Albanian installers and EPC firms who must price self-producer projects in lek will find the shortlist below. Four proposal tools are weighed on what their own vendors publish. Aurora Solar suits a fixed export rate; Energy Toolbase suits cash, loan, lease and PPA side-by-side offers.
An Albanian quote carries a short fee table in ALL, so the vendor pages we read, which never name Albania, matter less than what you can type in. OpenSolar’s core app is free and accepts a custom tariff. Aurora Solar takes a fixed export rate. Energy Toolbase lines up cash, loan, lease and PPA (power purchase agreement) structures. SurgePV puts roof modeling and proposals in one per-user product. None of the four prints a lek price on the pages we read.
What follows is a desk comparison of published vendor pages, checked October 2026, with no side-by-side runs. SurgePV publishes this page and is one of the four tools on it. Vendor facts come from each vendor’s own site, and the Albania fee figures come from the ERE regulation cited in the section above. Retail tariffs and support rules sit outside this page, so read them from ERE and the distribution operator.
Solargraf, an earlier entry on this page, has been dropped because its site, solargraf.com, answered automated reads with HTTP 403 in October 2026.
Five yardsticks drive the Albania tables: tariff entry, export-credit setting, local-language proposals, price in a published currency and free start.
Want to see SurgePV quote an Albania project?
Book a guided demo and bring a real Albania site. We walk through design, yield, finance and the proposal in one platform.
Book a Free DemoChecking cost first? See the SurgePV pricing page.
What an Albanian Self-Producer Quote Has to Show
This list is about the quote, so it follows the money and the paperwork a client will ask about. The facts come from the ERE regulation on new connections in the distribution system, approved by ERE Board Decision 166 of 2016 and amended through Decision 145 of 19 July 2024. Annex 3 sets connection tariffs for solar self-producers with a total installed capacity up to 500 kWp.
One-off connection fees. The study and project-approval tariff (T1) is a fixed 1,000 ALL for household customers, 5,000 ALL for non-household low-voltage customers and 23,000 ALL for customers connected at 6, 10, 20 or 35 kV. ALL is the Albanian lek. The distance tariff (T2) and capacity tariff (T3) are both 0 ALL for these self-producers. The service tariff (T4) adds 1,500 ALL for grid update and 1,000 ALL for administration, plus the initial meter verification. A quote can therefore show a short fee table, not a per-kW charge.
What the client pays for separately. The operator does the work at the connection point. The applicant pays for the works on the customer’s side and the supply line to the generating resource and may choose who does them, so the installer’s price sits outside the operator’s tariff. The meter must be verified by an independent authorized entity, which sends its report to the customer and the operator.
Timing to put in a proposal. For an ordinary low-voltage connection of 0 to 20 kW, the regulation gives the operator not more than 20 working days. It gives the applicant 7 working days from the notification to pay the connection costs, otherwise the application is refused and must be filed again. We read those steps in the general low-voltage procedure, and the regulation also has a separate section for new generation plants, so ask the operator which timeline applies to a given self-producer. For generation connections, the deadline to realize the connection is two years from approval of the connection point.
Documents the client must supply. Across the three bands the file includes an ID, a document proving ownership of the building and the number of an existing customer contract without debt. The 0 to 10 kWp band also asks for a proposal for the net metering arrangement and the PV product datasheets.
What this means for tool choice. Because fees are a few thousand lek, the quote’s savings table matters more than the fee line. Use a tool where you can enter your own tariff and currency, and ask each vendor to print the fee table in ALL. The vendor pages we read list prices in other currencies.
Best-For Picks for Albania
- A fixed export rate: Aurora Solar. Its help article has a “Fixed export rate” field in “$ per kWh”. Check how that unit sits next to the lek-denominated charges in Albania’s Annex 3.
- Cash, loan, lease and PPA offers side by side: Energy Toolbase. Its FAQ says the platform supports “cash purchases, power purchase agreements (PPAs), loans, and leases”. There is no published price. Ask whether the 1,000 to 23,000 ALL study tariff can appear as a one-off cost line, since these suit commercial clients.
- Your own tariff in a free core app: OpenSolar. Its tariff article lists flat, time-of-use, tiered and demand rates and several export-credit options. The core app is free; API Access and connectors are charged from 16 April 2026. A custom tariff is how you would model Albania’s household tier step.
