Gujarat routes rooftop applications through state and national systems and has a detailed GERC regulatory history. Because archived SURYA Gujarat material remains searchable, applicants should distinguish the live portal process from old scheme rates and verify current entitlement before contracting. See 5kW Solar Panel Price in India for more. See Best Solar Design Software India for more.
GERC Net Metering Order
The Gujarat Electricity Regulatory Commission (GERC) has issued comprehensive net metering regulations covering residential, commercial, and industrial consumers. Gujarat’s net metering framework is widely considered one of the clearest in India. See Solar Energy India for more.
Key provisions:
- Residential consumers can install net-metered solar up to their sanctioned load
- Commercial consumers can access net metering up to 1 MW
- Export credits are applied at the DISCOM’s APPC — approximately Rs. 3.40 to Rs. 3.80 per unit depending on the DISCOM
- Annual settlement: credits accumulate across billing months and are reconciled annually (surplus paid at APPC or carried forward)
Group Net Metering: GERC explicitly provides for Group Net Metering, allowing a solar installation on a common rooftop (such as a housing society terrace) to distribute generation credits across multiple individual electricity connections in the same consumer group. This mechanism enables apartment societies to collectively benefit from a single rooftop solar installation.
Four DISCOMs: Territory and Process
UGVCL (Uttar Gujarat Vij Company Limited)
Territory: North Gujarat — Ahmedabad (partial rural), Gandhinagar, Mehsana, Patan, Banaskantha, Sabarkantha, Aravalli districts.
Online portal: UGVCL consumer portal for rooftop solar applications.
Note: Gandhinagar area has high residential solar density; transformer capacity checks are relevant here.
MGVCL (Madhya Gujarat Vij Company Limited)
Territory: Central Gujarat — Vadodara, Anand, Kheda, Panchmahals, Dahod, Chhota Udaipur districts.
Online portal: MGVCL consumer services portal.
Note: Vadodara industrial corridor has significant commercial-industrial rooftop demand alongside residential.
PGVCL (Paschim Gujarat Vij Company Limited)
Territory: West Gujarat and Saurashtra — Rajkot, Jamnagar, Bhavnagar, Junagadh, Amreli, Porbandar, Gir Somnath, Morbi, Kutch (Bhuj) districts.
Online portal: PGVCL’s dedicated solar application section.
Note: Kutch district has some of India’s highest solar irradiance. Rajkot has a large SME base with significant commercial rooftop potential.
DGVCL (Dakshin Gujarat Vij Company Limited)
Territory: South Gujarat — Surat, Bharuch, Narmada, Vadodara (partial), Valsad, Navsari, Tapi, Dang districts.
Online portal: DGVCL consumer portal.
Note: Surat’s diamond and textile industries drive commercial-industrial rooftop solar demand. DGVCL’s Surat urban network has experienced transformer saturation in some industrial areas.
Net Metering Limits
| Consumer Category | Net Metering Limit | Export Rate |
|---|---|---|
| Residential (LT) | Up to sanctioned load | DISCOM APPC |
| Commercial (LT) | Up to 1 MW | DISCOM APPC |
| Industrial (HT) | Up to 1 MW | DISCOM APPC |
| Housing Society (Group NM) | Up to total group sanctioned load | DISCOM APPC |
Rooftop Solar Subsidy in Gujarat: Verify the Live Entitlement
As checked on 8 August 2026, the MNRE National Portal’s DISCOM directory routes Gujarat subsidy applications to the SURYA Gujarat system for DGVCL, MGVCL, PGVCL, UGVCL and listed Torrent Power areas. The live SURYA Gujarat FAQ says a new rooftop applicant must select an installer from its empanelled list.
Eligible residential consumers may receive central PM Surya Ghar CFA under the rules and rates displayed in the current application workflow. Commercial and industrial connections are not eligible for that residential CFA. Older SURYA Gujarat resolutions and archived rate documents can remain searchable after budgets, schemes or processes change, so they should not be treated as a current additional cash entitlement.
