Solar Software Migration: Move Project Data Safely

Solar software migration plan for installers: inventory your data, map fields, run a pilot, cut over safely and keep records. A checklist you can use.

Rainer Neumann

Written by

Rainer Neumann

Editorial contributor · SurgePV

Rainer Neumann

Edited by

Rainer Neumann

Editorial contributor · SurgePV

Published ·Updated

Answer

To migrate solar software safely, inventory what you hold, decide which records you must carry over, and map each field to the new tool before moving anything. Export first, pilot on a few live projects, compare results against the old tool, then cut over and keep the old data readable. Treat design, pricing and customer commitments as items needing human review.

Moving a solar team from one design, proposal or CRM tool to another is a data-control project as much as a software change. Projects in flight carry prices, equipment choices and promises to customers, and each of those can change shape when it moves. This guide gives a plan for moving project data without losing the record of what was agreed.

Last updated: November 2026

SurgePV publishes this post and sells solar design software. The steps below apply to any move between tools.

In this guide:

  • What to inventory before you move
  • How to map and validate fields
  • How to run a pilot and cut over
  • What to keep and for how long
  • A checklist and common failures

Planning a move to a new design tool?

Ask for a walkthrough on one of your own projects before you commit to a migration plan.

Book a Demo

Checking cost first? See the SurgePV pricing page.

What to Inventory Before a Solar Software Migration

Start with a list of what lives in the current tool and who depends on it. A migration fails most often because someone discovers late that a template, report or integration was in use.

Record the following for each system:

  • Active projects: stage, owner and next customer deadline.
  • Finished projects: how often you reopen them for warranty, repowering or audit questions.
  • Equipment and pricing libraries: modules, inverters, racking, adders and labor rates.
  • Templates: proposals, contracts, financing options and branding.
  • Customer records: contact details, consent status and communication history.
  • Integrations: CRM, accounting, permit tools and any automation or API users.
  • Users and permissions: who can edit designs, prices and proposals.

Rank each item by what breaks if it is wrong or missing. A wrong price in a template is worse than a missing photo.

Pro Tip

Pick three recent projects of different types, such as a simple roof, a complex roof and one with storage. Use them as your test set through every step below. They show gaps that a clean example hides.

Decide What to Move and What to Archive

You do not have to rebuild every old project in the new tool. Move what you will keep changing, and archive the rest in a format that stays readable.

Data type Usual approach Why
Active projects Rebuild or import, then verify They carry current commitments
Signed proposals and contracts Archive the signed PDF unchanged The signed document is the record
Closed projects Archive exports, drawings and reports You rarely revise them
Equipment library Recreate from manufacturer datasheets Do not copy a value you cannot trace
Pricing templates Rebuild and approve by the owner Wrong prices are costly
Customer contacts Export and import with consent status Preserve opt-outs
Hourly production files Export as CSV where offered Lets you compare results later

An hourly production file for a full year has 8,760 rows (365 days times 24 hours), so check row counts after any export. Whether a given tool offers such an export is a question for that vendor, and its own help pages are the only reliable answer.

How to Map Fields and Check Data Quality

Map each field in the old tool to a field in the new one, and write down what happens when there is no match. Do this before moving a single project.

For each material field, record four things: its source, its owner, the event that updates it, and how you will check it after the move. Examples of material fields are system size, module and inverter models, tilt and azimuth, shading assumptions, utility rate, financing terms and the customer’s address.

Check these problems before importing:

  • Duplicates: the same customer in two records.
  • Units: feet versus metres, kW versus kWp, monthly versus annual figures.
  • Dates and time zones: especially for interval data.
  • Stale values: old equipment, expired incentives and out-of-date tariffs.
  • Free-text notes: these rarely map, so decide where they will live.

If a normal input is missing or disputed, write an exception with an owner and a release condition so an urgent deal does not skip the record.

Export First and Check the Export

Export from the old tool before you change anything, and open the files to prove they are complete. An unchecked backup is not a backup.

  1. Export the data in the most open format the tool offers, such as CSV for tables and PDF or DXF for drawings.
  2. Count rows and files against what you see in the tool.
  3. Open a sample file in a different program to confirm it is readable.
  4. Store a copy outside the old tool, with access limited to the people who need it.
  5. Note the date, the tool version and who ran the export.

Customer data also has legal weight. Under the EU GDPR, a person can ask for personal data they provided to be given to them in a “structured, commonly used and machine-readable format” where processing is based on consent or a contract and done by automated means, per GDPR Article 20. If you serve customers in the EU or UK, make sure your export and your new tool can honour that request, and ask your legal adviser what applies to you.

Run a Pilot on Live Projects

Move a small, bounded set of real projects first and run them side by side with the old tool. The pilot proves the workflow, not only the data.

Choose your test projects and compare, for each one:

  • System size and bill of materials
  • Annual energy production
  • Shading assumptions and losses
  • Pricing and financial outputs
  • The final customer-facing proposal

Small differences are normal because tools use different models and default assumptions. Large ones need an explanation before you trust the new tool. For an independent sanity check, run the same location and system size through a public estimator such as the PVWatts Calculator, run by the National Laboratory of the Rockies, which estimates production for grid-connected PV systems. It will not match any design tool exactly, but a large gap is a prompt to check inputs.

Key Takeaway

A field that arrives from another system has been transferred, not validated. Check each material value against the site evidence, scope, equipment datasheet and customer instruction before it appears in a proposal or purchase order.

