This page is for installers and EPC teams in Finland choosing solar proposal software. Short answer: for quoting a system that exports to the grid, pick a tool with a custom export-credit field; for design and proposals from one vendor, pick Enact Solar.
Which solar proposal tool fits a Finland quote? The vendor pages we read do not name Finland, so pick by what you can enter yourself. OpenSolar’s core app is free and takes a custom tariff. Energy Toolbase compares cash, loan, lease and PPA (power purchase agreement) options. Enact Solar lists design and proposals from one vendor. SurgePV lists proposal generation in one product with roof modeling, priced per user. No vendor here lists a local-currency price on the pages we read.
This is a desk comparison of what each vendor publishes, checked October 2026. We have not run side-by-side tests. SurgePV publishes this page and is one of the four tools on it. Tool facts come from each vendor’s own site. We did not read Finland utility or regulator pages for this version, so local tariffs, incentives and rules are not covered here. Take them from your utility or regulator.
Solargraf, which an earlier version of this page listed, is not compared here. Its site, solargraf.com, returned HTTP 403 to automated reads in October 2026.
Criteria used: tariff entry, export-credit setting, local-language proposals, price in a published currency, free start.
Want to see SurgePV quote a Finland project?
Book a guided demo and bring a real Finland site. We walk through design, yield, finance and the proposal in one platform.
Book a Free DemoChecking cost first? See the SurgePV pricing page.
Best-For Picks for Finland
A Finnish quote is more than a payback chart: exported power needs a buyer, the contractor must be registered, and an inspection record has to be handed over. The notes below turn that into questions for each proposal tool.
- Quoting a system that exports to the grid: a tool with a custom export-credit field. The Energiateollisuus general information form for small-scale generation (updated 10 June 2025) says the electricity that flows into the network company’s grid needs a buyer before connection, so the quote must name one or show export as blocked.
- Design and proposals from one vendor: Enact Solar. Its home page says it operates in 35+ countries, and its proposals list loan, lease and PPA options with DocuSign e-signatures.
- Comparing cash, loan, lease and PPA options: Energy Toolbase. Its FAQ says the platform supports “cash purchases, power purchase agreements (PPAs), loans, and leases”. It does not publish a price.
- Entering your own tariff in a free core app: OpenSolar. Its tariff article lists flat, time-of-use, tiered and demand rates, and several ways to credit exports. The core app is free. The vendor charges for API Access and connectors from 16 April 2026.
- Roof model to bill of materials and proposal in one product, priced per user: SurgePV. It lists roof modeling, shading, yield, financial modeling, bill of materials and proposals. Ask in a demo how it handles a Finland tariff and local-currency. Its published scope names neither.
Finland Solar Proposal Software Comparison Table
The tools are in alphabetical order. This is not a ranking. Pick by the situation above. Prices checked October 2026 on each vendor’s own page.
| Tool | Best for | Price | Free or paid | Decisive scope fact |
|---|---|---|---|---|
| Enact Solar | Design and proposals from one vendor | $279 per month billed annually (Design and Proposals) | Paid; “Start Trial” offered, terms not stated | Loan, lease and PPA options; DocuSign e-signatures |
| Energy Toolbase | Cash, loan, lease and PPA comparisons | Not published (book a demo) | Paid | Works with partner design tools |
| OpenSolar | Custom tariff, free core app | Core app free of charge; API Access and connectors charged from 16 April 2026 | Free core app, paid API and connectors | 13 proposal languages |
| SurgePV | Roof model to BOM and proposal, per user | $1,899 per user per year (1 user), in US dollars | Paid, guided demo | BOM and proposal generation in scope |
Finland Criteria Matrix
Each cell says Documented, Partial or Not stated. Documented means the vendor’s own page states it. Partial means the page states only part of it, or states it for other countries. Not stated means the pages we read in October 2026 do not mention it. There are no scores or weights.
| Tool | Tariff entry | Export-credit setting | Local-language proposals | Price in a published currency | Free start |
|---|---|---|---|---|---|
| Enact Solar | Partial (tariff lookup listed; Finland not named) | Not stated | Not stated | Partial (USD plan shown; see the entry) | Partial (trial offered; terms not stated) |
| Energy Toolbase | Partial (utility rates team described; Finland not named) | Not stated | Not stated | Not published for ETB Developer | Not stated |
| OpenSolar | Documented (custom tariff) | Partial (several credit options; none named for Finland) | Partial (13 proposal languages; see the entry) | Documented (core app free) | Documented |
| SurgePV | Partial (financial modeling; no tariff entry described) | Not stated | Not stated | Partial (USD only) | Not stated (guided demo) |
Two things stand out. No vendor page we read names Finland. The tools differ most on whether you can enter a tariff and an export rate yourself. A tool that is Not stated on a row may still do it, so ask each vendor to build one real Finland quote before you buy.
