A Norwegian homeowner or housing co-operative will ask who buys the surplus, how large the main fuse is and how a shared roof splits its output. None of the vendor pages we read gives a Norway tariff or subsidy rule, so the choice below rests on what each vendor publishes. OpenSolar’s core app is free. Aurora Solar lists design, financing integrations and proposal tracking. SurgePV lists roof modeling, bill of materials and proposals in one product, priced per user in US dollars. Build one real Norway quote in each tool before you pay.
This page compares what each vendor publishes, with checks made in November 2026. We ran no side-by-side trials. SurgePV publishes this page and is a vendor on this list, one of 5 tools. Vendor facts come from each vendor’s own site, and prices may change. Solargraf was in an earlier version but is left out now, because its site returned HTTP 403 (access denied) to automated reads.
Method: tools appear in alphabetical order, with no ranking. Criteria: design link, price and the scope each vendor states. See How We Ordered These Tools.
Want to see SurgePV on your own project?
Book a guided demo and bring a real site. We walk through design, yield, finance and the proposal in one platform.
Book a Free DemoChecking cost first? See the SurgePV pricing page.
Best-For Picks for Norway
-
A residential quote that carries financing and tracks who opened it: Aurora Solar. Its pricing page lists tablet-friendly proposals, integrated financing and proposal activity tracking. Contract Manager and e-signature tools sit on Enterprise, which matters if a housing co-operative must sign.
-
One vendor family for design, quotes, engineering and asset management: Enact Solar. Its homepage shows no prices, so ask what a Norway project costs.
-
Commercial and storage quotes driven by utility rates: Energy Toolbase. ETB Developer lists a database of more than 120,000 utility rates and payment option comparison. The price comes on a call. The rate database may not cover the Norwegian supplier price the RME page says you must show as editable.
-
A free quote, checkout and e-signature for a single-home sale: OpenSolar. The core app is free. API Access and connectors are charged from 16 April 2026.
-
A quote built from the roof model, priced per user: SurgePV. It lists 3D roof modeling, shading, yield, financial modeling, bill of materials and proposal generation, with access by guided demo. Ask it to show an editable surplus price and a main fuse size.
Comparison Table
Listed alphabetically. This is not a ranking; pick by the situation above. Prices checked November 2026 on each vendor’s own page.
| Tool | Best for | Price | Free or paid | Decisive scope fact |
|---|---|---|---|---|
| Aurora Solar | Design and sales proposals, per user | Basic $159 per user per month; $135 per user per month billed annually | Paid | Contract Manager and e-signature tools only on Enterprise |
| Enact Solar | Design, proposals and asset management | Not shown on homepage | Not stated | Homepage gives no feature detail for proposals |
| Energy Toolbase | Commercial solar and storage proposals | Not published; demo with pricing | Paid, quote on a call | In-app PV panel layout marked not included for ETB Developer |
| OpenSolar | Free core app with proposals | Core app free; API Access and connectors charged from 16 April 2026 | Free core app, paid API and connectors | Proposal formats are for residential workflows |
| SurgePV | Roof model to proposal in one product | $1,899 per user per year (1 user) | Paid, guided demo | Proposal built from the design model; no Norway-specific output stated |
What a Norwegian Quote Has to Spell Out
A proposal in Norway is more than a price and a payback. Several points that a Norwegian homeowner or housing co-operative will ask about are set by the regulator, and a quote tool has to let you write them in.
Who pays for the surplus. The RME prosumer questions and answers says that to be paid for surplus power the customer must choose a power supplier that handles both production and consumption, and that not all suppliers offer this. RME says it does not regulate the price suppliers offer. A quote should therefore show the export price as an input the customer can change, not a fixed figure.
What the grid company must do. The same page says an electrician or installer must register the plant with the grid company, and that the customer can feed in up to the size of the main fuse. If the grid has to be upgraded for that, the grid company pays. The regulator also says a grid company and a customer may agree compensation, but the grid company cannot require it. Put the main fuse size and the registration step into the scope of work.
Feed-in charge. The RME news item on plusskunder gives the energy part of the feed-in charge as typically between minus 5 and plus 5 ore per kWh, and says plusskunder are exempt from the fixed part. That page dates from 2016 and was last updated in 2019, so treat the numbers as background and ask the grid company for the current charge before it goes in a quote.
Shared production for co-operatives. The RME guide to sharing surplus production on one property says the producer, not the recipients, tells the grid company how to split surplus, and the producer picks the distribution key. The grid company must offer equal distribution and optional static distribution. A recipient cannot pass shared power on. A quote for a housing co-operative should state which key is used.
None of the vendor pages we read lists these Norwegian items as a proposal field. Ask for a sample quote where the supplier price, the main fuse and the sharing key are editable.
What to Check for Norway
Bring a real Norway quote to each vendor and look for four things. The surplus price from the customer’s own power supplier must be editable. The main fuse size and the grid-company registration step must fit into the scope of work. A sharing key for a housing co-operative must be settable. The price must be in the currency you will be invoiced in. Where a page is silent on Norway we say so, and a demo or trial is where you settle it.
Tool Entries
Aurora Solar
Aurora’s pricing page frames Basic as a plan for residential design and sales.
Best for: residential installers in Norway who sell single homes and want a tablet-friendly proposal with financing built in.
Not the right choice if: a housing co-operative needs a contract or signature flow, because Contract Manager, e-signature tools and customizable sales agreement templates are listed on Enterprise only. Basic and Premium list one user and 50 projects a month, and Aurora’s FAQ says extra licenses can be bought in the app.
What the vendor documents: customizable proposal templates, custom branding, and custom pricing methods (per watt, per component or flat fee). It also lists adders, discounts and incentives, a utility rate database, and web and PDF proposals. Adders are extra items added to the price. It lists proposal activity tracking and integrated and custom financing (GoodLeap, Dividend, Mosaic and more). It also lists financing and energy bill comparisons. Design features on the same page include 3D roof modeling and trees and performance simulation.
Price (checked October 2026): Basic is $159 per user per month billed monthly, or $135 per user per month billed annually ($1,620 billed annually). Premium is $259 per user per month billed monthly, or $220 per user per month billed annually ($2,640 billed annually). Enterprise is custom per project. Source: Aurora pricing.
Limitations: annual Basic and Premium plans carry a one-year commitment, per Aurora’s pricing FAQ. None of the pages we read names a Norwegian export price or main fuse field.
Vendor link: aurorasolar.com.

