A Sri Lankan rooftop quote has to pick between PUCSL’s three schemes, which pay nothing for exports, a feed-in tariff, or a rate on all generation. OpenSolar’s core app is free. Aurora Solar lists design, financing integrations and proposal tracking. Energy Toolbase lists commercial solar and storage proposals built on utility rates. SurgePV lists roof modeling, bill of materials and proposals in one product, priced per user in US dollars. None of the vendor pages we read gives a Sri Lanka-specific tariff or subsidy rule, so run each tool on a real Sri Lankan project.
Vendor facts come from each vendor’s own pages, read in November 2026 and subject to change. No tool was run side by side. SurgePV publishes this page and is one of the 4 tools on it. Solargraf, which the earlier version of this page listed, is not compared because its site returned HTTP 403 (access denied) to automated reads.
Methodology: tools are listed alphabetically and are not ranked. Criteria used: design link, price and what the vendor says it covers. See How We Ordered These Tools.
Want to see SurgePV on your own Sri Lankan project?
Book a guided demo and bring a real site. We walk through design, yield, finance and the proposal in one platform.
Book a Free DemoChecking cost first? See the SurgePV pricing page.
Best-For Picks for Sri Lanka
- A residential job with financing integrations: Aurora Solar. Its pricing page lists tablet-friendly proposals, integrated financing and proposal activity tracking. The three schemes need different quote logic, so ask whether it can model a no-payment export, a feed-in tariff and gross generation.
- A commercial job above the 500 kW band, built on utility rates: Energy Toolbase. ETB Developer lists a database of more than 120,000 utility rates and payment option comparison, with price given on a call. PUCSL lists LKR 23.18 per kWh above 500 kW from 1 July 2024, so ask how a size band is entered.
- Modelling Net Metering on a free core app: OpenSolar. The core app is free and takes a custom tariff, a low-risk way to show a scheme where exports earn nothing. API Access and connectors are charged from 16 April 2026.
- A proposal from the roof model, sized against Contract Demand: SurgePV. It lists 3D roof modeling, shading, yield, financial modeling, bill of materials and proposal generation. Ask for a proposal that shows system size against the customer’s Contract Demand, measured as the inverter’s maximum power.
Comparison Table
Listed alphabetically. This is not a ranking; pick by the situation above. Prices checked November 2026 on each vendor’s own page.
| Tool | Best for | Price | Free or paid | Decisive scope fact |
|---|---|---|---|---|
| Aurora Solar | Design and sales proposals, per user | Basic $159 per user per month; $135 per user per month billed annually | Paid | Contract Manager and e-signature tools only on Enterprise |
| Energy Toolbase | Commercial solar and storage proposals | Not published; demo with pricing | Paid, quote on a call | In-app PV panel layout marked not included for ETB Developer |
| OpenSolar | Free core app with proposals | Core app free; API Access and connectors charged from 16 April 2026 | Free core app, paid API and connectors | Proposal formats are for residential workflows |
| SurgePV | Roof model to proposal in one product | $1,899 per user per year (1 user) | Paid, guided demo | Proposal built from the design model; no Sri Lanka-specific output stated |
What to Check for Sri Lanka
Ask each vendor to model one real Sri Lankan project, and look for five things. First, a proposal in the language and currency your customer reads, which for tariffs is the rupee. Second, a way to switch between Net Metering, Net Accounting and Net Plus. Third, a tariff band and start date you can enter. Fourth, the design data behind the production figure. Fifth, a price in the currency you will be invoiced in. Sri Lankan coverage was not verified for any tool, and a demo or trial is the place to settle it.
Tool Entries
Aurora Solar
Sri Lanka quote check: Ask whether export pay can be set to zero, to a fixed tariff, or applied to all generation.
Aurora Solar sells a design and sales platform.
Best for: Sri Lankan residential installers that want design, a tablet-friendly proposal and financing integrations in one tool. Aurora’s pricing page describes Basic as a plan for residential design and sales.
