Back to Blog
solar policy9 min read

Italy Solar Incentives 2026: Superbonus and RID

Italy solar incentives for 2026: the 50% and 36% renovation deduction, Superbonus status, Ritiro Dedicato and energy community tariffs.

Akash Hirpara

Written by

Akash Hirpara

Co-Founder · SurgePV

Rainer Neumann

Edited by

Rainer Neumann

Editorial contributor · SurgePV

Published ·Updated

Answer

Italy's main 2026 solar incentive for homes is a tax deduction: 50% of costs for a main home and 36% for other homes, up to €96,000, claimed over 10 years. The last Superbonus rate is for 2025 spending. Scambio sul posto is closed to new plants. New plants can use Ritiro Dedicato or join an energy community.

Last updated: November 2026

The 2026 picture for Italian solar is short. The renovation deduction, Ritiro Dedicato and the energy community tariff are open. Superbonus and scambio sul posto are not available for new 2026 projects. The rest of this page gives the rates, the dates and the rules, with the official source for each. Three things are still open in 2026: the renovation deduction, Ritiro Dedicato, and the incentive tariff for energy communities. The other rows are closed, or have an end date that may have passed.

Quoting an Italian rooftop in 2026?

Model the roof, yield and the deduction in one proposal so the client sees the net cost.

Book a Demo

No commitment required, 20 minutes, live project walkthrough. Checking cost first? See the SurgePV pricing page.

Italy solar incentives in 2026: status table

Incentive Rate Limit Who qualifies Status Source
Renovation deduction (bonus ristrutturazioni) 50% for a main home, 36% for other homes (2025 and 2026 spending) €96,000 per property unit Owner or holder of a real right of use. Renters get 36% Open. Falls to 36% and 30% for 2027 spending Agenzia delle Entrate
Superbonus 110% to end 2023, 70% in 2024, 65% in 2025 Not covered here Condominiums, owners of 2 to 4 units, some non-profits No 2026 rate listed Agenzia delle Entrate
Scambio sul posto (net metering) Closed to new plants Plant in service by 29 May 2025. Request by 26 Sept 2025 Existing plants Closed ARERA 78/2025
Ritiro Dedicato (RID) The GSE buys the power you feed into the grid Not stated here New and existing plants Open ARERA 78/2025
Energy community (CER) tariff 20-year tariff on shared energy 5 GW in total, until 31 Dec 2027 Plants up to 1 MW in a community Open under the rules (use of the 5 GW not checked) MASE operating rules
CER grant (PNRR) Up to 40% of eligible cost Plants up to 1 MW Towns under 5,000 people Rules say until 30 June 2026, a date that has passed MASE operating rules
Conto Energia (feed-in tariff) Closed 6 July 2013 EUR 6.7 billion a year cap None Closed ARERA 250/2013

Sources are named in the sections below. GSE is the Gestore dei Servizi Energetici, the state energy services company. ARERA is the national energy regulator. MASE is the environment and energy ministry. IRPEF is Italian personal income tax.

Key Takeaway

For a private owner in 2026, the renovation deduction is the main route: 50% on a main home, 36% on other homes, on up to €96,000, spread over 10 years. Superbonus and scambio sul posto are not available for new 2026 projects.

How does the renovation deduction work for solar panels?

The renovation deduction cuts your IRPEF bill by a share of what you spend. The tax agency, Agenzia delle Entrate, lists these rates:

Spending year Main home (owner) Other homes Spending limit
2025 and 2026 50% 36% €96,000 per unit
2027 36% 30% €96,000 per unit
2028 to 2033 30% 30% €48,000 per unit

The deduction is split into 10 equal yearly parts (Agenzia delle Entrate, renovation guide, February 2026). To get the higher rate, you must own the home or hold a real right of use, such as usufruct. Renters and family members who live there get the lower rate.

Solar panels qualify. The tax agency’s guide lists a PV system as an eligible energy-saving work. It also lists storage systems among the works whose data go to ENEA. The system must serve the home. Two more rules come from the tax agency’s resolution 22/E of 2 April 2013. The deduction is excluded when selling the extra power counts as a business activity, and it gives a system over 20 kW as an example. You cannot combine the deduction with a feed-in incentive tariff. The resolution is from 2013, so check that the rule still holds.

Pay with the special bank transfer for tax deductions. It must show the reason for the payment, the tax code of the person who gets the deduction, and the tax code or VAT number of the firm doing the work. Send the works data to ENEA, the national energy agency, within 90 days of the end of the works. The tax agency’s guide adds that, without a specific rule, a missing or late ENEA filing does not by itself cost you the deduction. Still, file on time.

A worked example

Say a 6 kWp system costs €9,000 and the client owns the main home.

  • Deduction at 50%: €9,000 x 0.50 = €4,500.
  • Yearly part: €4,500 / 10 = €450 for 10 years.
  • For a second home at 36%: €9,000 x 0.36 = €3,240, or €324 a year.

