Pick by the job. OpenSolar’s core app is free and lists Norwegian among its proposal languages. PVsyst does not list Norwegian among its translations. HelioScope and Aurora Solar price in US dollars. PVsyst documents P50 to P90 yield results. SurgePV lists roof modeling, bill of materials and proposals in one product, priced per user in US dollars. The local rule to model is tax on surplus power: the Norwegian Tax Administration page on surplus power says income from selling surplus power from your own home is tax-free up to NOK 15,000 per year per residential property. No vendor here states a Norwegian surplus-power rule on the pages we read.
This is a desk comparison of what each vendor publishes, checked November 2026. We have not run side-by-side tests. SurgePV publishes this page and is one of the five tools on it. Tool facts come from each vendor’s own site. Other tools are not compared here. See the global list of solar design software for them.
Criteria used: Norwegian support, surplus power tax, diagrams and price.
Want to see SurgePV on your own project?
Book a guided demo and bring a real site. We walk through design, yield, finance and the proposal in one platform.
Book a Free DemoChecking cost first? See the SurgePV pricing page.
Best-For Picks for Norway
- A free core app with proposals in a listed language: OpenSolar. Its help article lists 13 proposal languages including Norwegian. The core app is free. API Access and connectors are charged from 16 April 2026.
- Yield evidence for a large Norwegian roof or a lender: PVsyst. Its help describes P50 to P90 evaluations. It lists 11 translations besides English, not Norwegian. It runs on Windows only.
- Commercial rooftop, carport and ground mount with published plan prices: HelioScope. Pro is $2,640 per license per year for designs up to 5 MW (DC), with P90, P95 and P99 values.
- Design and sales proposals on a per-user plan: Aurora Solar. Basic is $135 per user per month billed annually. Prices are in US dollars.
- Roof model to bill of materials and proposal in one product, priced per user: SurgePV. Ask in a demo for Norwegian output and local tariffs. Its published scope states neither.
Comparison Table
Listed alphabetically. This is not a ranking; pick by the situation above. Prices checked on each vendor’s own page in October and November 2026.
| Tool | Best for | Price | Free or paid | Decisive scope fact |
|---|---|---|---|---|
| Aurora Solar | Design and sales proposals, per user | Basic $159 per user per month; $135 per user per month billed annually | Paid | SLD editor “only available in Europe”; P50 only |
| HelioScope | Commercial design, published prices | Basic $159 per month or $1,620 per year; Pro $259 per month or $2,640 per year, per license | Paid | Up to 5 MW (DC) on Pro; USD prices |
| OpenSolar | Free core app, proposals | Core app free; API Access and connectors charged from 16 April 2026 | Free core app, paid API and connectors | Free core app; custom tariffs |
| PVsyst | Yield evidence | CHF 700 per year (Professional) | Paid | Documents P50 to P90 evaluations; Windows only |
| SurgePV | Roof model to BOM and proposal, per user | $1,899 per user per year (1 user) | Paid, guided demo | BOM and proposal generation in scope; no Norway-specific output stated |
Tool Entries
Aurora Solar
Best for: teams that want design and sales proposals on a per-user plan and can work with a US-dollar price list.
Not the right choice if: you need a P90 yield (Aurora does not natively output P90 for solar energy production), or you need a diagram or price list built for Norway. The SLD editor is “only available in Europe”, and the pages we read do not name Norway.
What the vendor documents: the single line diagram editor page says the editor is only available in Europe. The help article on P-values says Aurora’s estimates are P50 values from typical-year weather data. The help article on utility rates lets you set an export rate in dollars per kWh and a compensation policy. The pricing page offers a regional selector for North America and Europe and does not list the languages of the app or proposals.
Price (checked November 2026): on the pricing page, Basic is $159 per user per month, or $135 per user per month billed annually ($1,620 billed annually). Premium is $259 per user per month, or $220 per user per month billed annually ($2,640 billed annually). Prices are in US dollars.
Limitations: the pages we read name no Norway-specific surplus-power sale or tax rule.
Vendor link: aurorasolar.com.

HelioScope
Best for: commercial teams that design rooftop, carport and ground mount together and want published plan prices.
Not the right choice if: your site is above 5 MW (DC) and you do not want the Enterprise plan, or you need a surplus-power sale or tax rule. Pro stops at 5 MW (DC), and the pages we read do not name Norway.
What the vendor documents: rooftop, carport and ground mount layouts and storage design on all projects. Every plan has shade reports and an 8760 production report (a yield figure for each hour of the year) and a 50,000-component module and inverter library. Pro adds LiDAR-assisted modeling (using laser-scan height data), financial modeling, sales proposals, and P90, P95 and P99 values. Single-axis trackers, PVsyst export and designs up to 30 MW (DC) are Enterprise features. The plan page states “Accuracy within 1% of PVsyst”. That is the vendor’s claim.
Price (checked November 2026): Basic is $159 per license per month or $1,620 per license per year, with 1 user, 120 projects per year and designs up to 1.25 MW (DC). Pro is $259 per month or $2,640 per year, for designs up to 5 MW (DC). Enterprise is custom per-project pricing. Source: HelioScope pricing. The free trial is 14 days, one per customer.
Limitations: the pages we read name no Norway-specific surplus-power sale or tax rule.
Vendor link: helioscope.aurorasolar.com.

