Back to Best Solar Software
Best ListBest-Of List5 tools compared

Best Solar Software in Finland (2026): 5 Tools Compared

Overview of solar software for Finland, with a short guide to the roles in a Finnish grid connection: owner, network company, contractor and Fingrid.

SurgePV publishes this list and sells solar design and proposal software, so we have a commercial interest in this category. This is a desk comparison of what each vendor publishes; we have not run side-by-side tests. Prices and vendor facts checked November 2026. How we evaluate software

Published Last updated
Rainer Neumann

Written by

Rainer Neumann

Editorial contributor · SurgePV

Keyur Rakholiya

Edited by

Keyur Rakholiya

CEO & Co-Founder · SurgePV

Finnish installers sell into a market split at 1 MW and at a 50 kW protection step, and they write quotes in Finnish or Swedish. Aurora Solar, HelioScope, OpenSolar, PVsyst and SurgePV are compared on what each vendor publishes. OpenSolar is the only one whose help article lists Finnish and Swedish proposals and has a free core app; Aurora Solar suits home sales with financing; PVsyst gives yield evidence; SurgePV covers design, finance and proposals in one product. Prices stay in each vendor’s own currency, unconverted.

Vendor facts were read from public pages in October 2026, with no hands-on runs. SurgePV publishes this page and is a vendor on this list. A wider set is on the global list of solar design software.

Criteria used: roof and array design, shading and energy yield, financial modeling and proposals, electrical and bill-of-materials outputs, language support, published price.

Disclosure and methodology: SurgePV is both publisher and vendor here, so it has an interest in the outcome. The method is a desk read of each vendor’s public pages in October 2026. The criteria below and Sources and Dates give the detail.

Working on a Finnish project? See SurgePV on it

Book a guided demo and bring a real site. We walk through design, yield, finance and the proposal in one platform.

Book a Free Demo

Checking cost first? See the SurgePV pricing page.

Best-For Picks for Finland

This overview page answers which tool category you need and who is involved in a Finnish connection. For layout and yield detail, use the design page; for quotes, use the proposal page.

  • Understanding the connection process before choosing a tool: the Energiateollisuus form. The Energiateollisuus general information form for small-scale generation (updated 10 June 2025) shows who does what, which helps you decide whether you need design depth, proposals or both.
  • Finnish home sales with financing: Aurora Solar. The pricing page lists tablet-friendly proposals and integrated financing on every plan, in dollars. Its diagram editor is available in Europe, which includes Finland.
  • Finnish commercial roofs that cross the 50 kW protection step: HelioScope. Its pricing page lists rooftop, carport and ground-mount layout with single-line diagrams on all plans, and P90, P95 and P99 values on Pro.
  • A Finnish or Swedish proposal on a free core app: OpenSolar. The vendor says the core app stays free, with charges only for API Access and supported connectors.
  • Lender-facing yield evidence for a Finnish plant moving beyond small-scale: PVsyst. Its help describes P50 to P90 evaluations, and it is Windows only.
  • Roof model to proposal in one product for a Finnish team: SurgePV. The pricing page lists $1,899, $1,499 or $1,299 per user per year by seat count. Ask the vendor for Finnish-language output.

Comparison Table

Listed alphabetically. This is not a ranking; pick by the situation above.

Tool Best for Price (checked Oct 2026) Free or paid One decisive scope fact
Aurora Solar Residential sales and design Basic $159 per user per month, or $135 billed annually; Premium $259, or $220 billed annually. Aurora pricing Paid Basic and Premium each include 1 user and 50 projects per month
HelioScope Commercial solar-plus-storage Basic $159 per license per month or $1,620 per year; Pro $259 per month or $2,640 per year. HelioScope pricing Paid; vendor lists a free trial Designs up to 1.25 MW DC (Basic), 5 MW (Pro), 30 MW (Enterprise)
OpenSolar Teams that want a free core app Core app free; API Access and connectors charged from 16 April 2026. OpenSolar, 16 Feb 2026 Free core app, paid API and connectors Single line diagram generator and automatic bill of materials inside the app
PVsyst Yield evidence CHF 700 per year (PVsyst 8 Professional) Paid, one-month trial Documents P50 to P90 evaluations; Windows only
SurgePV Design plus proposals in one subscription Individual $1,899 per user per year (1 user); 3 seats $1,499 per user per year; 5 seats $1,299 per user per year. SurgePV pricing Paid; guided demo, no self-serve trial Roof modeling, layout, shading, yield, financial modeling, BOM, proposals

Language Support for Finland

OpenSolar’s proposal language article lists Finnish. OpenSolar’s proposal language article lists Swedish. Those two lists do not cover every tool here; the pages read for the other tools here do not state their interface or proposal languages. The vendor pages read for this list do not name a Finland grid operator, tariff or permit rule. Local requirements come from the authority and utility, not from the software. See the solar design workflow and shading analysis pages for SurgePV’s published scope.

