Back to Blog
solar business21 min read

10 Questions to Ask Before Sending a Solar Proposal

Use ten release questions to check the project, scope, production, financials, assumptions, duties, versions, and next steps before you send a solar proposal.

Keyur Rakholiya

Written by

Keyur Rakholiya

CEO & Co-Founder · SurgePV

Rainer Neumann

Edited by

Rainer Neumann

Editorial contributor · SurgePV

Published ·Updated

Answer

Ask ten questions before sending a solar proposal. Does it support one customer decision? Is it the right project and version? Do scope and modeled output agree? Do energy and financial inputs trace to accepted sources? Are assumptions visible, and is responsibility clear? Can an outside reader follow it? Is this the exact file, with a next step?

Last updated: November 2026

SurgePV publishes this post and sells solar proposal software.

A proposal can open fine and still show a layout from one design revision, savings from another usage record, and a price from an expired scenario. Use the ten questions below to name the version you plan to send. They also help you check the evidence behind each claim the customer will see.

Copy the table below into your own proposal review. Each question needs a recorded answer or a stop. For the wider quality workflow, see the solar proposal pre-send checklist. For the financial evidence behind question 6, see the projected savings questions.

# Question Check Stop if
1 What customer decision does this proposal support? Proposal class, reader, decision and limits are written down No bounded job, or the call to action asks for a later-stage commitment
2 Does every field belong to the same customer and project? Project ID, site, usage, images, filenames and attachments Conflicting or ambiguous identity
3 Do the system image, equipment, scope and BOM agree? One design revision behind layout, quantities, inclusions and exclusions Stale file, unresolved substitution or mismatched scope
4 Can the modeled production be rebuilt from accepted inputs? Design, equipment, weather basis, shading, losses, model version, run date, units, period Output cannot be traced to a run
5 Does the usage and utility context match the claim? Usage source, period, meter, rate source and date Old bill, wrong meter or unreviewed rate shown as certain
6 Do the financial figures mean what the proposal says? Cost boundary, scenario, metric definition, incentives, timing A saving or payback figure with no supporting scenario
7 Are assumptions and exclusions visible where they matter? Assumptions sit beside the claims they change A material assumption is hidden or has no owner
8 Are responsibilities and approvals stated accurately? What the company, customer, utility, lender and reviewers have and have not done An approval is implied that has not happened
9 Can an outside reader interpret the exact proposal? Reader states the decision, option, basis, assumptions and next step unaided The reader misreads a chart, figure or option
10 Is this the exact version you will send, track and correct? Versions, recipient, channel, owner, next step, correction route Sent file differs from the reviewed file

Start the proposal from one project model

SurgePV supports roof modeling, shading, yield and financial modeling, and proposal generation in one workflow, so fewer fields are re-keyed before review.

Book a Demo

Checking cost first? See the SurgePV pricing page.

What does the pre-send review decide?

The pre-send review decides one thing. May this fixed version of a proposal go to one named recipient for one stated purpose? The review checks that the file the customer will see matches the accepted project, design, production, financial, scope, content and review records.

Use five answer states, not just yes or no:

State Meaning What happens next
Accept Evidence and authorized review support this field for the stated purpose Continue
Accept with visible condition The proposal class permits a bounded condition that is shown near the affected claim Continue only within recorded condition
Block Required evidence, consistency, or authority is absent Do not send
Escalate A qualified person or external party must decide Hold the affected part until it is decided
Not applicable The question genuinely does not affect this proposal class or its claims Record owner and rationale

Key Takeaway

A pass needs an answer state, an evidence link and a version. If a reviewer cannot point to all three, the answer is block or escalate, not accept.

“Looks fine” is not an answer state. “The designer checked it” is not enough on its own. The record must say what the designer reviewed, against which version and evidence, and whether later changes reopened that review.

Define the exact version before the review. List these items:

  • project id
  • proposal class
  • intended recipient
  • design revision
  • production model
  • financial scenario
  • scope version
  • content version
  • the rendered file
  • review state

If any of them changes during the review, create a new version. Then restart the affected questions.

Which records must exist before the review begins?

Prepare these records before the review starts:

  • the proposal brief
  • project identity
  • the accepted source register
  • the current design and equipment state
  • the production model
  • consumption and utility context
  • the cost and financial scenario
  • the assumption and unknown register
  • the scope and responsibility map
  • required reviews
  • the content and claim inventory
  • the rendered candidate
  • the version graph
  • the recipient
  • the release owner

A missing record must show up as a block. Do not rebuild it from memory.

