Solar Software in Iceland (2026): Five Tools Compared

Five solar software tools compared on what each vendor publishes for work in Iceland: Icelandic support, grid rules, diagrams and price. Checked November 2026. SurgePV is one of the five.

SurgePV publishes this list and sells solar design and proposal software, so we have a commercial interest in this category. This is a desk comparison of what each vendor publishes; we have not run side-by-side tests. Prices and vendor facts checked November 2026. How we evaluate software

Published Last updated
Rainer Neumann

Written by

Rainer Neumann

Editorial contributor · SurgePV

Keyur Rakholiya

Edited by

Keyur Rakholiya

CEO & Co-Founder · SurgePV

This page is for Icelandic installers and EPCs choosing solar software, and the best pick depends on the job. Pick by the job. OpenSolar’s core app is free. HelioScope publishes plan prices. PVsyst documents P50 to P90 yield results and runs on Windows only. Aurora Solar prices per user in US dollars. SurgePV lists roof modeling, bill of materials (a parts list) and proposals in one product. None of the vendor pages we read lists Icelandic as a language or states an Icelandic tariff or grid rule. We did not verify Icelandic grid-connection rules from a primary source, so this page makes no claim about them.

This is a desk comparison of what each vendor publishes, checked November 2026. We have not run side-by-side tests. SurgePV publishes this page and is one of the five tools on it. Tool facts come from each vendor’s own site. Other tools are not compared here. See the global list of solar design software for them.

Criteria used: Icelandic support, grid rules, diagrams and price.

Working on an Icelandic project? See SurgePV on it

Book a guided demo and bring a real site. We walk through design, yield, finance and the proposal in one platform.

Book a Free Demo

Checking cost first? See the SurgePV pricing page.

Best-For Picks for Iceland

  • Free core app for a small Icelandic installer: OpenSolar. Pick it when you want to start without a licence fee and can write your own Icelandic proposal template, because Icelandic is not on its 13-language list. API Access and connectors are charged from 16 April 2026.
  • Evidence for a lender on a large Icelandic roof: PVsyst. Its P50 to P90 tool and monthly simulation suit a site where June gives most of the year and December gives almost nothing. It runs on Windows only and does not list Icelandic.
  • Hourly production on a commercial roof: HelioScope. Every plan has an 8760 production report, a figure for each hour of the year. Pro is $2,640 per license per year for designs up to 5 MW (DC).
  • Team quoting from one dollar price list: Aurora Solar. Basic is $135 per user per month billed annually. Aurora’s estimates are P50 values, so ask how it shows the seasonal swing.
  • Roof model through bill of materials to proposal in one product: SurgePV. Priced per user. Its published scope names no Icelandic output, so ask for one in the demo.

Comparison Table

Listed alphabetically. This is not a ranking; pick by the situation above. Prices checked on each vendor’s own page in October and November 2026.

Tool Best for Price Free or paid Decisive scope fact
Aurora Solar Design and sales proposals, per user Basic $159 per user per month; $135 per user per month billed annually Paid SLD editor “only available in Europe”; P50 only
HelioScope Commercial design, published prices Basic $159 per month or $1,620 per year; Pro $259 per month or $2,640 per year, per license Paid Up to 5 MW (DC) on Pro; USD prices
OpenSolar Free core app, proposals Core app free; API Access and connectors charged from 16 April 2026 Free core app, paid API and connectors Free core app; custom tariffs
PVsyst Yield evidence CHF 700 per year (Professional) Paid Documents P50 to P90 evaluations; Windows only
SurgePV Roof model to BOM and proposal, per user $1,899 per user per year (1 user) Paid, guided demo BOM and proposal generation in scope; no Iceland-specific output stated

Tool Entries

Aurora Solar

Best for: teams that want design and sales proposals on a per-user plan and can work with a US-dollar price list.

Not the right choice if: you need a P90 yield (Aurora does not natively output P90 for solar energy production), or you need a diagram or price list built for Iceland. The SLD editor is “only available in Europe”, and the pages we read do not name Iceland.

What the vendor documents: the single line diagram editor page says the editor is only available in Europe. The help article on P-values says Aurora’s estimates are P50 values from typical-year weather data. The help article on utility rates lets you set an export rate in dollars per kWh and a compensation policy. The pricing page offers a regional selector for North America and Europe and does not list the languages of the app or proposals.