- Roof model to BOM to proposal, one price per user: SurgePV. It lists roof modeling, shading, yield, financial modeling, bill of materials and proposals. Neither an Albania tariff nor lek output is named, so ask for an Albanian quote that adds the T1 and T4 fees and a client document checklist, and see which currency it prints.
Albania Solar Proposal Software Comparison Table
The tools are in alphabetical order. This is not a ranking. Pick by the situation above. Prices checked October 2026 on each vendor’s own page.
| Tool | Best for | Price | Free or paid | Decisive scope fact |
|---|---|---|---|---|
| Aurora Solar | Fixed export rate, custom rates, Albanian-use caveat | Basic $159 per user per month (monthly billing); $135 billed annually | Paid | Compensation policy: net billing or feed-in tariff |
| Energy Toolbase | Cash, loan, lease and PPA comparisons for Albanian self-producer fees | Not published (book a demo) | Paid | Works with partner design tools |
| OpenSolar | Custom tariff, free core app, Albanian self-producer fees | Core app free of charge; API Access and connectors charged from 16 April 2026 | Free core app, paid API and connectors | 13 proposal languages |
| SurgePV | Roof model to BOM and proposal, per user, one price | $1,899 per user per year (1 user), in US dollars | Paid, guided demo | BOM and proposal generation in scope |
Albania Criteria Matrix
In this grid, Documented means the vendor’s own page states the item. Partial means the page covers only some of it or only other countries. Not stated means the pages we read in October 2026 are silent. No scores or weights are applied for Albania.
| Tool | Tariff entry | Export-credit setting | Local-language proposals | Price in a published currency | Free start |
|---|---|---|---|---|---|
| Aurora Solar | Documented (custom rates, or Genability and Aurora rates) | Documented (fixed export rate; net billing or feed-in tariff) | Not stated | Partial (dollar figures; currency not named) | Not stated |
| Energy Toolbase | Partial (utility rates team described; Albania not named) | Not stated | Not stated | Not published for ETB Developer | Not stated |
| OpenSolar | Documented (custom tariff) | Partial (several credit options; none named for Albania) | Partial (13 proposal languages; see the entry) | Documented (core app free) | Documented |
| SurgePV | Partial (financial modeling; no tariff entry described) | Not stated | Not stated | Partial (USD only) | Not stated (guided demo) |
Two points stand out for Albania. No vendor page we read names the country, and the tools split mainly on whether you can type a tariff and an export rate yourself. A row marked Not stated may still be possible, so ask each vendor to build one Albanian quote with the lek fees before you pay.
Tool Entries
Aurora Solar
Best for: Albanian teams that need one fixed export rate in the design tool, with a net billing or feed-in tariff switch, before adding the lek fee table by hand.
Not the right choice if: you want a lek price or an Albanian-language proposal from the vendor, since neither shows on the pages we read, or you want a free tool: the plans we read are paid, with a custom Enterprise tier.
What the vendor documents: all plans on the pricing page include 3D roof modeling, proposal templates, custom pricing methods and a utility rate database, and the page lets you “Configure your own rates or use rates from Genability and Aurora”. Web and PDF proposals and financing comparisons also appear, and Premium adds battery modeling and bankable shade reports. On feed-in tariffs, the help article reads “With Feed-in tariff, Aurora credits all the energy the system produces at a tariff rate”.
Price (checked October 2026): Basic $159 per user per month billed monthly, or $135 per user per month billed annually ($1,620 billed annually). Premium $259 per user per month, or $220 per user per month billed annually ($2,640 billed annually). Enterprise is custom, per project. The page shows a dollar sign and does not name the currency.
Limitations: the article’s fixed export rate unit is “$ per kWh”, which does not match the lek fees in Annex 3. The pricing page lists North America and Europe regions. Albania is not named on the pages we read.
Vendor link: aurorasolar.com

Energy Toolbase
Best for: firms in Albania pitching commercial clients who want cash, loan, lease and PPA offers compared, or solar paired with storage.
Not the right choice if: you need a published price, since the pricing page sends you to a demo booking, or you want a roof designer you can verify is built in. The ETB Developer page names partnerships with design tools, so ask how layouts reach it.
