Solar Software in Sweden (2026): Five Tools Compared

Five solar software tools compared on what each vendor publishes for Swedish work: Swedish-language proposals, diagrams, tariff entry, yield evidence and price currency. Checked November 2026.

SurgePV publishes this list and sells solar design and proposal software, so we have a commercial interest in this category. This is a desk comparison of what each vendor publishes; we have not run side-by-side tests. Prices and vendor facts checked November 2026. How we evaluate software

Published Last updated
Rainer Neumann

Written by

Rainer Neumann

Editorial contributor · SurgePV

Keyur Rakholiya

Edited by

Keyur Rakholiya

CEO & Co-Founder · SurgePV

A Swedish installer quoting a villa roof now has to price the customer’s feed-in without the old tax reduction, and answer in Swedish. OpenSolar’s core app is free and lists Swedish among its proposal languages. PVsyst documents P50 to P90 yield and prices in Swiss francs, but its languages page lists no Swedish. P90 is a yield met or exceeded in 90% of years, and P50 in 50%. Aurora Solar and HelioScope price in US dollars, and SurgePV bundles roof modeling, a bill of materials and proposals per user in dollars. No vendor here gives a krona (SEK) price.

The rule that changed for the worse is Skatteverket’s. The tax reduction for micro-production of renewable electricity ended on 1 January 2026, so a tool that still shows it for new production is showing a rule that no longer applies. SLD means single line diagram, a simple drawing of how the system is wired.

The comparison reads what each vendor publishes as of November 2026, with no side-by-side runs. SurgePV publishes this page and is a vendor on this list. The one Swedish rule covered comes from Skatteverket’s own page; grid-owner and Energimyndigheten pages were not read. Tool facts come from each vendor’s own site. For other tools see the global list of solar design software.

Criteria used: Swedish proposals, diagram, tariff and surplus entry, yield evidence, price currency.

Want to see SurgePV on your own Swedish project?

Book a guided demo and bring a real site. We walk through design, yield, finance and the proposal in one platform.

Book a Free Demo

Checking cost first? See the SurgePV pricing page.

Best-For Picks for Sweden

  • A free core app for a Swedish-language household quote: OpenSolar. Swedish is on its proposal language list, though you translate the template yourself, and API Access and connectors are charged from 16 April 2026.
  • Yield evidence for a large roof or a bank: PVsyst. Its help describes P50 to P90 evaluations. The languages page lists no Swedish and the help pages are English only, and it is Windows only.
  • Commercial design with financials and proposals per licence: HelioScope. Pro lists financial modeling, sales proposals and P90 values at $2,640 per year, and its financial model needs a surplus price entered by hand now that no reduction applies.
  • Residential design and proposals per user: Aurora Solar. Basic is $159 per user per month, or $135 billed annually, in dollars with no krona price.
  • One per-user licence from roof model to bill of materials and proposal: SurgePV. Ask in a demo how its financial model treats the end of the micro-production reduction, and for Swedish output.

Comparison Table

Listed alphabetically. This is not a ranking; pick by the situation above. Prices checked November 2026 on each vendor’s own page.

Tool Best for Price Free or paid Decisive scope fact
Aurora Solar Design and sales proposals, per user Basic $159 per user per month; $135 per user per month billed annually Paid SLD editor “only available in Europe”; P50 only
HelioScope Commercial design and simulation Basic $1,620 per year; Pro $2,640 per year Paid, free trial offered Pro lists financial modeling, proposals and P90
OpenSolar Free core app Core app free; API Access and connectors charged from 16 April 2026 Free core app, paid API and connectors Swedish in proposal languages; you translate the template
PVsyst Yield evidence CHF 700 per year (Professional) Paid, one-month trial Documents P50 to P90 evaluations; Windows only
SurgePV Roof model to BOM and proposal, per user $1,899 per user per year (individual plan) Paid, guided demo BOM and proposal generation in scope; no Swedish output stated

Tool Entries

Aurora Solar

Best for: teams that want design and sales proposals on a per-user plan and can work with a US-dollar price list.

Not the right choice if: you need a diagram editor for this market (the single line diagram editor page says the editor is “only available in Europe” and lists no countries), a P90 yield (Aurora does not natively output P90 for solar energy production), or a price in Swedish kronor (SEK).

What the vendor documents: the help article on P-values says Aurora’s estimates are P50 values from typical-year weather data. The help article on utility rates lets you set an export rate in dollars per kWh and a compensation policy. The pages we read do not state which languages the app or proposals support.

Price (checked November 2026): on the pricing page, Basic is $159 per user per month, or $135 per user per month billed annually ($1,620 billed annually). Premium is $259 per user per month, or $220 per user per month billed annually ($2,640 billed annually). The page uses a $ sign without naming the currency and shows North America as the selected region. Premium adds LIDAR-assisted modeling, bankable shade reports and battery modeling.

Limitations: the pages we read name no Swedish tariff, grid-owner form or Skatteverket rule.

Vendor link: aurorasolar.com.

Aurora Solar public website page, captured 29 October 2026
Aurora Solar public website capture, captured 29 October 2026. This shows the vendor's website, not a test inside the software.

