You file Irish rooftop paperwork outside your design tool. The installer files an NC6 with ESB Networks. The NC6 is the form that notifies ESB Networks of a micro-generator, a small generating system. A larger system needs an NC7, the mini-generation application form. The grant runs through an SEAI-registered company and the SEAI portal. No vendor on this list states an ESB Networks or SEAI output on the pages we read. So pick by the question each tool does answer. OpenSolar’s core app is free and generates a single line diagram (SLD, a simple drawing of how the system is wired). API Access (a way for other software to connect) and connectors are charged from 16 April 2026. PV*SOL publishes a euro price and generated circuit diagrams. PVsyst documents P50 to P90 yield evidence. P50 is a yield level expected to be met or exceeded in 50% of years, and P90 in 90% of years. SurgePV documents roof modeling, bill of materials (a parts list) and proposals in one product, priced per user.
This is a desk comparison of what each vendor publishes, checked October 2026. We have not run side-by-side tests. Local rules below come from ESB Networks, SEAI and the Commission for Regulation of Utilities (CRU), Ireland’s independent energy and water regulator. Tool facts come from each vendor’s own site. For planning exemptions and building regulations, see our Ireland solar compliance guide.
Criteria used: diagram for an NC7 file, NC6 or NC7 form data, equipment register match, SEAI grant and export-rate modelling, published price currency, yield evidence.
Want to see SurgePV on your own project?
Book a guided demo and bring a real site. We walk through design, yield, finance and the proposal in one platform.
Book a Free DemoChecking cost first? See the SurgePV pricing page.
Best-For Picks for Ireland
- A generated diagram to attach to an NC7 file: Easy PV, OpenSolar or PV*SOL. Each documents a generated schematic or diagram. ESB Networks does not accept hand-drawn diagrams with an NC7. None of the three says its output follows ESB Networks’ format, so check a sample before you buy. PVsyst also documents a single line diagram. It covers grid-connected systems only and does not include storage.
- Free core app on a small residential job: OpenSolar. Its free page says the core app is free for solar professionals. API Access and connectors are charged from 16 April 2026. It generates single line diagrams.
- A euro price list with 3D shading: PV*SOL. Its product page shows 845 euro plus VAT (value-added tax) per named-user licence for one year. It runs on Windows 10 and 11 only.
- Yield evidence for a larger project: PVsyst. Its documentation describes P50 to P90 evaluations. The pages we read describe no quotation or proposal output.
- Roof model to bill of materials and proposal in one product, priced per user: SurgePV. It documents roof modeling, shading, yield, financial modeling, electrical workflow support, bill of materials and proposals, priced in US dollars. Ask in a demo whether it exports a block diagram for an NC7 file. Also ask whether you can get a euro quote with VAT. Its published scope states neither.
Comparison Table
Listed alphabetically. This is not a ranking; pick by the situation above. Prices checked October 2026 on each vendor’s own page.
| Tool | Best for | Price | Free or paid | Decisive scope fact |
|---|---|---|---|---|
| Easy PV | Free tier, schematic, Irish site | Basic free; Pro £35 / month (UK site, pounds) | Free and paid | Lists an automatic schematic; Ireland pricing not shown |
| OpenSolar | Free core app and diagram | Core app free; API Access and connectors charged from 16 April 2026 | Free core app, paid API and connectors | Diagram templates listed for other countries, not Ireland |
| PV*SOL premium | Euro price, 3D shading, circuit diagrams | EUR 845.00 per named user per year, plus VAT | Paid, trial download | Windows 10 and 11 only |
| PVsyst | Yield evidence | CHF 700 per year (Professional) | Paid | Documents P50 to P90 evaluations; Windows only |
| SurgePV | Roof model to BOM and proposal, per user | $1,899 per user per year (1 user); euro price and VAT not stated | Paid, guided demo | BOM and proposal generation in scope; no ESB output stated |
Ireland Criteria Matrix
Each cell is Documented, Partial or Not stated, based on the vendor pages we read in October 2026. We list them under Sources and Dates. Documented means the page states it for this task. Partial means the page lists a related feature but not the Irish item. Not stated means we did not find it on those pages. There are no scores or weights.
