Back to Best Solar Software
Best ListBest-Of List8 tools compared

Solar Tracker Design Software (2026): Eight Tools Compared

Eight tools compared for solar tracker projects on tracker types, terrain and grading, backtracking, yield simulation and published price. A desk comparison, checked October 2026.

SurgePV publishes this list and sells solar design and proposal software, so we have a commercial interest in this category. This is a desk comparison of what each vendor publishes; we have not run side-by-side tests. Prices and vendor facts checked October 2026. How we evaluate software

Published Last updated
Rainer Neumann

Written by

Rainer Neumann

Editorial contributor · SurgePV

Keyur Rakholiya

Edited by

Keyur Rakholiya

CEO & Co-Founder · SurgePV

Which tool should you use to design a solar tracker project? It depends on the site and the job. For terrain-following tracker layouts, PVcase and PVFARM list the tools you need. PVsyst is the yield tool, with backtracking options. HelioScope designs single-axis trackers up to 30 MW (DC) on its Enterprise plan only. A tracker is a frame that turns the panels to follow the sun. RatedPower and PVcase also list cut and fill, which means digging soil from high spots and filling low spots. SurgePV’s published scope does not list tracker design, so it is not the pick for this job.

This is a desk comparison of what each vendor publishes, checked October 2026. We have not run side-by-side tests. SurgePV publishes this page and is one of the tools on it. Tool facts come from each vendor’s own site.

Criteria used: tracker types, terrain and grading, backtracking, yield simulation, electrical and parts-list output, and published price.

This page covers software that designs or simulates tracker projects. It does not cover the control software that moves the tracker motors.

Want to see SurgePV on your own tracker project?

Book a guided demo and bring a real site. We walk through design, yield, finance and the proposal in one platform.

Book a Free Demo

Checking cost first? See the SurgePV pricing page.

Best-For Picks

  • Terrain-following trackers inside AutoCAD: PVcase. Its Ground Mount page says it supports “fixed-tilt, east-west and single-axis tracker configurations in one workflow”. Its blog describes Terrain Following Tracker (TFT) optimization that also factors in ground grading.
  • Utility-scale tracker layouts in a browser: PVFARM. Its FAQ says it supports single-axis tracker systems and fixed-tilt systems. It says its algorithms adapt to terrain-following trackers and work with grading calculations. It says it is fully cloud-based.
  • Yield simulation of tracker systems, with backtracking: PVsyst. Its product page lists single-axis and dual-axis trackers with “safety and backtracking options”. It runs only on Windows and does not draw a site layout. Check the hill note in the PVsyst entry before you use it on sloped land.
  • Tracker layouts with cut and fill and a layout editor: RatedPower. Its platform page says you can shift trackers, roads and structures in the Layout Editor. It also says you can run cut-and-fill to see how terrain moves the layout. It publishes no price.
  • Commercial and utility designs up to 30 MW (DC), with single-axis trackers on one plan: HelioScope. Single-axis trackers are on its Enterprise plan only. Enterprise is priced per project.

Comparison Table

Listed alphabetically. This is not a ranking; pick by the situation above. Prices were checked October 2026 on each vendor’s own page.

Tool Best for Price Free or paid Decisive tracker fact
Arka360 Residential and commercial teams that also want proposals Premium (US dollar table) $358 per month; Basic $199 per month Paid “Single axis tracker” listed under Professional and Enterprise, not Basic
HelioScope Designs from rooftop to 30 MW (DC) Enterprise: custom per-project pricing Paid; free trial button Single-axis trackers on Enterprise only
PVcase Terrain-following trackers in AutoCAD Not published; “Talk to sales” Paid Ground Mount lists single-axis tracker configurations
PVFARM Cloud-based utility-scale layouts Not published; annual license “tailored to your specific needs” Paid; 7-day free trial Single-axis and fixed-tilt layouts with terrain-following support
PVsyst Tracker yield simulation CHF 700 per year (PVsyst 8 Professional) Paid; one-month free trial Single and dual-axis trackers with backtracking; no slope-aware backtracking
RatedPower Utility-scale layouts with cut and fill Not published; per-company subscription Paid; demo Layout Editor can shift trackers
SAM No-cost output and cost modeling Free Free desktop application Webinar covers “tracking and self-shading”; no layout tool
SurgePV Proposals after the design is done $1,899 per user per year (1 user) Paid, guided demo Published scope does not list trackers

Tracker Criteria Matrix

Cells read Documented when the vendor’s own pages state it. They read Partial when the pages state only part of it. They read Not stated when the pages we read in October 2026 do not mention it. There are no scores or weights.