Who Does What in a Finnish Grid Connection

The Energiateollisuus general information form for small-scale generation (updated 10 June 2025) is the clearest public map of the roles. It is a recommended form of the Finnish energy industry association for connecting production equipment and/or storage of at most 1,000 kW nominal power to the network.

  • The owner of the plant is the first named party. The form asks for the owner’s contact details, the address of the connection and the metering point number, which is printed on the network service bill.
  • The equipment supplier or the electrical contractor may fill the form in. The owner, or someone the owner authorises such as the contractor, signs it.
  • The network company (verkkoyhtio) receives the form. It has the right to check that the equipment meets the technical conditions, and may ask for other information. It has no duty to connect equipment that does not meet the EN 50549 series.
  • The electrical contractor is identified on the form by a TUKES number and must give both the customer and the network company a commissioning inspection record.
  • A buyer of the electricity must exist before connection for any power that flows to the network, unless transfer is technically blocked.
  • Fingrid, the transmission system operator, appears because the form says its VJV2024 and/or SJV2024 requirement documents must also be followed.

What this means for software. A homeowner or small installer mostly needs a tool that produces a sensible layout, a yield figure and a customer-ready document. Teams with larger or storage-heavy projects will care about diagrams and inverter data, since the form asks for inverter model, phases, fault current and any battery. The vendor pages read name no Finnish utility, tariff or permit rule, so the software choice sits downstream of the network company’s requirements.

Where to go next. If your job is layout, diagrams and yield, read the Finland design list. If your job is quoting and paperwork for customers, read the Finland proposal list.

Tool Entries

Listed alphabetically. This is not a ranking; pick by the situation above.

Aurora Solar

Finland angle: The vendor says its single line diagram editor is only available in Europe, which includes Finland.

Best for: Finnish residential installers whose home quotes are tied to financing.

Not the right choice if: your Finnish jobs are commercial roofs above the 50 kW protection step. Aurora’s menu points commercial work to HelioScope.

What the vendor documents: 3D roof modeling and trees, performance simulation and automated panel placement. It also lists tablet-friendly proposals and integrated financing. It has an AHJ database of more than 25,000 US jurisdictions. AHJ means the local permit office. Premium adds LIDAR-assisted modeling (laser measuring of the site), bankable shade reports and battery modeling. Enterprise adds unlimited users and a contract manager (the pricing page tooltip says e-signature tools). It also adds APIs (links that let other software connect). Enterprise also adds drone mapping, dealer and team configurations, and advanced user permissions. It adds access to plan sets, engineering stamps and professional services. Aurora’s help centre lists a DXF export, a file other drawing programs can open. It also lists a Single-Line Diagram Editor. A single-line diagram is a simple drawing of how the system is wired. The article says the editor is only available in Europe.

Price (checked October 2026): Basic $159 per user per month billed monthly, or $135 billed annually ($1,620 per year). Premium $259 monthly, or $220 billed annually ($2,640 per year). Enterprise is custom. See Aurora’s pricing page.

Limitations: Plan sets and engineering stamps are listed as add-ons. Basic and Premium each include one user. Per its help article, Aurora gives P50 values only. A P50 value is a yield level expected to be met or exceeded in 50% of years. Aurora does not natively output P90.

Vendor link: aurorasolar.com

Aurora Solar public website page, captured 29 October 2026
Aurora Solar public website capture, captured 29 October 2026. This shows the vendor's website, not a test inside the software.

HelioScope

Finland angle: A commercial-design tool; the Finnish connection form in this overview covers equipment up to 1,000 kW, so compare with your project size.

Best for: Finnish commercial designers working on rooftop, carport and ground-mount projects with storage. Its footer shows HelioScope as an Aurora Inc. company, though pricing is separate.

Not the right choice if: Finnish home sales with financing integrations drive the decision. HelioScope’s site describes commercial solar software. Aurora’s separate residential product is the better documented fit for that.

