Back to Best Solar Software
Best ListBest-Of List4 tools compared

Solar Proposal Software for Bulgaria: Four Tools Compared (2026)

Four solar proposal tools compared on what each vendor publishes for Bulgaria: tariff entry, export-credit settings, local-language proposals, price and free start. Checked October 2026.

SurgePV publishes this list and sells solar design and proposal software, so we have a commercial interest in this category. This is a desk comparison of what each vendor publishes; we have not run side-by-side tests. Prices and vendor facts checked October 2026. How we evaluate software

Published Last updated
Nirav Dhanani

Written by

Nirav Dhanani

Co-Founder · SurgePV

Rainer Neumann

Edited by

Rainer Neumann

Editorial contributor · SurgePV

A Bulgarian quote lives or dies on three entries: the rate your client pays, the credit for surplus power, and the currency printed at the bottom. No vendor page read names Bulgaria, so the useful test is what you can type in yourself. OpenSolar’s core app is free and accepts a custom tariff. Energy Toolbase compares cash, loan, lease and PPA (power purchase agreement) offers. Enact Solar sells design and proposals as one product. SurgePV lists proposal generation beside roof modeling, priced per user. None of them lists a lev price on the pages read.

This is a paper comparison of vendor pages read in October 2026, with no hands-on trials. SurgePV publishes this page and is a vendor on it. The only Bulgarian source is a 2023 news report on the rooftop permit change, summarised below; local tariffs and incentives are outside it. Take them from your utility or the regulator.

Solargraf, which an earlier version of this page listed, is not compared here. Its site, solargraf.com, returned HTTP 403 to automated reads in October 2026.

Criteria used: tariff entry, export-credit setting, local-language proposals, price in a published currency, free start.

Want to see SurgePV on your own project?

Book a guided demo and bring a real site. We walk through design, yield, finance and the proposal in one platform.

Book a Free Demo

Checking cost first? See the SurgePV pricing page.

Best-For Picks for Bulgaria

  • One vendor for design and quote: Enact Solar. Its home page claims operation in 35+ countries, and proposals can show loan, lease and PPA options with DocuSign e-signatures.
  • Financing comparisons for a Bulgarian business client: Energy Toolbase. Its FAQ says it supports “cash purchases, power purchase agreements (PPAs), loans, and leases”. No price is published.
  • A zero-cost app where you type the Bulgarian tariff yourself: OpenSolar. Its tariff article covers flat, time-of-use, tiered and demand rates and several export-credit modes. API Access and connectors cost extra from 16 April 2026.
  • A single per-user product from roof model to proposal: SurgePV. It lists shading, yield, financial modeling, a bill of materials and proposals. Ask for a Bulgarian-language quote and a lev amount in the demo, as its scope names neither.

Comparison Table

Rows run alphabetically with no ranking; choose from the picks above. Each price was read in October 2026 on the vendor’s own page.

Tool Best for Price Free or paid Decisive scope fact
Enact Solar Design and proposals from one vendor $279 per month billed annually (Design and Proposals) Paid; “Start Trial” offered, terms not stated Loan, lease and PPA options; DocuSign e-signatures
Energy Toolbase Cash, loan, lease and PPA comparisons Not published (book a demo) Paid Works with partner design tools
OpenSolar Custom tariff, free core app Core app free of charge; API Access and connectors charged from 16 April 2026 Free core app, paid API and connectors 13 proposal languages
SurgePV Roof model to BOM and proposal, per user $1,899 per user per year (1 user), in US dollars Paid, guided demo BOM and proposal generation in scope

Bulgaria Criteria Matrix

Cells read Documented (the vendor’s page states it), Partial (only part of it, or only for other countries) or Not stated (silent in the October 2026 pages). No scores, no weights.

Tool Tariff entry Export-credit setting Local-language proposals Price in a published currency Free start
Enact Solar Partial (tariff lookup listed; Bulgaria not named) Not stated Not stated Partial (USD plan shown; see the entry) Partial (trial offered; terms not stated)
Energy Toolbase Partial (utility rates team described; Bulgaria not named) Not stated Not stated Not published for ETB Developer Not stated
OpenSolar Documented (custom tariff) Partial (several credit options; none named for Bulgaria) Partial (13 proposal languages; see the entry) Documented (core app free) Documented
SurgePV Partial (financial modeling; no tariff entry described) Not stated Not stated Partial (USD only) Not stated (guided demo)

The widest gap is whether you can key in a tariff and an export rate yourself. A Not stated cell can still hide a working feature, so ask each vendor to build one real Bulgarian quote from a sample bill.

Tool Entries

Enact Solar

Enact Solar is run by Enact Systems Inc. and says on its home page that it operates in 35+ countries.

