Latvian installers and EPC firms selecting proposal software get four tools compared here. For demand-charge tariffs on a free core app, OpenSolar is the pick; for PPA, lease or loan comparisons on commercial jobs, Energy Toolbase is.
A Latvian household quote must follow net billing: monthly settlement, a 1 April to 31 March credit window and fixed charges listed apart from energy. The proposal also has to read well in Latvian, which OpenSolar’s 13-language list omits. OpenSolar documents custom tariffs with demand charges on a free core app, and Energy Toolbase lists PPA and lease financing. A PPA (power purchase agreement) lets the customer pay for a system’s output instead of owning it. SurgePV documents roof modeling through proposals at a per-user price and states no Latvia tariff output. No vendor here names Latvia, so put one real Latvian bill through each.
What follows is a desk comparison of vendor-published material read in October 2026, without side-by-side trials. Tool facts are from the vendors’ sites. Net-billing detail comes from a 2021 explainer and a 2024 news report in the section below, so no claim is made about current tariff levels, and earlier unsourced market figures were removed.
Criteria applied: custom tariff entry, demand or capacity charge fields, Latvian proposals, lease or PPA financing, a US dollar price, and a free tier.
Solargraf is not part of this update. solargraf.com could not be opened by automated tools in October 2026, leaving nothing to source.
Want to see SurgePV quote a Latvia project?
Book a guided demo and bring a real Latvia site. We walk through design, yield, finance and the proposal in one platform.
Book a Free DemoChecking cost first? See the SurgePV pricing page.
Best-For Picks for Latvia
- Free core app with demand-charge tariffs: OpenSolar. Its help article covers flat, time-of-use, tiered and demand-charge rates, plus fixed and minimum charges. The core app is free; API Access and connectors are charged from 16 April 2026. Latvian is missing from the language list, so request a sample in Latvian.
- Commercial PPA, lease or loan modeling: Energy Toolbase. Its FAQ names cash, PPA, loan and lease structures, with the price quoted on a demo call.
- Proposals shown on a tablet: Aurora Solar. The Basic plan lists tablet-friendly sales proposals, and the rate can be edited per project or built as a custom rate with demand charges.
- Roof model, bill of materials and proposal in a per-user product: SurgePV. The vendor documents roof modeling, shading, yield, financial modeling, a bill of materials and proposals. In a demo, ask how it treats a Latvia tariff and a capacity charge, which its published scope omits.
Latvia Solar Proposal Software Comparison Table
Alphabetical rather than ranked, so choose by the situations above. Prices were read in October 2026 on each vendor’s page and are in the vendor’s currency.
| Tool | Best for | Price | Free or paid | Decisive Latvia fact |
|---|---|---|---|---|
| Aurora Solar | Tablet-friendly proposals | $159 or $259 per user per month (monthly billing); $135 or $220 billed annually | Paid | Pricing page lists North America and Europe regions; Latvia not named |
| Energy Toolbase | PPA and lease modeling for commercial deals | Price given on a demo call | Paid | Latvia not named on the pages we read |
| OpenSolar | Custom tariffs with demand charges | Core app free of charge; API Access and connectors charged from 16 April 2026 | Free core app, paid API and connectors | 13 proposal languages; Latvian is not on that list |
| SurgePV | Roof model to BOM and proposal, per user | $1,899 per user per year (1 user), in US dollars | Paid, guided demo | BOM and proposal generation in scope; no Latvia item stated |
Latvia Criteria Matrix
Each cell is Documented, Partial or Not stated. Documented: the vendor’s page says so. Partial: a related feature is stated but not the full item. Not stated: the pages read in October 2026 are silent. No scores or weights.
| Tool | Custom tariff entry | Demand or capacity charge fields | Latvian proposal language | Lease or PPA financing | US dollar price | Free tier |
|---|---|---|---|---|---|---|
| Aurora Solar | Documented (configure your own rates) | Documented (help article on custom rates adds demand charges) | Not stated | Documented (loan, lease, PPA or cash product in Sales Mode) | Partial ($ shown, currency not named) | Not stated |
| Energy Toolbase | Documented (help center: create your own custom rate schedules) | Partial (FAQ: models demand charge reduction with storage) | Not stated | Documented (cash, PPA, loan, lease) | Not published for ETB Developer (demo call) | Not stated |
| OpenSolar | Documented (custom tariff form) | Documented (demand charges in the form) | Partial (13 languages; Latvian is not on that list) | Partial (options depend on market and provider) | Documented (core app free; paid services in US$) | Documented |
| SurgePV | Not stated | Not stated | Not stated | Not stated | Documented ($1,899 per user per year, 1 user) | Not stated (guided demo) |
Two things to note. No page names a Latvia tariff, although the OpenSolar and Aurora help articles describe custom rates with demand charges. An unstated item may still work, so have each vendor model one real Latvia bill before you buy.
Tool Entries
Aurora Solar
Best for: teams wanting tablet-friendly proposals and a rate database to edit or extend. For Latvia, set the quote up around monthly netting and separate fixed charges.
