A Slovak household or small firm applying through e-Žiadosti for a source up to 10.8 kW wants a quote in euros that shows what the operator charges. Of the five tools here, OpenSolar’s core app is free, Aurora Solar lists design, financing integrations and proposal tracking, and SurgePV combines roof modeling, a bill of materials and proposals under a per-user dollar licence. No vendor page we read gives a Slovak tariff or subsidy rule, so enter one real Slovak project into each tool.
The comparison reads what each vendor publishes as of November 2026, with no side-by-side runs. SurgePV publishes this page and is a vendor on this list. The country section draws on one distribution operator’s small-source page only. Tool facts come from each vendor’s own site, and prices may change. Spreadsheets have no vendor page and are left out.
Tools are alphabetical, not ranked, and the criteria are design link, price and stated scope. See How We Ordered These Tools.
Want to see SurgePV on your own Slovak project?
Book a guided demo and bring a real site. We walk through design, yield, finance and the proposal in one platform.
Book a Free DemoChecking cost first? See the SurgePV pricing page.
Best-For Picks for Slovakia
- A quote that must itemise the connection fee, reserved-capacity charge and nuclear fund levy: any tool with a custom line item and custom tariff. OpenSolar and Aurora both take your own tariff, so ask in a demo whether each charge can sit on its own line.
- Residential design with financing and tracking: Aurora Solar. Its pricing page lists tablet-friendly proposals, integrated financing and proposal activity tracking, which suits a customer who has a 10-working-day contract draft to sign. Contract Manager and e-signature are Enterprise only.
- A free core app with checkout and e-signature for small installers: OpenSolar. The signing flow matches an electronic contract step, though API Access and connectors are charged from 16 April 2026.
- 3D shading, circuit diagrams and a 20-year financial analysis: PV*SOL. A Windows program at EUR 845.00 plus VAT per named user for one year, already in euros, which matches the Slovak operator’s currency.
- Roof model to proposal under one dollar licence: SurgePV. It lists 3D roof modeling, shading, yield, financial modeling, bill of materials and proposal generation, by guided demo. Ask how it handles a Slovak-language proposal in euros.
Comparison Table
Listed alphabetically. This is not a ranking; pick by the situation above. Prices checked November 2026 on each vendor’s own page.
| Tool | Best for | Price | Free or paid | Decisive scope fact |
|---|---|---|---|---|
| Aurora Solar | Design and sales proposals, per user | Basic $159 per user per month; $135 per user per month billed annually | Paid | Contract Manager and e-signature tools only on Enterprise |
| OpenSolar | Free core app with proposals | Core app free; API Access and connectors charged from 16 April 2026 | Free core app, paid API and connectors | Proposal formats are for residential workflows |
| PV*SOL | Windows design with 3D shading | EUR 845.00 per named user per year, plus VAT | Paid, 30-day trial | Windows 10 and 11 only |
| SurgePV | Roof model to proposal in one product | $1,899 per user per year (1 user) | Paid, guided demo | Proposal built from the design model; no Slovakia-specific output stated |
What to Check for Slovakia
Give each vendor one real small-source job and check five things. First, a proposal in Slovak and euros. Second, a tariff field plus a surplus rate, remembering that the operator describes surplus going to a virtual battery without a stated value. Third, a place for the reserved-capacity charge and levies. Fourth, the design data behind the production figure. Fifth, an invoice in a currency you can pay. A demo or trial is where to find out what is covered.
Tool Entries
Aurora Solar
Aurora Solar sells a design and sales platform.
Best for: residential installers and sales teams that want design, a tablet-friendly proposal and financing integrations in one tool. Aurora’s pricing page describes Basic as a plan for residential design and sales.
Not the right choice if: you need Contract Manager, e-signature tools or customizable sales agreement templates. The pricing page lists these on Enterprise and not on Basic or Premium. It is also not the right choice if you need more than one user and 50 projects a month on Basic or Premium. Aurora’s FAQ says additional licenses can be bought in the app.
What the vendor documents: customizable proposal templates, custom branding, and custom pricing methods (per watt, per component or flat fee). It also lists adders, discounts and incentives, a utility rate database, and web and PDF proposals. Adders are extra items added to the price. It lists proposal activity tracking and integrated and custom financing (GoodLeap, Dividend, Mosaic and more). It also lists financing and energy bill comparisons. Design features on the same page include 3D roof modeling and trees and performance simulation.
