If you want free software, OpenSolar’s core app is free. From 16 April 2026 the vendor charges for API Access (a way for other software to connect) and for connectors. SolarEdge Designer states no subscription fee, and its page describes designing SolarEdge systems. If you quote only a few jobs a month, Pylon charges per project. If you want a paid design-to-proposal web application with published per-user prices, compare SurgePV, Aurora Solar and Arka360. For drone surveys, look at Scanifly, and for lender-style yield simulation on a Windows desktop, look at PVsyst.
This is a desk comparison of what each vendor publishes, checked October 2026. We have not run side-by-side tests.
Criteria used: published price and unit, free or trial access, proposals, permit and electrical documents, and CRM (customer relationship management software, a tool to track leads and customers) or lead management.
Tools not compared: Solargraf is not compared on this page. solargraf.com returned HTTP 403 to automated reads, including a headless browser, read October 2026.
Want to see SurgePV on your own quote?
Book a guided demo and bring a real site. We walk through design, yield, finance and the proposal in one platform.
Book a Free DemoChecking cost first? See the SurgePV pricing page.
Best-For Picks by Situation
- Free core app with a project CRM and US permit integrations: OpenSolar. Its pages say the core app is free of charge. The vendor charges for API Access and connectors from 16 April 2026. The pages list a single line diagram generator, a Project Management CRM and permitting integrations for US projects. A single line diagram is a simple drawing of how the system is wired.
- A few quotes a month, or uneven volume: Pylon. It prices Standard projects at $4.00 and Pro projects at $10.00 (the page does not name the currency). It has no monthly minimum. It offers free credits for five Standard projects.
- Installs built on SolarEdge equipment: SolarEdge Designer. SolarEdge says there are no license or subscription fees.
- A paid bundle with lead management and permit services: Arka360. Its Basic plan lists lead management, and it sells permit and PE stamp services separately. The vendor says its PE stamps are “Reviewed and sealed by certified Electrical PEs”.
- Web-based design, shading, financial analysis and proposals in one product, priced per user: SurgePV. Its pricing page lists unlimited projects, shadow analysis, generation and financial analysis, and proposal generation under “Everything included”. Confirm fair-use limits.
Moving into commercial work? HelioScope lists P90, P95 and P99 values on Pro. Those are yield levels expected to be met or exceeded in 90%, 95% or 99% of years. Need a drone survey instead of a roof climb? Scanifly. Need a detailed yield simulation on Windows? PVsyst. Want LiDAR-assisted (laser measuring of the site) residential design? Aurora Solar lists it on Premium.
Comparison Table
Listed alphabetically. This is not a ranking; pick by the situation above.
| Tool | Best for | Price (checked October 2026) | Free access | One scope fact |
|---|---|---|---|---|
| Arka360 | Paid bundle with lead management | Basic $199 per month, 1 user (arka360.com) | Not stated on the pricing page | Permit and PE stamp services sold separately |
| Aurora Solar | Residential design and sales | Basic $135 per user per month billed annually ($1,620 per year); Premium $220 per user per month billed annually ($2,640 per year) (aurorasolar.com) | Not stated on the pricing page | LiDAR-assisted modeling and bankable shade reports on Premium |
| HelioScope | Commercial rooftop and ground mount | Basic $1,620 per license per year; Pro $2,640 per license per year (helioscope.aurorasolar.com) | Free trial offered | Single-line diagrams listed on the plan comparison |
| OpenSolar | Free core app with design, proposals and CRM | Core app free; API Access and connectors charged from 16 April 2026; optional Enterprise Services from US$500 per month (opensolar.com) | Core app free | Single line diagram generator; help article lists templates for AU, NZ, US, CA, UK, FR, DE, IT, ES and IN |
| PVsyst | Detailed yield simulation | CHF 700 per license per year, PVsyst 8 Professional (pvsyst.com) | One-month free trial | Windows install, one license per computer |
| Pylon | Pay-per-project quoting | $4.00 per Standard project, $10.00 per Pro project; currency not named on the page (getpylon.com) | Free credits for five Standard projects | Standard projects listed to 30 kW DC, Pro to 99 kW+ |
| Scanifly | Drone-based site surveys | Not stated on the pages read | Not stated on the pages read | Mobile app free with a design product subscription |
| SolarEdge Designer | SolarEdge installs | No license or subscription fees (solaredge.com) | Free to register | Checks designs against SolarEdge design rules |
| SurgePV | Design-to-proposal in one web app | $1,899 per user per year (1 user); see /pricing | Guided demo, no self-serve trial | Unlimited projects listed on /pricing (confirm fair-use limits) |
Every price above was read on the vendor’s own page in October 2026. Taxes, discounts and plan limits change, so confirm them with the vendor before you buy.
