You work in France with a fixed local process. You send the connection request to Enedis, the grid operator. You get a Consuel attestation before Enedis starts the system. If you sell power to EDF OA, the buyer, your S21 contract rate depends on the power of the system and the date of your connection request. No vendor page we read says a tool produces a Consuel file. Only Trace Software’s French blog names S21, for Archelios PRO. So pick by what each tool does state. Archelios PRO and Aurora list Enedis consumption data. Archelios PRO and PV*SOL premium publish euro prices. PVsyst documents P50 to P90 yield evidence. P50 is a yield expected to be met or exceeded in 50% of years, and P90 in 90% of years. OpenSolar’s core app is free. SurgePV lists roof modeling, bill of materials (a parts list) and proposals in one product, priced per user.
This is a desk comparison of what each vendor publishes, checked October 2026. We have not run side-by-side tests. SurgePV publishes this list and is one of the tools on it. See our editorial standards. Local rules below come from Enedis, EDF OA and photovoltaique.info. Tool facts come from each vendor’s own site. This list covers six tools. It does not cover every tool sold in France.
Criteria used: diagram for a Consuel file, Enedis consumption data, S21 tariff steps, French language, price currency, yield evidence.
Working on a French project? See SurgePV on it
Book a guided demo and bring a real site. We walk through design, yield, finance and the proposal in one platform.
Book a Free DemoChecking cost first? See the SurgePV pricing page.
Best-For Picks for France
- Enedis consumption data in the design tool: Archelios PRO Gold or Aurora. Archelios PRO Gold lists “Import consumption profile from the Enedis API”. Aurora’s help article on consumption patterns lists “France: Enedis regional aggregate profiles”.
- A euro price list: Archelios PRO or PV*SOL premium. Archelios PRO lists 990, 1,490 and 1,990 euro a year excluding tax, by project size. PV*SOL premium lists 845 euro plus VAT for one named user for one year.
- A free tool for small jobs: Archelios PRO Free or OpenSolar. Archelios PRO Free covers projects up to 9 kWp. OpenSolar’s core app is free. OpenSolar charges for API Access and connectors from 16 April 2026.
- Yield evidence for a larger roof: PVsyst or Archelios PRO Gold. PVsyst documents P50 to P90 evaluations. Archelios PRO Gold lists P50, P75 and P90 probability indicators.
- A generated electrical diagram to start a Consuel file: OpenSolar, Aurora, PV*SOL premium, PVsyst or Archelios PRO. OpenSolar’s help article lists France as a single line diagram template. Aurora’s editor is “only available in Europe”. None says its diagram follows the Consuel format, so check a sample before you buy.
- Roof model to bill of materials and proposal in one product, priced per user: SurgePV. It documents roof modeling, shading, yield, financial modeling, electrical workflow support, bill of materials and proposals, priced in US dollars. Ask in a demo about French language, Consuel and S21. Its published scope states none of them.
Comparison Table
Listed alphabetically. This is not a ranking; pick by the situation above. Prices checked October 2026 on each vendor’s own page.
| Tool | Best for | Price | Free or paid | Decisive scope fact |
|---|---|---|---|---|
| Archelios PRO | Enedis data import, euro price, free tier | Free (9 kWp per project); Silver 990, Gold 1,490, Platinum 1,990 euro a year, excl. tax | Free and paid | Gold lists an Enedis API consumption import |
| Aurora Solar | Teams already on Aurora | $159 or $259 per user per month (billed monthly); $135 or $220 billed annually | Paid | Lists France Enedis regional profiles; no euro price read |
| OpenSolar | Free quoting with a French proposal | Core app free of charge; API Access and connectors charged from 16 April 2026 | Free core app, paid API and connectors | France is a listed diagram template |
| PV*SOL premium | Euro price, 3D shading, French interface | EUR 845.00 per named user per year, plus VAT | Paid, trial download | Windows 10 and 11 only |
| PVsyst | Yield evidence | CHF 700 per year (Professional) | Paid, one-month trial | Documents P50 to P90 evaluations; Windows only |
| SurgePV | Roof model to BOM and proposal, per user | $1,899 per user per year (1 user), in US dollars | Paid, guided demo | BOM and proposal generation in scope; no French item stated |
France Criteria Matrix
Each cell is Documented, Partial or Not stated, based on the vendor pages we read in October 2026. Documented means the page states it for this task. Partial means the page lists a related feature but not the French item. Not stated means we did not find it on those pages. There are no scores or weights.