Price (checked October 2026): Basic is $159 per user per month billed monthly, or $135 per user per month billed annually ($1,620 billed annually). Premium is $259 per user per month billed monthly, or $220 per user per month billed annually ($2,640 billed annually). Enterprise is custom per project. Source: Aurora pricing.
Limitations: annual Basic and Premium plans carry a one-year commitment, per Aurora’s pricing FAQ. Basic and Premium list 1 user and 50 projects a month.
Vendor link: aurorasolar.com.

OpenSolar
OpenSolar says its core app stays free and that a partner ecosystem helps fund the product (its 16 February 2026 post).
Best for: installers who want design, a proposal, checkout and e-signature in one free core application.
Not the right choice if: you need commercial proposals. OpenSolar’s proposal FAQ says Swipe, Scroll and Bespoke “are for residential proposal workflows”. It is also not for you if you plan to connect many outside systems, because API Access and connectors are charged from 16 April 2026. The proposal page also says availability is “enabled by region”.
What the vendor documents: the Sales Machine Proposal page lists Swipe (slide-based), Scroll (long-form) and Bespoke proposals. It also lists a Quick Quote path, a fast quote and checkout route for simpler service and non-solar jobs. It lists branding controls and a template library. It lists savings views that compare current and electrified energy costs. It also lists deposits through CashFlow. It also lists financing “where available” and acceptance inside the same flow. A WhatsApp share option and section-view tracking “where available” are listed as well. The e-signature page lists a built-in signing workflow, PandaDoc or DocuSign.
Price (checked October 2026): the core app is free of charge for solar professionals, per the vendor (free page). From 16 April 2026 the vendor charges for API Access, a per-project fee. The per-project API fee is on OpenSolar’s API page. It also charges for supported connectors, a monthly fee per organization. The 16 February 2026 post says accounting connectors are billed as a monthly fee per organization. Bespoke proposals are offered through the optional paid Enterprise Services. Support is US$500 per month. Customize is US$1,350 per month (one exclusive proposal template). Enterprise is custom (“fully bespoke proposal”). Premium imagery is pay per image (price shown in the app).
Limitations: the proposal page says Swipe, Scroll and Bespoke support up to six designs per project where design selection applies. The API page prices API Access and connectors by region. We did not compare those regional rates.
Vendor link: opensolar.com

PV*SOL
PV*SOL premium is a Windows program from Valentin Software.
Best for: designers who want 3D shading, circuit diagrams and a profitability calculation that can run at P90 in one Windows program.
Not the right choice if: your system is not full feed-in and you want P90. It is also not right if you need a browser tool. The Bankability help page says the P value setting relates only to full feed-in systems. The premium product page lists a Windows install. Valentin also publishes a separate browser tool, PV*SOL online, which this page does not compare.
What the vendor documents: shading calculated from 3D objects, automatic circuit diagrams and a financial analysis over 20 years. It also lists project reports in 24 languages (the product page; the home page says 23). The Bankability help page says the profitability calculation can run at P50 (the default), P90 or a self-selected P value. It says P10 and P90 values normally come from the climate data. The product page describes the reports as bankable; that is the vendor’s word.
Price (checked October 2026): 845.00 EUR plus VAT (value-added tax) for a named-user license for one year. The vendor offers a free trial for 30 days. It describes the trial as covering all features except report printing and saving. Source: Valentin Software and pvsol.software.
Limitations: the system requirements list Windows 10 and Windows 11 (64 bit) and an internet connection.
Vendor link: pvsol.software.

SurgePV
SurgePV is our product.
Best for: installers and EPC teams (engineering, procurement and construction) that want a proposal generated from the same 3D roof model, array layout and shading analysis, with energy-yield and financial modeling in one web application.
Not the right choice if: you need a self-serve trial (SurgePV offers a guided demo), or financing options, contracts or e-signature inside the proposal flow. The pricing page lists proposal generation and a generation and financial analysis feature, and does not describe those items. SurgePV’s published product scope does not list a CRM (customer tracking tool). Outputs support design and documentation but do not replace approval by the responsible engineer, authority, lender or utility.
What the vendor documents: 3D roof modeling, solar array layout, shading analysis and energy-yield modeling. It also lists financial modeling, electrical workflow support, bill-of-materials output and proposal generation. The pricing page lists unlimited projects, shadow analysis, generation and financial analysis, and proposal generation under “Everything included”. See the solar proposal software page for the product.
Price (checked November 2026): $1,899 per user per year for 1 user, $1,499 per user for 3 seats, $1,299 per user for 5 seats, in US dollars. Access is a guided demo.