AHRQ describes flowcharts as visual process-step representations. They help you look at handoffs, responsible people, problem sources, and areas to improve. Use that healthcare workflow tool only as an analogy. Map the route from accepted input to customer file, and mark each owner.

Record What it must identify Owner
Proposal brief Proposal class, reader, purpose, permitted decision, prohibited interpretations Sales or proposal owner
Project record Customer or account, site, usage or meter context, selected project state Project owner
Technical chain Site evidence, design, equipment, production, BOM, affected reviews Qualified technical owners
Commercial chain Cost boundary, utility, finance, tax or incentive status, scenario Qualified commercial owners
Assumption register Documented, modeled, assumed, pending, or externally decided fields Field owners
Responsibility map Company, customer, partner, reviewer, and authority decisions Sign-off owner
Version graph Project, design, model, scope, content, proposal, and customer artifact Configuration owner
Reader test Exact rendered surfaces, tasks, findings, corrections Content and sign-off owners

Do not ask for records that the proposal class does not need. An early concept and a detailed commercial proposal need different evidence. The proposal brief must state that difference. Otherwise the team will use a missing record as a reason to guess.

Set up the review so the evidence is easy to find. From the proposal record, link the active source register, design, model run, financial scenario, assumption record, scope and reviewer decisions. Keep old files visible as history, but mark them clearly as inactive. A reviewer should not have to guess which attachment a salesperson thought was current.

Decide who decides what before the meeting. The sign-off owner coordinates the whole proposal, but each specialist keeps their own call. Say production review belongs to an energy-model owner. Say utility treatment belongs to a reviewer qualified in that market. Say customer wording belongs to a sales or compliance owner. Keep those lines. The review is where those calls come together.

What ten questions should the sign-off owner ask?

Ask these questions. What decision does the proposal support? Is it the correct project? Do the system and scope agree? Do production and financial claims trace to accepted inputs? Are the assumptions visible? Are responsibilities and approvals accurate? Can a skeptical reader interpret it? Are the exact version and the next action under control?

1. What customer decision is this proposal allowed to support?

Require the proposal class, intended reader, decision, stage and limits. An early concept may support a decision to continue the assessment. It must not look like final engineering, a firm price, utility approval, guaranteed production, or permission to build.

Evidence: the proposal brief and the status the customer can see. Owner: the proposal owner. Stop: the document has no bounded job, or its call to action (CTA) asks for a later-stage commitment.

2. Does every field belong to the same customer and project state?

Compare the customer or account, site, building, meter or usage context, project option, and selected revision. Check images, filenames, charts, and attachments, not only the front page. Data that looks right but sits on the wrong project is still wrong.

Evidence: a stable project id and source links. Owner: the project owner. Stop: the identity conflicts or is unclear. Re-entry: a confirmed project state and a rebuilt proposal.

3. Do the system image, equipment, scope, and BOM context agree?

Trace the visible layout, capacity or quantity, and equipment to one design revision. Do the same for inclusions, exclusions, allowances, customer work, and materials context. A BOM (bill of materials) is the parts list. A changed module or layout can affect more than the picture.

Evidence: the design, equipment, scope, and dependency versions. Owner: the responsible design and commercial reviewers. Stop: a stale file, an unresolved substitution, or a mismatched scope.

4. Can the modeled production be reconstructed from accepted inputs?

Name these items:

  • the project design
  • the equipment
  • the weather or resource basis
  • how shading was treated
  • the loss assumptions
  • the model version
  • the run date
  • the scenario
  • the output
  • the reviewer

State what field evidence is still pending. State what would trigger a new calculation.

The U.S. Department of Energy’s homeowner solar guide says online tools give estimates for getting started. It tells readers to work with a solar installer for a custom estimate of how much power a system will generate.

Add the modeled period, units and output limit to the production figure the customer sees. A system size in kW is not the same as estimated energy in kWh over a named period. A proposal may show an uncertainty percentile or a production guarantee. If so, keep the method or contract that gives that label its meaning. Do not attach either label to an ordinary simulation result without evidence. See the solar-yield prediction guide for model and uncertainty limits.

5. Does the consumption and utility context match the customer claim?

Confirm each of these:

  • the usage source
  • the period
  • whether the data is complete
  • any changes made to the data
  • future-load assumptions
  • how the meter relates to the data
  • the utility source
  • the service context
  • the treatment
  • the effective date
  • the reviewer

Keep observed use apart from modeled future changes.