| Tool | Diagram for a Consuel file | Enedis consumption data | S21 tariff steps | French language | Price currency | Yield evidence |
|---|---|---|---|---|---|---|
| Archelios PRO | Partial (single-line schematics and execution plans; Consuel not named on the product page) | Documented (Gold: Enedis API import) | Partial (economic study listed; a 2021 French blog post says the economy tab takes the S21 threshold and second tariff) | Documented (language menu lists French) | Documented (EUR, excl. tax) | Documented (Gold: P50, P75, P90) |
| Aurora Solar | Partial (single-line diagram editor, Europe only; Consuel not named) | Documented (France: Enedis regional aggregate profiles) | Partial (net billing or feed-in tariff setting; S21 not named) | Partial (French site and help; app language not stated) | Documented ($ prices) | Partial (P50 only) |
| OpenSolar | Partial (France is a listed template; Consuel format not stated) | Not stated | Partial (custom tariffs; no French tariff named) | Documented (proposal language list includes French) | Partial (core app free; API Access and connectors charged from 16 April 2026; no euro price) | Not stated |
| PV*SOL premium | Partial (circuit diagrams; Consuel not named) | Not stated | Partial (feed-in tariff database; countries not stated) | Documented (interface lists French) | Documented (EUR, plus VAT) | Partial (P50 and P90 in the Bankability help topic, full feed-in only) |
| PVsyst | Partial (single line diagram for grid-connected systems, storage not included; Consuel not named) | Not stated | Partial (fixed feed-in tariff over a contract period) | Documented (translated into French) | Documented (CHF) | Documented |
| SurgePV | Not stated (electrical workflow support listed) | Not stated | Partial (financial modeling listed) | Not stated | Documented (USD) | Not stated (energy-yield modeling listed) |
Two things stand out. No vendor product page we read names Consuel or the S21 tariff, and only Trace Software’s French blog names S21. The tools differ most on Enedis data, on the currency they price in, and on whether they document P50 to P90.
Tool Entries
Archelios PRO
Best for: designers who want a euro-priced web application with a free tier, an Enedis consumption import and P50 to P90 indicators.
Not the right choice if: you need a stated Consuel or S21 output (the product pages name neither, and the French blog names only S21), or you need the Enedis import on the cheapest paid tier (the vendor lists it on Gold).
What the vendor documents: on its product page, archelios PRO is a web application for rooftop projects up to large solar plants. It lists 3D modeling, automatic layout, inverter configuration, automatic string wiring and production calculation. It also lists self-consumption analysis, an economic study with return and payback, a sizing report and “Single-line schematics and execution plans”. Silver adds P50. Gold adds “Use of P50, P75, P90 probability indicators”, “Import consumption profile from the Enedis API” and PDF and CSV reports. Platinum adds custom probability indicators. The page does not say which tier includes the single-line schematics. The login page at archelios.com has a language menu that lists French.
Price (checked October 2026): Free for projects up to 9 kWp. Silver is 990 euro excl. tax a year (up to 100 kWp per project). Gold is 1,490 euro (up to 1 MWp). Platinum is 1,990 euro (unlimited power). The vendor also sells archelios CALC, an electrical sizing product, from 1,350 euro excl. tax a year.
Limitations: the Free tier lists only module and inverter sizing, output and economic calculation. The 44 English solar pages we searched on the Trace Software site do not mention Consuel or the S21 contract. Its French pages do. A 2021 blog post says the economy tab takes the S21 threshold of 1,100 hours and a second tariff. A 2025 post on the 2025 S21 change names the Enedis API in Archelios PRO. A customer story says archelios CALC, a separate product, was bought to meet Consuel requirements. We found no page that says an archelios PRO file follows the Consuel format or computes the current S21 rate. The product page describes reports and deliverables, and does not mention a customer proposal document.
Vendor link: trace-software.com.

Aurora Solar
Best for: teams that already use Aurora and want Enedis regional consumption profiles for French homes.
Not the right choice if: you need a euro price (the pricing page we read shows dollars), a French app language stated in writing, or a P90 output. Aurora’s help says its production estimates are P50 values and that it “does not natively output P90”.