Best for: Bulgarian installers who would rather buy design and quoting from one supplier.

Not the right choice if: your office expects a built-in CRM or project module. Enact’s installer page describes a lead API and a design API that let you connect your own CRM. It does not describe a CRM of its own. Permit-ready engineering drawings are a separate product with its own price.

What the vendor documents: roof creation with height and pitch detection from a digital surface model (a height map of the surface). It also lists obstacle and tree detection, shading analysis, storage sizing with time-of-use simulation, and tariff lookup. Proposals come with pricing templates, loan, lease and PPA (power purchase agreement) options, plus DocuSign e-signatures.

Price (checked October 2026): the pricing page lists Design and Proposals at “$279/month billed annually - save $240/yr (Or $299/month - 2 users)”. The page labels $299 as “2 users”, so we cannot tell whether it is a monthly-billing price or a two-user price. Ask Enact. Prices are in dollars.

Limitations: the plan allows unlimited residential projects and proposals but 10 new commercial projects a month, which matters for a Bulgarian firm with factory roofs. Neither Bulgaria nor leva is mentioned.

Vendor link: enact.solar

Enact Solar public website page, captured 29 October 2026
Enact Solar public website capture, captured 29 October 2026. This shows the vendor's website, not a test inside the software.

Energy Toolbase

Best for: teams quoting Bulgarian business clients who must set cash, loan, lease and PPA offers side by side, or add storage.

Not the right choice if: you need a published price. The pricing page asks you to book a demo. It is also not right if you need a roof design tool you can confirm is built in. The ETB Developer page lists “PV design partnerships with leading design software tools”. Ask the vendor about layout.

What the vendor documents: the ETB Developer page lists proposals, quick financial analysis, “up-to-date utility rates” and lead management. It says the platform tracks “120k+” utility rates. Its FAQ says it supports “cash purchases, power purchase agreements (PPAs), loans, and leases”. It is web-based.

Price (checked October 2026): not published for ETB Developer. The pricing page says “Book 30 minutes” for a demo and pricing for your team size. Dollar figures on that page belong to its ETB Controller and ETB Monitor products.

Limitations: the pages do not say which countries the utility rates cover, so a Bulgarian rate would likely be entered by hand, and leva are not mentioned.

Vendor link: energytoolbase.com

Energy Toolbase public website page, captured 29 October 2026
Energy Toolbase public website capture, captured 29 October 2026. This shows the vendor's website, not a test inside the software.

OpenSolar

Best for: a small Bulgarian crew that wants a free core app and is happy to type in the tariff.

Not the right choice if: the client needs Bulgarian, which the list does not include. The language article lists English, Dutch, Swedish, Spanish, French, Norwegian, Thai, German, Polish, Portuguese, Italian, Danish and Finnish. The article says a proposal template must be translated by hand.

What the vendor documents: a custom tariff with flat, time-of-use, tiered and demand rates, plus a choice of how exports are credited. The choices are Net Billing, Net Billing with Credit Carryover, Buy All, Sell All and Net Energy Metering. The article does not say which one fits a given country’s program.

Price (checked October 2026): the core app is free of charge for solar professionals, per the vendor. From 16 April 2026 the vendor charges for API Access, a per-project fee, and for supported connectors, a flat monthly subscription. Source: its 16 February 2026 post and its API page.

Limitations: no Bulgarian tariff or lev pricing is described, and a Bulgarian proposal means building a manually translated template.

Vendor link: opensolar.com

OpenSolar public website page, captured 29 October 2026
OpenSolar public website capture, captured 29 October 2026. This shows the vendor's website, not a test inside the software.

SurgePV

SurgePV is our product.

Best for: Bulgarian teams wanting layout, shading, yield, finance, parts list and proposal in one per-user product, who will use the demo to see Bulgarian items. See solar proposal software for the product page.

Not the right choice if: you need to self-start (a guided demo is the offer) or want a lev price before any sales conversation. Outputs support design and documentation. They do not replace approval by the responsible engineer, authority, lender or utility.

What the vendor documents: 3D roof modeling, array layout, shading analysis, energy-yield modeling, financial modeling, electrical workflow support, bill-of-materials output and proposal generation.

Price (checked October 2026): $1,899 per user per year for 1 user, $1,499 per user for 3 seats, $1,299 per user for 5 seats, in US dollars. Confirm any local-currency amount and taxes in a written quote.

Limitations: results depend on source data, assumptions and equipment models. SurgePV’s published scope is silent on a Bulgarian tariff, an export-credit setting, Bulgarian-language proposals and any design size limit.

Vendor link: surgepv.com.

SurgePV public website page, captured 29 October 2026
SurgePV public website capture, captured 29 October 2026. This shows the vendor's website, not a test inside the software.

