This page is for installers and EPC teams in Qatar choosing solar proposal software. Short answer: for residential design and sales with financing integrations, pick Aurora Solar; for commercial solar and storage proposals built on utility rates, pick Energy Toolbase.
Pick by the job. OpenSolar’s core app is free. Aurora Solar lists design, financing integrations and proposal tracking. SurgePV lists roof modeling, bill of materials and proposals in one product, priced per user in US dollars. None of the vendor pages we read gives a Qatar-specific tariff or subsidy rule, so test each tool on a real Qatar project.
This is a desk comparison of what each vendor publishes, checked November 2026. We have not run side-by-side tests. SurgePV publishes this page and is one of the 4 tools on it. Tool facts come from each vendor’s own site. Prices are as listed by the vendors in November 2026 and may change. Solargraf, which the earlier version of this page listed, is not compared because its site returned HTTP 403 (access denied) to automated reads.
Methodology: tools are listed alphabetically and are not ranked. Criteria used: design link, price and what the vendor says it covers. See How We Ordered These Tools.
Want to see SurgePV quote a Qatar project?
Book a guided demo and bring a real Qatar site. We walk through design, yield, finance and the proposal in one platform.
Book a Free DemoChecking cost first? See the SurgePV pricing page.
Best-For Picks for Qatar
- Residential design and sales with financing integrations: Aurora Solar. Its pricing page lists tablet-friendly proposals, integrated financing and proposal activity tracking. Contract Manager and e-signature tools are on Enterprise. Its pricing page names financing integrations such as GoodLeap, Dividend and Mosaic; ask whether any apply to a Qatar customer.
- Commercial solar and storage proposals built on utility rates: Energy Toolbase. ETB Developer lists a database of more than 120,000 utility rates and payment option comparison. Price is given on a call. Utility-rate modeling matters for commercial Qatar quotes; ask how a net-billing credit carried to the next bill is entered.
- A free core app with proposals, checkout and e-signature: OpenSolar. The core app is free. API Access and connectors are charged from 16 April 2026. A free core app lets a small Qatar installer try one net-billing quote before paying for anything.
- Roof model to proposal in one product, priced per user: SurgePV. It lists 3D roof modeling, shading, yield, financial modeling, bill of materials and proposal generation. Access is a guided demo. Ask whether the proposal can list the Application and Connection Fees on separate lines from equipment.
Qatar Solar Proposal Software Comparison Table
Listed alphabetically. This is not a ranking; pick by the situation above. Prices checked November 2026 on each vendor’s own page.
| Tool | Best for | Price | Free or paid | Decisive scope fact |
|---|---|---|---|---|
| Aurora Solar | Design and sales proposals, per user | Basic $159 per user per month; $135 per user per month billed annually | Paid | Contract Manager and e-signature tools only on Enterprise |
| Energy Toolbase | Commercial solar and storage proposals | Not published; demo with pricing | Paid, quote on a call | In-app PV panel layout marked not included for ETB Developer |
| OpenSolar | Free core app with proposals | Core app free; API Access and connectors charged from 16 April 2026 | Free core app, paid API and connectors | Proposal formats are for residential workflows |
| SurgePV | Roof model to proposal in one product | $1,899 per user per year (1 user) | Paid, guided demo | Proposal built from the design model; no Qatar-specific output stated |
What to Check for Qatar
Bring one real Qatar bill and one real system size to the demo. Check that the tool caps size against the customer’s load, models a monthly net-billing credit, lists the two Kahramaa fees apart from equipment, and produces the proposal in the language your customer reads.
Tool Entries
Aurora Solar
Qatar quote check: Ask whether the proposal can cap system size against an entered customer load.
Aurora Solar sells a design and sales platform.
Best for: residential installers and sales teams that want design, a tablet-friendly proposal and financing integrations in one tool. Aurora’s pricing page describes Basic as a plan for residential design and sales.
Not the right choice if: you need Contract Manager, e-signature tools or customizable sales agreement templates. The pricing page lists these on Enterprise and not on Basic or Premium. It is also not the right choice if you need more than one user and 50 projects a month on Basic or Premium. Aurora’s FAQ says additional licenses can be bought in the app.
What the vendor documents: customizable proposal templates, custom branding, and custom pricing methods (per watt, per component or flat fee). It also lists adders, discounts and incentives, a utility rate database, and web and PDF proposals. Adders are extra items added to the price. It lists proposal activity tracking and integrated and custom financing (GoodLeap, Dividend, Mosaic and more). It also lists financing and energy bill comparisons. Design features on the same page include 3D roof modeling and trees and performance simulation.
Price (checked October 2026): Basic is $159 per user per month billed monthly, or $135 per user per month billed annually ($1,620 billed annually). Premium is $259 per user per month billed monthly, or $220 per user per month billed annually ($2,640 billed annually). Enterprise is custom per project. Source: Aurora pricing.
