Back to Blog
solar design18 min read

NSRDB Solar Data: NREL Irradiance for PV Design

NSRDB solar data explained: what NREL's radiation database contains, its 4 km and 30-minute resolution, reported accuracy and how to use it in PV design.

Keyur Rakholiya

Written by

Keyur Rakholiya

CEO & Co-Founder · SurgePV

Rainer Neumann

Edited by

Rainer Neumann

Editorial contributor · SurgePV

Published ·Updated

Answer

The NSRDB is NREL's free, satellite-derived solar resource database. Its standard product gives GHI, DNI, DHI and weather variables on a 4 km grid at 30-minute steps, and newer GOES-based data offers 2 km and 5-minute resolution from 2019. Designers use it to screen sites and estimate yield, then validate bankable projects with ground data.

Last updated: November 2026

Solar resource data decides how much a system will produce. Using PVGIS-ERA5 as an illustration, a 1 kWp south-facing array yields about 1,826 kWh a year in Phoenix and about 1,165 kWh in Seattle, so the Seattle system produces roughly 36% less. For most US solar designers, the data behind that kind of gap comes from one source: the National Solar Radiation Database.

NREL’s NSRDB feeds tools such as PVWatts and SAM, and PVsyst documents how to import it. NREL is now called the National Laboratory of the Rockies, but the dataset and most documentation still use the NREL name. NSRDB is free, serially complete and updated annually. Yet many designers treat it as a black box. They enter an address, accept the default weather file, and move on without understanding the resolution, uncertainty or limits baked into the numbers.

That gap matters. Annual energy scales roughly in proportion to irradiance, so a 5% irradiance error becomes roughly a 5% yield error, which can shift payback on a commercial project. This guide explains what NSRDB data contains, how it is produced, where it is accurate, where it falls short and how to use it in a design workflow.

In this guide:

  • What the NSRDB is and which datasets it offers in 2026
  • The solar radiation components and meteorological variables included
  • How NSRDB data moves from satellite imagery to energy yield output
  • Accuracy benchmarks and real limitations designers should know
  • How to access and download NSRDB data for a project site
  • How to carry the data into design, financial and proposal work

Turn Irradiance Into a Yield and Payback Model

SurgePV covers shading analysis, energy-yield modeling and financial modeling in one project, so weather data ends up in a customer-ready proposal.

Book a Demo

No commitment required · 20 minutes · Live project walkthrough, or see the SurgePV pricing page


What Is the NSRDB and Why Solar Designers Use It

The National Solar Radiation Database (NSRDB) is a collection of solar irradiance and meteorological time-series datasets maintained by the National Renewable Energy Laboratory (NREL). It is a widely used solar resource input for US design, simulation and financial modeling tools.

The modern NSRDB is built from satellite imagery rather than ground station networks. Earlier versions relied heavily on airport weather observations. The current Physical Solar Model (PSM) uses geostationary satellite radiance measurements, physical radiative transfer models, and reanalysis data to produce continuous coverage across the United States and an expanding set of international locations.

Designers use NSRDB data for four core tasks:

  1. Site screening: Compare resource quality across candidate locations before detailed design.
  2. System sizing: Convert irradiance into expected kWh/kWp for module and inverter selection.
  3. Energy yield modeling: Feed hourly or sub-hourly data into simulation engines for P50/P90 analysis.
  4. Financial forecasting: Link production estimates to savings, payback, and IRR calculations.

Because NSRDB is free and covers the entire US with consistent methodology, it removes the cost barrier that used to force small installers to guess resource values from regional maps. A designer in Boise starts from the same dataset as a large engineering firm in New York, at least for the initial design stage.

The database is updated annually. Per the Data.gov catalog entry, it now covers 1998 to 2025. NREL continues to refresh older years when model improvements are released, so the historical record is periodically reprocessed rather than frozen. This is important for long-term yield studies: the 1998 data you download today may have been recalculated with a newer algorithm than the same year downloaded five years ago.


NSRDB Data Products and Resolution in 2026

Not all NSRDB files are the same. The database contains several products with different spatial coverage, temporal resolution, and intended use cases.

