change per customer, with the supplier’s name and date printed on the quote. Third, self-used and exported energy shown as two lines. Fourth, the design data behind the production figure. Fifth, a price in the currency you will be invoiced in. UK coverage was not verified for any tool, and a demo or trial is the place to settle it.
What a UK Solar Quote Has to Say About Export Income
A proposal for a UK customer turns on one number the installer does not control: the export rate. Ofgem runs the Smart Export Guarantee (SEG), and its page states that licensed electricity suppliers must declare their SEG status every year. The supplier that signs up the customer, called the SEG licensee, sets the rate, the contract length and the other terms. Ofgem says any tariff must stay above zero, and that payments are based on actual meter readings, even where a supplier offers an alternative payment model.
Ofgem’s guidance for generators adds three facts that shape a quote. Eligible technologies are solar PV, wind, micro-CHP, hydro and anaerobic digestion, and the installation must be in Great Britain. Solar PV may have a total installed capacity of up to 5 MW. The customer applies to a SEG licensee, which does not have to be their current energy supplier. So two customers on the same roof can be offered different export rates, and a proposal built on one fixed number can be wrong for the next customer.
For a UK proposal, that points to a tool where the export rate is an input you can change per quote. Aurora Solar’s help article on editing utility rates lets you set an export rate and a compensation policy. OpenSolar’s tariff article shows how to build a custom tariff with flat, tiered and demand-charge rates. Both are described in the entries below. Neither vendor page we read names a UK supplier’s SEG tariff, so you enter the customer’s chosen rate yourself and print the source and date on the quote.
One older scheme should stay out of new quotes. Ofgem’s Feed-in Tariff page says the FIT scheme closed to new applicants from 1 April 2019, under the Feed-in Tariffs (Closure, etc.) Order 2018 made on 18 December 2018. A payback table that still assumes FIT payments for a new system is out of date.
Questions to put to each vendor in a demo: can the export rate be set per project, can the proposal show self-used energy and exported energy as two lines, and does the price list come in pounds sterling. The vendor pages we read price in US dollars, Swiss francs or per project, and do not state a pound price.
Tool Entries
Aurora Solar
Aurora Solar sells a design and sales platform.
Best for: UK residential installers that want design, a tablet-friendly proposal and financing integrations in one tool, entering each customer’s export rate by hand. Aurora’s pricing page describes Basic as a plan for residential design and sales.
Not the right choice if: you need Contract Manager, e-signature tools or customizable sales agreement templates, which the pricing page lists on Enterprise only, or more than one user and 50 projects a month on Basic or Premium. Aurora’s FAQ says additional licenses can be bought in the app.
What the vendor documents: customizable proposal templates, custom branding, and custom pricing methods (per watt, per component or flat fee). It also lists adders, discounts and incentives, a utility rate database, and web and PDF proposals. Adders are extra items added to the price. It lists proposal activity tracking and integrated and custom financing (GoodLeap, Dividend, Mosaic and more). It also lists financing and energy bill comparisons. Design features on the same page include 3D roof modeling and trees and performance simulation.
Price (checked October 2026): Basic is $159 per user per month billed monthly, or $135 per user per month billed annually ($1,620 billed annually). Premium is $259 per user per month billed monthly, or $220 per user per month billed annually ($2,640 billed annually). Enterprise is custom per project. Source: Aurora pricing.
Limitations: annual plans carry a one-year commitment per the pricing FAQ, and the pages we read name no UK supplier’s SEG tariff and show prices with a $ sign.
Vendor link: aurorasolar.com.

OpenSolar
OpenSolar says its core app stays free and that a partner ecosystem helps fund the product (its 16 February 2026 post).
Best for: UK installers who want design, a proposal, checkout and e-signature in one free core application, with a custom tariff built per customer.
Not the right choice if: you need commercial proposals. OpenSolar’s proposal FAQ says Swipe, Scroll and Bespoke “are for residential proposal workflows”. It is also not for you if you plan to connect many outside systems, because API Access and connectors are charged from 16 April 2026. The proposal page also says availability is “enabled by region”.
What the vendor documents: the Sales Machine Proposal page lists Swipe (slide-based), Scroll (long-form) and Bespoke proposals. It also lists a Quick Quote path, a fast quote and checkout route for simpler service and non-solar jobs. It lists branding controls and a template library. It lists savings views that compare current and electrified energy costs. It also lists deposits through CashFlow. It also lists financing “where available” and acceptance inside the same flow. A WhatsApp share option and section-view tracking “where available” are listed as well. The e-signature page lists a built-in signing workflow, PandaDoc or DocuSign.
Price (checked October 2026): the core app is free of charge for solar professionals, per the vendor (free page). From 16 April 2026 the vendor charges for API Access, a per-project fee. The per-project API fee is on OpenSolar’s API page. It also charges for supported connectors, a monthly fee per organization. The 16 February 2026 post says accounting connectors are billed as a monthly fee per organization. Bespoke proposals are offered through the optional paid Enterprise Services. Support is US$500 per month. Customize is US$1,350 per month (one exclusive proposal template). Enterprise is custom (“fully bespoke proposal”). Premium imagery is pay per image (price shown in the app).
Limitations: Swipe, Scroll and Bespoke support up to six designs per project where selection applies. The API page prices access by region, and no UK supplier tariff is named on the pages we read.
Vendor link: opensolar.com