What the Software Fee Works Out To
Small teams often compare subscription and per-project pricing by cost per project. The table divides each published annual fee by the projects you quote. It covers one user and the software fee only. Vendors count and cap projects differently, so read the limit column before you rely on a figure.
| Tool and plan | 10 projects a month (120 a year) | 30 a month (360 a year) | 60 a month (720 a year) | Plan limit on the vendor page |
|---|---|---|---|---|
| OpenSolar (core app) | $0 | $0 | $0 | Core app free; API Access and connectors charged from 16 April 2026 |
| SolarEdge Designer | $0 | $0 | $0 | No license or subscription fee stated |
| Pylon Standard ($4.00 per project) | $480 per year | $1,440 per year | $2,880 per year | Standard projects listed to 30 kW DC |
| Pylon Pro ($10.00 per project) | $1,200 per year | $3,600 per year | $7,200 per year | Pro projects listed to 99 kW+ |
| Aurora Solar Basic ($1,620 per year billed annually) | $13.50 per project | $4.50 per project | Over the 50 projects per month limit | 1 user, 50 projects per month |
| HelioScope Basic ($1,620 per year) | $13.50 per project | Over the 120 projects per year limit | Over the 120 projects per year limit | 1 user, 10 projects per month, 120 per year |
| Arka360 Basic ($199 per month, $2,388 per year) | $19.90 per project | $6.63 per project | $3.32 per project | Project limit not stated in the US plan card |
| SurgePV Individual ($1,899 per year) | $15.83 per project | $5.28 per project | $2.64 per project | Unlimited projects listed on /pricing (confirm fair-use limits) |
The arithmetic: Pylon is $4.00 or $10.00 times 120, 360 or 720 projects. A subscription is the annual fee divided by projects. The $1,620 plans give $1,620 / 120 = $13.50 and $1,620 / 360 = $4.50. Arka360 gives $2,388 / 120 = $19.90, $2,388 / 360 = $6.63 and $2,388 / 720 = $3.32. SurgePV gives $1,899 / 120 = $15.83, $1,899 / 360 = $5.28 and $1,899 / 720 = $2.64. Arka360’s annual figure is 12 times the monthly price because its US view lists a monthly price only. Pylon’s page shows a dollar sign without naming the currency, so its rows are not directly comparable with the USD rows. PVsyst and Scanifly are left out. PVsyst is a per-license fee for a different kind of tool. Scanifly does not state a price on the pages we read.
Tool-by-Tool Comparison
Listed alphabetically. This is not a ranking; pick by the situation above.
Arka360
Arka360 sells design, proposal and lead management software, plus permit services.
Best for: small teams that want design, proposals and lead management on one paid plan and a vendor that also sells permit drawings.
Not the right choice if: you want to know the cost of permit drawings or PE stamps before you order. The pages we read list the services and turnaround but no price for them.
What the vendor documents: the Basic card lists basic design software, an engineering service portal, lead management, a shade report and a basic proposal. Premium adds AI assisted modeling, battery storage and backup sizing, CAD (computer-aided design) export and customized proposals. The US feature table lists the electric single line diagram and CAD export on Premium and Enterprise only. It lists a utility rate finder and financing (cash, loan, lease, PPA, a power purchase agreement) on all three plans. Arka360 also lists an automatically generated bill of materials. The permit page lists NEC-compliant drawings for rooftop permitting. It lists structural and electrical PE stamps on request. It also lists delivery in 24 to 48 hours.
Price (checked October 2026): Basic $199 per month and includes 1 user. Premium $358 per month and includes 2 users. Enterprise is “Talk to Sales”. The figures here are the visible US-dollar cards. The page also holds rupee tables for India. It has a second rupee set on its /pricing-in page and hidden dollar tables. We do not quote those here. Source: Arka360 pricing.
Limitations: the pricing page does not say whether a free trial exists. Its feature comparison list and its plan cards show different levels of detail. Ask Arka360 which plan carries each item you need.