Evidence: an accepted energy and utility register. Stop: an old bill, the wrong meter, an unreviewed rate context, or a missing input shown as certain. Re-entry: current evidence and a named decision.

6. Do financial figures mean what the proposal says they mean?

Name these items:

  • the cost boundary
  • the cash or financing scenario
  • how the result depends on production
  • the utility treatment
  • the metric definition
  • the timing rule
  • recurring items
  • the tax or incentive state
  • any limits that are specific to the customer

Keep separate options separate.

For the full savings check, read 8 questions to answer before showing a customer their projected solar savings. Here, confirm that the figures in the proposal match its accepted output. Do not rebuild the financial analysis from memory.

A simple arithmetic check keeps an energy comparison apart from a bill claim. Take a hypothetical example. Estimated annual production of 18,000 kWh divided by observed annual use of 20,000 kWh is 90%. That is a yearly energy ratio. It does not prove 90% lower bills, 90% self-consumption or off-grid operation. Generation and demand happen at different times. Export credits and remaining charges depend on the tariff (the utility’s price list) and on the customer model. The same DOE guide says savings depend on how much electricity you use and on system size. They also depend on whether you buy or lease and on how much the system generates. The utility’s rates matter, and so does what the utility pays for power you export.

Before sending, reconcile these outputs:

Visible claim Check before sending
Annual energy offset Same annual period, energy units, model boundary and customer-use basis
Annual electricity-bill reduction Current applicable tariff, modeled imports and exports, remaining charges and assumptions
Net cash saving Defined treatment of finance payments, operating costs and other included cash flows
Incentive-adjusted price Verified project eligibility and timing, with the gross-price scenario retained

If the supporting scenario for a claim is missing, correct the claim or take it out.

7. Are material assumptions, unknowns, and exclusions visible where they matter?

Ask which claims would change if an assumption proves wrong. Put key conditions beside the system, production, savings, price, scope, or timing content they affect. Then link to a readable register. A generic footer cannot carry every qualification.

Evidence: an assumption register with the source or reason, owner, state, affected outputs, and a way to confirm each one. Stop: an unresolved material input is hidden or has no owner.

8. Are responsibilities, reviews, and outside approvals shown accurately?

Keep these apart:

  • company work
  • qualified professional review
  • customer decisions
  • partner roles
  • utility action
  • permits
  • lender decisions
  • tax treatment
  • other outside authority

Say what has happened and what has not.

9. Can a skeptical reader interpret the exact rendered proposal?

Give the proposal to a typical reader who did not build it. Ask the reader to state the decision, project, selected option, and production basis. Ask for the financial scenario, a key assumption, the responsibility limit, and the next action. Do not coach them.

Digital.gov describes plain language as content that is clear and easy to understand. It says content should be created, designed and tested for its audience. Record what the reader actually got wrong, and fix that part.

A chart or branded layout may hide the numbers. If so, see branding a solar proposal for keeping the decision and evidence first.

Pro Tip

Run the reader test with someone outside design and sales. Give them the exact PDF or link you plan to send, and ask for the decision, the option and the next step in their own words.

10. Is this the exact version that will be sent, tracked, and corrected?

Match the project, design, production, financial, scope, content, review, and rendered versions. Confirm these items:

  • the recipient
  • the channel
  • the sign-off owner
  • the send time
  • the active link or attachment
  • the next decision
  • the support route
  • the correction path

Mark earlier versions superseded.

The proposal tracking guide covers post-send stages and view signals. Say you revise a proposal after sending it. Then run the revised proposal consistency checklist before the new version goes out.

10
release questions in this checklist
5
answer states: accept, accept with condition, block, escalate, not applicable
5
configuration management elements in NASA's systems engineering handbook

The first two figures count items in the checklist above. The third comes from NASA’s configuration management guidance, accessed November 2026.

Which proposals are blocked, and why?

Version, source and assumption links in one project make a blocked proposal easier to trace. See how a project record carries into the proposal.

See a Live Walkthrough

Checking cost first? See the SurgePV pricing page.

How should the pre-send review be documented?

Use one record for the fixed version. For each question, capture the answer state, evidence, version, reviewer scope, condition, stop reason, affected output and what is needed to re-enter review. Record the final sign-off owner, recipient, channel, file and time. Keep blocked and superseded versions. That way a correction does not depend on memory, and it does not overwrite what a customer received.