What the vendor documents: the Lifestyle Consumption Patterns article lists France with “Enedis regional aggregate profiles”. Its single-line diagram editor builds a diagram from the design. The article says the editor is “only available in Europe”. Aurora has a French-language Europe site, and its help centre offers a French option. The pages we read do not say whether the app itself runs in French. A help article on utility rates says compensation policy can be net billing or feed-in tariff, with a rate in dollars per kWh.
Price (checked October 2026): on aurorasolar.com/pricing, Basic is $159 per user per month billed monthly, or $135 per user per month billed annually. Premium is $259 per user per month billed monthly, or $220 per user per month billed annually. Enterprise is custom, per project. The page shows a dollar sign and no euro price.
Limitations: the pricing page lists an AHJ database (a list of permit offices) of 25,000+ US jurisdictions. The pages we read name no French permit or Consuel item.
Vendor link: aurorasolar.com/eu.

OpenSolar
Best for: small installers who want a free core app, a proposal in French and a generated single line diagram. Check the diagram against what Consuel asks for.
Not the right choice if: you need a stated Enedis import or a named S21 tariff, or documented P50 to P90 yield evidence. A search of the help centre for “France” returned five articles, and none is about a French tariff or Consuel.
What the vendor documents: its help article on single line diagrams says they are supported in “Australia (AU), New Zealand (NZ), United States (US), Canada (CA), United Kingdom (UK), France (FR), Germany (DE), Italy (IT), Spain (ES), and India (IN)”. The proposal language article lists French among 13 languages. A proposal needs a template translated by hand. The help centre has a Utility Tariffs section. You can create a custom tariff yourself.
Price (checked October 2026): the core app is free of charge for solar professionals, per the vendor. From 16 April 2026 the vendor charges for API Access (a per-project fee) and supported connectors (a monthly fee per organization). The per-project API fee is on OpenSolar’s API page. The 16 February 2026 post says accounting connectors are billed as a monthly fee per organization. Optional paid Enterprise Services: Support US$500 per month, Customize US$1,350 per month, Enterprise custom.
Limitations: the pages we read state no Consuel format, no Enedis data import and no French tariff library.
Vendor link: opensolar.com.

PV*SOL premium
Best for: designers who want a euro-priced named-user licence with 3D shading analysis, generated circuit diagrams and a French interface.
Not the right choice if: you work on a Mac or in a browser (the system requirements list Windows 10 and 11), or you need a stated Consuel, Enedis or S21 output.
What the vendor documents: on the product page, 3D visualisation and shading analysis, and self-consumption, battery and EV modelling. It lists “fully customizable circuit diagrams, including safety components”. It lists a 20-year financial analysis that uses a feed-in tariff database. The page does not say which countries the tariff database covers. The interface is in German, English, Spanish, French, Italian, Polish, Czech, Portuguese and Turkish, and project reports come in 24 languages. A customer presentation for quotations is also available. The help centre has a Bankability (P50, P90) topic.
Price (checked October 2026): EUR 845.00 plus VAT for a named-user licence, one year. The vendor offers a free trial download. Its PV*SOL site says the trial runs 30 days with all features except report printing and saving.
Limitations: the Bankability topic gives P50 by default and a P90 or self-selected P-value for the profitability calculation. It says this relates only to full feed-in. A search of the help centre found no mention of Consuel, Enedis or S21.
Vendor link: valentin-software.com.

PVsyst
Best for: yield evidence on larger roofs, where a lender, investor or insurer wants a simulation report.
Not the right choice if: you need quotations and proposals from the same tool, or you work on a Mac or in a browser. The requirements page says PVsyst runs only under Windows. A search of the PVsyst help index found no quotation or proposal output.
What the vendor documents: a P50 to P90 evaluation. PVsyst says the annual production has a 50% probability of exceeding the P50 value and a 90% probability of exceeding the P90 value. Its single line diagram help page describes an editor and viewer. It is available for grid-connected systems only. It does not include storage, and the page says the feature is “still work in progress”. The languages page says English is the reference language and lists French among the translations. Its economic evaluation help page covers a fixed feed-in tariff over a contract period and self-consumption economics.
Price (checked October 2026): CHF 700 per year for PVsyst 8 Professional, with grouped-order discounts of 5% for 2 to 4 licences, 15% for 5 to 9 and 20% for 10 or more. The product page lists a one-month free trial. No euro price is published.