| Tool | Diagram for NC7 | NC6 or NC7 form data | Equipment register match | SEAI grant or export rates | Price currency | Yield evidence |
|---|---|---|---|---|---|---|
| Easy PV | Partial (automatic schematic) | Not stated | Not stated | Partial (financial projections, self consumption estimate) | Documented (GBP, Pro only) | Not stated |
| OpenSolar | Partial (generator; Ireland not a listed template) | Not stated | Not stated | Partial (custom tariffs and export settings; no Irish rates stated) | Partial (core app free; API Access and connectors charged from 16 April 2026; no euro price) | Not stated |
| PV*SOL | Partial (circuit diagrams; Irish format not stated) | Not stated | Not stated | Partial (20-year financial analysis, feed-in tariff database) | Documented (EUR, plus VAT) | Partial (“bankable reports”; P50 and P90 in the Bankability help topic, full feed-in only) |
| PVsyst | Partial (single line diagram for grid-connected systems, storage not included; Irish format not stated) | Not stated | Not stated | Partial (feed-in tariff and self-consumption help page; no Irish rates stated) | Documented (CHF) | Documented |
| SurgePV | Not stated (electrical workflow support listed) | Not stated | Not stated | Partial (financial modeling listed) | Documented (USD) | Not stated (energy-yield modeling listed) |
Two things stand out. No vendor page we read mentions the NC6 or NC7 forms, ESB Networks’ Low Carbon Technology Register, SEAI’s Triple E register or the SEAI grant. The tools differ most on whether they generate a diagram, which currency they price in, and whether they document P50 to P90.
Tool Entries
Easy PV
Best for: installers who buy from the UK distributor Midsummer and want a free design and proposal tier to try on Irish jobs.
Not the right choice if: you need a stated ESB Networks or SEAI output (neither is stated on the pages we read), or a euro price (the UK site lists Pro in pounds, and the Irish site shows no Pro price in the text we read).
What the vendor documents: on easy-pv.co.uk, Basic lists 2D and 3D roof design, PV system design, performance calculations and self consumption estimation (how much of the power you use yourself). It also lists structural analysis, automatic schematic, financial projections, a project pricing calculator, customer proposal and payment options. Pro adds team sharing, CRM integration, e-signing, additional forms and reports, and an “Automatic DNO application”. A DNO is a distribution network operator, a UK term for the company that runs the local power network. The UK site also describes MCS compliant reports, which are UK terms. The Irish site is titled “Easy PV Ireland”. It lists the same Basic and Pro features. Its Basic list omits “Automated DNO forms”, which the UK site shows.
Price (checked October 2026): Basic is free and Pro is £35 / month on the UK site; the page does not state a billing term. Enterprise is “call to discuss”. No euro price appears on either site in the text we read.
Limitations: the pages we read do not say whether the DNO application covers ESB Networks forms, and they do not mention the SEAI grant. The help page for the Pro DNO application describes a UK form. It starts from a customer MPAN number (Meter Point Administration Number, which identifies a UK electricity supply) and goes through Connect Direct. Irish connections use an MPRN (Meter Point Reference Number).
Vendor link: easy-pv.co.uk.

OpenSolar
Best for: small installers who want a free core app with proposals and a generated single line diagram. Check the diagram against what ESB Networks asks for.
Not the right choice if: you need a diagram template that lists Ireland (neither OpenSolar page we read does), or documented P50 to P90 yield evidence.
What the vendor documents: its single line diagram page lists “Region-specific templates for AU, US, UK, DE, IT, ES”. Its help article lists a longer set (AU, NZ, US, CA, UK, FR, DE, IT, ES and IN) and does not list Ireland either. It says the template region defaults to your organisation’s country and can be changed. Its help centre has a Utility Tariffs section covering export, feed-in (a set price paid for power you send to the grid) and compensation settings. You can enter custom tariffs yourself. The Why OpenSolar page says the community spans 185+ countries and 13+ languages.