HelioScope

Best for: commercial designers who want rooftop, carport and ground-mount modeling with storage, priced per licence in US dollars. HelioScope is part of the Aurora Solar family.

Not the right choice if: you need a price in Swedish kronor (SEK), a stated interface language for this market, or a free tool. The Basic plan covers designs up to 1.25 MW DC and Pro up to 5 MW DC.

What the vendor documents: the HelioScope homepage says it lets commercial professionals design, simulate and sell solar-plus-storage projects, with automatic layout and sub-minute simulations. The pricing page lists financial modeling, sales proposals and P90, P95 and P99 values under Pro. It lists export to PVsyst and API access under Enterprise. It states no interface languages.

Price (checked November 2026): Basic is $159 per licence per month or $1,620 per year. Pro is $259 per licence per month or $2,640 per year. Enterprise is custom per project. The page lists US dollars only.

Limitations: the pages we read name no Swedish tariff, grid-owner form or Skatteverket rule.

Vendor link: helioscope.aurorasolar.com.

HelioScope public website page, captured 29 October 2026
HelioScope public website capture, captured 29 October 2026. This shows the vendor's website, not a test inside the software.

OpenSolar

Best for: small installers who want a free core app. Swedish is on its proposal language list. You translate the proposal template yourself.

Not the right choice if: you need a diagram template listing Sweden (its SLD article lists AU, NZ, US, CA, UK, FR, DE, IT, ES and IN) or documented P50 to P90 yield results.

What the vendor documents: the proposal language article lists English, Dutch, Swedish, Spanish, French, Norwegian, Thai, German, Polish, Portuguese, Italian, Danish and Finnish. It says you need a manually translated proposal template. The single line diagram article says SLDs are supported in AU, NZ, US, CA, UK, FR, DE, IT, ES and IN. The tariff article shows how to create a custom tariff with flat, tiered and demand-charge rates.

Price (checked November 2026): the core app is free of charge for solar professionals, per the vendor. From 16 April 2026 the vendor charges for API Access and supported connectors, per its 16 February 2026 post. No Swedish kronor (SEK) price appears.

Limitations: the pages we read name no Swedish tariff, grid-owner form or Skatteverket rule.

Vendor link: opensolar.com.

OpenSolar public website page, captured 29 October 2026
OpenSolar public website capture, captured 29 October 2026. This shows the vendor's website, not a test inside the software.

PVsyst

Best for: yield evidence on a large roof or a ground-mounted site, where a lender or investor wants a simulation report. Swedish is not among its translations, so the screen is English or another listed language.

Not the right choice if: you want proposals from the same tool (the pages we read describe none), you need a diagram that shows storage, or you work on a Mac. The requirements page says PVsyst runs only under Windows.

What the vendor documents: a P50 to P90 evaluation. P50 and P90 are yields with a 50% and 90% probability of being exceeded in a year. The languages page says English is the reference language and lists French, German, Spanish, Portuguese, Italian, Turkish, Korean, Chinese, Japanese, Polish and Russian as translations. The documentation itself is not translated. The single line diagram page describes an editor and viewer for grid-connected systems, leaves out storage, and calls the feature “still work in progress”. The economic evaluation help page covers feed-in tariffs and self-consumption.

Price (checked November 2026): CHF 700 per year for PVsyst 8 Professional, with grouped-order discounts of 5% for 2 to 4 licences, 15% for 5 to 9 and 20% for 10 or more. The product page offers a one-month free trial. No Swedish kronor (SEK) price is published.

Limitations: the pages we read name no Swedish tariff, grid-owner form or Skatteverket rule.

Vendor link: pvsyst.com.

PVsyst public website page, captured 29 October 2026
PVsyst public website capture, captured 29 October 2026. This shows the vendor's website, not a test inside the software.

SurgePV

SurgePV is our product, and this page is published by SurgePV.

Best for: teams that want roof modeling, shading, yield, financial modeling, bill of materials and proposals in one product, priced per user. Ask in a demo for the Swedish output, SEK pricing and Swedish tariff entry.

Not the right choice if: you want a self-serve trial (SurgePV offers a guided demo), or you need a price in Swedish kronor (SEK) in writing before talking to sales. The pricing page lists US dollars. It is also not right if you want a free tool for small jobs, because OpenSolar’s core app is free. Outputs support design and documentation but do not replace approval by the responsible engineer, authority, lender or utility. SurgePV’s published product scope does not list a CRM (customer tracking tool), monitoring or ERP (business management software).

What the vendor documents: 3D roof modeling, array layout and shading analysis. It also lists energy-yield modeling, financial modeling, electrical workflow support, bill-of-materials output and proposal generation. See solar design software for the product page.

Price (checked November 2026): $1,899 per user per year on the individual plan, in US dollars. Team tiers are priced per user and need the stated seat count.

Limitations: results depend on source data, assumptions and equipment models. The pricing page and published scope do not state a Swedish interface, SEK pricing or P50 to P90 results.

Vendor link: surgepv.com.