Limitations: the help index has no hit for Consuel or Enedis. It names no French tariff.
Vendor link: pvsyst.com.

SurgePV
SurgePV is our product.
Best for: teams that want roof modeling, shading, yield, financial modeling, bill of materials and proposals in one product, priced per user. Confirm French outputs in a demo.
Not the right choice if: you want a self-serve trial (SurgePV offers a guided demo). It is also not right if you need a euro price in writing before talking to sales, because the pricing page lists US dollars. Another case is a free tool for small jobs, where Archelios PRO Free and OpenSolar’s core app are free. Outputs support design and documentation but do not replace approval by the responsible engineer, authority, lender or utility. That includes Consuel and Enedis. SurgePV’s published product scope does not list a CRM (customer tracking tool). It does not list monitoring or ERP (business management software) tools.
What the vendor documents: 3D roof modeling, array layout and shading analysis. It also lists energy-yield modeling, financial modeling, electrical workflow support, bill-of-materials output and proposal generation. See solar design software and solar proposal software for the product pages.
Price (checked October 2026): $1,899 per user per year for 1 user, $1,499 per user for 3 seats, $1,299 per user for 5 seats, in US dollars.
Limitations: results depend on source data, assumptions and equipment models. The pricing page and published scope do not state a French interface, a Consuel diagram, an Enedis data import, the S21 tariff or P50 to P90 outputs.
Vendor link: surgepv.com.

French Rules That Shape the Choice
The connection request goes to Enedis. Enedis says you choose one of three options: use all the power you make, use part and inject the surplus, or inject everything. You then file a connection request online. Enedis says injecting power before Enedis commissions the system is forbidden and is not paid. If you use all your power and sell none, you sign a CACSI (Convention d’Autoconsommation Sans Injection), an agreement with Enedis. If you sell power, Enedis names the contracts CAE and CU-I.
Consuel must issue an attestation first. Enedis says the attestation of conformity from the Consuel is “obligatoire” before commissioning, under article D342-19 of the Code de l’énergie. It adds that plug-and-play equipment that meets NF EN 50549-1-4 may be exempt. Photovoltaique.info, a site that Enedis links, lists a blue attestation (Cerfa 15523) for systems without storage and a violet one (Cerfa 15524) for systems with storage. It says one connection case needs a technical file called SC 144E, with a detailed diagram of the connection. For systems above 250 kVA, the network operator asks for a control report instead. The same site says the technical reference is NF C 15-100 with the guide UTE C 15-712-1, and XP C 15-712-3 when there is storage. NF and UTE texts are paid or gated. We did not read the clauses and name none.
The S21 contract sets the sale price. EDF OA’s S21 page describes a contract based on the arrêté (government order) of 6 October 2021. The contract lasts 20 years if the installation is finished within 24 months of the complete connection request. The rate depends on the power, the quarter of the request, and whether you sell all or only the surplus. For requests from 28 March 2025, there is no support for selling everything at 9 kWc or less. For requests from 22 September 2025, systems above 100 kWc are no longer eligible for S21. They move to a simplified tender (AOS). An order of 1 June 2026, published on 4 June 2026, requires one metering point for each new installation for requests from 5 June 2026. The page also explains the “Q power” rule for sites that add more panels within 18 months. We print no tariff figure because the rate depends on your request date. Use EDF OA’s simulator.
The installer needs a recognized qualification. Enedis says the company must hold a qualification recognized by the State, such as QualiPV, Qualibat, Qualifelec or Certisolis, to reach some aids and the purchase tariff. Your proposal tool does not replace this.
Language, units and prices. French sources write kWc for kilowatts of peak power. This page writes kWp. Three tools state French in their software languages (PV*SOL premium, PVsyst and Archelios PRO). OpenSolar lists French for proposals. Only Archelios PRO and PV*SOL premium publish a euro price. Archelios PRO lists prices excluding tax.
What to Ask a Vendor Before Buying
Ask each vendor for one sample project. Then look for these items. First, the electrical diagram you would add to a Consuel file. Second, a way to load Enedis consumption data. Third, a field for your S21 rate and request quarter. Fourth, a French proposal or report. Fifth, a price in the currency you will be invoiced in. Where a vendor does not publish a feature on the pages we read, the matrix says so. A demo or trial is the place to confirm it.