OpenSolar
Best for: small installers who want a free core app and proposals in a listed language.
Not the right choice if: you need a diagram template that lists Norway, or documented P50 to P90 yield results. The pages we read mention neither.
What the vendor documents: the proposal language article lists English, Dutch, Swedish, Spanish, French, Norwegian, Thai, German, Polish, Portuguese, Italian, Danish and Finnish. It says you need a manually translated proposal template. The single line diagram article says SLDs are supported in AU, NZ, US, CA, UK, FR, DE, IT, ES and IN. The tariff article shows how to create a custom tariff with flat, tiered and demand-charge rates.
Price (checked November 2026): the core app is free of charge for solar professionals, per the vendor. From 16 April 2026 the vendor charges for API Access and supported connectors, per its 16 February 2026 post. The core app stays free.
Limitations: the pages we read name no Norway-specific surplus-power sale or tax rule.
Vendor link: opensolar.com.

PVsyst
Best for: yield evidence on a large roof or a ground-mounted site, where a lender or investor wants a simulation report.
Not the right choice if: you want proposals from the same tool (the pages we read describe none), you need a diagram that shows storage, or you work on a Mac. The requirements page says PVsyst runs only under Windows.
What the vendor documents: a P50 to P90 evaluation. P50 and P90 are yields with a 50% and 90% probability of being exceeded in a year. The languages page says English is the reference language. It lists French, German, Spanish, Portuguese, Italian, Turkish, Korean, Chinese, Japanese, Polish and Russian as translations. The documentation itself is not translated. The single line diagram page describes an editor and viewer for PV strings, inverters and transformers. It covers grid-connected systems only, leaves out storage, and calls the feature “still work in progress”. The economic evaluation help page covers feed-in tariffs and self-consumption.
Price (checked November 2026): CHF 700 per year for PVsyst 8 Professional, with grouped-order discounts of 5% for 2 to 4 licences, 15% for 5 to 9 and 20% for 10 or more. The product page offers a one-month free trial.
Limitations: the pages we read name no Norway-specific surplus-power sale or tax rule.
Vendor link: pvsyst.com.

SurgePV
SurgePV is our product. We publish this list and sell this software.
Best for: teams that want roof modeling, shading, yield, financial modeling, bill of materials and proposals in one product, priced per user. Ask for Norway outputs in a demo.
Not the right choice if: you want a self-serve trial (SurgePV offers a guided demo), or you need a local-currency price in writing before talking to sales. The pricing page lists US dollars. It is also not right if you want a free tool for small jobs, because OpenSolar’s core app is free. Outputs support design and documentation but do not replace approval by the responsible engineer, authority, lender or utility. SurgePV’s published product scope does not list a CRM (customer tracking tool), monitoring or ERP (business management software).
What the vendor documents: 3D roof modeling, array layout and shading analysis. It also lists energy-yield modeling, financial modeling, electrical workflow support, bill-of-materials output and proposal generation. See solar design software for the product page.
Price (checked November 2026): $1,899 per user per year for 1 user, $1,499 per user for 3 seats, $1,299 per user for 5 seats, in US dollars.
Limitations: results depend on source data, assumptions and equipment models. The pricing page and published scope do not state a Norwegian interface, a Norway-specific surplus-power sale or tax rule or P50 to P90 results.
Vendor link: surgepv.com.