Limitations: results depend on source data, assumptions, equipment models and review. The published scope does not state Slovakia-specific tariffs, subsidies, language or currency, so ask for them in a demo.
Vendor link: surgepv.com. Book a Free Demo.

See SurgePV on your own Slovak project
Book a guided demo and ask for the Slovak outputs you need.
Book a Free DemoWhat a Slovak Quote Has to Show a Small-Source Customer
The Západoslovenská distribučná page on small sources up to 10.8 kW gives several facts a proposal should reflect. They apply to one distribution operator, so check the operator for your client’s area.
Fees and charges. Connection and access of a small source to the distribution system are free of charge. The page says business applicants pay a connection fee after signing the contract, invoiced in advance on receipt of the signed contract, while non-business applicants do not pay it and get no advance invoice. Under the contract the producer pays charges for exceeding the maximum reserved capacity, the National Nuclear Fund levy and the system access price, following current price decisions. From 1 January 2026, the page says, households are billed for exceeding the maximum reserved capacity when running a generation facility, under Price Decree 154/2024. A savings figure that ignores these charges overstates the payback.
Surplus electricity. The page says surplus can be fed into a virtual battery. It does not describe the accounting in the text we read, so a quote should not state a value per surplus kWh unless the operator has given one in writing.
Timeline for the customer. The operator sends the contract draft within 10 working days of the online application, made through e-Žiadosti with separate forms for households and businesses. The customer signs electronically. A business must pay the connection fee within 14 calendar days of the invoice, or the offer lapses. The signed contract must come back within 6 months of the company’s signature, or a new application is needed. A quote should state these deadlines so the customer knows the offer can lapse.
Currency and language. Amounts on the page are in euros, and the page is in Slovak. None of the vendor pages we read for this list states a Slovak proposal template. Tools that charge in dollars or Swiss francs, such as Aurora, HelioScope and PVsyst, leave the conversion to you.
For layout and yield tools, see solar design software for Slovakia.
How We Ordered These Tools
The tools are not ranked. They are alphabetical, and the best-for picks follow from what each vendor publishes.
- Design link: whether the vendor says the proposal is built from the design. We did not assess output quality.
- Price: the price the vendor lists, in the vendor’s own currency. We did not assess discounts or negotiated quotes.
- Scope: what the vendor’s own pages say the tool covers. Where a page is silent, we say so and do not infer.
Go Deeper on a Category
- Solar proposal software, all markets
- Solar design software for Slovakia
- Solar software in Slovakia
- SurgePV solar proposal software
Sources and Dates
- Západoslovenská distribučná (read November 2026): Západoslovenská distribučná page on small sources up to 10.8 kW
Vendor pages were read in October and November 2026. Screenshots are public website captures from 29 October 2026. Sources are the vendor pages linked in each entry: pricing, product and help pages. SurgePV facts come from its pricing page. SurgePV publishes this page and is a vendor on this list.
Frequently Asked Questions
What is the best solar proposal software in Slovakia?
It depends on the job. OpenSolar’s core app is free. Aurora Solar lists design, financing integrations and proposal tracking. SurgePV lists roof modeling, bill of materials and proposals in one product. We did not verify Slovakia-specific coverage for any tool, so test each on a real Slovakia project before you buy.
How much does solar proposal software cost in Slovakia?
Vendors price in their own currency, and the pages we read do not give a local-currency price. SurgePV lists $1,899 per user per year for one user. OpenSolar’s core app is free, with charges for API Access and connectors from 16 April 2026. Aurora Basic is $159 per user per month, or $135 per user per month billed annually. PV*SOL premium is EUR 845.00 plus VAT per named user per year.
Is there free solar proposal software for Slovakia?
OpenSolar says its core app is free for solar professionals. The vendor charges for API Access and supported connectors from 16 April 2026. Check regional availability of any free tool for Slovakia.
Can solar proposal software handle Slovakia tariffs and incentives?
The vendor pages we read describe tariff and incentive features in general terms and do not list Slovakia-specific rates or programs. Ask each vendor to model one real Slovakia bill and incentive in a demo or trial.
Does SurgePV publish this list?
Yes. SurgePV publishes this page and is a vendor on this list. The tools are listed alphabetically and are not ranked.
Which costs should a Slovak small-source quote include?
On the Západoslovenská distribučná page, connection and access are free, but business applicants pay a connection fee and producers pay charges for exceeding reserved capacity, the National Nuclear Fund levy and the system access price. From 1 January 2026 households are billed for exceeding reserved capacity. Check your own operator’s page.