Price (checked October 2026): the core app is free of charge for solar professionals, per the vendor. From 16 April 2026 the vendor charges for API Access (a per-project fee) and supported connectors (a monthly fee per organization). The per-project API fee is on OpenSolar’s API page. The 16 February 2026 post says accounting connectors are billed as a monthly fee per organization. Optional paid Enterprise Services: Support US$500 per month, Customize US$1,350 per month, Enterprise custom. Premium imagery is pay per image (price shown in the app).
Limitations: the pages we read state no ESB Networks form data, SEAI grant or Irish export-rate output. The two diagram pages disagree on the template list, so confirm with the vendor.
Vendor link: opensolar.com.

PV*SOL premium
Best for: designers who want a euro-priced named-user licence with 3D shading analysis and generated circuit diagrams, and a vendor-listed sales partner for Ireland.
Not the right choice if: you work on a Mac or in a browser (the system requirements list Windows 10 and 11), or you need a stated ESB Networks or SEAI output.
What the vendor documents: on the product page, 3D visualisation and shading analysis, and self-consumption, battery and EV modelling. It lists “fully customizable circuit diagrams, including safety components”. It also lists a product database of over 30,000 modules and 9,000 inverters. It lists a 20-year financial analysis that uses a feed-in tariff database. The page does not say which countries the tariff database covers. It also says a customer presentation for quotations and consultations is available. The help centre has a Bankability (P50, P90) topic. The sales partner page lists The Solar Design Company under “United Kingdom and Ireland”, with English-language training.
Price (checked October 2026): EUR 845.00 plus VAT for a named-user licence, one year. A free trial version is offered for download.
Limitations: the product page says it creates “bankable reports”. The Bankability help topic gives P50 by default and a P90 or self-selected P-value for the profitability calculation. It says this relates only to full feed-in. It names no Irish form, grant or register.
Vendor link: valentin-software.com.

PVsyst
Best for: yield evidence on projects above the micro-generation size, such as a commercial roof, where a lender, investor or insurer wants a simulation report.
Not the right choice if: you need an NC7 diagram that shows inverter-connected storage, because PVsyst’s single line diagram does not include storage systems. It is also not right if you need quotations and proposals from the same tool, because the pages we read describe none. If you work on a Mac or in a browser, note that the requirements page says it runs only under Windows.
What the vendor documents: a P50 to P90 evaluation covering weather variability and simulation uncertainties. English is the reference language, and the software is translated into other languages. Its single line diagram help page describes an editor and viewer for PV strings, inverters and transformers. It is available for grid-connected systems only. The page says the feature is “still work in progress”. ESB Networks asks for an NC7 diagram to show any inverter-connected storage. The pages we read describe no proposal output. Its economic evaluation help page covers a fixed feed-in tariff over a contract period and self-consumption economics. It names no Irish rates.
Price (checked October 2026): CHF 700 per year for PVsyst 8 Professional, with grouped-order discounts of 5% for 2 to 4 licences, 15% for 5 to 9 and 20% for 10 or more. No euro price is published.
Limitations: the vendor pages we read do not mention Irish forms, grants or lenders.
Vendor link: pvsyst.com.

SurgePV
SurgePV is our product.
Best for: teams that want roof modeling, shading, yield, financial modeling, bill of materials and proposals in one product, priced per user. Confirm Irish outputs in a demo.
Not the right choice if: you want a self-serve trial (SurgePV offers a guided demo). It is also not right if you need a euro price with VAT in writing before talking to sales. Ask for a quote, because the pricing page lists US dollars. Another case is a free tool for small jobs, where OpenSolar’s core app is free. Outputs support design and documentation but do not replace approval by the responsible engineer, authority, lender or utility. SurgePV’s published product scope does not list a CRM. It is not a monitoring or ERP (business management software) product.
What the vendor documents: 3D roof modeling, array layout and shading analysis. It also lists energy-yield modeling, financial modeling, electrical workflow support, bill-of-materials output and proposal generation. See solar design software for the product page.