What the vendor documents: Rooftop, carport, ground-mount and battery layout on all plans. It also lists CAD (computer-aided design) export and single-line diagrams. It lists an 8760 production report (one result for each hour of the year) and shade reports too. The production report also lists a bill of materials with module, wire and inverter quantities (see the help article). Pro adds LIDAR-assisted modeling, storage modeling and financial analysis tools. Pro also adds customizable reports, sales proposals, and P90, P95 and P99 values. Enterprise adds single-axis trackers, designs up to 30 MW DC and export to PVsyst.

Price (checked October 2026): Basic $159 per license per month, or $1,620 per license per year. Pro $259 per month, or $2,640 per year. Enterprise is custom per project. See HelioScope’s pricing page. The standard free trial lasts 14 days, per its help article.

Limitations: Each Basic or Pro license covers one user. Enterprise lists unlimited users. Basic includes 10 projects per month, or 120 on annual billing. Basic designs up to 1.25 MW DC. Financials and sales proposals start at Pro.

Vendor link: helioscope.aurorasolar.com

HelioScope public website page, captured 29 October 2026
HelioScope public website capture, captured 29 October 2026. This shows the vendor's website, not a test inside the software.

OpenSolar

Finland angle: The only tool here whose help article lists Finnish and Swedish proposal languages.

Best for: Finnish installers who want design, Finnish or Swedish proposals and a bill of materials in one free app.

Not the right choice if: your Finnish workflow pushes data into a CRM (customer relationship management system), an accounting tool or a reporting tool. API Access and supported connectors are charged from 16 April 2026.

What the vendor documents: Two energy calculators, per its help center article. The calculators are PVWatts 6 at hourly resolution and the System Advisor Model with 3D shading. Its site lists an automatic bill of materials and a single line diagram generator. The generator has templates for Australia, the US, the UK, Germany, Italy and Spain on its marketing page. Its help article lists templates for Australia, New Zealand, the US, Canada, the UK, France, Germany, Italy, Spain and India. The site also lists Sales Machine proposals and Auto Design, which it labels beta. It also lists the ability to design and sell commercial systems.

Price (checked October 2026): The core app is free of charge for solar professionals, per the vendor. The vendor says partners fund it (Why Free page). From 16 April 2026 the vendor charges for API Access and supported connectors. API Access lets other software connect, and it is a per-project fee. The per-project API fee is on OpenSolar’s API page. Supported connectors are a monthly fee per organization. The 16 February 2026 post says accounting connectors are billed as a monthly fee per organization. Optional paid Enterprise Services: Support US$500 per month, Customize US$1,350 per month, Enterprise custom (Enterprise Services page). Premium imagery is pay per image (price shown in the app).

Limitations: No maximum system size appears on the pages read.

Vendor link: opensolar.com

OpenSolar public website page, captured 29 October 2026
OpenSolar public website capture, captured 29 October 2026. This shows the vendor's website, not a test inside the software.

PVsyst

Finland angle: A yield-evidence tool; its help pages are in English, which matters if your team works in Finnish.

Best for: a large Finnish roof or ground-mount site, where a lender or investor asks for a simulation report.

Not the right choice if: the same tool must write quotes (the pages describe none), the diagram must show storage, or your Finnish office runs Macs. The requirements page says PVsyst runs only under Windows.

What the vendor documents: a P50 to P90 evaluation. P50 and P90 are yields with a 50% and 90% probability of being exceeded in a year. The languages page says English is the reference language. It lists French among the translations. The documentation itself is not translated. The single line diagram page describes an editor and viewer for PV strings, inverters and transformers. It covers grid-connected systems only, leaves out storage, and calls the feature “still work in progress”. The economic evaluation help page covers feed-in tariffs and self-consumption.

Price (checked October 2026): CHF 700 per year for PVsyst 8 Professional, with grouped-order discounts of 5% for 2 to 4 licences, 15% for 5 to 9 and 20% for 10 or more. The product page offers a one-month free trial.

Limitations: the pages read describe no proposal output. They list the Windows-only requirement and the grid-connected-only diagram editor.

Vendor link: pvsyst.com.

PVsyst public website page, captured 29 October 2026
PVsyst public website capture, captured 29 October 2026. This shows the vendor's website, not a test inside the software.

SurgePV

Finland angle: A single product from roof model to proposal; ask in the demo for Finnish language output.

SurgePV is our product, and we publish this list.

Best for: Finnish teams that want array layout, shading, energy-yield and financial modeling, electrical workflow support, bill-of-materials output and proposals together, priced per user. See the solar design workflow, shading analysis and proposal software.