Pylon
Pylon’s privacy policy names Saru Technologies Pty Ltd, North Strathfield, NSW, Australia, as the operator.
Best for: UK installers who quote a variable number of small jobs and want to pay per project, with unlimited users.
Not the right choice if: you quote systems above the Standard size cap or need an enterprise sign-on without contacting sales. The feature table lists a maximum DC generation size of 30 kW on Standard and 99 kW+ on Pro and Enterprise. It lists SSO (single sign-on) and API support under Enterprise.
What the vendor documents: solar system design and high resolution imagery in select countries. Standard also lists financial projections and instant web and PDF proposals. Pro adds a custom load profile, battery storage design and commercial-sized projects. The table also lists 3D shading simulation and eSignature at “80c/project”. The solutions menu lists single line diagrams. A project is an address and can hold up to five designs, each with its own proposal.
Price (checked October 2026): Standard is $4.00 per project and Pro is $10.00 per project. The page does not state the currency. The FAQ says there is no monthly minimum. It says new users get free credits for five Standard projects. It also says you can add unlimited users. A Solar CRM add-on is listed from $49.00 per user per month billed monthly. eSignature costs 80c per project on every plan. Source: Pylon pricing.
Limitations: image resolution depends on country, so check roof imagery on a UK address. Prices are in dollars.
Vendor link: getpylon.com.

SurgePV
SurgePV is our product.
Best for: UK installers and EPC teams (engineering, procurement and construction) that want a proposal built from the same 3D roof model, array layout and shading analysis, with energy-yield and financial modeling in one web application.
Not the right choice if: you need a self-serve trial (SurgePV offers a guided demo), or financing options, contracts or e-signature inside the proposal flow. The pricing page lists proposal generation and a generation and financial analysis feature, and does not describe those items. SurgePV’s published product scope does not list a CRM (customer tracking tool). Outputs support design and documentation but do not replace approval by the responsible engineer, authority, lender or utility.
What the vendor documents: 3D roof modeling, solar array layout, shading analysis and energy-yield modeling. It also lists financial modeling, electrical workflow support, bill-of-materials output and proposal generation. The pricing page lists unlimited projects, shadow analysis, generation and financial analysis, and proposal generation under “Everything included”. See the solar proposal software page for the product.
Price (checked November 2026): $1,899 per user per year for 1 user, $1,499 per user for 3 seats, $1,299 per user for 5 seats, in US dollars. Access is a guided demo.
Limitations: results depend on source data, assumptions, equipment models and review. The published scope states no UK tariff, SEG handling, subsidy, language or currency, so ask for them in a demo.
Vendor link: surgepv.com. Book a Free Demo.

See SurgePV on your own UK project
Book a guided demo and ask for the UK outputs you need.
Book a Free DemoHow We Ordered These Tools
Tools are listed alphabetically and carry no rank. The best-for picks follow what each vendor publishes, read against the Ofgem export points above.
- Design link: whether the vendor says the proposal is built from the design. Output quality was not assessed.
- Price: the vendor’s listed price in its own currency, none of which is pounds. Discounts and negotiated quotes were not assessed.
- Scope: what the vendor’s pages say the tool covers, including any export rate entry. Where a page is silent, nothing is inferred.
Go Deeper on a Category
- Solar proposal software, all markets
- Solar design software for the UK
- Solar software in the UK
- SurgePV solar proposal software
Sources and Dates
Vendor pages were read in October and November 2026. Screenshots are public website captures from 29 October 2026. Sources are the vendor pages linked in each entry: pricing, product and help pages. SurgePV facts come from its pricing page. SurgePV publishes this page and is a vendor on the list.
- ofgem.gov.uk (read November 2026): Smart Export Guarantee, SEG generators, Feed-in Tariffs
Frequently Asked Questions
What is the best solar proposal software in the UK?
It depends on the job. OpenSolar’s core app is free. Aurora Solar lists design, financing integrations and proposal tracking. SurgePV lists roof modeling, bill of materials and proposals in one product. We did not verify the UK-specific coverage for any tool, so test each on a real UK project before you buy.
How much does solar proposal software cost in the UK?
Vendors price in their own currency, and the pages we read do not give a local-currency price. SurgePV lists $1,899 per user per year for one user. OpenSolar’s core app is free, with charges for API Access and connectors from 16 April 2026. Aurora Basic is $159 per user per month, or $135 per user per month billed annually. Pylon Standard is $4.00 per project.
Is there free solar proposal software for the UK?
OpenSolar says its core app is free for solar professionals. The vendor charges for API Access and supported connectors from 16 April 2026. Check regional availability of any free tool for the UK.
Can solar proposal software handle the UK tariffs and incentives?
The vendor pages we read describe tariff and incentive features in general terms and do not list the UK-specific rates or programs. Ask each vendor to model one real the UK bill and incentive in a demo or trial.
Does SurgePV publish this list?
Yes. SurgePV publishes this page and is one of the tools on it. The tools are listed alphabetically and are not ranked.