Physical Solar Model Version 3 (PSMv3)

The Physical Solar Model version 3 (PSMv3) is the standard NSRDB product most designers encounter. According to the NSRDB catalog entry on Data.gov, the standard product provides:

  • Coverage: The United States and a growing list of international locations
  • Spatial resolution: 0.038 degrees latitude/longitude, nominally 4 km × 4 km
  • Temporal resolution: 30 minutes
  • Time period: 1998-2025, updated annually
  • License: Creative Commons Attribution 4.0, public access

The 4 km grid is small enough to capture broad geographic differences, such as the rain shadow east of the Cascade Range or the elevation gradient between Denver and the plains. It is not fine enough to resolve a single rooftop shaded by a neighboring building or a narrow coastal fog band.

GOES-R 5-Minute and 2 km Data

From 2019 onward, NREL provides newer GOES-based NSRDB data at higher resolution. The Data.gov entry lists 2 km spatial resolution, with time steps of 5 minutes for the US and 10 minutes for North, Central and South America. The ESIG Weather Dataset Needs report (2023) also describes this product. In summary:

  • Spatial resolution: 2 km × 2 km
  • Temporal resolution: 5 minutes (US), 10 minutes (Americas)

The higher cadence matters for distributed solar studies, battery dispatch modeling, and grid interconnection analysis where ramp rates and short-term variability affect export limits or storage cycling. It is overkill for a simple residential production estimate, but valuable for commercial and industrial projects with time-of-use rate structures.

Typical Meteorological Year (TMY)

TMY datasets are synthetic one-year files built by selecting representative months from the multi-year PSM record. They are designed for standardized system comparisons, not for capturing interannual variability. If you are comparing two inverter topologies or two module technologies at the same site, TMY is appropriate. If you are building a P90 bankability case, use the full PSM time series. PVsyst’s NSRDB import documentation describes how TMY and multi-year files are handled in professional simulation workflows.

International Extensions

NREL has extended NSRDB coverage beyond the United States with region-specific satellite inputs. Coverage, resolution and time period differ by region, so international projects should check which product exists for their exact coordinates before relying on it.

Product Coverage Resolution Best for
Standard PSM US and a growing list of international locations 4 km, 30 min, 1998-2025 General solar design and yield analysis
GOES-based US (5 min), Americas (10 min), from 2019 2 km Storage, ramp-rate and time-of-use studies
TMY Derived from the PSM record One synthetic year Equipment comparison and standardized modeling
NSRDB spatial resolution: standard vs GOES-based product (grid cell size, km)
  • Standard PSM4 km
  • GOES-based (2019 onward)2 km

Source: NREL NSRDB entry on Data.gov, checked November 2026.

Version History and Reprocessing

The NSRDB has moved through several major versions. The early NSRDB editions were built from ground observations at US weather stations. The modern PSM era brought satellite-derived irradiance and a much finer grid.

NREL periodically reprocesses the entire historical record when models improve. Model updates can change cloud property retrieval, aerosol handling and time-shifting methods. This means a 2005 weather file downloaded today may not match the same year downloaded in 2018. For most designers, the newer version is better. For long-term portfolio analysis, consistency across projects matters more than using the absolute latest version, so document which release you used.


What Variables Are Included in NSRDB Files

A solar designer does not just need irradiance. Temperature, wind, and albedo all affect real-world performance. NSRDB provides a bundled set of variables that allow complete PV simulation without searching multiple sources.

Core Solar Irradiance Components

The three fundamental irradiance values are:

  • GHI (Global Horizontal Irradiance): Total solar radiation on a horizontal surface, including direct and diffuse components.
  • DNI (Direct Normal Irradiance): Direct beam radiation perpendicular to the sun’s rays.
  • DHI (Diffuse Horizontal Irradiance): Scattered radiation on a horizontal surface from the sky dome, excluding the direct beam.

These three are related by the equation:

GHI = DHI + DNI × cos(zenith angle)

If your simulation tool asks for GHI only, it internally decomposes GHI into DNI and DHI using a decomposition model. If you have access to all three components directly from NSRDB, you can skip that estimation step and reduce one source of uncertainty. See our solar irradiance GHI DNI DHI guide for a deeper explanation.