Price (checked November 2026): on the pricing page, Basic is $159 per user per month, or $135 per user per month billed annually ($1,620 billed annually). Premium is $259 per user per month, or $220 per user per month billed annually ($2,640 billed annually). Prices are in US dollars.

Limitations: the pages we read name no Iceland-specific tariff or grid-company form.

Vendor link: aurorasolar.com.

Aurora Solar public website page, captured 29 October 2026
Aurora Solar public website capture, captured 29 October 2026. This shows the vendor's website, not a test inside the software.

HelioScope

Best for: commercial teams that design rooftop, carport and ground mount together and want published plan prices.

Not the right choice if: your site is above 5 MW (DC) and you do not want the Enterprise plan, or you need a tariff or grid-company form. Pro stops at 5 MW (DC), and the pages we read do not name Iceland.

What the vendor documents: rooftop, carport and ground mount layouts and storage design on all projects. Every plan has shade reports and an 8760 production report (a yield figure for each hour of the year) and a 50,000-component module and inverter library. Pro adds LiDAR-assisted modeling (using laser-scan height data), financial modeling, sales proposals, and P90, P95 and P99 values. Single-axis trackers, PVsyst export and designs up to 30 MW (DC) are Enterprise features. The plan page states “Accuracy within 1% of PVsyst”. That is the vendor’s claim.

Price (checked November 2026): Basic is $159 per license per month or $1,620 per license per year, with 1 user, 120 projects per year and designs up to 1.25 MW (DC). Pro is $259 per month or $2,640 per year, for designs up to 5 MW (DC). Enterprise is custom per-project pricing. Source: HelioScope pricing. The free trial is 14 days, one per customer.

Limitations: the pages we read name no Iceland-specific tariff or grid-company form.

Vendor link: helioscope.aurorasolar.com.

HelioScope public website page, captured 29 October 2026
HelioScope public website capture, captured 29 October 2026. This shows the vendor's website, not a test inside the software.

OpenSolar

Best for: small installers who want a free core app and proposals in a listed language.

Not the right choice if: you need a diagram template that lists Iceland, or documented P50 to P90 yield results. The pages we read mention neither.

What the vendor documents: the proposal language article lists English, Dutch, Swedish, Spanish, French, Norwegian, Thai, German, Polish, Portuguese, Italian, Danish and Finnish. It says you need a manually translated proposal template. The single line diagram article says SLDs are supported in AU, NZ, US, CA, UK, FR, DE, IT, ES and IN. The tariff article shows how to create a custom tariff with flat, tiered and demand-charge rates.

Price (checked November 2026): the core app is free of charge for solar professionals, per the vendor. From 16 April 2026 the vendor charges for API Access and supported connectors, per its 16 February 2026 post. The core app stays free.

Limitations: the pages we read name no Iceland-specific tariff or grid-company form.

Vendor link: opensolar.com.

OpenSolar public website page, captured 29 October 2026
OpenSolar public website capture, captured 29 October 2026. This shows the vendor's website, not a test inside the software.

PVsyst

Best for: yield evidence on a large roof or a ground-mounted site, where a lender or investor wants a simulation report.

Not the right choice if: you want proposals from the same tool (the pages we read describe none), you need a diagram that shows storage, or you work on a Mac. The requirements page says PVsyst runs only under Windows.

What the vendor documents: a P50 to P90 evaluation. P50 and P90 are yields with a 50% and 90% probability of being exceeded in a year. The languages page says English is the reference language. It lists French, German, Spanish, Portuguese, Italian, Turkish, Korean, Chinese, Japanese, Polish and Russian as translations. The documentation itself is not translated. The single line diagram page describes an editor and viewer for PV strings, inverters and transformers. It covers grid-connected systems only, leaves out storage, and calls the feature “still work in progress”. The economic evaluation help page covers feed-in tariffs and self-consumption.

Price (checked November 2026): CHF 700 per year for PVsyst 8 Professional, with grouped-order discounts of 5% for 2 to 4 licences, 15% for 5 to 9 and 20% for 10 or more. The product page offers a one-month free trial.

Limitations: the pages we read name no Iceland-specific tariff or grid-company form.

Vendor link: pvsyst.com.

PVsyst public website page, captured 29 October 2026
PVsyst public website capture, captured 29 October 2026. This shows the vendor's website, not a test inside the software.

SurgePV

SurgePV is our product. We publish this list and sell this software.

Best for: teams that want roof modeling, shading, yield, financial modeling, bill of materials and proposals in one product, priced per user. Ask for Iceland outputs in a demo.