Before accepting a quote, verify consumer category and name, current CFA for the proposed capacity, any Gujarat assistance actually displayed for that application, the installer entry for the correct licensee, equipment requirements, feasibility, metering, inspection, commissioning, DBT, and every charge outside assistance. Never deduct an unverified subsidy. Show gross project price, confirmed assistance, payment timing and exclusions separately; eligibility and disbursement are government decisions, not installer guarantees.
Disclosure: SurgePV and Heaven Green Energy have a common commercial relationship. This is a relevant Gujarat EPC option, not an independent ranking or subsidy guarantee.
Heaven Green Energy’s official pages document residential rooftop work, PM Surya Ghar support and Gujarat operations. Check its current entry for your exact DISCOM in the official portal, then compare written scope, equipment, warranty, service and price with other eligible bidders. Visit Heaven Green Energy for current service information.
Group Net Metering in Gujarat
Gujarat’s Group Net Metering framework is one of the most clearly defined in India. Key features:
Who can use it: A group of consumers with a common metered connection point — housing societies, apartment complexes, commercial complexes with multiple tenants.
How credits are distributed: The total generation from the common rooftop installation is credited proportionally across the member electricity accounts based on pre-agreed distribution ratios (set in the agreement with the DISCOM).
Size limits: The group system size is typically limited to the aggregate sanctioned load of all member connections.
Application process: The housing society (or group representative) applies to the DISCOM as a group, with a list of all participating consumer account numbers and the agreed credit distribution ratios.
GUVNL Tenders and Commercial Rooftop
GUVNL (Gujarat Urja Vikas Nigam Limited) runs Gujarat’s power procurement, including rooftop solar tenders for government buildings and commercial rooftop capacity. For installers working on projects above standard net metering thresholds:
- GUVNL issues periodic tenders for rooftop solar capacity (in MW) under long-term PPAs
- State government buildings, institutions, and hospitals are tendered separately
- Open access regulations for large commercial consumers who want to source power from dedicated solar projects
Commercial Rooftop Process
For commercial rooftop installations above what residential consumers install, the process is similar but involves:
- Higher application fee tiers
- Three-phase inverter specifications (typically required for systems above 10–15 kW)
- Commercial consumer-specific tariff category documentation
- Potential requirement for energy audit documentation for large HT connections
Solar proposals that clearly present commercial ROI analysis — including GST input credit on system cost, accelerated depreciation for businesses — are particularly effective in Gujarat’s SME-heavy commercial landscape.
Pro Tip: Annual Settlement Is a Strong Selling Point in Gujarat
Gujarat’s annual settlement period means that surplus summer generation (very high in Kutch, Saurashtra) accumulates as credits against winter consumption. This banking benefit can significantly improve the economics vs a monthly-settlement state. When producing solar software proposals for Gujarat customers, show the annual bill savings rather than month-by-month to capture the full banking benefit.
Design Gujarat Rooftop Projects with Four-DISCOM Compliance in Mind
SurgePV generates DISCOM-ready single-line diagrams and ALMM-verified equipment schedules formatted for Gujarat’s four DISCOM application portals.
Book a DemoNo commitment required · 20 minutes · Live project walkthrough
Frequently Asked Questions
What rooftop solar subsidy applies in Gujarat?
Eligible residential consumers can use central PM Surya Ghar CFA subject to current portal, equipment, vendor and DISCOM rules. Verify any additional Gujarat assistance in the live portals; do not rely on an archived document or installer promise.
Which DISCOMs operate in Gujarat?
UGVCL (North), MGVCL (Central), PGVCL (West/Saurashtra), DGVCL (South). Check your electricity bill for your DISCOM.
What is Group Net Metering?
A mechanism allowing a common rooftop solar system to distribute generation credits across multiple electricity connections in the same consumer group. Housing societies are the typical use case. GERC has a clear Group Net Metering framework.
What is the export rate?
Approximately Rs. 3.40–3.80 per unit (DISCOM APPC, set annually by GERC). Annual settlement applies.