Not the right choice if: You want a self-serve trial, because SurgePV offers a guided demo. You need an approved engineering package. SurgePV outputs support design and documentation. They do not replace approval by the responsible engineer, authority, lender, insurer or utility. You need a full CRM, monitoring or ERP product. SurgePV’s published product scope does not list a CRM. It is not a monitoring or ERP (business management software) product. If you want a free core app, OpenSolar lists one. If you need AutoCAD-based utility-scale ground-mount engineering, PVcase lists it on its own site.

What the vendor documents: 3D roof modeling, solar array layout, shading analysis, energy-yield modeling, financial modeling, electrical workflow support, bill-of-materials output and proposal generation.

Price (checked October 2026): Individual $1,899 per user per year (1 user). 3 seats $1,499 per user per year, or $4,497 a year in total. 5 seats $1,299 per user per year, or $6,495 a year in total. See SurgePV pricing.

Limitations: Results depend on source data, assumptions, equipment models, configuration and review. Pricing and contract terms are confirmed in a written quote. This page uses only SurgePV’s pricing page and product scope summary. They do not state ground-mount coverage or size limits, so those cells read “Not stated”. Ask for them in the demo.

Vendor link: SurgePV and Book a Free Demo

SurgePV public website page, captured 29 October 2026
SurgePV public website capture, captured 29 October 2026. This shows the vendor's website, not a test inside the software.

Finnish Solar Market Segments and What Installers Meet

The Finnish market splits by size, and the size decides which rules and which software a team needs. The figures below are as of the dates and sources named.

Utility scale is growing from a small base. The Renewables Finland release of 8 January 2026 says seven industrial-scale plants were completed in 2025, adding 227 MW, which took industrial-scale capacity to about 352 MW at the end of the year, more than double the year before. The largest plant, Utajärvi at 107 MW, is nearly a third of the national total and the first above 100 MW. Simo, at 70 MW, is second. The release says most capacity sits in Northern Ostrobothnia and that projects over 50 hectares fall under the zoning requirement of the Land Use and Building Act. Small-scale figures are not given there.

The small-scale boundary is 1 MW. The Energiateollisuus network recommendation YA 9:23, updated 2 June 2025 covers production and storage of at most 1 MW, and says the same 1 MW boundary appears in Fingrid’s power plant technical requirements. Below it, the connection size sets what a home can take. The recommendation gives single-phase or two-phase production a maximum fuse of 16 A, or about 3.7 kW per phase. Its table links the connection size to the solar power that can be connected: 11 kW for 3x25 A, 3x35 A and 3x50 A, 14.1 kW for 3x63 A, 18.7 kW for 3x80 A, 25.5 kW for 3x100 A, 31.5 kW for 3x125 A and 41.8 kW for 3x160 A. The document warns that the connection size does not guarantee that short-circuit current, and that the network company must supply the figure.

A 50 kW step for protection. The same recommendation says a central protection device is required from 50 kW of production, which it calls higher than the 11 kW of Italy or the 30 kVA of Austria and Germany. Teams that sell larger commercial roofs meet this step; teams that sell homes mostly do not.

What this means for an installer. Homes and small farms fit within the table values, and a quote that matches the table avoids a redesign. Commercial roofs above 50 kW add protection design. Ground-mount plants of industrial scale move into zoning and a different toolset.

Choosing software for this market. Match the tool to the segment: a fast layout and proposal for homes, diagrams and inverter data for larger roofs, and bankable simulation for utility scale. The Finland design list and Finland proposal list cover those jobs. SurgePV’s published scope is on its solar design workflow page, and you can book a demo with a Finnish sample roof.

What to Ask a Vendor Before Buying

Hand each vendor one Finnish home or farm roof and one roof above 50 kW, then check four points. Do the inverters and modules you buy in Finland sit in its database? Does the proposal come out in Finnish or Swedish? Do the diagram and bill of materials match the design that goes with the Energiateollisuus form? Is the quote in euros or in dollars? Features the vendor pages leave out are marked as such, so use a demo or trial to settle them.

See SurgePV on a Finnish project

Book a guided demo and bring a roof, the equipment and the files you must deliver.

Book a Free Demo

Live project walkthrough · No credit card required

How We Ordered These Tools

The tools are listed alphabetically and carry no score. The best-for picks come from what each vendor documents, not from a test.