What a Finnish Quote Needs Besides the Numbers
Exported power needs a named buyer. The Energiateollisuus general information form for small-scale generation (updated 10 June 2025) has a section for the buyer of electricity that moves into the network company’s grid. It says plainly that there must be a buyer before the system is connected, and that this also applies to batteries and bidirectional vehicle chargers. The form also allows the alternative that transfer from the site to the grid is technically blocked, in which case no buyer is needed. That gives a proposal two honest shapes: a self-consumption quote with export blocked, or an export quote that names who pays for the surplus and at what rate. A tool is only useful for the second if you can type in your own export credit, which is why tariff entry is a criterion here.
The contractor and inspection record are part of the deal. The same form asks the installer to give a TUKES number and says the contractor must always deliver a commissioning inspection record (käyttöönottotarkastuspöytäkirja) to both the customer and the network company. The owner or an authorised party such as the electrical contractor signs. The network company may ask for further information, and has the right to check the technical conditions for connection. A quote should therefore list these deliverables and who handles the form.
Size and storage change the quote. The form applies to equipment and/or storage of at most 1,000 kW nominal power, and asks for battery or vehicle-charger capacity in kWh and kW. A proposal that bundles a battery needs a line for it in the customer’s paperwork, not only in the price.
Language. The form itself is in Finnish. OpenSolar’s help article lists Finnish and Swedish among its proposal languages and says a proposal template must be translated by hand. None of the other vendor pages read state a Finnish or Swedish proposal option, so ask for a Finnish sample proposal in the demo.
Questions to put to each vendor. Can I enter a Finnish export rate and a buyer’s name? Can the proposal list the commissioning record and the form among the deliverables? Does the output show cost in euros? The pages read name no Finland tariff or euro pricing, so these stay open until a demo answers them.
Tool Entries
Enact Solar
Finland angle: Its page lists loan, lease and PPA options; a Finnish quote must also name a buyer for exported power, so check whether those fields can carry that.
Enact Solar is run by Enact Systems Inc. and says on its home page that it operates in 35+ countries.
Best for: installers that want design and proposals from one vendor.
Not the right choice if: you want a CRM or project management module. Enact’s installer page describes a lead API and a design API that let you connect your own CRM. It does not describe a CRM of its own. Permit-ready engineering drawings are a separate product with its own price.
What the vendor documents: roof creation with height and pitch detection from a digital surface model (a height map of the surface). It also lists obstacle and tree detection, shading analysis, storage sizing with time-of-use simulation, and tariff lookup. Proposals come with pricing templates, loan, lease and PPA (power purchase agreement) options, plus DocuSign e-signatures.
Price (checked October 2026): the pricing page lists Design and Proposals at “$279/month billed annually - save $240/yr (Or $299/month - 2 users)”. The page labels $299 as “2 users”, so we cannot tell whether it is a monthly-billing price or a two-user price. Ask Enact. Prices are in dollars.
Limitations: the Design and Proposals plan lists unlimited residential projects and proposals, and 10 new commercial projects per month. The pages we read do not name Finland or local-currency.
Vendor link: enact.solar

Energy Toolbase
Finland angle: Compares cash, loan, lease and PPA; a Finland quote also needs a named buyer for exported electricity, which you would have to add to the model yourself.
Best for: teams that must compare cash, loan, lease and PPA offers, or model solar with storage.
Not the right choice if: you need a published price. The pricing page asks you to book a demo. It is also not right if you need a roof design tool you can confirm is built in. The ETB Developer page lists “PV design partnerships with leading design software tools”. Ask the vendor about layout.
What the vendor documents: the ETB Developer page lists proposals, quick financial analysis, “up-to-date utility rates” and lead management. It says the platform tracks “120k+” utility rates. Its FAQ says it supports “cash purchases, power purchase agreements (PPAs), loans, and leases”. It is web-based.
Price (checked October 2026): not published for ETB Developer. The pricing page says “Book 30 minutes” for a demo and pricing for your team size. Dollar figures on that page belong to its ETB Controller and ETB Monitor products.
Limitations: the pages we read do not name Finland or local-currency, and do not say which countries the utility rates cover.
Vendor link: energytoolbase.com

OpenSolar
Finland angle: The one tool here whose help article lists Finnish and Swedish proposal languages, and it takes a custom tariff for the export rate.
Best for: small teams that want a free core app and will enter the local tariff by hand.
Not the right choice if: you need a proposal language outside the list. The language article lists English, Dutch, Swedish, Spanish, French, Norwegian, Thai, German, Polish, Portuguese, Italian, Danish and Finnish. The article says a proposal template must be translated by hand.
What the vendor documents: a custom tariff with flat, time-of-use, tiered and demand rates, plus a choice of how exports are credited. The choices are Net Billing, Net Billing with Credit Carryover, Buy All, Sell All and Net Energy Metering. The article does not say which one fits a given country’s program.
Price (checked October 2026): the core app is free of charge for solar professionals, per the vendor. From 16 April 2026 the vendor charges for API Access, a per-project fee, and for supported connectors, a flat monthly subscription. Source: its 16 February 2026 post and its API page.