Limitations: annual Basic and Premium plans carry a one-year commitment, per Aurora’s pricing FAQ. Basic and Premium list 1 user and 50 projects a month.
Vendor link: aurorasolar.com.

Energy Toolbase
Qatar quote check: Ask how a monthly surplus valuation deducted from the next bill is modeled.
ETB Developer is Energy Toolbase’s solar and storage modeling and proposal product.
Best for: commercial solar and storage sales teams. Their proposals depend on utility rates, incentives and storage economics.
Not the right choice if: you need a published price. The pricing page says pricing is given on a call and lists hardware and consulting items separately.
What the vendor documents: a simulation engine for solar and storage. It also has a database of more than 120,000 verified utility rates kept by an in-house rates team. It supports VNEM (virtual net energy metering), NEMA (net energy metering aggregation) and other billing structures. It also lists payment option comparison, incentive calculations and cost forecasts. Proposals use branded templates. The vendor lists notifications when a prospect opens a proposal. It also lists analytics on time spent per section, and lead management. It also lists “PV design partnerships with leading design software tools” and “real-time indicative pricing quotes from lenders”. The page’s comparison table marks in-app PV panel layout tools as not included for ETB Developer. Its FAQ says it supports financing structures including cash purchases, power purchase agreements (PPAs), loans and leases. Source: ETB Developer.
Price (checked October 2026): not published for ETB Developer. The pricing page offers a 30-minute demo with pricing for your team size, and lists hardware and consulting items separately.
Limitations: hardware, consulting and implementation packages are priced separately on the pricing page.
Vendor link: energytoolbase.com.

OpenSolar
Qatar quote check: Ask whether a custom export rate can be entered and edited by the customer.
OpenSolar says its core app stays free and that a partner ecosystem helps fund the product (its 16 February 2026 post).
Best for: installers who want design, a proposal, checkout and e-signature in one free core application.
Not the right choice if: you need commercial proposals. OpenSolar’s proposal FAQ says Swipe, Scroll and Bespoke “are for residential proposal workflows”. It is also not for you if you plan to connect many outside systems, because API Access and connectors are charged from 16 April 2026. The proposal page also says availability is “enabled by region”.
What the vendor documents: the Sales Machine Proposal page lists Swipe (slide-based), Scroll (long-form) and Bespoke proposals. It also lists a Quick Quote path, a fast quote and checkout route for simpler service and non-solar jobs. It lists branding controls and a template library. It lists savings views that compare current and electrified energy costs. It also lists deposits through CashFlow. It also lists financing “where available” and acceptance inside the same flow. A WhatsApp share option and section-view tracking “where available” are listed as well. The e-signature page lists a built-in signing workflow, PandaDoc or DocuSign.
Price (checked October 2026): the core app is free of charge for solar professionals, per the vendor (free page). From 16 April 2026 the vendor charges for API Access, a per-project fee. The per-project API fee is on OpenSolar’s API page. It also charges for supported connectors, a monthly fee per organization. The 16 February 2026 post says accounting connectors are billed as a monthly fee per organization. Bespoke proposals are offered through the optional paid Enterprise Services. Support is US$500 per month. Customize is US$1,350 per month (one exclusive proposal template). Enterprise is custom (“fully bespoke proposal”). Premium imagery is pay per image (price shown in the app).
Limitations: the proposal page says Swipe, Scroll and Bespoke support up to six designs per project where design selection applies. The API page prices API Access and connectors by region. We did not compare those regional rates.
Vendor link: opensolar.com

SurgePV
Qatar quote check: Ask for a sample proposal with fees on separate lines from the equipment price.
SurgePV is our product.
Best for: installers and EPC teams (engineering, procurement and construction) that want a proposal generated from the same 3D roof model, array layout and shading analysis, with energy-yield and financial modeling in one web application.
Not the right choice if: you need a self-serve trial (SurgePV offers a guided demo), or financing options, contracts or e-signature inside the proposal flow. The pricing page lists proposal generation and a generation and financial analysis feature, and does not describe those items. SurgePV’s published product scope does not list a CRM (customer tracking tool). Outputs support design and documentation but do not replace approval by the responsible engineer, authority, lender or utility.
What the vendor documents: 3D roof modeling, solar array layout, shading analysis and energy-yield modeling. It also lists financial modeling, electrical workflow support, bill-of-materials output and proposal generation. The pricing page lists unlimited projects, shadow analysis, generation and financial analysis, and proposal generation under “Everything included”. See the solar proposal software page for the product.
Price (checked November 2026): $1,899 per user per year for 1 user, $1,499 per user for 3 seats, $1,299 per user for 5 seats, in US dollars. Access is a guided demo.