Not the right choice if: you need Contract Manager, e-signature tools or customizable sales agreement templates for a utility interconnection file, which the pricing page lists on Enterprise only, or more than one user and 50 projects a month on Basic or Premium. Aurora’s FAQ says additional licenses can be bought in the app.
What the vendor documents: customizable proposal templates, custom branding, and custom pricing methods (per watt, per component or flat fee). It also lists adders, discounts and incentives, a utility rate database, and web and PDF proposals. Adders are extra items added to the price. It lists proposal activity tracking and integrated and custom financing (GoodLeap, Dividend, Mosaic and more). It also lists financing and energy bill comparisons. Design features on the same page include 3D roof modeling and trees and performance simulation.
Price (checked October 2026): Basic is $159 per user per month billed monthly, or $135 per user per month billed annually ($1,620 billed annually). Premium is $259 per user per month billed monthly, or $220 per user per month billed annually ($2,640 billed annually). Enterprise is custom per project. Source: Aurora pricing.
Limitations: annual plans carry a one-year commitment per the pricing FAQ, and the pages we read name no PUCSL scheme, rupee tariff or CEB or LECO item.
Vendor link: aurorasolar.com.

Energy Toolbase
Sri Lanka quote check: Ask how it models a tariff by size band and a 20-year agreement term.
ETB Developer is Energy Toolbase’s solar and storage modeling and proposal product.
Best for: commercial solar and storage sales teams in Sri Lanka whose proposals depend on utility rates, incentives and storage economics, such as the above-500 kW band.
Not the right choice if: you need a published price before a call, or an in-app PV panel layout, which the table marks as not included for ETB Developer. The pricing page says pricing is given on a call.
What the vendor documents: a simulation engine for solar and storage. It also has a database of more than 120,000 verified utility rates kept by an in-house rates team. It supports VNEM (virtual net energy metering), NEMA (net energy metering aggregation) and other billing structures. It also lists payment option comparison, incentive calculations and cost forecasts. Proposals use branded templates. The vendor lists notifications when a prospect opens a proposal. It also lists analytics on time spent per section, and lead management. It also lists “PV design partnerships with leading design software tools” and “real-time indicative pricing quotes from lenders”. The page’s comparison table marks in-app PV panel layout tools as not included for ETB Developer. Its FAQ says it supports financing structures including cash purchases, power purchase agreements (PPAs), loans and leases. Source: ETB Developer.
Price (checked October 2026): not published for ETB Developer. The pricing page offers a 30-minute demo with pricing for your team size, and lists hardware and consulting items separately.
Limitations: hardware, consulting and implementation packages are priced separately, and the pages we read name no Sri Lankan tariff or PUCSL item.
Vendor link: energytoolbase.com.

OpenSolar
Sri Lanka quote check: Ask whether Net Metering with a zero export rate can be set in a proposal.
OpenSolar says its core app stays free and that a partner ecosystem helps fund the product (its 16 February 2026 post).
Best for: Sri Lankan installers who want design, a proposal, checkout and e-signature in one free core application, and who can enter a custom tariff for a no-payment export scheme.
Not the right choice if: you need commercial proposals. OpenSolar’s proposal FAQ says Swipe, Scroll and Bespoke “are for residential proposal workflows”. It is also not for you if you plan to connect many outside systems, because API Access and connectors are charged from 16 April 2026. The proposal page also says availability is “enabled by region”.
What the vendor documents: the Sales Machine Proposal page lists Swipe (slide-based), Scroll (long-form) and Bespoke proposals. It also lists a Quick Quote path, a fast quote and checkout route for simpler service and non-solar jobs. It lists branding controls and a template library. It lists savings views that compare current and electrified energy costs. It also lists deposits through CashFlow. It also lists financing “where available” and acceptance inside the same flow. A WhatsApp share option and section-view tracking “where available” are listed as well. The e-signature page lists a built-in signing workflow, PandaDoc or DocuSign.