Run the review in this order:

  1. Freeze and identify the version.
  2. Confirm proposal class, recipient, and permitted decision.
  3. Ask all ten questions without skipping conditional fields.
  4. Record answer states and exact evidence, not only initials.
  5. Route blocks or escalations to named owners.
  6. Create a new version after material changes.
  7. Reopen only the affected questions, while checking the whole impression.
  8. Render and test the exact delivery surface.
  9. Authorize one recipient, channel, purpose, and version.
  10. Keep delivery, correction, withdrawal and new-version records.

Copy-ready solar proposal pre-send review record

Field Entry
Proposal id, class and status
Intended recipient, purpose, and permitted decision
Project, customer, site, usage, and selected revision
System, equipment, scope, and BOM context
Production inputs, model, scenario, run, and reviewer
Consumption, utility, and future-load record
Cost, financing, metrics, tax or incentive state
Assumptions, unknowns, exclusions, and confirmation paths
Company, customer, partner, reviewer, and external responsibilities
Reader-test tasks, answers, and corrections
Project, design, model, financial, content, and artifact versions
Question 1 state, evidence, owner, and condition
Question 2 state, evidence, owner, and condition
Question 3 state, evidence, owner, and condition
Question 4 state, evidence, owner, and condition
Question 5 state, evidence, owner, and condition
Question 6 state, evidence, owner, and condition
Question 7 state, evidence, owner, and condition
Question 8 state, evidence, owner, and condition
Question 9 state, evidence, owner, and condition
Question 10 state, evidence, owner, and condition
Blocks, escalation, affected outputs, and re-entry
Final sign-off owner, recipient, channel, file, and time
Correction route, withdrawal state, and new version

Illustrative example: usage changes after financial review

This example is illustrative. It is not a customer case or a result.

A proposal passed financial review using an accepted usage record. Before sending, sales gets a newer usage file and adds it to the CRM. Nobody reopens the proposal. The layout and production model have not changed. But the savings that depend on usage may no longer match the accepted scenario.

Question five blocks sending because two usage sources are active. Question six also reopens, because the financial figures on the page depend on the earlier usage context. The project owner records the new source. Qualified reviewers decide whether it applies. Where needed, the team creates a new scenario and a new proposal. The technical review that was not affected stays in place.

The review works here because it finds the dependency before the proposal goes out.

What should happen when an answer is blocked or disputed?

Pause the proposal. Keep the disputed values and their sources. Find the customer claims they affect. Assign the person authorized to decide. State what may continue, and require clear evidence before the proposal re-enters review. Do not pick the more favorable value. Do not let an old approval follow a changed input. Create a linked new version and retest the affected pages. Tell earlier recipients if qualified review says a correction is needed.

NASA’s systems-engineering handbook describes configuration management as five elements. They are planning and management, identification, change management, status accounting and verification. The same habit applies to proposals. Know which version is current, control changes, and check the result.

Failure Why yes/no hides it Required action
Two plausible project values Both can look reasonable Preserve both, name owners, block dependent claims
Narrow reviewer response “Approved” may cover one field Record scope and route other decisions
Pending external authority The company cannot decide it for them Show external status or suppress affected claim
Changed input after approval Old acceptance may be stale Impact review and new version
Reader misinterprets chart Data may be correct while impression is not Redesign, qualify, or remove and retest
Exact PDF differs from reviewed link Review and delivery objects diverge Block until version parity is restored

An exception can allow a narrower proposal in one case only. The company’s qualified rules must define what that output means. They must say which fields are hidden, what stays visible, and what the customer may do with it. “Preliminary” is not permission to show every unsupported number with a disclaimer.

Where can SurgePV support the pre-send check, and where does it stop?

SurgePV can support roof modeling, array layout, shading, energy-yield and financial modeling, electrical workflow, BOM output, and proposal generation in connected project context. Your team still accepts outside evidence and applies local rules. Your team approves customer claims and decides tax and utility treatment.

The published product scope includes roof modeling, array layout, shading, energy-yield and financial modeling, electrical workflow, BOM output, and proposal generation. Results depend on source data, assumptions, equipment models, configuration and review. Outputs support design and documentation workflows. They do not replace approval by the responsible engineer, authority, lender, insurer or utility.

Use connected context to cut the work of rebuilding versions where it is supported. Keep a human in charge of each of these:

  • project identity
  • accepting evidence
  • technical decisions
  • financial and customer claims
  • review scope
  • send conditions
  • delivery
  • correction

Useful measures include these:

  • blocked proposals by question
  • missing evidence by owner
  • changes after review
  • reader-test failures
  • version mismatches
  • avoidable corrections after sending
  • how well you can rebuild the exact file

They show where the review is working. They do not prove accuracy or sales results. Use them to improve the review, and keep them out of marketing claims.