Enact Solar
Enact calls itself an AI-enabled platform and announces a tie-up with PVComplete.
Best for: a Norwegian EPC that would rather buy design, proposals, engineering and asset management from one vendor family than join several tools together.
Not the right choice if: you must see a price or a feature list before a call. The homepage lists “Design & Proposals” and “Engineering” for installers without detail and shows no prices, so a Norway surplus or fuse field cannot be checked from it.
What the vendor documents: the homepage says “End-to-End Software: Design, Proposals, Engineering, and Asset Management” and links Engineering to PVComplete’s PVCAD. It lists integrations “across dozens of global manufacturers” and says the company operates in 35+ countries (a company-reported figure). The homepage does not mention CRM functionality.
Price (checked November 2026): not shown on the homepage, which links to “Software Pricing” and “Provider Pricing” pages.
Limitations: the homepage names no Norway tariff, subsidy or language item, so every Norway question goes to the vendor.
Vendor link: enact.solar.

Energy Toolbase
ETB Developer is the solar and storage modeling and proposal product from Energy Toolbase.
Best for: Norwegian commercial and storage sales teams whose proposals turn on rates, incentives and storage economics rather than a flat household price.
Not the right choice if: you want a price before talking to someone. The pricing page gives pricing on a call and lists hardware and consulting items separately. It is also a poor fit for a small home sale where the RME rule about choosing a supplier that handles both production and consumption is the main input.
What the vendor documents: a simulation engine for solar and storage. It also has a database of more than 120,000 verified utility rates kept by an in-house rates team. It supports VNEM (virtual net energy metering), NEMA (net energy metering aggregation) and other billing structures. It also lists payment option comparison, incentive calculations and cost forecasts. Proposals use branded templates. The vendor lists notifications when a prospect opens a proposal. It also lists analytics on time spent per section, and lead management. It also lists “PV design partnerships with leading design software tools” and “real-time indicative pricing quotes from lenders”. The page’s comparison table marks in-app PV panel layout tools as not included for ETB Developer. Its FAQ says it supports financing structures including cash purchases, power purchase agreements (PPAs), loans and leases. Source: ETB Developer.
Price (checked October 2026): not published for ETB Developer. The pricing page offers a 30-minute demo with pricing for your team size, and lists hardware and consulting items separately.
Limitations: hardware, consulting and implementation packages are priced separately on the pricing page. The pages we read do not say which countries the rate database covers.
Vendor link: energytoolbase.com.