Tool Tracker types Terrain and grading Backtracking Yield simulation SLD or parts list
Arka360 Partial (“Single axis tracker” on Professional and Enterprise) Not stated Not stated Documented (“8760 production report”) Partial (“Electric single line diagram” on Professional and Enterprise)
HelioScope Partial (single-axis trackers on Enterprise only) Not stated Documented (help center: backtracking can be turned on or off in the condition set) Documented (8760 production report; P90, P95 and P99 on Pro) Partial (single-line diagrams on all plans; no parts list stated)
PVcase Documented (single-axis tracker configurations) Documented (slope analysis, grading, piling) Partial (help center: single-axis layouts export to PVsyst for backtracking calculations) Partial (QuickYield in Ground Mount; Yield product lists P50 and P90) Documented (SLD and BOM export)
PVFARM Documented (single-axis and fixed-tilt) Documented (terrain-following, grading) Not stated Partial (energy model in the same project) Documented (SLD for LV and MV circuits; BoQ and BoM reports)
PVsyst Documented (single-axis, dual-axis and other types) Partial (backtracking on a hill described; no slope-aware backtracking) Documented Documented Partial (SLD editor “still work in progress”)
RatedPower Partial (Layout Editor shifts trackers) Documented (cut and fill) Not stated Documented (2D and 3D energy yield) Partial (.dwg export)
SAM Partial (webinar covers tracking) Not stated Not stated Documented (free desktop modeling) Not stated
SurgePV Not stated Not stated Not stated Partial (energy-yield modeling; no tracker model stated) Partial (electrical workflow support; bill-of-materials output)

Layout tools and the yield tool often work together. PVcase says it can export layouts and topography meshes for use in other tools such as PVsyst. HelioScope lists export to PVsyst on Enterprise. RatedPower lists energy yield export to PVsyst.

Tool Entries

Arka360

Best for: teams that do residential and commercial work and want a proposal tool that also lists a single-axis tracker option.

Not the right choice if: you need terrain-following trackers or grading. The pricing page does not mention them. It is also not right if you are on the Basic plan, because the tracker row is ticked only under Professional and Enterprise.

What the vendor documents: in the US dollar feature table, “Single axis tracker”, “8760 production report”, “PVsyst export” and “Electric single line diagram”. The tracker and SLD rows are ticked under Professional and Enterprise only.

Price (checked October 2026): the US dollar cards show Basic at $199 per month (includes 1 user) and Premium at $358 per month (includes 2 users). The feature table calls the Premium plan “Professional Plan”. Enterprise is “Talk to Sales”. The same page also holds rupee tables and other dollar tables, so confirm which one applies to you.

Limitations: the pages we read do not describe tracker layout rules, backtracking or terrain. The pricing page still carries a webinar banner dated 9 January 2025.

Vendor link: arka360.com

Arka360 public website page, captured 29 October 2026
Arka360 public website capture, captured 29 October 2026. This shows the vendor's website, not a test inside the software.

HelioScope

Best for: teams that design rooftop, carport and ground-mount projects in one tool and need single-axis trackers up to 30 MW (DC).

Not the right choice if: you need trackers on a lower plan. The pricing page lists single-axis trackers under Enterprise only. It is also not right if you need terrain-following tools. The page does not mention them.

What the vendor documents: all plans list rooftop, carport, ground mount and battery layout, CAD export, single-line diagrams, an 8760 production report, shade reports and “Global weather coverage”. Pro adds a Utility Rate Editor, financial analysis tools, sales proposals, and P90, P95 and P99 values. Enterprise adds single-axis trackers, designs up to 30 MW (DC), export to PVsyst and direct API access.

Price (checked October 2026): Basic is $159 USD per license per month, or $1,620 USD per license per year. Pro is $259 USD per month, or $2,640 USD per year. Neither plan includes trackers. Enterprise is “Custom per-project pricing”. The page shows a Free Trial button, but does not state how long the trial lasts.