Limitations: the pages we read do not name Finland or local-currency.
Vendor link: opensolar.com

SurgePV
Finland angle: Ask in the demo for a Finnish proposal sample and whether the bill of materials matches the inverter data the network company’s form requires.
SurgePV is our product.
Best for: teams that want roof modeling, array layout, shading analysis and energy-yield modeling. They also want financial modeling, electrical workflow support, bill-of-materials output and proposal generation in one product, priced per user. They should confirm the Finland items in a demo. See solar proposal software for the product page.
Not the right choice if: you want a self-serve trial (SurgePV offers a guided demo). It is also not right if you need a local-currency price in writing before talking to sales. Outputs support design and documentation. They do not replace approval by the responsible engineer, authority, lender or utility.
What the vendor documents: 3D roof modeling, array layout, shading analysis, energy-yield modeling, financial modeling, electrical workflow support, bill-of-materials output and proposal generation.
Price (checked October 2026): $1,899 per user per year for 1 user, $1,499 per user for 3 seats, $1,299 per user for 5 seats, in US dollars. Confirm any local-currency amount and taxes in a written quote.
Limitations: results depend on source data, assumptions and equipment models. SurgePV’s published scope does not name a Finland tariff, an export-credit setting, local-language proposals or a design size limit.
Vendor link: surgepv.com.

How We Ordered These Tools
We did not rank these tools. They are listed alphabetically, and the best-for picks come from the matrix above.
- Tariff entry: the quote must use the tariff for your client’s class. We did not assess how any tool prices time-of-use or tiered rates.
- Export-credit setting: exported power can earn a set rate or a credit. We did not assess whether any tool can model a given country’s program.
- Local-language proposals: a client reads a quote best in a familiar language. We did not assess translation quality.
- Price in a published currency: a price in a known currency shows what a buyer pays. We did not assess discounts or negotiated quotes.
- Free start: a free plan lets a small team try the workflow. We did not assess the limits of any free plan beyond what its page states.
Methodology and Disclosure
SurgePV is published by SurgePV, which is also one of the vendors on this list. Its entry follows the same template and sources as the others: the vendor’s own public pages, read in October 2026. The Finland items are open questions for every vendor, SurgePV included. Where a page does not state a feature, we say Not stated.
Sources and Dates
Vendor pages were read in October 2026. Sources are the vendor links and help articles in each entry above. SurgePV facts come from its own pricing page and proposal software page.
See SurgePV on your Finland project
Book a guided demo and ask for the Finland items you need in the quote.
Book a Free DemoCountry sources read in November 2026: Energiateollisuus general information form for small-scale generation (updated 10 June 2025).
More Solar Software Guides to Compare
- Solar software in Finland
- Solar design software for Finland
- Best solar proposal software, all markets
- Aurora Solar alternatives
Frequently Asked Questions
What is the best solar proposal software in Finland?
It depends on what the quote must show. The vendor pages we read do not name Finland, so pick by what you can enter yourself. OpenSolar’s core app is free and takes a custom tariff. Energy Toolbase compares cash, loan, lease and PPA options. Enact Solar lists design and proposals from one vendor. SurgePV lists proposal generation in one product with roof modeling, priced per user.
Is there free solar proposal software for Finland?
OpenSolar says its core app is free for solar professionals. It charges for API Access and supported connectors from 16 April 2026. Its help article lists 13 proposal languages. The other tools here are paid, and the pages we read show no free plan for them. SurgePV offers a guided demo and no self-serve trial.
Can proposal software show Finland tariffs and local currency?
No vendor page we read names Finland tariffs or a Finland price list. OpenSolar lets you enter custom tariffs. Enter the rate for your client’s class from your utility, and check that the proposal prints the currency you want.
Which proposal tools support Finland languages?
The pages we read do not say which tools offer a Finland interface or proposal template. OpenSolar’s help article lists English, Dutch, Swedish, Spanish, French, Norwegian, Thai, German, Polish, Portuguese, Italian, Danish and Finnish, and says a proposal template must be translated by hand. Check the language list before you buy.
How much does solar proposal software cost for Finland installers?
No vendor on this page lists a Finland price on the pages we read. Energy Toolbase does not publish a price for ETB Developer. Enact Solar lists Design and Proposals at $279 per month billed annually. OpenSolar’s core app is free. SurgePV Individual is $1,899 per user per year. Ask each vendor for a written quote.
Who must buy the electricity a Finnish solar system exports?
The Energiateollisuus connection form says exported electricity needs a buyer before connection, including for batteries and vehicle chargers, unless transfer to the grid is technically blocked. A proposal should name the buyer or show export as blocked.
What paperwork should a Finnish solar quote promise the customer?
The connection form is signed by the owner or an authorised party such as the contractor, lists the contractor’s TUKES number, and requires the contractor to deliver a commissioning inspection record to both the customer and the network company.