Meteorological and Ancillary Variables

NSRDB also provides:

  • Air temperature
  • Dew point
  • Relative humidity
  • Wind speed and direction
  • Surface pressure
  • Precipitable water vapor
  • Aerosol optical depth (AOD)
  • Surface albedo
  • Solar zenith angle
  • Cloud type and cloud optical depth
  • Fill flags indicating missing or gap-filled data

Temperature feeds directly into module temperature and power derating. Wind speed affects convective cooling of the array. Albedo matters for bifacial gain estimates. Aerosol optical depth helps explain why some desert sites show lower production than raw irradiance would suggest.


How NSRDB Data Flows Into Solar Energy Calculations

The NSRDB pipeline transforms raw satellite measurements into usable design inputs through several modeling steps, described in Sengupta et al. (2018). Understanding this chain helps designers judge when the output is trustworthy and when it needs ground validation.

Step 1: Satellite Cloud Detection

The process starts with geostationary weather satellites, primarily the GOES series for the Americas. The PATMOS-x algorithm developed by the University of Wisconsin identifies cloud properties, including cloud type, optical depth, and effective radius, from half-hourly visible and infrared radiance images.

Step 2: Clear-Sky and Cloudy-Sky Radiation Modeling

For clear-sky conditions, NSRDB uses the REST2 radiative transfer model to compute GHI and DNI. REST2 accounts for aerosols, water vapor, ozone, and other atmospheric constituents.

For cloudy skies, NSRDB uses the Fast All-sky Radiation Model for Solar Applications (FARMS). FARMS combines satellite cloud properties with atmospheric profiles to estimate GHI under cloud cover. DNI in cloudy conditions is derived using the DISC model or, in more recent implementations, FARMS-DNI, a physics-based approach that reduces the historical overestimation of direct beam under overcast skies.

Step 3: Ancillary Data Integration

Variables such as aerosol optical depth, precipitable water vapor, temperature, wind, and surface albedo come from NASA’s MERRA-2 reanalysis dataset. These inputs fill gaps that satellite radiance alone cannot resolve, particularly aerosol loading and atmospheric moisture.

Step 4: Time-Series Output for Simulation Tools

The final product is a gridded time series that simulation tools ingest. PVWatts uses NSRDB data to estimate annual production quickly, and SAM allows more detailed configuration. Design platforms apply module, inverter, shading and loss models on top of a weather dataset. Which dataset a platform uses varies by vendor and region, so ask.

The quality of that forecast depends on more than the irradiance data. Shading, soiling, snow, mismatch, and temperature losses often exceed the underlying irradiance uncertainty. A designer with perfect weather data but poor shading assumptions will still produce a poor yield estimate.


NSRDB Accuracy, Validation, and Limitations

NSRDB is widely trusted, but it is not perfect. Knowing where it excels and where it breaks down separates reliable designs from optimistic ones.

Reported Accuracy Benchmarks

NSRDB has been validated against ground-based radiation networks. One caution: the first published headline figures of roughly 5% for GHI and 10% for DNI were later corrected. A 2018 note in Renewable and Sustainable Energy Reviews reported hourly-average bias of about -2.6% to 4.0% for GHI and about -2.7% to 15.9% for DNI across seven SURFRAD stations (PSM v3, 1998 to 2016), depending on location.

Component Reported bias range Basis
GHI (hourly average) about -2.6% to 4.0% Seven SURFRAD stations, PSM v3, 1998-2016
DNI (hourly average) about -2.7% to 15.9% Seven SURFRAD stations, PSM v3, 1998-2016

Hourly errors are larger than daily or monthly errors because satellite models struggle to place individual clouds at exactly the right time. DNI is the hardest component to model.

Upper end of reported NSRDB bias vs ground stations (% bias, hourly average)
  • GHI4 %
  • DNI15.9 %

Source: Renewable and Sustainable Energy Reviews validation note (2018), seven SURFRAD stations, checked November 2026.

A 2023 NREL study in Solar Energy added the physics-based FARMS-DNI model to the NSRDB algorithm. Validated against 19 surface sites, it reduced the significant DNI overestimation in the conventional NSRDB at all sites, with the largest benefit under overcast conditions.

Key Takeaway

Treat GHI as the more reliable output and DNI as the one to check. If your project depends on direct beam, such as trackers or concentrating systems, validate against ground data near the site.