Not the right choice if: you need a Latvia rate preloaded or Latvian proposals. Neither the pricing page nor the help articles read here name Latvia or list Latvian.
What the vendor documents: the pricing page lists 3D roof modeling, performance simulation, adders, discounts and incentives, and a utility rate database where you “configure your own rates or use rates from Genability and Aurora”. Premium adds LIDAR-assisted modeling, bankable shade reports and battery modeling. Its help article on editing rates says you can change the import rate, export rate, rate details and compensation policy for a project. Its help article on custom rates lets an admin create a rate with tiers, time-of-use periods and demand charges. Its financial analysis article says a loan, lease, PPA or cash product must be chosen in Sales Mode.
Price (checked October 2026): Basic $159 per user per month billed monthly, or $135 per user per month billed annually ($1,620 billed annually); Premium $259 per user per month, or $220 billed annually ($2,640 billed annually). Enterprise is custom, per project. The page shows “$” and does not name the currency.
Limitations: the pricing page lists North America and Europe as regions without naming Latvia, and no Latvia rate appears in the pages read.
Vendor link: aurorasolar.com.

Energy Toolbase
Best for: developers modeling PPA, lease or loan offers with storage for commercial customers. For Latvia, check whether such offers fit alongside monthly netting.
Not the right choice if: a published price is needed or Latvia must be named. The pricing page has you book 30 minutes, with demo and price given on the call.
What the vendor documents: its ETB Developer FAQ says the platform supports cash purchases, power purchase agreements, loans and leases. It says the platform has a built-in database of utility rates, incentives and tariffs, and that it models demand charge reduction with battery storage. It also says ETB Developer is web-based. The product page counts 120,000+ tracked utility rates and describes a fully custom proposal template builder.
Price (checked October 2026): no ETB Developer figure is published on the pricing page. The page also lists implementation and support packages with no price.
Limitations: Latvia and the countries behind the rate database go unnamed in the pages read. The rate schedules help page says users can create custom rate schedules and that its rates database spans 50 states and 42 international territories.
Vendor link: energytoolbase.com.

OpenSolar
Best for: installers who want a free core app and a custom tariff with demand charges. For Latvia, check a Latvian-language proposal sample first.
Not the right choice if: proposals must be written in Latvian. The language article lists 13 supported languages, and Latvian is not one of them.
What the vendor documents: its tariff article says you can create a custom tariff with a tariff type and compensation mechanism. The rate structures are flat, time-of-use, tiered and demand charges. You can add fixed and minimum charges. Its integrated finance page says the options depend on your market and provider, and may include loans, leases, PPAs and third-party ownership.
Price (checked October 2026): the core app is free of charge for solar professionals, per the vendor. From 16 April 2026 the vendor charges for API Access, which lets other software connect to OpenSolar, and for supported connectors. This comes from its 16 February 2026 post.
Limitations: a Latvia tariff has to be built manually, and the pages read name none.
Vendor link: opensolar.com.

SurgePV
SurgePV is our product.
Best for: teams wanting roof modeling, shading, yield and financial modeling in one product, with a bill of materials (the parts list) and per-user proposals. Latvia items are checked in a demo.
Not the right choice if: you need a self-serve trial, since a guided demo is offered, or want a custom tariff form, demand charge fields and Latvian output in writing before a sales call. The published scope states none of them. Outputs support design and documentation but do not replace the responsible engineer, authority, lender or utility. A CRM (customer and sales tracking tool) is not in the published scope, and monitoring and ERP (business management software) are outside it. OpenSolar documents a custom tariff form that SurgePV’s scope does not.
What the vendor documents: 3D roof modeling, array layout, shading analysis, energy-yield modeling, financial modeling, electrical workflow support, bill-of-materials output and proposal generation. See solar proposal software for the product page.
Price (checked October 2026): $1,899 per user per year for 1 user, $1,499 per user for 3 seats, $1,299 per user for 5 seats, in US dollars.
Limitations: results depend on source data, assumptions and equipment models, and the published scope lists no tariff form, capacity charge field, Latvian output or PPA modeling.
Vendor link: surgepv.com.

How Net Billing Shapes a Latvian Quote
A Latvian rooftop quote depends on how the household is settled for exported power. The figures below come from one explainer dated 20 April 2021, so treat them as a description of the rules then, and check the operator and the law for what applies now.
Net billing basics. The LV portals explainer of 20 April 2021 says net billing is available to households producing for their own use and applies within a single distribution system service contract. Net consumption is settled monthly, a surplus in one month is credited in the next, and surplus must be used between 1 April and 31 March of the following year, after which credits are cleared. A quote should show the settlement year and say what happens to credits not used by 31 March.
What the customer pays on. As of April 2021 per the same explainer, self-consumed electricity incurs only fixed charges (connection and capacity components), power fed into the grid and taken back pays network service fees, and other consumption pays the full rate. Households producing renewable electricity had been exempt from the variable part of the mandatory procurement component (OIK) since 1 April 2020. A proposal should list each of these lines instead of showing one blended price.