Vendor link: arka360.com and permit services.

Aurora Solar
Aurora Solar sells a solar design and sales platform. HelioScope, listed below, describes itself as an Aurora Inc. company.
Best for: residential teams that want remote design with LiDAR-assisted modeling and tablet-friendly sales proposals.
Not the right choice if: you need LiDAR-assisted modeling or bankable shade reports without paying for Premium. Also look elsewhere if you need more than 1 user on a Basic or Premium license. The pricing page lists 1 user on both and unlimited users on Enterprise.
What the vendor documents: 3D roof modeling and trees, irradiance analysis, tablet-friendly sales proposals, a utility rate database, and integrated financing. The design page lists NEC validation reports. Premium adds LiDAR-assisted modeling, bankable shade reports and battery modeling.
Price (checked October 2026): Basic is $159 per user per month billed monthly or $135 per user per month billed annually ($1,620 per year). Premium is $259 per user per month billed monthly or $220 per user per month billed annually ($2,640 per year). Both list 50 projects per month. Enterprise is custom. Source: Aurora pricing.
Limitations: a free trial is not stated on the pricing page. Plan sets and engineering stamps are listed as an Enterprise and add-on service, not a Basic feature.
Vendor link: aurorasolar.com.

HelioScope
HelioScope is part of Aurora Inc.; its footer reads “an Aurora Inc. Company”.
Best for: small installers who start quoting commercial rooftop, carport or ground-mount projects and need layout, simulation and single-line diagrams in one tool.
Not the right choice if: your work is mostly homes. HelioScope describes its plans as tools for “commercial solar-plus-storage design”, and Basic includes 10 projects per month.
What the vendor documents: per its plan comparison, single-line diagrams, CAD export, a 50,000-component module and inverter library, an 8760 production report and shade reports. Pro adds LiDAR-assisted modeling and AI-based obstruction detection. Pro also adds financial modeling, sales proposals, and P90, P95 and P99 values.
Price (checked October 2026): Basic is $159 per license per month or $1,620 per license per year, including 1 user. Per the page, it also includes 10 projects per month (120 per year). Pro is $259 per license per month or $2,640 per license per year. Enterprise is custom. Source: HelioScope pricing.
Limitations: designs up to 1.25 MW (DC) on Basic and 5 MW (DC) on Pro. Single-axis trackers and PVsyst export are Enterprise features.
Vendor link: helioscope.aurorasolar.com.

OpenSolar
OpenSolar says partners that pay to be on its platform make the core app free for installers.
Best for: small teams that want design, proposals and a project CRM in a core app the vendor describes as free. The vendor charges for API Access and connectors from 16 April 2026.
Not the right choice if: you want one fixed all-inclusive price. Premium 2D and 3D imagery is “pay-per-project” per its sales page. Its support and customization plans are paid, at US$500 and US$1,350 per month.
What the vendor documents: a single line diagram generator. The diagram is “automatically generated from your system design and stringing”. It has templates for AU, NZ, US, CA, UK, FR, DE, IT, ES and IN per its help article. The marketing page lists AU, US, UK, DE, IT and ES. The tool also has proposals, financing, CashFlow payments and e-signature. It has a Project Management CRM with table and Kanban views. It also has Auto Design, which the page says is in beta. For US projects it lists permitting integrations with partners including GreenLancer and SolarAPP+ (a platform that automates permitting for residential solar and storage). Its “Why Free?” page says partners that pay to be on the platform fund it.
Price (checked October 2026): the home page says “100% Free of charge” for the core app. From 16 April 2026 the vendor charges for API Access (a per-project fee) and supported connectors (a flat monthly subscription). This is per the post linked under Limitations. Optional Enterprise Services are paid: Support US$500 per month, Customize US$1,350 per month, Enterprise custom. Premium imagery is pay per image, and the app shows the price. Sources: Why Free? and Enterprise Services.
Limitations: OpenSolar’s 16 February 2026 post says that from 16 April 2026 the core app stays free. It says charges apply to API Access and supported connectors to third-party tools (it names CRM and accounting among the uses). The pages we read do not describe project size limits or compare plan features. Confirm limits in the OpenSolar help center before you commit.
Vendor link: opensolar.com.

PVsyst
PVsyst is a Windows desktop program from PVsyst SA in Satigny, Switzerland.