How We Ordered These Tools
SurgePV publishes this page and is a vendor on this list. Its entry uses the same vendor-page sources and template as every other tool here.
We did not rank these tools. They are listed alphabetically, and the best-for picks come from the matrix above.
- Diagram for a Consuel file: Consuel must issue an attestation before Enedis starts the system, and one connection case needs a detailed diagram. We did not assess whether any tool’s diagram meets Consuel’s format.
- Enedis consumption data: real load data makes a self-consumption estimate more useful. We did not assess how accurate any profile is.
- S21 tariff steps: the S21 rate depends on power, request quarter and sale mode. We did not assess whether any tool calculates it correctly.
- French language: a French proposal or report helps with French customers. We did not assess translation quality.
- Price currency: the currency shows what a French buyer will pay and whether tax is added. We did not assess discounts or negotiated quotes.
- Yield evidence: larger projects may need a report a lender or insurer will read. We did not assess acceptance by any French lender.
Sources and Dates
Vendor pages were read in October 2026. Archelios PRO (product page, Gold, CALC). Aurora (pricing, P-values). OpenSolar (free, enterprise services). PV*SOL (premium, trial). PVsyst (shop, languages). SurgePV (pricing). French sources are the Enedis page on installing solar panels, the EDF OA S21 page and the photovoltaique.info Consuel page. All are linked above and were read in October 2026. We searched for Consuel, Enedis and S21 in the PVsyst help index, the PV*SOL help index, the Aurora and OpenSolar help centres, 44 English solar pages on the Trace Software site, and about 70 French solar and archelios pages on that site. A page that only repeats the search word is not a hit. Where a search found a mention, the entry says so. The photovoltaique.info page summarizes the UTE guide. We did not read the guide itself.
See SurgePV on a French project
Book a guided demo and ask for the French outputs you need.
Book a Free DemoRelated Solar Software Lists
- Solar design software in France
- Solar proposal software in France
- Solar software in Germany and in Spain, two nearby country lists
- Solar software in the Netherlands and in Poland
Frequently Asked Questions
What is the best solar software in France?
It depends on the job. From what the vendors publish, Archelios PRO lists an Enedis consumption import and a euro price. PV*SOL premium has a euro price and a French interface. PVsyst documents P50 to P90 yield evidence. OpenSolar’s core app is free and lists France as a diagram template. SurgePV documents roof modeling, bill of materials and proposals in one product, priced per user in US dollars. No vendor page we read states a Consuel output. Only Trace Software’s French blog names S21, for Archelios PRO.
Which solar software has a euro price?
Two do. Archelios PRO lists 990 euro (Silver), 1,490 euro (Gold) and 1,990 euro (Platinum) a year, excluding tax. PV*SOL premium is 845 euro plus VAT (value-added tax) for a named-user licence for one year. PVsyst Professional is 700 Swiss francs a year. Aurora lists dollar prices and SurgePV lists 1,899 US dollars per user per year for one user. OpenSolar’s core app is free, but the vendor charges for API Access and supported connectors from 16 April 2026.
Does solar software prepare the Consuel file?
No vendor page we read says so. Consuel is the body that issues the attestation of conformity, a certificate required before a grid-connected system is switched on. Several tools generate an electrical diagram, but none says it follows the Consuel format. Ask the vendor to show a sample file before you buy.
Can solar software work out the EDF OA S21 tariff?
Only Trace Software names S21, in French blog posts about Archelios PRO. A post about the October 2021 order says the economy tab takes that order’s 1,100-hour threshold and second tariff. No other vendor page we read names S21. EDF OA, the buyer, sets the S21 rate by the power of the system, the quarter of the complete connection request, and whether you sell all or only the surplus. OpenSolar and Aurora document custom tariff settings, so you can check the rate in EDF OA’s simulator and key it in by hand.
Is there free solar software for French installers?
Yes, with limits. Archelios PRO Free covers projects up to 9 kWp (kilowatts of rated panel power) and lists module and inverter sizing, output and economic calculation. OpenSolar says its core app is free for solar professionals, but it charges for API Access and supported connectors from 16 April 2026. Neither states a Consuel or EDF OA output.
Which tools use Enedis consumption data?
Archelios PRO Gold lists an import of consumption profiles from the Enedis API. Aurora’s help centre lists France with Enedis regional aggregate profiles in its consumption patterns article. The other pages we read do not mention Enedis data.