OpenSolar
OpenSolar says its core app stays free and that a partner ecosystem helps fund it (16 February 2026 post).
Best for: a small Norwegian installer who wants design, a proposal, checkout and e-signature without a licence fee.
Not the right choice if: you quote housing co-operatives or commercial roofs, because OpenSolar’s proposal FAQ says Swipe, Scroll and Bespoke “are for residential proposal workflows”. Budget for outside connections too, since API Access and connectors are charged from 16 April 2026, and the proposal page says availability is “enabled by region”.
What the vendor documents: the Sales Machine Proposal page lists Swipe (slide-based), Scroll (long-form) and Bespoke proposals. It also lists a Quick Quote path, a fast quote and checkout route for simpler service and non-solar jobs. It lists branding controls and a template library. It lists savings views that compare current and electrified energy costs. It also lists deposits through CashFlow. It also lists financing “where available” and acceptance inside the same flow. A WhatsApp share option and section-view tracking “where available” are listed as well. The e-signature page lists a built-in signing workflow, PandaDoc or DocuSign.
Price (checked October 2026): the core app is free of charge for solar professionals, per the vendor (free page). From 16 April 2026 the vendor charges for API Access, a per-project fee. The per-project API fee is on OpenSolar’s API page. It also charges for supported connectors, a monthly fee per organization. The 16 February 2026 post says accounting connectors are billed as a monthly fee per organization. Bespoke proposals are offered through the optional paid Enterprise Services. Support is US$500 per month. Customize is US$1,350 per month (one exclusive proposal template). Enterprise is custom (“fully bespoke proposal”). Premium imagery is pay per image (price shown in the app).
Limitations: the proposal page says Swipe, Scroll and Bespoke support up to six designs per project where design selection applies. API Access and connectors are priced by region, and we did not compare those rates.
Vendor link: opensolar.com

SurgePV
SurgePV is our product.
Best for: Norwegian installers and EPC teams that want the quote to come from the same 3D roof model, array layout and shading analysis, with energy-yield and financial modeling in one web application.
Not the right choice if: you want a self-serve trial (SurgePV offers a guided demo) or financing, contracts and e-signature inside the quote. The pricing page lists proposal generation and a generation and financial analysis feature without describing those. The published scope lists no CRM (customer tracking tool). Outputs support design and documentation but do not replace sign-off by the responsible engineer, authority, lender or utility.
What the vendor documents: 3D roof modeling, solar array layout, shading analysis and energy-yield modeling. It also lists financial modeling, electrical workflow support, bill-of-materials output and proposal generation. The pricing page lists unlimited projects, shadow analysis, generation and financial analysis, and proposal generation under “Everything included”. See the solar proposal software page for the product.
Price (checked November 2026): $1,899 per user per year for 1 user, $1,499 per user for 3 seats, $1,299 per user for 5 seats, in US dollars. Access is a guided demo.
Limitations: results depend on source data, assumptions and equipment models. The published scope names no Norway tariff, surplus price field, language or currency, so ask for them in a demo.
Vendor link: surgepv.com. Book a Free Demo.

How We Ordered These Tools
We did not rank these tools. The order is alphabetical, and each best-for pick follows from what that vendor publishes.
-
Design link: whether the vendor says the quote is built from the design model. We did not assess output quality.
-
Price: the figure the vendor lists, in its own currency. Discounts and negotiated quotes were not assessed, and Norwegian kroner prices are not published on the pages we read.
-
Scope: what each vendor’s own pages say the tool covers. Where a page says nothing about a Norwegian item we say so and do not infer.
Go Deeper on a Category
- Solar proposal software, all markets
- Solar design software for Norway
- Solar software in Norway
- SurgePV solar proposal software
Sources and Dates
Vendor pages were read in October and November 2026. Screenshots are public website captures from 29 October 2026. Sources are the vendor pages linked in each entry: pricing, product and help pages. SurgePV facts come from its pricing page. SurgePV publishes this page and is a vendor on the list. We could not read Solargraf’s site, so it is not compared. Norway regulator sources, read November 2026: NVE solar statistics, RME prosumer FAQ, RME plusskunde news, RME surplus-sharing guide.
Frequently Asked Questions
What is the best solar proposal software in Norway?
It depends on the job. OpenSolar’s core app is free. Aurora Solar lists design, financing integrations and proposal tracking. SurgePV lists roof modeling, bill of materials and proposals in one product. We did not verify Norway-specific coverage for any tool, so test each on a real Norway project before you buy.
How much does solar proposal software cost in Norway?
Vendors price in their own currency, and the pages we read do not give a local-currency price. SurgePV lists $1,899 per user per year for one user. OpenSolar’s core app is free, with charges for API Access and connectors from 16 April 2026. Aurora Basic is $159 per user per month, or $135 per user per month billed annually. Energy Toolbase does not publish a price for ETB Developer. Enact shows no prices on its homepage.
Is there free solar proposal software for Norway?
OpenSolar says its core app is free for solar professionals. The vendor charges for API Access and supported connectors from 16 April 2026. Check regional availability of any free tool for Norway.
Can solar proposal software handle Norway tariffs and incentives?
The vendor pages we read describe tariff and incentive features in general terms and do not list Norway-specific rates or programs. Ask each vendor to model one real Norway bill and incentive in a demo or trial.
Does SurgePV publish this list?
Yes. SurgePV publishes this page and is one of the tools on it. The tools are listed alphabetically and are not ranked.
What should a Norwegian solar quote state about surplus power?
It should show the export price as an editable input, because RME does not regulate supplier prices, and name the main fuse size, since a customer can feed in up to that size. For a housing co-operative, state the sharing key the producer chose with the grid company.