Price (checked October 2026): the core app is free of charge for solar professionals, per the vendor (free page). From 16 April 2026 the vendor charges for API Access, a per-project fee. The per-project API fee is on OpenSolar’s API page. It also charges for supported connectors, a monthly fee per organization. The 16 February 2026 post says accounting connectors are billed as a monthly fee per organization. Bespoke proposals are offered through the optional paid Enterprise Services. Support is US$500 per month. Customize is US$1,350 per month (one exclusive proposal template). Enterprise is custom (“fully bespoke proposal”). Premium imagery is pay per image (price shown in the app).
Limitations: Swipe, Scroll and Bespoke support up to six designs per project where selection applies. The API page prices access by region, and no Sri Lankan tariff is named on the pages we read.
Vendor link: opensolar.com

SurgePV
Sri Lanka quote check: Ask for a sample proposal that states system size against an entered Contract Demand.
SurgePV is our product.
Best for: Sri Lankan installers and EPC teams (engineering, procurement and construction) that want a proposal built from the same 3D roof model, array layout and shading analysis, with energy-yield and financial modeling in one web application, sized against Contract Demand.
Not the right choice if: you need a self-serve trial (SurgePV offers a guided demo), or financing options, contracts or e-signature inside the proposal flow. The pricing page lists proposal generation and a generation and financial analysis feature, and does not describe those items. SurgePV’s published product scope does not list a CRM (customer tracking tool). Outputs support design and documentation but do not replace approval by the responsible engineer, authority, lender or utility.
What the vendor documents: 3D roof modeling, solar array layout, shading analysis and energy-yield modeling. It also lists financial modeling, electrical workflow support, bill-of-materials output and proposal generation. The pricing page lists unlimited projects, shadow analysis, generation and financial analysis, and proposal generation under “Everything included”. See the solar proposal software page for the product.
Price (checked November 2026): $1,899 per user per year for 1 user, $1,499 per user for 3 seats, $1,299 per user for 5 seats, in US dollars. Access is a guided demo.
Limitations: results depend on source data, assumptions, equipment models and review. The published scope states no Sri Lankan tariff, subsidy, language or currency, so ask for them in a demo.
Vendor link: surgepv.com. Book a Free Demo.

See SurgePV on your own Sri Lankan project
Book a guided demo and ask for the Sri Lankan outputs you need.
Book a Free DemoWhat a Sri Lankan Rooftop Quote Must Reflect
Sri Lanka’s rooftop schemes are described by the regulator, PUCSL. Source: PUCSL, Rooftop Solar PV Connection Schemes. Source: PUCSL, Guidelines on Rooftop Solar PV installation for Utility Providers (April 2019). The 2019 guideline is older, and PUCSL’s page notes that its earlier tariff is “not used at present”, so use the guideline for scheme structure and the page for tariffs. The PUCSL page does not say whether each scheme is open to new applicants, so ask CEB or LECO before you quote.
Three schemes, three quote models. Under Net Metering the customer is credited for energy added to the grid, but no payment is made for excess electricity over consumption. PUCSL’s page says surplus is banked and can be used for up to ten years. Under Net Accounting the export is paid at a Cabinet-approved feed-in tariff agreed when the agreement is signed. Under Net Plus the customer is paid for all solar generation, imports are billed at the end-user tariff, and two separate meters measure import and export.
Tariff bands on the PUCSL page. Rates are given by size band: up to 500 kW (AC), above 500 kW, and aggregation. For agreements from 1 July 2024 the page lists LKR 27.06 per kWh up to 500 kW and LKR 23.18 per kWh above 500 kW and for aggregation, with 20-year agreements. An earlier schedule from 26 October 2022 listed Rs 37.00 and Rs 34.50. A quote must name the date and band it assumes.