Review the patterns by comparable proposal class. A repeated block at project identity points to a different upstream control than a repeated block at reader interpretation. Many changes after review may mean the review happens before the proposal is stable. A version mismatch may point to uncontrolled exports, not a model problem. Keep the cause you observed attached to the metric. Then managers will not prescribe one fix for every failure.

Do not reward reviewers for answering “accept” on every question. A working review will sometimes stop delivery, narrow the output, or ask for current evidence. Track whether each block had a clear owner and a way back in. The goal is a sound decision to send, not a green dashboard.

Frequently Asked Questions

Who should approve a solar proposal before it is sent?

Approval should come from the people authorized for the proposal class and the claims involved. The sign-off owner can coordinate the decision. But some topics may need different qualified reviewers. These are technical, production, financial, utility, tax, contract, legal, customer, and outside-authority questions. Record the exact scope of each review. Silence, software output and one narrow comment are not blanket approval.

Can a preliminary solar proposal be sent with missing information?

A clearly preliminary output can be sent under a company’s approved rules. But you must state its permitted purpose, missing evidence, hidden fields, assumptions, limits, next action, and what readers must not infer. Some gaps should block delivery entirely. A qualified owner decides the path. A generic disclaimer does not rescue unsupported production, savings, price, eligibility or approval content.

How long should a solar proposal review take?

There is no fixed time. The depth of review depends on the proposal class, project evidence, changes, exceptions, customer claims, the market, and the specialist decisions needed. Measure review time for similar work. Remove avoidable waiting. Keep the evidence and sign-off the proposal needs. Do not cut review to hit a speed target.

Should the customer receive the proposal assumptions?

The customer should see key assumptions in readable form, near the claims they affect. Give enough detail to understand the source or reason, status, owner, effect, and how to confirm it. A fuller register can support review. Do not show irrelevant internal noise. But do not hide key assumptions about production, usage, utility, cost, financing, tax, scope, timing, or responsibility in a distant footer.

Can SurgePV approve a solar proposal before it is sent?

SurgePV can support modeling and proposal generation. The company’s authorized reviewers decide the release. Outputs depend on source data, assumptions, equipment models, configuration and review. Qualified people and the right outside parties stay responsible for technical, financial, utility, customer, permit and other approvals.

Further Reading

For the financial side of question 6, see the projected savings questions. For post-send follow-up, see the proposal tracking guide.

Make ready-to-send reconstructable

The ten questions should not become a ceremony. They should let you explain why one proposal was sent. The manager can point to the customer decision, project, design, and production. The manager can also point to the financials, assumptions, responsibilities, reader test, versions, recipient, and next action. Nobody has to rebuild the story from chat.

Watch for answers that rest on “probably,” “latest,” “the reviewer saw it,” or “the customer will ask if it matters.” Then the record is not ready. Block, narrow, escalate or correct the affected content.

A proposal is ready to send when its evidence, meaning, authority, and file identity survive the questions before the customer has to ask them.

To see how a proposal is built from a single project record, look at SurgePV solar proposal software or the pricing page.

See the project-to-proposal path in SurgePV

A guided demo shows roof modeling, layout, shading, energy-yield and financial modeling, and proposal generation in one workflow. Your team keeps ownership of sources, claims and sign-off.

Book a Free Demo

Sources

Primary research and reference material used for this desk-research article.

Where this fits

This article is part of SurgePV's Solar Business & Operations hub, which works through the topic from first principles to the decisions a project team actually has to make.

About the Contributors

Author
Keyur Rakholiya
Keyur Rakholiya

CEO & Co-Founder · SurgePV

Keyur Rakholiya is identified by SurgePV as its CEO and a company co-founder. His SurgePV author page lists only role information that can be tied to the public profile below; credentials, project totals, testing claims, media appearances, and speaking engagements are not asserted without retained evidence.

Editor
Rainer Neumann
Rainer Neumann

Editorial contributor · SurgePV

Rainer Neumann is credited as an editorial contributor on SurgePV content. This profile does not assert engineering credentials, project totals, software-testing experience, education, speaking engagements, or media citations because independent verification evidence is not retained in the publication record.

Get Solar Design Tips in Your Inbox

Join 2,000+ solar professionals. One email per week - no spam.

No spam · Unsubscribe anytime

Book Free Demo

Choose which optional technologies SurgePV may use. Essential storage remains active for security and requested features.