Best for: engineers and consultants who need a detailed yield simulation with losses by component, for example when a lender or client asks for one.
Not the right choice if: you want a browser tool or customer-facing proposals. The pages we read list simulation and economic assessment, not proposal generation. A search of its help index found no quotation or proposal output.
What the vendor documents: near shadings from a 3D scene, horizon import, electrical shading (mismatch) calculation, sub-hourly simulation and detailed gains and losses reports. It also lists an economic assessment that calculates NPV (net present value), LCOE (levelized cost of energy) and ROI (return on investment), with a feed-in tariff and self-consumption page. It lists weather databases including NLR/NSRDB TMY and Meteonorm 9. PVsyst has a single line diagram editor and viewer for grid-connected systems only. It does not cover storage systems. It was introduced in V7.3.0 and is described as still work in progress.
Price (checked October 2026): CHF 700 per year for PVsyst 8 Professional, updates included. The shop lists discounts of 5% for 2 to 4 licenses, 15% for 5 to 9 and 20% for 10 or more. Source: PVsyst shop.
Limitations: it installs on the workstation where it is used, with one license per computer, and runs on Windows only. Remote desktop and server installs are listed as unsupported.
Vendor link: pvsyst.com.

Pylon
Pylon is operated by Saru Technologies Pty Ltd, North Strathfield NSW, per its privacy policy.
Best for: small residential teams with low or uneven monthly volume that want to pay only when they quote.
Not the right choice if: your projects are above 30 kW DC (kilowatts of panel capacity) and you want the Standard rate. The pricing table lists a 30 kW maximum DC size for Standard and 99 kW+ for Pro. Its page also says high resolution imagery is available in select countries. Check your country.
What the vendor documents: panel placement on aerial imagery, 3D shading simulation, financial projections and web and PDF proposals. It also lists single line diagrams generated from the design, battery design, interval data analysis, e-signature, and up to five designs per project.
Price (checked October 2026): Standard is $4.00 per project and Pro is $10.00 per project. The page shows a dollar sign and does not name the currency; its payment gateway line says fees include GST. It states no monthly minimum and unlimited users. Credits are bought in packs, and the feature list shows e-signature at 80c per project. The vendor offers new users free credits for five Standard projects, with no credit card. A CRM add-on starts from $49.00 per user per month billed monthly. Source: Pylon pricing.
Limitations: its pages reference AS/NZS 5033:2021, an Australian and New Zealand standard, in the site information section. Check the local documents you need.
Vendor link: getpylon.com.

Scanifly
Scanifly sells drone-based site survey and design software.
Best for: teams that want measurements and shading from a drone flight instead of a roof climb.
Not the right choice if: you do not want to fly a drone or pay for a survey. Scanifly says a drone with GPS and a camera is needed, and it can outsource the survey for an additional fee.
What the vendor documents: PrelimDesign for remote design using satellite imagery, LiDAR and Nearmap, and DroneDesign for on-site design with real-time shading. It lists plan sets turned from 3D models. It lists stamped plan sets in under 48 hours (residential only, per its design services page). It also lists integrations with proposal, financing and racking tools, and a mobile app for iOS and Android.
Price (checked October 2026): not stated on the home page, product pages or the why-Scanifly page we read. The /pricing path returns a 404. The mobile app is free with any design product subscription. Source: Scanifly field operations.
Limitations: price is not stated on the pages we read, so budgeting means asking Scanifly for a quote or demo.
Vendor link: scanifly.com.

SolarEdge Designer
SolarEdge Designer is a design tool from SolarEdge, an inverter manufacturer.
Best for: installers whose systems use SolarEdge equipment and want design, stringing and proposals without a software fee.
Not the right choice if: you design with other manufacturers’ equipment. SolarEdge’s page frames the tool around “all your SolarEdge systems” and SolarEdge design rules. Confirm what it supports for other brands.
What the vendor documents: HD satellite imagery, AI-assisted 3D modeling and roof detection, and automatic placement using an irradiance map and shading analysis. It also lists automatic stringing and DC cabling, and battery and backup planning. It lists sales proposals with energy simulation, financial analysis and ROI forecasts. It lists integration with AutoCAD, PVsyst and the SolarEdge monitoring platform.
Price (checked October 2026): “No Extra Charges”: free automatic upgrades with no license or subscription fees. The sign-up button reads “Register - No Extra Cost”. Source: SolarEdge Designer.