Sizing ceiling. The 2019 guideline says installed capacity cannot exceed the customer’s Contract Demand, measured as the inverter’s maximum power. It says the customer decides the capacity, weighing resource, investment and average energy needs. Net Metering suits systems that match own use because exports earn no payment.
Metering layout. For Net Plus the solar inverter output goes to a sealed meter cubicle holding both import and export meters. If space is short, the consumer arranges to move the metering point, at the prevailing rate charged to the consumer.
Process and timing. The guideline lists contact with the CEB or LECO area engineer, an application with an initial review fee, an estimate within one week, an interconnection agreement, commissioning testing by a competent engineer witnessed by the utility, and parallel operation once testing and the agreement are done. It also says inverters must carry type test certificates from an accredited laboratory.
Net Plus Plus. PUCSL describes it as allowing a system larger than the contract demand, classed as a power plant with separate wiring. Check its status with the utility.
What to ask a proposal vendor. Can the quote switch between a no-payment scheme, a feed-in tariff and a gross-generation scheme? Can a tariff band and start date be entered? Can the proposal show the 20-year agreement term? None of the vendor pages we read states Sri Lankan output.
How We Ordered These Tools
Tools are listed alphabetically and carry no rank. The best-for picks follow what each vendor publishes, read against the PUCSL schemes above.
- Design link: whether the vendor says the proposal is built from the design. Output quality was not assessed.
- Price: the vendor’s listed price in its own currency. Discounts and negotiated quotes were not assessed.
- Scope: what the vendor’s pages say the tool covers, including any scheme or tariff band. Where a page is silent, nothing is inferred.
Go Deeper on a Category
- Solar proposal software, all markets
- Solar design software for Sri Lanka
- Solar software in Sri Lanka
- SurgePV solar proposal software
Sources and Dates
Vendor pages were read in October and November 2026. Screenshots are public website captures from 29 October 2026. Sources are the vendor pages linked in each entry: pricing, product and help pages. SurgePV facts come from its pricing page. SurgePV publishes this page and is a vendor on the list. We could not read Solargraf’s site, so it is not compared.
- pucsl.gov.lk: PUCSL, Rooftop Solar PV Connection Schemes (read November 2026)
- pucsl.gov.lk (guideline): PUCSL, Guidelines on Rooftop Solar PV installation for Utility Providers (April 2019) (read November 2026)
Frequently Asked Questions
Which rooftop solar schemes does PUCSL describe for Sri Lanka?
Net Metering, Net Accounting, Net Plus and Net Plus Plus. Net Metering pays nothing for excess export, Net Accounting pays a Cabinet-approved feed-in tariff, and Net Plus pays for all generation through a separate export meter.
What feed-in rates does PUCSL list for Sri Lankan rooftop solar?
For agreements from 1 July 2024 its page lists LKR 27.06 per kWh up to 500 kW and LKR 23.18 per kWh above 500 kW and for aggregation, on 20-year agreements. Check the dated schedule before you quote.
How large can a rooftop system be in Sri Lanka?
The 2019 PUCSL guideline says installed capacity cannot exceed the customer’s Contract Demand, taken as the inverter’s maximum power. Net Plus Plus is described as an exception.
Is a rooftop scheme open to new applicants in Sri Lanka?
PUCSL’s rooftop page does not say. Ask CEB or LECO which scheme and tariff apply before issuing a quote.
How much does solar proposal software cost in Sri Lanka?
Vendors price in their own currency, and the pages we read do not give a local-currency price. SurgePV lists $1,899 per user per year for one user. OpenSolar’s core app is free, with charges for API Access and connectors from 16 April 2026. Aurora Basic is $159 per user per month, or $135 per user per month billed annually. Energy Toolbase does not publish a price for ETB Developer.
Does SurgePV publish this list?
Yes. SurgePV publishes this page and is one of the tools on it. The tools are listed alphabetically and are not ranked.


