Pick by the job, because the five vendors differ more on Spain than on features. Aurora Solar lists household usage profiles built from Spanish smart meter data. OpenSolar’s core app is free and lists a Spain diagram template. API Access (a way for other software to connect) and connectors are charged from 16 April 2026. PV*SOL premium has a Spanish screen language, 37 extra Spain climate data sets and a euro price. PVsyst documents P50 to P90 yield levels. P50 is a yield expected to be met or exceeded in 50% of years, and P90 in 90% of years. SurgePV documents roof modeling, bill of materials (a parts list) and proposals in one product, priced per user.
This is a desk comparison of what each vendor publishes, checked October 2026. We have not run side-by-side tests. SurgePV publishes this page and is one of the tools on it. Tool facts come from each vendor’s own site. Spanish rules come from the BOE (Spain’s official state gazette), IDAE and the law on local taxes. This page covers five tools. It does not cover every tool sold in Spain.
Criteria used: Spanish language, Spanish usage or climate data, surplus credit settings, diagram template for Spain, shared self-consumption, price currency.
Want to see SurgePV on your own Spanish project?
Book a guided demo and bring a real site. We walk through design, yield, finance and the proposal in one platform.
Book a Free DemoChecking cost first? See the SurgePV pricing page.
Best-For Picks for Spain
- Spanish home usage profiles in a sales proposal: Aurora Solar. Its help center lists household profiles for Spain built from measured Spanish smart meter data. It also has a Spanish website. Its plans are priced in dollars.
- Free core app with a Spain diagram template: OpenSolar. Its help article lists Spain among the countries with a single line diagram (SLD, a simple drawing of how the system is wired). Spanish is a supported proposal language. API Access and connectors are charged from 16 April 2026.
- Spanish screen language, Spain climate data and a euro price: PV*SOL premium. Its help lists 37 extra climate data sets for Spain. Its product page shows 845 euro plus VAT per named user per year. It runs on Windows 10 and 11 only.
- Yield evidence for a lender or insurer: PVsyst. Its help describes P50 to P90 evaluations. The program screens are available in Spanish. The help pages are in English only.
- Roof model to bill of materials and proposal in one product, priced per user: SurgePV. It is priced in US dollars. Ask in a demo whether it supports Spanish outputs and surplus credit rules. Its published scope does not say.
Comparison Table
Listed alphabetically. This is not a ranking; pick by the situation above. Prices checked October 2026 on each vendor’s own page.
| Tool | Best for | Price | Free or paid | Decisive scope fact |
|---|---|---|---|---|
| Aurora Solar | Spanish home usage profiles | Basic $159 per user per month; $135 per user per month billed annually (“$”, no currency named) | Paid | Help lists Spain profiles; no P90 output |
| OpenSolar | Free core app, Spain diagram template | Core app free; API Access and connectors charged from 16 April 2026 | Free core app, paid API and connectors | Spain listed for diagrams |
| PV*SOL premium | Spanish screens, Spain climate data, euro price | EUR 845.00 per named user per year, plus VAT | Paid, trial download | 37 extra Spain climate data sets; Windows only |
| PVsyst | Yield evidence | CHF 700 per year (Professional) | Paid, one-month trial | P50 to P90 evaluations; Windows only |
| SurgePV | Roof model to BOM and proposal, per user | $1,899 per user per year (1 user); euro price not stated | Paid, guided demo | BOM and proposal generation in scope |
Spain Criteria Matrix
Each cell is Documented, Partial or Not stated. It is based on the vendor pages we read in October 2026. Documented means the page states it for this task. Partial means the page lists a related feature but not the Spanish item. Not stated means the pages we read do not mention it. There are no scores or weights.
| Tool | Spanish language | Spanish usage or climate data | Surplus credit settings | Diagram template for Spain | Shared self-consumption | Price currency |
|---|---|---|---|---|---|---|
| Aurora Solar | Partial (Spanish website; app language not stated) | Documented (Spain household profiles) | Partial (net billing or feed-in tariff per design; Spain not named) | Partial (SLD editor for Europe; Spain not named) | Not stated | Partial (“$” shown; currency not named) |
| OpenSolar | Documented (Spanish proposals; needs a translated template) | Partial (TMY weather data; Spain not named) | Partial (tariff and compensation help articles; Spain not named) | Documented (ES in both vendor lists) | Not stated | Partial (core app free; API Access and connectors charged) |
| PV*SOL premium | Documented (Spanish screens and reports) | Documented (37 extra Spain climate data sets) | Partial (feed-in and net-metering tariff databases; Spain not named) | Partial (circuit diagrams; Spain not named) | Not stated | Documented (EUR, plus VAT) |
| PVsyst | Partial (Spanish screens; help in English only) | Partial (seven weather databases; Spain not named) | Partial (self-consumption economy page; Spain not named) | Partial (SLD for grid-connected systems; Spain not named) | Not stated | Documented (CHF) |
| SurgePV | Not stated | Not stated (energy-yield modeling listed) | Partial (financial modeling listed) | Not stated (electrical workflow support listed) | Not stated | Documented (USD) |
Two things stand out. Only Aurora Solar and PV*SOL premium name Spain data of their own. Only OpenSolar lists Spain for diagrams. No vendor page we read describes shared self-consumption.