Limitations: results depend on source data, assumptions, equipment models and review. The published scope does not state Qatar-specific tariffs, subsidies, language or currency, so ask for them in a demo.
Vendor link: surgepv.com. Book a Free Demo.

See SurgePV on your Qatar project
Book a guided demo and ask which outputs you get for Qatar work.
Book a Free DemoWhat a Qatar Quote Must Reflect
A customer quote in Qatar has to follow Kahramaa’s billing and fee rules, not only the hardware price. The points below come from Kahramaa’s customer guideline. The layout side is on the design page, and the connection process is on the Qatar overview.
System size is capped by the customer’s load. The guideline cites Kahramaa’s policy KM-PW-PL01: a customer can install a PV system up to the capacity of their load. Its example is a 4000 watt load, which allows a 4000 watt system, about 13 modules of 300 watts. A quote for a larger array than the load is not within that policy. Source: Kahramaa, Solar PV Connection Guidelines for Customers (PW-PWR/G1).
Net billing, not net metering. The guideline says Qatar’s incentive mechanism is net billing. The main smart meter records kWh taken from and injected into the network over the monthly billing cycle. Any surplus is given a financial valuation, and that amount is deducted from the next billing cycle. The guideline does not give the valuation rate in the text we read, so a quote should leave the export rate as an input the customer can check with Kahramaa.
Two payments. The guideline lists an Application Fee, for the feasibility analysis, and a Connection Fee, for the connection work including inspections and witnessing the commissioning test. Kahramaa may decide not to charge the Application Fee for some small systems that do not impact the network. If the connection needs modification or upgrading of the distribution system, Kahramaa may decide, under its incentive policy, whether to charge for it. A quote should separate these from the installer’s price.
Commissioning above 50 kW. For systems greater than 50 kW (nearly 166 modules of 300 watts in the guideline’s wording), Kahramaa must witness the commissioning test. The contractor must give Kahramaa at least 5 days’ notice of the test date. Smaller systems may or may not be attended.
Connection Agreement. After test results are verified, Kahramaa gives the customer a Connection Agreement setting the terms for self-consumption and the net-billing arrangement. The customer signs, then generates.
What to ask a proposal vendor. Can the export rate be entered as a field you update? Can the proposal show a monthly credit carried to the next bill? Can fees be listed separately from equipment? Does it cap system size against an entered load? None of the vendor pages we read states Kahramaa-specific billing, so test one real Qatar bill in a trial.
How We Ordered These Tools
We did not rank these tools. They are listed alphabetically, and the best-for picks come from what each vendor publishes.
- Design link: whether the vendor says the proposal is built from the design. We did not assess output quality.
- Price: the price the vendor lists, in the vendor’s own currency. We did not assess discounts or negotiated quotes.
- Scope: what the vendor’s own pages say the tool covers. Where a page is silent, we say so and do not infer.
More Solar Software Guides to Compare
- Solar proposal software, all markets
- Solar design software for Qatar
- Solar software in Qatar
- SurgePV solar proposal software
Sources and Dates
Vendor pages were read in October and November 2026. Screenshots are public website captures from 29 October 2026. Sources are the vendor pages linked in each entry: pricing, product and help pages. SurgePV facts come from its pricing page. SurgePV publishes this page and is a vendor on the list. We could not read Solargraf’s site, so it is not compared.
- km.qa: Kahramaa, Solar PV Connection Guidelines for Customers (PW-PWR/G1) (read November 2026)
Frequently Asked Questions
What is the largest system a Qatar customer can quote?
Kahramaa’s guideline, citing its policy KM-PW-PL01, says a customer can install a PV system up to the capacity of their load. Its example is a 4000 watt load allowing a 4000 watt system, about 13 modules of 300 watts.
How is solar export paid for in Qatar?
The guideline describes net billing. The smart meter records import and export over the monthly cycle, surplus receives a financial valuation, and the amount is deducted from the next billing cycle. The valuation rate is not in the text we read.
What fees should a Qatar solar quote list?
Kahramaa’s guideline lists an Application Fee and a Connection Fee. Kahramaa may waive the Application Fee for some small systems, and may or may not charge for network upgrades the connection needs.
Does Kahramaa witness commissioning of every system?
No. The guideline says Kahramaa must witness commissioning for systems above 50 kW, with at least 5 days’ notice from the contractor. For smaller systems it may decide to attend or not.
How much does solar proposal software cost in Qatar?
Vendors price in their own currency, and the pages we read do not give a local-currency price. SurgePV lists $1,899 per user per year for one user. OpenSolar’s core app is free, with charges for API Access and connectors from 16 April 2026. Aurora Basic is $159 per user per month, or $135 per user per month billed annually. Energy Toolbase does not publish a price for ETB Developer.
Does SurgePV publish this list?
Yes. SurgePV publishes this page and is one of the tools on it. The tools are listed alphabetically and are not ranked.