Not the right choice if: you want a self-serve trial (SurgePV offers a guided demo), or you need a local-currency price in writing before talking to sales. The pricing page lists US dollars. It is also not right if you want a free tool for small jobs, because OpenSolar’s core app is free. Outputs support design and documentation but do not replace approval by the responsible engineer, authority, lender or utility. SurgePV’s published product scope does not list a CRM (customer tracking tool), monitoring or ERP (business management software).

What the vendor documents: 3D roof modeling, array layout and shading analysis. It also lists energy-yield modeling, financial modeling, electrical workflow support, bill-of-materials output and proposal generation. See solar design software for the product page.

Price (checked November 2026): $1,899 per user per year for 1 user, $1,499 per user for 3 seats, $1,299 per user for 5 seats, in US dollars.

Limitations: results depend on source data, assumptions and equipment models. The pricing page and published scope do not state a Icelandic interface, a Iceland-specific tariff or grid-company form or P50 to P90 results.

Vendor link: surgepv.com.

SurgePV public website page, captured 29 October 2026
SurgePV public website capture, captured 29 October 2026. This shows the vendor's website, not a test inside the software.

Checking Icelandic Rules

We did not find a primary-source statement on grid connection for small solar systems that we could verify, so we state none. Orkustofnun, the National Energy Authority, is the place to ask about permits and the connecting grid company is the place to ask about connection. Bring the same sample project to every vendor and ask each one to show how it handles your local tariff and a surplus sale.

What Iceland’s Light and Subsidy Page Mean for Tool Choice

Iceland sits far north, so annual yield and the shape of the year are both unusual. The figures below come from PVGIS, the European Commission Joint Research Centre solar tool, run by us in November 2026 for central Reykjavik (64.15 N, 21.94 W, 18 m) with 1 kWp of crystalline silicon, 14% system losses, fixed mounting, PVGIS horizon data, data years 2005 to 2023. At a 35 degree tilt facing south, PVGIS returns 706 kWh per kWp per year. Akureyri in the north (65.68 N, 18.11 W) returns 818 kWh per kWp per year at the same settings, but PVGIS used its ERA5 radiation set for that point and its SARAH3 set for Reykjavik, so compare the two cities with care.

The monthly spread is the part a tool has to handle. For Reykjavik the model gives 0.88 kWh per kWp in December and 3.56 in January, against 118.63 in May, 110.68 in June and 111.36 in July. November to February together make 4.1% of the year and May to August make 61.9%. Akureyri shows 0.09 kWh per kWp in December and 145.68 in May. A tool that reports one annual number hides this, so look for monthly or hourly output. PVsyst’s P50 to P90 tool and HelioScope’s 8760 report (an hourly figure for each of the year’s 8,760 hours) both give you more than a single total. Aurora states its estimates are P50 values from typical-year weather data.

The tilt matters less than the season. In the Reykjavik run, 15 degrees gives 656 kWh per kWp, 35 degrees gives 706, 60 degrees gives 683 and a vertical south wall gives 534. A flat array gives 582. That flat-roof result is useful on Icelandic commercial roofs, where a flat layout may be the practical choice. The design-focused list covers the tilt and orientation trade-offs in more detail, and the proposal-focused list covers how to present this seasonal shape to a customer. See PVGIS to reproduce each figure.

On money, Orkustofnun, the National Energy Authority, lists “Solar cell subsidies” among its applications for individuals and for legal entities. The subsidy page we read says “Open for applications until August 31st 2024”. It gives no amounts or conditions, so treat it as a sign that a scheme existed, not as current terms. Check Orkustofnun directly for any open round before you put a subsidy in a quote. We found no primary-source page on net metering or grid connection for small systems, so this page states none.

What to Ask a Vendor Before Buying

Ask each vendor for one sample project. Then look for these items. First, a Icelandic proposal for your client. Second, the diagram you would give the grid operator. Third, a way to enter your local tariff and a surplus sale. Fourth, a price in the currency you will be invoiced in. Where a vendor does not publish a feature on the pages we read, a demo or trial is the place to settle it.

How We Ordered These Tools

We did not rank these tools. They are listed alphabetically, and the best-for picks come from what each vendor publishes.