Typical numbers the explainer gives. Panels at about EUR 1,300 to 2,000 per kW depending on installation, a Baltic yield of about 900 to 1,000 kWh per kW per year, 130 to 140 kWh per kW in a summer month and 5 to 25 in a winter month, and one worked example of EUR 6,500 invested with about EUR 564 a year saved and a payback near 10 years. These are 2021 figures from an explainer, not a price list. Use them only as a sanity check on your own inputs.
Market scale. The LSM report of 8 February 2024 citing Sadales tīkls reports about 19,000 microgenerators connected to the Sadales tīkls network by the end of 2023.
What to ask a vendor. Ask for a sample quote that shows monthly netting, the 1 April to 31 March credit window, and fixed charges separately. Check that all prices are in euros and editable. SurgePV’s published scope is on its proposal software page, and pricing is on the pricing page. For connection rules and equipment limits see the Latvia design list.
What to Ask a Vendor Before Buying
Give each vendor the same real Latvia electricity bill and ask for a complete sample proposal. Look at where the tariff and any fixed or capacity charge are entered, whether output can be in Latvian, which financing routes suit how your customers pay, and whether prices can be in euros. The matrix marks anything the pages read leave unsaid, and a demo is where to settle it. Permits and grid connection sit outside the vendor pages, so take them to the Latvian authorities. The net-billing section above holds what the 2021 explainer states.
How We Ordered These Tools
Ordering method: no ranking was applied. Tools run alphabetically and the best-for picks follow from the matrix. SurgePV publishes this page and is one of the vendors on the list. It is listed by the same rules as the others and is not placed first.
- Custom tariff entry: a Latvia bill rarely resembles a US rate, so the check is whether a tariff can be entered. Modeling accuracy was not assessed.
- Demand or capacity charge fields: larger customers may pay on capacity as well as energy. The tools’ arithmetic was not assessed.
- Latvian proposal language: buyers tend to prefer proposals in their own language. Translation quality was not assessed.
- Lease or PPA financing: commercial clients weigh owning against paying for output. Whether any tool can model a Latvia deal was not assessed.
- US dollar price: a stated price allows planning before a call. Discounts and negotiated quotes were not assessed.
- Free tier: a free plan lets a small team try the workflow. Limits beyond what the page states were not assessed.
Sources and Dates
Latvian quote facts were read in November 2026 from the LV portals explainer of 20 April 2021 and the LSM report of 8 February 2024 citing Sadales tīkls. The net billing rules described are as of April 2021 and may have changed.
Vendor pages were read in October 2026 and the headline prices were rechecked on 3 November 2026. They are Aurora (pricing and three help articles), Energy Toolbase (pricing, FAQ and product page), OpenSolar (free page, 16 February 2026 post, and the tariff, language and finance pages linked above) and SurgePV (pricing). Screenshots are captures of each vendor’s public website from 29 October 2026.
See SurgePV on your Latvia project
Book a guided demo and ask how it handles a Latvia tariff and capacity charge.
Book a Free DemoMore Solar Software Guides to Compare
- Best solar software in Latvia
- Solar design software for Latvia
- Best solar proposal software, all markets
- Solar proposal software features and SurgePV pricing
Frequently Asked Questions
What is the best solar proposal software in Latvia?
It depends on the job. OpenSolar documents custom tariffs with demand charges, and its core app is free. Energy Toolbase lists PPA and lease financing. Aurora Solar lists tablet-friendly proposals. SurgePV documents roof modeling through proposals but states no Latvia output. No tool here names Latvia on the pages we read, so ask each vendor to model one real Latvia electricity bill.
Can proposal software handle electricity tariffs in Latvia?
OpenSolar and Aurora Solar help articles describe custom rates with demand charges, and OpenSolar lists flat, time-of-use and tiered rates too. Energy Toolbase’s help center says users can create custom rate schedules. None of these pages names a Latvia tariff, so enter the rate from the customer’s bill and check the result.
Is there free solar proposal software for Latvia?
OpenSolar says its core app is free for solar professionals. From 16 April 2026 it charges for API Access and supported connectors. The other tools here are paid or priced on request.
Does solar proposal software support Latvian proposals?
OpenSolar lists 13 proposal languages: English, Dutch, Swedish, Spanish, French, Norwegian, Thai, German, Polish, Portuguese, Italian, Danish and Finnish. For Latvia, Latvian is not on that list. The Aurora, Energy Toolbase and SurgePV pages we read do not list proposal languages for Latvia. Ask each vendor if you must send proposals in Latvian.
How much does solar proposal software cost for an installer in Latvia?
Prices are in US dollars, as each vendor shows them. OpenSolar’s core app is free. Aurora lists $159 per user per month for Basic billed monthly, or $135 per user per month billed annually. SurgePV lists $1,899 per user per year for one user. Energy Toolbase gives its price on a demo call.