SurgePV public website page, captured 29 October 2026
SurgePV public website capture, captured 29 October 2026. This shows the vendor's website, not a test inside the software.

Swedish Rules That Shape the Choice

Tax reduction for micro-production has ended. Skatteverket’s page on micro-production of renewable electricity says that from 1 January 2026 you get no tax reduction for electricity fed into the grid. Electricity fed in up to 31 December 2025 still qualifies if the conditions were met. The reduction was 60 öre per kWh on a base of up to 30,000 kWh, so up to 18,000 kronor a year. The base could not exceed the kWh drawn from the grid at the connection point.

Conditions for earlier years. The installation shared the same connection point and main fuse as the home’s grid connection, with feed-in and output metered there. The fuse could not exceed 100 amperes. Only the person registered with the grid company as the producer could claim it.

What this means for software. A tool that applies a feed-in deduction to production from 2026 gives a result that no longer matches Skatteverket’s page. Ask each vendor how its financial model treats the end of the reduction, and enter your own surplus price instead. None of the vendor pages we read mention the change.

How We Ordered These Tools

The tools are not ranked. They are alphabetical, and the best-for picks follow from the criteria below.

  • Swedish proposals: Swedish clients expect Swedish documents. We did not assess the quality of any translation.
  • Diagram: Installers need a wiring drawing for the grid owner. We did not assess whether any diagram meets a Swedish grid owner’s format.
  • Tariff and surplus entry: Savings depend on the electricity price and the surplus price. We did not assess whether any calculation is correct.
  • Yield evidence: Larger projects may need a report a lender will read. We did not assess acceptance by any lender.
  • Price currency: The currency shows what a Swedish buyer will pay. We did not assess discounts or negotiated quotes.

Sources and Dates

Vendor pages were read in October and November 2026. Aurora Solar (pricing, diagram editor, P-values, utility rates). HelioScope (homepage, pricing). OpenSolar (free, API and connector charges, languages, diagrams, tariffs). PVsyst (shop, product, languages, diagram, P50 to P90, economics). SurgePV (pricing). The Swedish source is the Skatteverket page linked above, read in November 2026.

See SurgePV on your own Swedish project

Book a guided demo and ask for the Swedish outputs you need.

Book a Free Demo

Go Deeper on a Category

Frequently Asked Questions

What is the best solar software in Sweden?

It depends on the job. OpenSolar’s core app is free and lists Swedish among its proposal languages. PVsyst documents P50 to P90 yield results, but Swedish is not among its translations. HelioScope Pro lists financial modeling, proposals and P90 values. Aurora Solar prices per user in US dollars. SurgePV lists roof modeling, bill of materials and proposals in one product. None of the vendor pages we read states a krona price.

Is there free solar software for Sweden?

OpenSolar says its core app is free for solar professionals. The vendor charges for API Access and supported connectors from 16 April 2026. Swedish is on its list of proposal languages, but you must translate the proposal template yourself.

Does the Swedish tax reduction for solar still apply?

Not for new production. Skatteverket says the tax reduction for micro-production of renewable electricity ends on 1 January 2026. Electricity fed in up to 31 December 2025 still qualifies if the conditions were met. The old rate was 60 öre per kWh on up to 30,000 kWh.

Which solar software works in Swedish?

OpenSolar lists Swedish among its proposal languages. PVsyst’s languages page does not list Swedish, and its help pages are in English only. Aurora, HelioScope and SurgePV do not state a Swedish interface in the pages we read.

Can solar software show Swedish kronor?

None of the vendors on this list states a SEK price on the pages we read. OpenSolar lets you build a custom tariff with flat, tiered and demand-charge rates. Aurora lets you edit export rates, shown in dollars per kWh. PVsyst has a feed-in and self-consumption help page. Test each tool with a sample bill before you buy.

How much does solar software cost in Sweden?

Each vendor uses its own currency, and none publishes a krona price. OpenSolar’s core app is free, with charges for API Access and connectors from 16 April 2026. PVsyst 8 Professional is 700 Swiss francs per year. HelioScope Basic is $1,620 per year and Pro is $2,640 per year. Aurora Basic is $159 per user per month, or $135 per user per month billed annually. SurgePV lists $1,899 per user per year on the individual plan.

About the Contributors

Author
Rainer Neumann
Rainer Neumann

Editorial contributor · SurgePV

Rainer Neumann is credited as an editorial contributor on SurgePV content. This profile does not assert engineering credentials, project totals, software-testing experience, education, speaking engagements, or media citations because independent verification evidence is not retained in the publication record.

Editor
Keyur Rakholiya
Keyur Rakholiya

CEO & Co-Founder · SurgePV

Keyur Rakholiya is identified by SurgePV as its CEO and a company co-founder. His SurgePV author page lists only role information that can be tied to the public profile below; credentials, project totals, testing claims, media appearances, and speaking engagements are not asserted without retained evidence.

Ready to Design and Propose Faster?

SurgePV covers solar design, energy-yield modeling, financial modeling, and proposals in one platform. Book a guided demo to see it on a project like yours.

Choose which optional technologies SurgePV may use. Essential storage remains active for security and requested features.