Limitations: Basic designs up to 1.25 MW (DC) and Pro up to 5 MW. Its help article on single-axis trackers says the feature is part of the Enterprise plan. It also says you can turn backtracking on or off and set the maximum angle in the condition set. A help center search for “terrain”, “slope” and “grading” found no terrain-following tool.

Vendor link: helioscope.aurorasolar.com

HelioScope public website page, captured 29 October 2026
HelioScope public website capture, captured 29 October 2026. This shows the vendor's website, not a test inside the software.

PVcase

Best for: utility-scale teams that work in AutoCAD and want terrain-following tracker layouts, grading and construction outputs.

Not the right choice if: you want a published price. PVcase says “Talk to sales” on its plan pages. It is also not right if you do not use AutoCAD. The Ground Mount page says it integrates with AutoCAD and Civil 3D environments.

What the vendor documents: the Ground Mount plans page lists slope analysis, collision analysis, ground grading and grading heatmaps, piling analysis, stringing, SLD export, a bill of materials export, AC and DC coupled battery storage, QuickYield, and export to PVcase Yield and PVsyst. The Ground Mount page lists single-axis tracker configurations. The vendor blog describes Terrain Following Tracker optimization. The Yield plans page lists “probability scenarios (P50, P90)” and bifacial modeling.

Price (checked October 2026): not published. The plan pages say “Talk to sales” or “Request pricing”. They show no currency or unit.

Limitations: the pages we read do not describe a backtracking calculation inside PVcase. Its help article on exporting single-axis trackers to PVsyst shows how to turn on backtracking calculations in PVsyst. Ask for a demo on a sloped site of your own.

Vendor link: pvcase.com

PVcase public website page, captured 29 October 2026
PVcase public website capture, captured 29 October 2026. This shows the vendor's website, not a test inside the software.

PVFARM

Best for: utility-scale teams that want to test layout, grading and tracker choices in the cloud before they buy.

Not the right choice if: you want a published price. Its FAQ says pricing is “tailored to your specific needs”. The FAQ also recommends the latest Google Chrome and at least 16 GB of RAM.

What the vendor documents: support for single-axis tracker and fixed-tilt systems. It says its algorithms “adapt to the undulations of terrain-following trackers” and work with grading calculations. It also lists single line diagrams for LV and MV circuits, and bill of quantities (BoQ) and bill of materials (BoM) reports. LV and MV mean low voltage and medium voltage. You can keep existing tracker positions while you change the electrical parts. The home page lists “Yield in the same model”.

Price (checked October 2026): an annual license with packages by discipline. No amount is published. The FAQ offers a free 7-day trial with two one-on-one training sessions.

Limitations: the pages we read do not describe backtracking rules or give a project size limit.

Vendor link: pvfarm.io

PVFARM public website page, captured 29 October 2026
PVFARM public website capture, captured 29 October 2026. This shows the vendor's website, not a test inside the software.

PVsyst

Best for: yield studies of tracker systems, where you need backtracking options and your choice of weather data.

Not the right choice if: you need a site layout or proposals from the same tool. It is also not right if you work on a Mac or in a browser. The requirements page says it runs only under Windows.

What the vendor documents: the product page lists single-axis and dual-axis trackers with “safety and backtracking options”. It also lists bifacial systems, near shading in a 3D scene, and weather data from seven databases. Its backtracking page explains that trackers “move backward to prevent mutual shading”. It lists backtracking for horizontal north-south and tilted-axis trackers, and for some other types with limits. It says backtracking for 2-axis trackers is not yet implemented.

Price (checked October 2026): CHF 700 per year for PVsyst 8 Professional. Discounts are 5% for 2 to 4 licenses, 15% for 5 to 9 and 20% for 10 or more. The product page lists a one-month free trial.

Limitations: the backtracking-on-a-hill page says PVsyst “does not currently implement advanced slope-aware backtracking strategies and cannot optimize individual tracker positions”. Its backtracking page says PVsyst uses one tracking angle for all trackers in a group. The single line diagram editor is “still work in progress”.

Vendor link: pvsyst.com

PVsyst public website page, captured 29 October 2026
PVsyst public website capture, captured 29 October 2026. This shows the vendor's website, not a test inside the software.

RatedPower

Best for: utility-scale teams that want fast layouts with cut and fill and a layout editor.