Limitations: the Designer page we read does not list a CRM or permit documents.
Vendor link: solaredge.com.

SurgePV
SurgePV is our product. SurgePV publishes this list and is one of the vendors on it.
Best for: installers who want roof modeling, layout, shading, yield and financial modeling, and proposals in one web application with a published per-user price.
Not the right choice if:
- you need a self-serve trial. SurgePV offers a guided demo and does not advertise a trial.
- you want a free tool. OpenSolar’s core app is free, but API Access and connectors are charged from 16 April 2026. SolarEdge Designer states no subscription fee.
- you want a full CRM. SurgePV’s published product scope does not list a CRM. OpenSolar lists a Project Management CRM.
- you want to pay per project. SurgePV is priced per user per year, while Pylon publishes a per-project price.
- you need approval from a lender, authority or engineer. SurgePV outputs support design and documentation but do not replace that approval.
What the vendor documents: the pricing page lists these items under “Everything included”. They are unlimited projects, AI solar designing, shadow analysis, generation and financial analysis, proposal generation, 3D embedded designing, DC stringing and free onboarding. For the product detail, see solar design software and solar proposal software.
Price (checked October 2026): $1,899 per user per year for 1 user. $1,499 per user per year for 3 seats ($4,497 for the 3 seats). $1,299 per user per year for 5 seats ($6,495 for the 5 seats). Access starts with a guided demo.
Limitations: results depend on the source data, assumptions and equipment models you use. Pricing, access and contract terms are confirmed in a written quote.
Vendor link: SurgePV solar design software.
Sources and Dates
Vendor pages were read in October 2026, and prices are the figures each vendor published on those pages. The links below are the vendor pages the entries rely on, grouped by tool. SurgePV facts come from its own pricing and demo pages.
- Arka360: automatically generated bill of materials, Arka360 pricing, arka360.com, permit services
- Aurora Solar: Aurora pricing, aurorasolar.com
- HelioScope: HelioScope pricing, helioscope.aurorasolar.com
- OpenSolar: sales page, help article, Why Free?, Enterprise Services, 16 February 2026 post, opensolar.com
- PVsyst: feed-in tariff and self-consumption, single line diagram, PVsyst shop, pvsyst.com
- Pylon: privacy policy, single line diagrams generated from the design, Pylon pricing, getpylon.com
- Scanifly: design services page, Scanifly field operations, scanifly.com
- SolarEdge Designer: SolarEdge Designer

How to Choose Software for a Small Installation Business
Work through these five questions in order.
- How many quotes do you send each month? Use the cost table above. In the table, per-project pricing costs less at low volume, and the per-user cost per project falls as volume grows.
- Which documents must you produce? Single line diagrams, plan sets or PE stamps differ by vendor. OpenSolar, HelioScope, Pylon and Arka360 (Premium) list single line diagrams. PVsyst has an editor for grid-connected systems. Arka360, Aurora Solar and Scanifly sell plan set or permit services. Check which your local authority accepts.
- Who runs the software? If it is the owner, a free or per-project tool lets you try it with little commitment.
- What is your hardware mix? SolarEdge Designer’s page describes designing SolarEdge systems. Mixed-brand shops should check equipment libraries before they commit.
- What is your next segment? Commercial work brings P90 values and larger design limits; HelioScope and PVsyst list them.
For a wider view, see the best solar installer software list and the best solar design software list. If you are watching the budget, compare free solar design software and free solar proposal software. Once quotes become contracts, solar proposal tracking software and solar compliance software cover the next steps.
How We Ordered These Tools
SurgePV publishes this page and is a vendor on this list. Its entry uses the same vendor-page sources and template as every other tool here.
The tools are listed alphabetically, and the matrix records what each vendor documents, not what we saw in use. “Not stated” means the pages we read did not say; the feature may still exist.