Cut Over and Keep a Way Back

Set a cutover date, tell the team and customers what changes, and keep the old tool readable until the new records pass review. Do not switch the team on the busiest week of the quarter.

  • Freeze edits in the old tool at the cutover time, and say so in writing.
  • Move the final changes, then verify the active projects one by one.
  • Keep the old subscription or read-only access until your last audit date for those projects has passed.
  • Agree who answers questions during the first two weeks, and how issues get logged.
  • Tell customers with open proposals if links or documents will change.

If you are moving to SurgePV, the pricing page lists annual per-user prices that fall as team size rises. Treat licence cost as one line in the plan, not the whole business case.

SurgePV published annual price per user by plan size (USD per user per year)
  • 1 user$1,899
  • 3 users$1,499
  • 5 users$1,299

Source: SurgePV pricing page (public list prices, annual billing), checked November 2026.

Prices, product access and contract terms should be confirmed in a written quote.

Train People and Review

Training is part of the migration. Walk each role through its own tasks on the pilot projects, then run a review two to four weeks after cutover.

At the review, check what the team still does outside the new tool, which exceptions came up, which reports are missing and whether customers saw anything wrong. Update your field map and checklist from what you learn.

See a real project move through the workflow

Book a guided demo to review design, financial modeling and proposal output on a project you choose.

Book a Demo

Checking cost first? See the SurgePV pricing page.

Migration Checklist

  • Inventory of data, templates, integrations and users completed
  • Test set of three varied projects chosen
  • Field map written, with an owner for each material field
  • Exports taken, counted, opened and stored outside the old tool
  • Equipment values traced to manufacturer datasheets
  • Pilot run side by side, with differences explained
  • Customer consent and opt-outs preserved
  • Cutover date and freeze communicated
  • Old data kept readable through the audit period
  • Review held two to four weeks after cutover

Common Migration Failures

  • No owner: nobody decides which system holds the master record.
  • Copying by habit: every old field moves, including ones nobody uses.
  • No pilot: the first live proposal is the first test.
  • Silent unit errors: a kW value read as kWp or a metre read as a foot.
  • Lost context: notes and approvals stay behind in the old tool.

For migration-specific pages on named design tools, see the SurgePV migration section and the Aurora Solar to SurgePV move plan.

Evidence and Limits

The National Laboratory of the Rockies photovoltaic research pages and the U.S. Department of Energy Solar Energy Technologies Office give public context on PV technology and costs. They do not validate any single project or any one tool. This guide is desk research, and it does not replace local requirements, engineering review, contracts or manufacturer documentation.

SurgePV’s solar design software supports a connected workflow from roof model to proposal. It does not promise a particular speed, approval or production result, and its import options are not published, so ask for them in writing. To plan a move, book a demo or check the pricing page.

Frequently Asked Questions

How do you migrate solar design software without losing project data?

Export everything you need before you touch the new tool, then verify the export opens and is complete. Map each field from the old system to the new one, pilot on a few live projects and keep the old data readable until the new records have been checked.

What data should you move when changing solar software?

Move what you still act on: active projects, equipment and pricing templates, customer contact records, signed proposals and the files needed for permits and warranties. Archive finished projects in a readable export instead of rebuilding them, unless you expect to revise them.

How long does a solar software migration take?

No published benchmark applies to every team, because it depends on project count, data quality and training. Plan it as stages: inventory, mapping, a pilot on live projects, cutover and a review. Set the dates from your own project calendar, not from a vendor claim.

Can solar software migration replace professional review?

No. A migration moves records, and it does not approve designs. Site data, engineering, pricing and customer commitments still need review by the responsible person, and anything that changes in the new tool should be checked before it reaches a customer.

Can I import projects from Aurora Solar or other tools into SurgePV?

SurgePV does not publish a list of file types it imports from other design tools, so no promise is made here. Ask for the answer in writing at a demo before you plan around it, and check the per-tool pages on the SurgePV migration section.

Sources

Primary research and reference material used for this desk-research article.

Where this fits

This article is part of SurgePV's Solar Business & Operations hub, which works through the topic from first principles to the decisions a project team actually has to make.

Black Friday deal

Still Designing Solar the Hard Way?

This Black Friday, get 20% off annual plans or 10% off monthly plans and experience AI-powered roof modelling, advanced shading analysis and professional solar proposals.

Claim the Black Friday deal

Hurry! Offer ends December 1.Last chance: offer ends December 1.

About the Contributors

Author
Rainer Neumann
Rainer Neumann

Editorial contributor · SurgePV

Rainer Neumann is credited as an editorial contributor on SurgePV content. This profile does not assert engineering credentials, project totals, software-testing experience, education, speaking engagements, or media citations because independent verification evidence is not retained in the publication record.

Editor
Rainer Neumann
Rainer Neumann

Editorial contributor · SurgePV

Rainer Neumann is credited as an editorial contributor on SurgePV content. This profile does not assert engineering credentials, project totals, software-testing experience, education, speaking engagements, or media citations because independent verification evidence is not retained in the publication record.

Get Solar Design Tips in Your Inbox

Join 2,000+ solar professionals. One email per week - no spam.

No spam · Unsubscribe anytime

Book Free DemoBlack Friday: 20% off

Choose which optional technologies SurgePV may use. Essential storage remains active for security and requested features.