Not the right choice if: you want a published price or a per-seat license. Its pricing page says it does not publish list prices. It sells a per-company subscription with unlimited users and projects.

What the vendor documents: on its platform page, a Layout Editor where you shift trackers, roads and structures and align them to parcel borders and fencing. It also lists cut-and-fill runs and .dwg export and import. The pricing page lists “2D and 3D energy yield assessment” with export to PVsyst. The 3D energy yield packages are add-ons. It lists AC and DC coupled storage on every plan.

Price (checked October 2026): not published. Plans are Basic, Advanced and Enterprise, all “Talk to sales”.

Limitations: the pages we read do not state which tracker types it supports or whether it models backtracking. The platform page says complex geometry sometimes needs a second pass after a .dwg round trip.

Vendor link: ratedpower.com

RatedPower public website page, captured 29 October 2026
RatedPower public website capture, captured 29 October 2026. This shows the vendor's website, not a test inside the software.

SAM

Best for: no-cost studies of PV output and project cost, by engineers who are happy to build a model by hand.

Not the right choice if: you need a site layout, grading or drawings. SAM is a modeling tool, not a layout tool.

What the vendor documents: the SAM home page calls SAM “a free desktop application for techno-economic analysis of energy technologies”. That means it studies how a system performs and what it costs. A webinar on its PV videos page covers “tracking and self-shading”. The same page lists P50/P90 simulations. The download page lists versions for Windows, Mac and Linux.

Price (checked October 2026): free. You register to get a free software key.

Limitations: we did not find a page that lists tracker types or backtracking. SAM’s own documentation site did not load for us in October 2026.

Vendor link: sam.nlr.gov

SAM public website page, captured 29 October 2026
SAM public website capture, captured 29 October 2026. This shows the vendor's website, not a test inside the software.

SurgePV

SurgePV is our product.

Best for: teams that want roof modeling, array layout, shading analysis, energy-yield modeling, financial modeling, electrical workflow support, bill-of-materials output and proposals in one product, priced per user. See solar design software for the product page.

Not the right choice if: you need tracker layout, terrain-following design or backtracking. SurgePV’s published scope lists solar array layout, but it does not name trackers. Ask in a demo whether your project fits. It is also not for you if you want a self-serve trial. SurgePV offers a guided demo. Its outputs support design and documentation. They do not replace approval by the responsible engineer, authority, lender or utility.

What the vendor documents: 3D roof modeling, array layout, shading analysis, energy-yield modeling, financial modeling, electrical workflow support, bill-of-materials output and proposal generation.

Price (checked October 2026): $1,899 per user per year for 1 user, $1,499 per user per year for 3 seats, $1,299 per user per year for 5 seats. Prices are in US dollars.

Limitations: results depend on source data, assumptions and equipment models. The pricing page and published scope do not state tracker types, backtracking or terrain tools.

Vendor link: surgepv.com

SurgePV public website page, captured 29 October 2026
SurgePV public website capture, captured 29 October 2026. This shows the vendor's website, not a test inside the software.

What Tracker Design Needs, in Plain Words

Tracker types. A single-axis tracker turns on one axis. A dual-axis tracker turns on two. PVsyst’s orientation page lists several tracking types, such as horizontal north-south axis, tilted axis and two-axis frames. Check that your tool supports the type your tracker maker sells.

Backtracking. On a tracker field, rows can shade each other when the sun is low. PVsyst says that with backtracking, trackers “no longer follow the sun but instead move backward to prevent mutual shading”. It also says backtracking does not increase total irradiance. It only reduces the electrical losses that shading causes. A near shading loss of about 2 to 3% typically remains in PVsyst results, per its backtracking page. For more background, see our guide to solar tracking and fixed tilt.

Ground coverage ratio (GCR). PVsyst defines GCR as the PV area divided by the ground area it occupies. It also says GCR cannot be defined in one universal way, because tools differ on what counts as PV area and ground area. So compare GCR numbers only when two tools use the same definition. PVsyst says GCR is shown for reference and is not used directly in the simulation. See its GCR page.

Slopes. On a hill, no single tracking angle gives perfect backtracking, per PVsyst. PVcase and PVFARM say their tools handle terrain-following trackers. We did not test either claim. Ask each vendor to run a sloped site of yours and show you the shading result.