Tool Entries
Aurora Solar
Best for: home installers who sell on proposals and want a Spanish usage profile to start from.
Not the right choice if: you need a P90 yield figure (Aurora’s help says its estimates are P50 values, and it does not output P90 for solar production), or a euro price (the plan pages show “$” and no currency name).
What the vendor documents: a Lifestyle Consumption Patterns article. It lists profiles for Spain built from measured Spanish household smart meter data, with Spanish names such as “Uso diurno” (daytime use). The help center also lists a compensation policy setting. You choose net billing or feed-in tariff for each design. Its single line diagram editor is “only available in Europe”. The weather data help article says Solcast is the prioritized option in Europe. Aurora runs a Spanish website with its own plan page.
Price (checked October 2026): Basic is $159 per user per month billed monthly, or $135 per user per month billed annually ($1,620 per year). Premium is $259 per user per month, or $220 per user per month billed annually ($2,640 per year). Enterprise is custom, per project. The Spanish plan page shows the same amounts with “$” and no currency name.
Limitations: none of the 306 English help articles we read mention Real Decreto 244/2019, autoconsumo, compensación simplificada or collective self-consumption. The help article on editing rates labels the feed-in rate field “$ per kWh”, so ask the vendor how to enter a euro rate. The pages we read do not say whether the app itself runs in Spanish.
Vendor link: aurorasolar.com.

OpenSolar
Best for: small installers who want a free core app, a generated single line diagram and Spanish proposals.
Not the right choice if: you need documented P50 to P90 yield evidence, or a stated Spanish surplus credit calculation.
What the vendor documents: its help article on single line diagrams says they are supported in ten countries, including Spain (ES). The diagram page lists a shorter set that also includes ES. A help article on proposal language lists 13 languages, including Spanish. For a Spanish proposal you need a proposal template that has been translated by hand. Its help center has a Utility Tariffs section covering export, feed-in (a set price paid for power you send to the grid) and compensation settings. You can enter custom tariffs yourself.
Price (checked October 2026): the core app is free of charge for solar professionals, per the vendor. From 16 April 2026 the vendor charges for API Access (a per-project fee) and supported connectors (a flat monthly subscription). The date comes from its 16 February 2026 post. The billing types come from its API page.
Limitations: none of the 437 English support articles we read mention Real Decreto 244/2019, autoconsumo or compensación simplificada. They do not name Spain in the tariff articles.
Vendor link: opensolar.com.

PV*SOL premium
Best for: designers who want Spanish screens, extra Spain climate data and a euro-priced named-user license, with 3D shading analysis.
Not the right choice if: you work on a Mac or in a browser (the system requirements list Windows 10 and 11), or you need a stated Spanish surplus credit calculation.
What the vendor documents: on the product page, screens in German, English, Spanish, French, Italian, Polish, Czech, Portuguese and Turkish, and project reports in 24 languages. It lists 3D visualization and shading analysis, self-consumption, battery and EV modeling, and “fully customizable circuit diagrams”. It lists a 20-year financial analysis that uses a feed-in tariff database. The climate data help page says “For Spain another 37 climate data sets are included”. Its system requirements page lists a Spanish map service (IGN). Valentin lists Soleme (Móstoles, Madrid) as a sales partner for Spain.
Price (checked October 2026): EUR 845.00 plus VAT for a named-user license, one year. A free trial version is offered for download.
Limitations: the 124 help pages we read do not mention Real Decreto 244/2019, autoconsumo or shared self-consumption. The help topic on bankability (P50, P90) gives P50 by default and says the P90 option relates only to full feed-in.
Vendor link: valentin-software.com.

PVsyst
Best for: yield evidence on larger projects, such as a commercial roof, where a lender, investor or insurer wants a simulation report.
Not the right choice if: you need quotations and proposals from the same tool (the pages we read describe none), or you work on a Mac or in a browser. The requirements page says it runs only under Windows.
What the vendor documents: the product page lists 12 program languages, including Spanish, and seven weather databases. The languages page says the help is in English only. A P50 to P90 evaluation page says the P50 value has a 50% probability of being exceeded and the P90 value a 90% probability. Its economic evaluation page covers a fixed feed-in tariff and a self-consumption economy with one tariff for energy you use and another for energy you sell. The single line diagram page says the feature covers grid-connected systems only, leaves out storage and is “still work in progress”.