| Tool | Price published | Free access | Proposals | Electrical or permit documents | CRM or lead management |
|---|---|---|---|---|---|
| Arka360 | Yes, USD per month | Not stated | Basic proposal (Basic) | Electric single line diagram (Premium and Enterprise); permit services sold separately | Lead management (Basic) |
| Aurora Solar | Yes, USD per user per month | Not stated | Tablet-friendly sales proposals | NEC validation reports; plan sets service | Not stated |
| HelioScope | Yes, USD per license per year | Free trial | Sales proposals (Pro) | Single-line diagrams, CAD export | Not stated |
| OpenSolar | Core app free; API Access and connectors charged | Core app free | Proposals, e-signature | Single line diagram generator; US permitting integrations | Project Management CRM |
| PVsyst | Yes, CHF per year | One-month free trial (product page) | No proposal output found in its help index | Single line diagram editor (grid-connected systems only) | Not stated |
| Pylon | Yes, $ per project | Free credits for five Standard projects | Web and PDF proposals | Automatic single line diagrams | CRM add-on |
| Scanifly | Not stated | Not stated | Integrations with proposal tools | Plan sets, stamped in 48 hours | Not stated |
| SolarEdge Designer | No fee stated | Free to register | Sales proposals | Not stated | Not stated |
| SurgePV | Yes, USD per user per year | Guided demo, no self-serve trial | Proposal generation | DC stringing listed on /pricing; no diagram output named | Published product scope does not list a CRM |
Price published and unit. It matters because a small team needs the monthly cost at its own volume. We did not negotiate quotes, and we left out taxes, add-ons and volume discounts.
Free or trial access. It matters because a small team can test a tool on a real quote before paying. We did not open any trial.
Proposals. It matters because the proposal is what the homeowner sees. We did not compare proposal output.
Electrical or permit documents. It matters because permit paperwork can cost a small team days. We did not check what any authority accepts.
CRM or lead management. It matters because small teams often have no other pipeline tool. We did not test any CRM.
Where SurgePV differs: it lists unlimited projects, shading, financial analysis and proposals in one product, priced per user. Its pricing page does not name a single line diagram output. That is why it is the pick only for the web-based design-to-proposal case.
Not covered in this update: a split of homeowner or consumer apps from installer tools, and a table of per-project fees beyond the figures above.
Frequently Asked Questions
What is the best solar software for a small installer?
It depends on the job. OpenSolar’s core app is free of charge, but the vendor charges for API Access and connectors from 16 April 2026. OpenSolar lists design, proposals, single line diagrams and a project CRM. Pylon charges per project, so cost follows your quote volume. SurgePV and Aurora Solar are priced per user and Arka360 per month, all with published prices. Use the comparison table to match the tool to your quote volume and the documents you must produce.
How much should a small installer spend on solar software?
Published prices range from no fee to a few thousand dollars a year. OpenSolar’s core app is free of charge, but the vendor charges for API Access and supported connectors from 16 April 2026. SolarEdge Designer states no subscription fee. Aurora Solar Basic is $1,620 per user per year billed annually. HelioScope Basic is $1,620 per license per year. SurgePV Individual is $1,899 per user per year. Arka360 Basic is $199 per month. Pylon is $4 or $10 per project (its page does not name the currency). So 10 projects a month is $480 or $1,200 a year at those rates.
Is free solar software good enough for a real business?
OpenSolar says its core app is free of charge and funded by partners. But the vendor charges for API Access and supported connectors from 16 April 2026. Its pages list design, proposals, single line diagrams, e-signature and a project management CRM. It also sells paid support plans from US$500 per month and pay-per-project premium imagery. Check each limit against your own project types before you commit.
Can 1 person run a solar business with software?
Several vendors publish single-user plans. Aurora Solar Basic, HelioScope Basic, Arka360 Basic and SurgePV Individual each include 1 user. Pylon lists unlimited users. Software covers design and proposals. Site visits, installation and permits still need people, and some vendors sell permit services for that.
Do small installers need a CRM?
Not always. OpenSolar lists a Project Management CRM inside a core app the vendor describes as free. Arka360 lists lead management on its Basic plan. Pylon sells a CRM add-on from $49 per user per month billed monthly. SurgePV’s published product scope does not list a CRM. If you already track leads somewhere else, OpenSolar says its API can connect to an existing CRM. But its 16 February 2026 post says API Access is paid from 16 April 2026 while the core app stays free.
What software do small installers use for permits?
Several vendors list permit documents. OpenSolar has a single line diagram generator and permitting integrations for US projects. Arka360, Aurora Solar and Scanifly sell plan set or permit services. Pylon says it generates single line diagrams. Which documents your authority accepts is set locally, so check with the authority before you choose.
Related lists
For related comparisons, see best solar quoting software and best solar software in the United States. For the product behind the SurgePV entry, see solar proposal software and the residential solar page.