  • Roof and array design. Layout is the first step every other output depends on. Not assessed: how long a layout takes or how accurate the roof model is.
  • Shading and energy yield. Yield drives savings and financing numbers. Not assessed: whether any tool’s results match measured generation.
  • Financial modeling and proposals. Sales teams need a customer-ready document, not just a design file. Not assessed: proposal quality or close rates.
  • Electrical and bill-of-materials outputs. Permit and purchasing work needs a diagram and a materials list. Not assessed: whether outputs pass any authority’s review.
  • Language support. Finnish and Swedish speakers read the quote, and only OpenSolar’s article lists both. Not assessed: the quality of any translation.
  • Published price. Buyers need a number before a demo. Not assessed: discounts, quotes or total cost of ownership.

Sources and Dates

Finnish market facts were read in November 2026 from the Renewables Finland release of 8 January 2026 and the Energiateollisuus network recommendation YA 9:23, updated 2 June 2025.

Vendor pages were read in October 2026. Tool facts come from each vendor’s own public pages, linked here by tool. Aurora Solar (DXF export, Single-Line Diagram Editor, Aurora’s pricing page, help article). HelioScope (HelioScope’s site, help article, HelioScope’s pricing page, help article). OpenSolar (help center article, automatic bill of materials, single line diagram generator, help article, Sales Machine proposals, Auto Design, free of charge, Why Free page, OpenSolar’s API page, 16 February 2026 post, Enterprise Services page, opensolar.com). PVsyst (requirements page, P50 to P90 evaluation, languages page, single line diagram page, economic evaluation help page, CHF 700 per year for PVsyst 8 Professional, product page, pvsyst.com). SurgePV (SurgePV pricing).

Country sources read in November 2026: Energiateollisuus general information form for small-scale generation (updated 10 June 2025).

Frequently Asked Questions

What is the best solar software in Finland?

HelioScope lists commercial rooftop, carport and ground-mount design with storage. OpenSolar is the pick for a free core app; Aurora Solar for residential sales with financing; PVsyst for yield evidence; SurgePV for design, financial modeling and proposals in one product. None of the vendor pages read names a Finland utility, tariff or permit rule, so test each tool on a sample Finland project.

Is there free solar software for Finland?

OpenSolar says its core app stays free, with charges only for API Access and supported connectors from 16 April 2026. The other tools here are paid.

Which solar software works in the local language in Finland?

OpenSolar lists Finnish among its proposal languages; OpenSolar lists Swedish among its proposal languages. The other tools here do not state their languages on the pages read, so ask each vendor to show your language in a demo or trial.

How much does solar software cost for Finland teams?

Published prices differ in currency and unit, so they are not converted. Aurora Basic is $135 per user per month billed annually. HelioScope Basic is $1,620 per license per year. OpenSolar’s core app is free, with charges for API Access and connectors from 16 April 2026. PVsyst 8 Professional is CHF 700 per year. SurgePV Individual is $1,899 per user per year.

Can solar software replace local approvals in Finland?

No. Outputs support design and documentation. They do not replace approval by the responsible engineer, authority, lender or utility. Ask the authority and utility for the documents they require.

Who is involved in connecting a solar system to the grid in Finland?

Per the Energiateollisuus connection form: the plant owner, the equipment supplier or electrical contractor who fills it in, the network company that receives and checks it, a buyer for any exported electricity, and Fingrid’s requirement documents for the system side. The contractor also delivers a commissioning inspection record.

Which Finland page should I read, overview, design or proposal?

Use this overview to choose a category. Use the Finland design list for layout, diagrams and yield, and the Finland proposal list for quotes, export buyers and customer paperwork.

About the Contributors

Author
Rainer Neumann
Rainer Neumann

Editorial contributor · SurgePV

Rainer Neumann is credited as an editorial contributor on SurgePV content. This profile does not assert engineering credentials, project totals, software-testing experience, education, speaking engagements, or media citations because independent verification evidence is not retained in the publication record.

Editor
Keyur Rakholiya
Keyur Rakholiya

CEO & Co-Founder · SurgePV

Keyur Rakholiya is identified by SurgePV as its CEO and a company co-founder. His SurgePV author page lists only role information that can be tied to the public profile below; credentials, project totals, testing claims, media appearances, and speaking engagements are not asserted without retained evidence.

Ready to Design and Propose Faster?

SurgePV covers solar design, energy-yield modeling, financial modeling, and proposals in one platform. Book a guided demo to see it on a project like yours.

Choose which optional technologies SurgePV may use. Essential storage remains active for security and requested features.