Price (checked October 2026): CHF 700 per year for PVsyst 8 Professional, with grouped-order discounts of 5% for 2 to 4 licenses, 15% for 5 to 9 and 20% for 10 or more. The product page lists a one-month free trial. No euro price is published.
Limitations: none of the 2,363 help sections we searched mention Real Decreto 244/2019 or autoconsumo.
Vendor link: pvsyst.com.

SurgePV
SurgePV is our product.
Best for: teams that want roof modeling, shading, yield, financial modeling, bill of materials and proposals in one product, priced per user. Confirm Spanish outputs in a demo.
Not the right choice if: you want a self-serve trial (SurgePV offers a guided demo). It is also not right if you need Spanish outputs or a euro price with VAT in writing before talking to sales. Another case is a free tool for small jobs, where OpenSolar’s core app is free. Outputs support design and documentation but do not replace approval by the responsible engineer, authority, lender or utility. SurgePV’s published product scope does not list a CRM (customer tracking tool). It is not a monitoring or ERP (business management software) product.
What the vendor documents: 3D roof modeling, array layout and shading analysis. It also lists energy-yield modeling, financial modeling, electrical workflow support, bill-of-materials output and proposal generation. See solar design software for the product page.
Price (checked October 2026): $1,899 per user per year for 1 user, $1,499 per user for 3 seats, $1,299 per user for 5 seats, in US dollars.
Limitations: results depend on source data, assumptions and equipment models. The published scope does not state Spanish language support, Spanish surplus credit rules, shared self-consumption or a P50 to P90 output.
Vendor link: surgepv.com.

Spanish Rules That Shape the Choice
Two kinds of self-consumption. Real Decreto 244/2019 splits self-consumption by whether power may flow to the grid. Without surplus, the plant must have an anti-spill device that stops any flow to the grid. With surplus, extra power can flow to the grid. With surplus then splits again into plants that take part in simplified compensation and plants that do not (BOE, Real Decreto 244/2019, article 4, consolidated text updated 21 March 2026).
What the anti-spill device needs. A change to the low-voltage electrical rules (ITC-BT-40) requires plants without surplus to fit a system that meets the tests in a new annex. The installer normally hands over the documents that show it meets the rules, together with the installation certificate. A design tool can list the device in the bill of materials. It cannot replace the paperwork.
How surplus is valued. Article 14 values surplus hour by hour. With a free-market retailer, the price is the hourly price you agree with them. With the regulated small-consumer price, the surplus is valued at the average hourly market price minus imbalance costs. In both cases the surplus value cannot be higher than the value of the energy you bought from the grid. The billing period is at most one month. Surplus under this scheme is exempt from the access charges for producers set in Real Decreto 1544/2011 (article 14). Once you pick a mode, you must stay in it for at least four months (article 8).
Shared self-consumption. Article 3 treats a plant as “nearby” in four cases. It is on the consumers’ internal network or linked by a direct line. It sits on the same low-voltage transformer. It is less than 500 meters from the consumers, measured between meters. It shares the same cadastral reference (the first 14 digits). A photovoltaic or wind plant of up to 5 MW can also count if it is less than 5,000 meters away and connected through the grid. All participants must sign one agreement with their sharing coefficients and send it to the distribution company. Annex I says the coefficients for each hour must add up to one. They may differ from hour to hour if everyone signs. A tool that shows one number for the whole building does not match this.
Local taxes. IBI is the property tax. ICIO is the tax on building works. Each town hall (ayuntamiento) decides its own rate and discounts. The national law on local finances lets an ordinance give an IBI discount of up to 50% of the tax for buildings with solar systems (BOE, Real Decreto Legislativo 2/2004, article 74.5). For ICIO, an ordinance may give a discount of up to 95% for works that add a solar system (article 103.2.b). Both discounts need the installation to have the approval (“homologación”) of the competent authority. The town sets the ICIO rate, and it cannot exceed 4% (article 102.3). Because every town decides, no tool can use one national figure.
Permits and grants. An installation without surplus does not need access and connection permits. A surplus installation of 15 kW or less on urbanized land is also exempt. Other surplus installations need permits (article 7). The RD 477/2021 aid for self-consumption and storage runs through regional calls. IDAE’s status page says each Comunidad Autónoma (region) must approve and publish its own call. We print no grant amounts because they differ by region and change often.
Language, money and units. Documents are in Spanish and prices in euros. Vendors on this page publish prices in USD, EUR or CHF. Quote the currency you will be invoiced in.