Ask before you buy. Which tracker types does it support? Does it handle slopes and grading? Can it export to your yield tool? What drawings and parts lists does it make? What is the price for your team size?

How We Ordered These Tools

We did not rank these tools. They are listed alphabetically, and the best-for picks come from the matrix above.

  • Tracker types: tools differ on which trackers they model. We did not assess whether any model matches a specific tracker maker’s product.
  • Terrain and grading: slopes change the layout and the shading. We did not assess earthwork quantities.
  • Backtracking: it changes the yield on dense fields. We did not assess whether any algorithm is correct.
  • Yield simulation: yield feeds the financial case. We did not assess accuracy against measured output.
  • SLD or parts list: these outputs feed procurement and approval. We did not assess whether an engineer or authority would accept them.

Not Compared Here

PVX, Helios 3D, Solesca and Virto Solar are compared on our ground mount design software list but not on this page. For plant-scale tools, see utility-scale design software and solar plant design software. For yield tools, see bankable simulation software.

Sources and Dates

Vendor pages were read in October 2026. Arka360 (pricing). HelioScope (pricing). PVcase (Ground Mount, plans, blog and Yield plans linked above). PVFARM (FAQ, home). PVsyst (shop, product page and help pages linked above). RatedPower (pricing, platform). SAM (home, PV videos and download pages linked above). SurgePV (pricing). We read the HelioScope and PVcase help centers in a headless browser.

See SurgePV on your own tracker project

Book a guided demo and ask whether your ground-mount or tracker project fits.

Book a Free Demo

Frequently Asked Questions

What is the best solar tracker design software?

It depends on the job. PVcase and PVFARM list terrain-following tracker support. PVsyst simulates single-axis and dual-axis trackers with backtracking options. RatedPower lists cut and fill and a layout editor that shifts trackers. HelioScope lists single-axis trackers on its Enterprise plan only. SurgePV’s published scope does not list trackers.

What is backtracking in solar tracker design?

On a tracker field, rows can shade each other when the sun is low. With backtracking, trackers stop following the sun and move backward to avoid that shading. PVsyst says backtracking does not increase total irradiance. It reduces the electrical losses that shading causes.

What is ground coverage ratio (GCR) for trackers?

GCR is the PV area divided by the ground area it occupies. PVsyst says it cannot be defined in one universal way, because tools differ on what they count as PV area and ground area. Compare GCR figures only when they use the same definition.

Can software design trackers on sloped land?

Some vendors say so. PVcase describes Terrain Following Tracker optimization that includes ground grading. PVFARM says its algorithms adapt to terrain-following trackers. RatedPower lists cut and fill. PVsyst says it does not currently implement advanced slope-aware backtracking. Ask each vendor to run one of your sloped sites.

Which tools simulate single-axis and dual-axis trackers?

PVsyst lists both single-axis and dual-axis trackers. PVcase and PVFARM list single-axis tracker support. HelioScope lists single-axis trackers on Enterprise. Arka360 lists a “Single axis tracker” row under Professional and Enterprise. The pages we read for the other tools do not list dual-axis trackers.

How much does solar tracker design software cost?

PVsyst 8 Professional is CHF 700 per year. SAM is free. Arka360 Premium is $358 per month in its US dollar table. HelioScope Enterprise, which includes trackers, is custom per project. PVcase, PVFARM and RatedPower publish no amount. SurgePV Individual is $1,899 per user per year.

About the Contributors

Author
Rainer Neumann
Rainer Neumann

Editorial contributor · SurgePV

Rainer Neumann is credited as an editorial contributor on SurgePV content. This profile does not assert engineering credentials, project totals, software-testing experience, education, speaking engagements, or media citations because independent verification evidence is not retained in the publication record.

Editor
Keyur Rakholiya
Keyur Rakholiya

CEO & Co-Founder · SurgePV

Keyur Rakholiya is identified by SurgePV as its CEO and a company co-founder. His SurgePV author page lists only role information that can be tied to the public profile below; credentials, project totals, testing claims, media appearances, and speaking engagements are not asserted without retained evidence.

Ready to Design and Propose Faster?

SurgePV covers solar design, energy-yield modeling, financial modeling, and proposals in one platform. Book a guided demo to see it on a project like yours.

Choose which optional technologies SurgePV may use. Essential storage remains active for security and requested features.