The deduction lowers the IRPEF you owe. Check that your client pays enough IRPEF to use each yearly part before you quote “50% back”.

Pro Tip

Before you quote the deduction, ask the client for last year’s IRPEF amount. If it is under €450 a year, a 50% deduction on a €9,000 system cannot be used in full.

Is the Superbonus still available?

The last Superbonus rate on the tax agency’s page is for 2025. The page lists 110% for spending up to 31 December 2023, 70% for 2024, and 65% for 2025. The 65% rate needed certain paperwork to be filed by 15 October 2024. The page lists no Superbonus rate for 2026 spending.

Source: Agenzia delle Entrate, Superbonus. If a seller offers you a “110%” deal for a 2026 project, ask for the legal basis in writing.

For the full history and how it ended, see our Superbonus guide.

What replaced feed-in tariffs and scambio sul posto?

A feed-in tariff is a fixed price paid for each kWh you make (see feed-in tariff). Italy’s version was the Conto Energia. The fifth edition ended on 6 July 2013. The regulator ARERA set that date after the cost of the scheme reached EUR 6.7 billion a year (ARERA decision 250/2013/R/efr).

Scambio sul posto is Italy’s net metering scheme (see net metering). It is closed to new plants. ARERA decision 78/2025/R/efr says plants that start up after 29 May 2025 cannot use it. For plants that qualified, the request had to reach the GSE by 26 September 2025. The decision also says existing agreements are not renewed after 15 years.

New plants can use Ritiro Dedicato instead. The ARERA decision says new plants can sell the power they feed in under Ritiro Dedicato, which follows ARERA decision 280/07. We do not quote a RID price here. Prices change, so read the current GSE terms before you build a payback model.

Source: ARERA decision 78/2025/R/efr. For the history of the tariffs, see our Italy feed-in tariffs guide.

What are energy community incentives (CER)?

A renewable energy community (CER, Comunità Energetica Rinnovabile) is a group that shares power from local plants. The GSE pays a tariff on the energy that is shared. It pays for 20 years. The rules come from MASE decree 414/2023 (the “CACER” decree), and the details are in the MASE operating rules.

The decree sets aside 5 GW of capacity, available until 31 December 2027. A plant can be up to 1 MW.

The base tariff depends on plant size:

Plant size Base tariff Ceiling (before the zone add-on)
Up to 200 kW €80 per MWh €120 per MWh
Above 200 kW to 600 kW €70 per MWh €110 per MWh
Above 600 kW €60 per MWh €100 per MWh

The tariff adds the amount by which the hourly market price falls below €180 per MWh. It never goes above the ceiling. The operating rules add €4 per MWh for plants in central regions and €10 per MWh for plants in northern regions. The rules cut the tariff if the plant also gets a capital grant. With a 40% grant, the tariff is cut by half.

The same rules describe a grant of up to 40% of eligible cost, paid from the PNRR (Italy’s recovery plan). It is for plants up to 1 MW in towns with fewer than 5,000 people. The rules say it applies until 30 June 2026, within a budget of EUR 2.2 billion. Check the GSE site for any later date.

Energy community base tariff by plant size (euros per MWh, before ceiling and zone add-on)
  • Up to 200 kW€80
  • 200 to 600 kW€70
  • Above 600 kW€60

Source: MASE CACER operating rules (decree 414/2023), checked November 2026.

For an installer, a CER can be an option for a roof that would export most of its power. Each community has a representative, called the Referente in the rules, who deals with the GSE. Ask who that is and how you will be paid.

Compare incentive routes on a real roof?

Set yield, tariff and cash flow in SurgePV, then show the client payback with and without the deduction.

Book a Demo

Guided demo, 20 minutes, no commitment. Checking cost first? See the SurgePV pricing page.

How much power does a solar system make in Italy?

Use a yield tool, not a rule of thumb. We used the EU’s PVGIS tool (version 5.3, SARAH3 data) for a south-facing, 30 degree system with 14% losses:

City Yield per kWp per year 6 kWp system per year
Milan 1,354 kWh 8,124 kWh
Rome 1,495 kWh 8,970 kWh
Palermo 1,531 kWh 9,186 kWh

Palermo makes about 13% more per kWp than Milan (1,531 / 1,354 = 1.13). Real roofs lose more to shade, tilt and direction, so model each roof. A shading analysis helps with that part. PVGIS source: European Commission, Joint Research Centre.

How do you work out payback in Italy?

Use this formula:

Payback in years = net cost / yearly benefit

Net cost is the installed cost minus the deduction. Yearly benefit is the bill you avoid on self-used power, plus what you earn from exported power.

Here is a worked example for a 6 kWp system on a main home in Rome. The cost and prices are assumptions, not market data. Replace them with your own quote and tariff.