Price (checked October 2026): $1,899 per user per year for 1 user, $1,499 per user for 3 seats, $1,299 per user for 5 seats, in US dollars.
Limitations: results depend on source data, assumptions and equipment models. The pricing page and published scope do not state an NC7 block diagram, an SEAI grant calculation, Irish export rates or P50 to P90 outputs.
Vendor link: surgepv.com.

Irish Rules That Shape the Choice
Grid connection with ESB Networks. A micro-generator is rated up to 25 A (about 6 kVA) single phase or 16 A (about 11 kVA) three phase. It connects under an “inform and fit” process, with no connection charge (ESB Networks, micro-generation). “Inform and fit” means you notify ESB Networks. You may connect if ESB Networks does not raise an objection within 20 business days. The NC6 goes in with a type test certificate showing the inverter meets IS EN 50549-1. Since 6 January 2025, ESB Networks asks you to choose a product on its Low Carbon Technology Register and record its reference number on the form. The register lists devices that ESB Networks has validated as meeting its requirements for connecting to the low-voltage network. ESB Networks issues the maximum export capacity within 20 working days of a correct application. Export payment starts from the processing date, not the submission date (ESB Networks, connect a micro-generator).
Above those limits, the diagram becomes a requirement. Mini-generation covers 6 kVA to 17 kVA single phase and 11 kVA to 50 kVA three phase. Each NC7 application needs a block diagram or single line diagram, a manufacturer’s type test certificate and an inverter datasheet. ESB Networks states that hand-drawn diagrams will not be accepted. The application fee is a non-refundable 1,041.81 euro including VAT at 23%. The average wait for a connection offer is 8 to 10 weeks from payment. You must not install before signing the connection agreement (ESB Networks, mini-generation). This is the one Irish rule that makes diagram output a buying criterion.
The SEAI grant. For homes, SEAI pays 700 euro per kWp (kilowatts of rated panel power) up to 2 kWp and 200 euro for every additional kWp up to 4 kWp. The grant is capped at 1,800 euro and paid pro rata, so part of a kWp counts in proportion. A 3 kWp system is 2 × 700 + 1 × 200 = 1,600 euro, and 2.5 kWp is 2 × 700 + 0.5 × 200 = 1,500 euro, which matches SEAI’s own example. The home must have an MPRN and have been built and occupied before 2025. A battery grant adds a flat 600 euro for a 5 kWh battery. You apply and wait for the letter of offer before work starts. Then you have 8 months to finish. Payment needs the installer’s Declaration of Works, the Inspection, Test and Commissioning Certificate, the Safe Electric (RECI) certificate, the completed NC6, an invoice, photographs and a post-works BER (SEAI solar electricity grant). Grant values change, so use the page for the current figure.
Export payments. ESB Networks does not buy or sell electricity. The CRU sets the eligibility rules for payment. Your supplier pays for each metered kWh (kilowatt-hour) exported, and the rate per kWh is shown on your bill (CRU, microgeneration). Rates differ by supplier, so a proposal tool needs an editable export rate rather than a built-in national figure. ESB Networks also says that where a customer is eligible for a smart meter, one is needed to be paid for export.
Regulator pointers. Use ESB Networks for connection forms, SEAI for the grant and its registered-company list, and the CRU for export payment rules.
What to Ask a Vendor Before Buying
Ask each vendor for one sample project. Then look for these items. First, the diagram you would attach to an NC7 file. Second, the device and inverter fields the NC6 asks for. Third, a way to enter your supplier’s export rate. Fourth, a grant line that follows the 700 and 200 euro tiers. Fifth, a price in the currency you will be invoiced in. Where a vendor does not publish a feature on the pages we read, the matrix says so. A demo or trial is the place to confirm it.
How We Ordered These Tools
We did not rank these tools. They are listed alphabetically, and the best-for picks come from the matrix above.
- Diagram for NC7: ESB Networks requires a block or single line diagram with each NC7 application. We did not assess whether any tool’s diagram meets ESB Networks’ format.