  • Icelandic interface or proposals: Clients and official papers use the local language. We did not assess the quality of any translation.
  • Tariff and settlement entry: Savings depend on the local tariff and settlement rule. We did not assess whether any calculation is correct.
  • Diagram for a grid-operator file: Grid operators ask for connection papers. We did not assess whether any tool’s diagram meets a local format.
  • Price currency: The currency shows what a local buyer will pay and whether VAT is added. We did not assess discounts or negotiated quotes.
  • Yield evidence: Larger projects may need a report a lender will read. We did not assess acceptance by any lender.

Sources and Dates

Vendor pages were read in October and November 2026. Aurora Solar (pricing, diagram editor, P-values, utility rates). HelioScope (pricing, free trial). OpenSolar (free, API and connector charges, languages, diagrams, tariffs). PVsyst (shop, product, languages, diagram, P50 to P90, economics). SurgePV (pricing). Iceland sources: Orkustofnun.

Added in November 2026 from primary sources: PVGIS, Orkustofnun solar cell subsidies. The PVGIS figures were produced by us with the settings stated in the section above, so rerun them at the PVGIS link to check.

See SurgePV on an Icelandic project

Book a guided demo and ask for the outputs you need.

Book a Free Demo

Frequently Asked Questions

Is there solar software in Icelandic?

None of the vendors on this list lists Icelandic as an interface or proposal language on the pages we read. OpenSolar lists 13 proposal languages and Icelandic is not among them. PVsyst lists English as the reference language plus 11 translations, and Icelandic is not among them.

Where do I check Icelandic grid-connection rules?

Ask the connecting grid company and Orkustofnun, the National Energy Authority. We did not verify a specific rule, so this page states none.

What is the best solar software in Iceland?

It depends on the job. OpenSolar does not list Icelandic among its proposal languages. PVsyst does not list Icelandic among its translations. PVsyst documents P50 to P90 yield results. SurgePV lists roof modeling, bill of materials and proposals in one product. None of the vendor pages we read states a tariff or grid-company form.

Is there free solar software for Iceland?

OpenSolar says its core app is free for solar professionals. The vendor charges for API Access and supported connectors from 16 April 2026. PVsyst offers a one-month free trial and HelioScope a 14-day trial. None of the vendors states a tariff or grid-company form.

Which solar software works in Icelandic?

OpenSolar does not list Icelandic among its proposal languages. PVsyst does not list Icelandic among its translations. Aurora Solar and SurgePV do not state a Icelandic interface on the pages we read.

How much does solar software cost in Iceland?

Each vendor uses its own currency. Aurora Basic is $159 per user per month, or $135 per user per month billed annually. HelioScope Pro is $2,640 per license per year. OpenSolar’s core app is free, with charges for API Access and connectors from 16 April 2026. PVsyst 8 Professional is 700 Swiss francs per year. SurgePV lists $1,899 per user per year for one user.

How much electricity does a solar panel make in Iceland?

For central Reykjavik, the PVGIS tool from the European Commission Joint Research Centre returns 706 kWh per kWp per year at a 35 degree south-facing tilt, with 14% system losses. Akureyri returns 818 kWh per kWp under the same settings, though PVGIS used a different radiation data set there. These are modelled figures for a reference setup, not a guarantee for a real roof.

Does Iceland have solar subsidies?

Orkustofnun lists a Solar cell subsidies application on its site and says it was open for applications until 31 August 2024. The page we read states no amounts or conditions. Ask Orkustofnun whether a round is open before you quote one.

Why does a solar tool for Iceland need monthly output?

In the Reykjavik PVGIS run, November to February make 4.1% of annual yield and May to August make 61.9%. December is 0.88 kWh per kWp and May is 118.63. A tool that shows only an annual total hides that shape.

About the Contributors

Author
Rainer Neumann
Rainer Neumann

Editorial contributor · SurgePV

Rainer Neumann is credited as an editorial contributor on SurgePV content. This profile does not assert engineering credentials, project totals, software-testing experience, education, speaking engagements, or media citations because independent verification evidence is not retained in the publication record.

Editor
Keyur Rakholiya
Keyur Rakholiya

CEO & Co-Founder · SurgePV

Keyur Rakholiya is identified by SurgePV as its CEO and a company co-founder. His SurgePV author page lists only role information that can be tied to the public profile below; credentials, project totals, testing claims, media appearances, and speaking engagements are not asserted without retained evidence.

Ready to Design and Propose Faster?

SurgePV covers solar design, energy-yield modeling, financial modeling, and proposals in one platform. Book a guided demo to see it on a project like yours.