Step Value
Installed cost (assumed) €9,000
Deduction at 50% €4,500
Yearly output (PVGIS) 6 x 1,495 = 8,970 kWh
Self-used share (assumed) 40% = 3,588 kWh
Value of self-used power at €0.25 per kWh (assumed) €897
Exported share 60% = 5,382 kWh
Export income at €0.08 per kWh (assumed) €431
Yearly benefit, before running costs €897 + €431 = €1,328
Payback, net of the full deduction €4,500 / €1,328 = 3.4 years
Payback with no deduction €9,000 / €1,328 = 6.8 years

This is a simple payback. It does not include running costs, panel ageing or the timing of the yearly parts. The first part belongs to the year you pay. You claim it in the tax return filed the next year. Explain this to the client.

A tool that links yield, tariffs and cash flow saves time. See the generation and financial tool.

What about business incentives?

The deduction above is a personal income tax deduction, so it is for private owners. For companies, the Transizione 5.0 tax credit has changed. The tax agency’s resolution 1/E of 12 January 2026 says that any credit left at 31 December 2025 is split into five equal yearly parts for 2026 to 2030. It is about using credit already granted.

This page does not describe any business scheme that started in 2026. Check the GSE site before you quote a business client. Source: Agenzia delle Entrate, resolution 1/E (2026).

Regional grants

Regions and towns run their own calls. We list none here. We found no current call that we could check at the source. Check your regional portal and the GSE site, and keep the notice with the project file.

Five mistakes to avoid

  1. Quoting scambio sul posto for a new plant. It is closed. Use Ritiro Dedicato or a CER.
  2. Selling a “110%” Superbonus deal in 2026. The last rate listed is for 2025.
  3. Paying without the special transfer. The deduction needs the right bank transfer with the correct data.
  4. Ignoring tax capacity. The deduction lowers IRPEF. Check that the client owes enough to use each part.
  5. Mixing incentives. The deduction cannot be combined with a feed-in incentive tariff.

For more, see the EU solar subsidies tracker and the solar ROI in Italy guide. To build Italian proposals with incentives and yield in one place, book a SurgePV demo.

Frequently Asked Questions

What is the Superbonus 110% in Italy?

The Superbonus was a tax deduction for energy-saving and safety works, and it included solar PV. The Agenzia delle Entrate lists 110% for spending up to 31 December 2023, 70% for 2024 and 65% for 2025. It lists no Superbonus rate for 2026 spending.

What tax deduction can I get for solar panels in Italy in 2026?

The renovation deduction. For spending in 2025 and 2026 it is 50% for a main home owned by the taxpayer and 36% in other cases, on up to €96,000 per property unit. You get it in 10 equal yearly parts against IRPEF.

Do feed-in tariffs still exist in Italy?

Not for new plants. The fifth Conto Energia ended on 6 July 2013, after the cost cap of EUR 6.7 billion a year was reached (ARERA decision 250/2013). New plants can use Ritiro Dedicato or join an energy community that earns a 20-year tariff on shared energy.

Is scambio sul posto still open?

No, not for new plants. ARERA decision 78/2025/R/efr says plants that start up after 29 May 2025 cannot use it, and requests had to reach the GSE by 26 September 2025. New plants can sell their exported power under Ritiro Dedicato.

What is an energy community (CER) in Italy?

A renewable energy community is a group that shares power from local plants. The GSE pays a 20-year tariff on the shared energy. The base tariff is €80 per MWh for plants up to 200 kW, €70 for above 200 kW to 600 kW, and €60 above 600 kW, with a ceiling and a zone add-on. The decree sets aside 5 GW until 31 December 2027.

Can I combine the renovation deduction with other incentives?

The tax agency’s resolution 22/E (2013) says the deduction cannot be combined with a feed-in incentive tariff. It can be combined with Ritiro Dedicato and scambio sul posto when the system serves the home. It is excluded when selling extra power counts as a business activity.

Where this fits

This article is part of SurgePV's Solar Incentives & Policy hub, which works through the topic from first principles to the decisions a project team actually has to make.

About the Contributors

Author
Akash Hirpara
Akash Hirpara

Co-Founder · SurgePV

Akash Hirpara is identified by SurgePV as a company co-founder. His SurgePV author page lists only role information that can be tied to the public profile below; education, certifications, project totals, financial results, speaking engagements, and media appearances are not asserted without retained evidence.

Editor
Rainer Neumann
Rainer Neumann

Editorial contributor · SurgePV

Rainer Neumann is credited as an editorial contributor on SurgePV content. This profile does not assert engineering credentials, project totals, software-testing experience, education, speaking engagements, or media citations because independent verification evidence is not retained in the publication record.

Get Solar Design Tips in Your Inbox

Join 2,000+ solar professionals. One email per week - no spam.

No spam · Unsubscribe anytime

Book Free Demo

Choose which optional technologies SurgePV may use. Essential storage remains active for security and requested features.