- NC6 or NC7 form data: the forms ask for device and inverter details, so a tool that holds them saves re-entry. We did not assess whether any tool exports those fields.
- Equipment register match: ESB Networks asks for a Low Carbon Technology Register reference, and SEAI keeps its own register for grants. We did not assess how closely any equipment database matches either register.
- SEAI grant or export rates: buyers ask what the system saves after the grant and export payments. We did not assess whether any calculation is correct.
- Price currency: the currency shows what an Irish buyer will pay and whether VAT is added. We did not assess discounts or negotiated quotes.
- Yield evidence: larger projects may need a report a lender or insurer will read. We did not assess acceptance by any Irish lender.
Sources and Dates
Vendor pages were read in October 2026. Easy PV (UK site, Irish site). OpenSolar (free, diagrams, why OpenSolar). PV*SOL (premium, partners). PVsyst (shop, languages). SurgePV (pricing). Irish sources are the ESB Networks micro-generation, mini-generation and register pages. They also include the SEAI solar electricity grant page and the CRU microgeneration page. All are linked above and were read in October 2026. The SEAI page blocks plain automated requests, so we read it in a rendering browser. SolarEdge Designer, named in the FAQ, was read on its product page.
See SurgePV on your own project
Book a guided demo and ask for the Irish outputs you need.
Book a Free DemoGo Deeper on a Category
- Proposal software for Irish installers
- Solar software in Ireland, all categories
- Solar design software in the UK, the nearest country list
- Best solar design software, all markets
Frequently Asked Questions
What is the best solar design software for Irish installers?
It depends on the job. From what the vendors publish, OpenSolar’s core app is free and generates a single line diagram (SLD, a simple drawing of how the system is wired). API Access (a way for other software to connect) and connectors are charged from 16 April 2026. PV*SOL has a euro price and generated circuit diagrams. PVsyst documents P50 to P90 yield evidence. Easy PV has a free tier and an Irish site. SurgePV documents roof modeling, bill of materials and proposals in one product, priced per user in US dollars. None of the vendor pages we read states an ESB Networks or SEAI output.
Can I use Easy PV in Ireland?
Easy PV runs an Irish site at easy-pv.ie. It has a free Basic tier and a Pro tier that lists an automatic DNO application. A DNO is a distribution network operator, a UK term for the company that runs the local power network. We could not confirm from that site that it fills in ESB Networks forms. The UK site prices Pro at 35 pounds a month with no euro price. Ask Midsummer, the vendor, what the Irish version outputs before you pay.
Which free tools lay out solar panels on an Irish roof?
OpenSolar says its core app is free for solar professionals. The vendor charges for API Access and supported connectors from 16 April 2026. Easy PV Basic is free. SolarEdge Designer’s page says it has no license or subscription fees. None of the three states an ESB Networks NC6 or NC7 output, so the installer still completes those forms.
Do I need design software to complete the NC6 form?
No. ESB Networks says the customer can complete the NC6 alone, though an installer or electrician usually does. The form needs a type test certificate showing the inverter meets IS EN 50549-1. It also needs the Low Carbon Technology Register reference of the device. A diagram is a required attachment only for an NC7 mini-generation application.
How much is the SEAI solar grant for a 3 kWp system?
SEAI lists 700 euro per kWp (kilowatts of rated panel power) for the first 2 kWp and 200 euro for each additional kWp up to 4 kWp, capped at 1,800 euro. A 3 kWp system is 2 x 700 + 1 x 200 = 1,600 euro. The home must have been built and occupied before 2025.
How much does solar design software cost in Ireland?
Prices are published in different currencies. OpenSolar’s core app is free, but the vendor charges for API Access and supported connectors from 16 April 2026. Easy PV Basic is free and Pro is 35 pounds a month on the UK site. PV*SOL premium is 845 euro plus VAT (value-added tax) per named user per year. PVsyst Professional is 700 Swiss francs per year. SurgePV lists 1,899 US dollars per user per year for one user. Only PV*SOL publishes a euro price.