Where NSRDB Performs Well

NSRDB works best in regions with:

  • Stable, sunny climates with low cloud variability
  • Flat terrain without sharp elevation changes within a 4 km cell
  • Low aerosol variability
  • Good satellite coverage

The Southwestern United States, large parts of the Great Plains, and similar arid or semi-arid regions generally show the smallest errors.

Where NSRDB Struggles

Accuracy degrades in areas with:

  • Persistent coastal fog or marine layers
  • Complex topography that creates microclimates smaller than 4 km
  • Rapid weather transitions, such as afternoon thunderstorms
  • High aerosol loading from wildfires, dust storms, or urban pollution
  • Polar or high-latitude regions with low sun angles and snow albedo effects

A rooftop in San Francisco’s Sunset District may sit under a persistent marine layer while a site three miles inland sees clear skies. NSRDB’s 4 km cell would blend those two microclimates into a single resource value. The same issue appears in mountainous regions, where valley fog and peak sunshine coexist within one grid cell.

For high-latitude sites such as Alaska, check the current coverage notes and consider a second data source.

The Microclimate Problem

The 4 km grid averages everything inside a cell. A project on a coastal bluff may share a cell with inland hills. A downtown rooftop may share a cell with a park. NSRDB cannot resolve building-scale shading, local heat island effects, or persistent fog pockets. For projects where these factors matter, designers should supplement NSRDB with on-site measurements or higher-resolution datasets.

The Tradeoff: Free vs. Bankable

NSRDB is sufficient for proposal generation, feasibility studies, and preliminary financing. Most residential installers and many commercial designers use it as the primary resource input. For project finance and lender due diligence, financiers often require Solargis, Meteonorm, or measured ground data with a longer validation period. The free dataset gets you to a confident design; the bankable dataset gets you to funding.


How to Access and Download NSRDB Data for a Project

There are three common ways to pull NSRDB data into a project.

Option 1: NREL NSRDB Viewer

The NREL NSRDB Viewer is an interactive map interface. You select a location, choose a dataset and time range, and download the file. This is the easiest path for one-off projects or quick site screening. Files are available in CSV and NetCDF formats.

Option 2: NREL API

For automated workflows, the NREL API returns NSRDB data programmatically. A typical request includes:

  • Latitude and longitude
  • Dataset name, such as psm3-2-2 or psm3-5min
  • Attributes requested (GHI, DNI, DHI, temperature, wind speed, etc.)
  • Time period and interval
  • API key

API access is useful for companies that want to pre-populate resource data across many leads or add solar resource lookup to a CRM.

Option 3: Solar Design Software

Most design platforms look up weather data for you when you enter an address. That removes manual download and formatting steps and reduces the risk of using the wrong coordinate or time zone. Ask your vendor which dataset it uses and how to see the source.


From Resource Data to Design, Finance and Proposals

Raw NSRDB data is only the starting point. The value comes from turning irradiance into production, finance and proposal outputs. SurgePV’s published scope covers 3D roof modeling, shading analysis, energy-yield modeling, financial modeling and proposal generation, and results depend on the source data and assumptions you use.

  • Design: Solar design software is where array layout and equipment choices meet the resource data. For a system-level walkthrough, see our guide on how to design a solar system.
  • Shading: Irradiance data tells you how much sun reaches a neighborhood. Shadow analysis estimates how much reaches the specific roof, which a 4 km grid cannot do.
  • Finance: The generation and financial tool links a production forecast to tariffs, incentives and financing so you can test payback and cash flow.
  • Proposals: Solar proposals turn the design and financial model into a customer-ready document.

Check Your Weather Data Against a Real Roof

Walk through a project from site lookup to shading, yield and a customer proposal, and see where your resource assumptions show up.

Book a Demo

No commitment required · Live project walkthrough · Costs first? See the SurgePV pricing page


Practical Design Checklist for NSRDB Users

Before closing a design based on NSRDB data, run through this checklist:

  • Confirm the dataset version and resolution match the project needs
  • Verify the selected grid cell represents the actual project terrain
  • Cross-check annual GHI against regional reference maps, a solar panel output calculator by location, or a second data source
  • Review the TMY vs. PSM choice based on whether you need typical or long-term statistics
  • Apply realistic soiling, shading, and mismatch losses on top of the weather file
  • Document the NSRDB product name, time period, and download date in the project file
  • For financing-grade reports, validate with ground measurements or the dataset your lender requires

Pro Tip

Download the weather file for your site and one for a site 20 km away. If annual GHI differs a lot, your project may sit near a microclimate boundary, and a ground-measured check is worth the cost.