How We Ordered These Tools

We did not rank these tools. They are listed alphabetically, and the best-for picks come from the matrix above.

  • Tariff entry: a Bulgarian quote needs the rate for your client’s class. How any tool handles time-of-use or tiered rates is not judged.
  • Export-credit setting: surplus power may earn a rate or a credit. Whether a tool can model a Bulgarian scheme is not judged.
  • Local-language proposals: a Bulgarian client reads a quote best in Bulgarian. Translation quality is not judged.
  • Price in a published currency: a known currency shows what a buyer pays. Discounts and negotiated quotes are not judged.
  • Free start: a free plan lets a small crew try the flow. Limits beyond what a page states are not judged.

Bulgarian Rooftop Rules and the Quote

What a quote promises depends on the permit route. Balkan Green Energy News reported in January 2023, updated August 2023, that parliament removed the building permit and project submission for rooftop solar used for self-consumption. The owner notifies the municipality, and silence for 14 days means tacit consent. The size limit was raised from the proposed 10.8 kW to 20 kW, and the same report says becoming a prosumer used to take up to a year.

For a quote this means the timeline you print can be shorter than it once was, but only inside the limit. It also reports EUR 30.5 million in grants for rooftop solar and an MP saying most Bulgarian installations are on fields, so a proposal tool is mostly for the roof segment. The article gives no tariff, so read the rate from the client’s bill. It dates from 2023; check current law before promising a limit.

Methodology and Disclosure

SurgePV is published by SurgePV, which is also one of the vendors on this list. Its entry follows the same template and sources as the others: the vendor’s own public pages, read in October 2026. The Bulgarian tariff, language and lev items are open questions for every vendor, SurgePV included. Where a page does not state a feature, we say Not stated.

Sources and Dates

Vendor pages were read in October 2026. Sources are the vendor links and help articles in each entry above. SurgePV facts come from its own pricing page and proposal software page. The Bulgarian permit facts come from the Balkan Green Energy News report, read in November 2026.

See SurgePV on your own project

Book a guided demo and ask for the Bulgaria items you need in the quote.

Book a Free Demo

Go Deeper on a Category

Frequently Asked Questions

What is the best solar proposal software in Bulgaria?

It depends on what the quote must show. The vendor pages we read do not name Bulgaria, so pick by what you can enter yourself. OpenSolar’s core app is free and takes a custom tariff. Energy Toolbase compares cash, loan, lease and PPA options. Enact Solar lists design and proposals from one vendor. SurgePV lists proposal generation in one product with roof modeling, priced per user.

Is there free solar proposal software for Bulgaria?

OpenSolar says its core app is free for solar professionals. It charges for API Access and supported connectors from 16 April 2026. Its help article lists 13 proposal languages. The other tools here are paid, and the pages we read show no free plan for them. SurgePV offers a guided demo and no self-serve trial.

Can proposal software show Bulgaria tariffs and local currency?

No vendor page we read names Bulgaria tariffs or a Bulgaria price list. OpenSolar lets you enter custom tariffs. Enter the rate for your client’s class from your utility, and check that the proposal prints the currency you want.

Which proposal tools support Bulgaria languages?

The pages we read do not say which tools offer a Bulgaria interface or proposal template. OpenSolar’s help article lists English, Dutch, Swedish, Spanish, French, Norwegian, Thai, German, Polish, Portuguese, Italian, Danish and Finnish, and says a proposal template must be translated by hand. Check the language list before you buy.

How much does solar proposal software cost for Bulgaria installers?

No vendor on this page lists a Bulgaria price on the pages we read. Energy Toolbase does not publish a price for ETB Developer. Enact Solar lists Design and Proposals at $279 per month billed annually. OpenSolar’s core app is free. SurgePV Individual is $1,899 per user per year. Ask each vendor for a written quote.

About the Contributors

Author
Nirav Dhanani
Nirav Dhanani

Co-Founder · SurgePV

Nirav Dhanani is identified by SurgePV as a company co-founder. His SurgePV author page lists only role information that can be tied to the public profile below; credentials, project totals, conversion results, and market-expansion claims are not asserted without retained evidence.

Editor
Rainer Neumann
Rainer Neumann

Editorial contributor · SurgePV

Rainer Neumann is credited as an editorial contributor on SurgePV content. This profile does not assert engineering credentials, project totals, software-testing experience, education, speaking engagements, or media citations because independent verification evidence is not retained in the publication record.

Ready to Design and Propose Faster?

SurgePV covers solar design, energy-yield modeling, financial modeling, and proposals in one platform. Book a guided demo to see it on a project like yours.

Choose which optional technologies SurgePV may use. Essential storage remains active for security and requested features.