Where to check. Use the BOE for the law and IDAE for grant status. Your town hall publishes its tax ordinances.
What to Ask a Vendor Before Buying
Ask each vendor for one sample project. Then look for these items. First, a way to enter your own hourly consumption or a Spanish usage profile. Second, a surplus credit that follows the hourly price and the one-month cap. Third, the sharing coefficients for a building with several consumers. Fourth, Spanish text on the proposal. Fifth, a price in the currency you will be invoiced in. Where a vendor does not publish a feature on the pages we read, the matrix says so. A demo or trial is the place to confirm it.
How We Ordered These Tools
We did not rank these tools. They are listed alphabetically, and the best-for picks come from the matrix above.
- Spanish language: customers and permit offices work in Spanish. We did not assess how good any translation is.
- Spanish usage or climate data: local weather and usage patterns change the yield and savings figures. We did not assess data accuracy.
- Surplus credit settings: Spanish surplus credit follows article 14. We did not assess whether any tool calculates it correctly.
- Diagram template for Spain: your installer files electrical documents. We did not assess whether any diagram meets a Spanish form.
- Shared self-consumption: buildings with several households need sharing coefficients. We did not assess how any tool would model them.
- Price currency: the currency shows what a Spanish buyer will pay. We did not assess discounts or negotiated quotes.
Sources and Dates
Vendor pages were read in October 2026. Aurora Solar (pricing, Spanish plans, help center English articles). OpenSolar (free, diagrams, support center English articles). PV*SOL (premium, partners, help pages). PVsyst (shop, product, help pages). SurgePV (pricing). Spanish sources are the BOE consolidated text of Real Decreto 244/2019 (updated 21 March 2026), the BOE consolidated text of Real Decreto Legislativo 2/2004 (updated 7 October 2026) and the IDAE status page. All are linked above and were read in October 2026.
See SurgePV on your own Spanish project
Book a guided demo and ask for the Spanish outputs you need.
Book a Free DemoGo Deeper on a Category
- Solar design software in Spain
- Proposal software in Spain
- Solar simulation software in Spain
- Solar software in Portugal, the nearest country list
- Solar software in France
- Best all-in-one solar design software
Frequently Asked Questions
What is the best solar software for Spain?
It depends on the job. Aurora Solar lists household usage profiles built from Spanish smart meter data. OpenSolar’s core app is free and lists a Spain diagram template. API Access (a way for other software to connect) and connectors are charged from 16 April 2026. PV*SOL premium has a Spanish screen language, 37 extra Spain climate data sets and a euro price. PVsyst documents P50 to P90 yield levels. SurgePV documents roof modeling, bill of materials and proposals in one product, priced per user in US dollars.
Which solar software supports autoconsumo under Real Decreto 244/2019?
None of the vendor pages we read mention Real Decreto 244/2019. We read the PV*SOL help pages, the PVsyst help pages, the Aurora Solar and OpenSolar help centers, and SurgePV’s published scope. You can still model a Spanish home with a custom tariff and your own consumption data. Check the surplus rules on this page, and ask each vendor for a sample project.
How does Spain value surplus solar power?
With simplified compensation, surplus energy earns a credit on your bill, valued hour by hour. The credit cannot be worth more than the energy you bought from the grid in the billing period. That period is at most one month. You qualify only if you meet all the conditions. They include a renewable source, installations totaling 100 kW or less, a signed surplus compensation contract, and no additional or specific pay scheme for the plant.
What is shared self-consumption in Spain?
Collective self-consumption means several consumers share power from one nearby plant. The plant must be close to the consumers. Examples are a link through the building’s internal network, the same low-voltage transformer, or less than 500 meters between meters. All participants sign one agreement that sets each person’s share. They send it to the distribution company. None of the vendor pages we read describe this sharing.
Can solar software calculate IBI and ICIO tax discounts in Spain?
None of the vendor pages we read mention them. IBI is the property tax and ICIO is the tax on building works. Each town hall (ayuntamiento) sets its own rates. The national law lets each town hall give a discount for solar systems through its own tax ordinance. For IBI the limit is 50% of the tax. For ICIO it is 95%. The discount is not automatic. Check the ordinance of the town where the project sits.
How much does solar software cost in Spain?
Vendors publish prices in different currencies. Aurora Solar shows dollar amounts: Basic is $159 per user per month billed monthly, or $135 per user per month billed annually. OpenSolar’s core app is free, but the vendor charges for API Access and supported connectors from 16 April 2026. PV*SOL premium is 845 euro plus VAT (value-added tax) per named user per year. PVsyst Professional is 700 Swiss francs per year. SurgePV lists 1,899 US dollars per user per year for one user. Only PV*SOL publishes a euro price.