Tax on Surplus Power Sales
The Norwegian Tax Administration page on surplus power says that for a home or holiday home you use yourself, income up to NOK 15,000 per year per residential property is tax-free. It says 85 percent of the amount above that is taxable, as capital income at 22 percent. The page says the rules cover solar panel systems and other renewable sources connected to a home, holiday home or other property. Business use is taxed differently, at up to 50.6 percent as business income. A payback model for a Norwegian home should treat export income against this limit.
Connecting a Solar System to the Norwegian Grid
What a design has to respect in Norway comes from the grid company and the regulator, not from the software. The NVE solar power statistics page says 32,419 solar installations with 767 MW of capacity were registered at the end of 2024, and that most plants are built on rooftops. It adds that production consumed locally is not measured, so output figures for self-consumption come from your own model, not from a public meter.
The regulator RME describes a plusskunde as a customer who sometimes produces more power than they use. Its RME news item on plusskunder says a plusskunde can deliver at most 100 kW of surplus power, which it equates to about 650 square metres of panels. The same page says the customer notifies the grid company, which explains the technical requirements in its network. A smart meter must be in place, and the customer needs a power supplier willing to buy surplus power and supply power when the panels fall short. The 2016 item is old; the NVE plusskunder tariff page, last updated 19 January 2026, still says a plusskunde can feed up to 100 kW into the grid. As of November 2026, ask the grid company whether other limits apply to your site.
The RME prosumer questions and answers says an electrician or installer must have registered the plant with the grid company, and that a customer with production and consumption behind one meter has a right to feed in power up to the size of the main fuse. RME also says the energy part of the feed-in charge reflects marginal loss costs, so you may be paid or charged depending on where you sit in the grid. Disputes with the grid company can go to Elklagenemda.
For a housing co-operative or a property with several tenants, the RME guide to sharing surplus production on one property says surplus production from renewable plants can be shared with other grid customers on the same property. The cap is 1 MW AC per property, and for solar that means the inverter’s nominal AC output. The grid company registers the sharing in Elhub per metering point.
For tool choice, this means a Norwegian design file should carry the inverter AC rating and a main-fuse size, and an export model should handle the 100 kW and 1 MW AC thresholds. None of the vendor pages we read states either threshold, so check this in a demo.
What to Ask a Vendor Before Buying
Ask each vendor for one sample project. Then look for these items. First, a Norwegian proposal for your client. Second, a way to enter hourly or spot-based export income and the surplus-power tax limit. Third, a diagram for the grid company. Fourth, a price in the currency you will be invoiced in. Where a vendor does not publish a feature on the pages we read, a demo or trial is the place to settle it.
How We Ordered These Tools
We did not rank these tools. They are listed alphabetically, and the best-for picks come from what each vendor publishes.
- Norwegian interface or proposals: Norwegian clients read Norwegian papers. We did not assess the quality of any translation.
- Surplus-power modeling: Export income and tax change the payback. We did not assess whether any tool’s calculation is correct.
- Diagram for the grid company: Grid companies set their own forms. We did not assess any tool’s diagram against a Norwegian format.
- Price currency: The currency shows what a Norwegian buyer will pay and whether VAT is added. We did not assess discounts or quotes.
Sources and Dates
Vendor pages were read in October and November 2026. Aurora Solar (pricing, diagram editor, P-values, utility rates). HelioScope (pricing, free trial). OpenSolar (free, API and connector charges, languages, diagrams, tariffs). PVsyst (shop, product, languages, diagram, P50 to P90, economics). SurgePV (pricing). Norway sources: Norwegian Tax Administration. Norway regulator sources, read November 2026: NVE solar statistics, RME prosumer FAQ, RME plusskunde news, RME surplus-sharing guide.
Go Deeper on a Category
- Solar design software for Norway
- Solar proposal software for Norway
- Solar design software for Norway
- Solar proposal software for Norway
- Solar software in Sweden, a neighbor market
- Solar software in Denmark, a neighbor market
- Solar software in Iceland, a neighbor market
- Best solar design software, all markets
Frequently Asked Questions
Is income from selling surplus solar power taxed in Norway?
The Norwegian Tax Administration says income up to NOK 15,000 per year per residential property is tax-free for a home or holiday home you use yourself. Of the amount above that, 85 percent is taxable, normally as capital income at 22 percent.
Does Norwegian solar software model the surplus-power tax limit?
None of the vendors on this list states a Norwegian surplus-power tax setting on the pages we read. OpenSolar lets you build a custom tariff. Ask each vendor to model a sample Norwegian home in a demo or trial.
What is the best solar software in Norway?
It depends on the job. OpenSolar lists Norwegian among its proposal languages. PVsyst does not list Norwegian among its translations. PVsyst documents P50 to P90 yield results. SurgePV lists roof modeling, bill of materials and proposals in one product. None of the vendor pages we read states a surplus-power sale or tax rule.
Is there free solar software for Norway?
OpenSolar says its core app is free for solar professionals. The vendor charges for API Access and supported connectors from 16 April 2026. PVsyst offers a one-month free trial and HelioScope a 14-day trial. None of the vendors states a surplus-power sale or tax rule.
Which solar software works in Norwegian?
OpenSolar lists Norwegian among its proposal languages. PVsyst does not list Norwegian among its translations. Aurora Solar and SurgePV do not state a Norwegian interface on the pages we read.
How much does solar software cost in Norway?
Each vendor uses its own currency. Aurora Basic is $159 per user per month, or $135 per user per month billed annually. HelioScope Pro is $2,640 per license per year. OpenSolar’s core app is free, with charges for API Access and connectors from 16 April 2026. PVsyst 8 Professional is 700 Swiss francs per year. SurgePV lists $1,899 per user per year for one user.
What is the surplus power limit for a plusskunde in Norway?
RME says a plusskunde can deliver at most 100 kW of surplus power, about 650 square metres of panels, and needs a smart meter, a notified grid company and a supplier that buys surplus. The NVE plusskunder page, last updated 19 January 2026, still gives the 100 kW limit; ask the grid company about your site. Sharing surplus on one property is capped at 1 MW AC.