Putting NSRDB Data to Work

Solar resource data is the foundation of every production estimate, payback calculation, and customer proposal. Three actions will improve your designs immediately:

  1. Match the dataset to the decision. Use the standard PSM for design iteration, GOES-based high-resolution data for storage and ramp studies, and TMY for standardized comparisons.
  2. Treat NSRDB as a regional average, not a site measurement. Add site-specific shading, soiling, and temperature losses rather than trusting the raw irradiance number.
  3. Standardize the workflow. Use one documented data source and one set of loss assumptions across projects, whether you pull the data through the API or through your design software.

To see how irradiance data flows through design, shading and financial modeling in one workflow, book a SurgePV demo or read our GHI, DNI and DHI guide.


Frequently Asked Questions

What is NSRDB solar data?

NSRDB stands for National Solar Radiation Database. It is a free, satellite-derived dataset from NREL that provides solar irradiance (GHI, DNI, DHI) and meteorological variables as a serially complete time series for the United States and a growing list of international locations. The Data.gov entry lists coverage from 1998 to 2025.

Is NSRDB data free to use for commercial solar projects?

Yes. The Data.gov entry lists NSRDB under a Creative Commons Attribution 4.0 license with public access, so it can be used for commercial screening, feasibility and preliminary yield work with attribution. Lenders often ask for additional validation, such as ground measurements or an independent resource assessment, so check your financier’s requirements.

What is the resolution of NSRDB data?

The standard NSRDB product is 30-minute data on grid cells of 0.038 degrees, nominally 4 km. Newer GOES-based data from 2019 onward is available at 2 km resolution, with 5-minute time steps for the US and 10-minute steps for North, Central and South America, per the Data.gov entry.

How accurate is NSRDB compared to ground measurements?

Accuracy varies by component and location. A 2018 validation note in Renewable and Sustainable Energy Reviews reported hourly bias of about -2.6% to 4.0% for GHI and about -2.7% to 15.9% for DNI at seven SURFRAD stations. DNI is the harder component, so check critical projects against local ground data.

How do I download NSRDB data for a specific location?

Use the NSRDB Viewer to pick a location, dataset and time range, or call the NREL API with latitude, longitude, dataset name and an API key. Files come in formats such as CSV. Many design tools also look up weather data for you when you enter an address, so ask your vendor which dataset it uses.

What is the difference between NSRDB PSM and TMY data?

PSM (Physical Solar Model) is the full multi-year time series. TMY (typical meteorological year) is a synthetic single year built by selecting representative months from that record. Use the full series for long-term yield and P90 analysis, and TMY for standardized comparisons between equipment options.

Should I use NSRDB or Meteonorm for my solar project?

Use NSRDB for free US resource screening and early design iteration. Consider Meteonorm, Solargis or ground measurements when a lender requires them, for international sites outside NSRDB coverage, or where microclimates are smaller than the 4 km grid. Check what your financier accepts before you choose.

Where this fits

This article is part of SurgePV's Solar Design hub, which works through the topic from first principles to the decisions a project team actually has to make.

About the Contributors

Author
Keyur Rakholiya
Keyur Rakholiya

CEO & Co-Founder · SurgePV

Keyur Rakholiya is identified by SurgePV as its CEO and a company co-founder. His SurgePV author page lists only role information that can be tied to the public profile below; credentials, project totals, testing claims, media appearances, and speaking engagements are not asserted without retained evidence.

Editor
Rainer Neumann
Rainer Neumann

Editorial contributor · SurgePV

Rainer Neumann is credited as an editorial contributor on SurgePV content. This profile does not assert engineering credentials, project totals, software-testing experience, education, speaking engagements, or media citations because independent verification evidence is not retained in the publication record.

Get Solar Design Tips in Your Inbox

Join 2,000+ solar professionals. One email per week - no spam.

No spam · Unsubscribe anytime

Book Free Demo

Choose which optional technologies SurgePV may use. Essential storage remains active for security and requested features.