What the vendor documents: on the ETB Developer page you get proposals, quick financial analysis, lead management and “up-to-date utility rates”, with “120k+” utility rates tracked. The FAQ adds support for “cash purchases, power purchase agreements (PPAs), loans, and leases”, and the tool is web-based.
Price (checked October 2026): not published for ETB Developer. The pricing page says “Book 30 minutes” for a demo and pricing for your team size. Dollar figures on that page belong to its ETB Controller and ETB Monitor products.
Limitations: Albania and a lek currency option are not named on the pages we read, and the pages do not list which countries the utility rates cover. Ask whether a 1,000 to 23,000 ALL one-off fee can sit in the cash flow.
Vendor link: energytoolbase.com

OpenSolar
Best for: small Albanian crews who want a free core app and will key in the tariff for the client’s class themselves, including the household tier.
Not the right choice if: your proposals must come in a language outside the list below. Albanian is not among the 13, and the article says templates are translated by hand. The language article lists English, Dutch, Swedish, Spanish, French, Norwegian, Thai, German, Polish, Portuguese, Italian, Danish and Finnish.
What the vendor documents: custom tariffs built from flat, time-of-use, tiered and demand rates, plus a menu of export credits: Net Billing, Net Billing with Credit Carryover, Buy All, Sell All and Net Energy Metering. The article never says which suits Albania.
Price (checked October 2026): the core app is free of charge for solar professionals, per the vendor. From 16 April 2026 the vendor charges for API Access, a per-project fee, and for supported connectors, a flat monthly subscription. Source: its 16 February 2026 post and its API page.
Limitations: Albania and lek output are not named on the pages we read.
Vendor link: opensolar.com

SurgePV
SurgePV is our product.
Best for: Albanian teams who want roof modeling, array layout, shading, yield, financial modeling, electrical workflow support, bill of materials and proposals in a single per-user product. Ask in the demo for an Albanian sample with T1 and T4 fees. See solar proposal software for the product page.
Not the right choice if: you want a self-serve trial, since SurgePV offers a guided demo, or a written lek price before any sales call. Outputs support design and paperwork; they do not replace sign-off from the responsible engineer, authority, lender or utility.
What the vendor documents: the scope covers 3D roof modeling, array layout, shading analysis, energy-yield modeling, financial modeling, electrical workflow support, bill-of-materials output and proposal generation.
Price (checked October 2026): $1,899 per user per year for 1 user, $1,499 per user for 3 seats, $1,299 per user for 5 seats, in US dollars. Confirm any local-currency amount and taxes in a written quote.
Limitations: results depend on source data, assumptions and equipment models. The published SurgePV scope names no Albania tariff, export-credit setting, Albanian-language proposal or design size cap.
Vendor link: surgepv.com.

How We Ordered These Tools
No ranking is given for Albania. Tools run alphabetically, and the best-for picks follow from the matrix.
- Tariff entry: an Albanian quote has to use the rate for the client’s class. We did not measure how any tool handles time-of-use or tiered rates.
- Export-credit setting: exports can earn a fixed rate or a credit. We did not measure whether any tool can model Albania’s net metering proposal.
- Local-language proposals: a client reads best in a familiar language. Translation quality was not assessed.
- Price in a published currency: a known currency shows the buyer’s real cost. Discounts and negotiated quotes were not assessed.
- Free start: a free plan lets a small crew try the flow. We did not assess its limits beyond what its page states.
Methodology and Disclosure
SurgePV is published by SurgePV, which is also one of the vendors on this list. Its entry uses the same sources as the other three: public vendor pages, read in October 2026. For Albania, the tariff, currency and language questions are open for every vendor, SurgePV included. Where a page is silent, the matrix says Not stated.
Sources and Dates
Albania regulator source, read in November 2026: the ERE regulation on new connections in the distribution system.
Vendor pages were read in October 2026; each entry above carries its vendor links and help articles. SurgePV facts come from its own pricing page and proposal software page.
See SurgePV on your Albania project
Book a guided demo and ask for the Albania items you need in the quote.
Book a Free DemoMore Solar Software Guides to Compare
- Solar software in Albania
- Solar design software for Albania
- Best solar proposal software, all markets
- Aurora Solar alternatives
Frequently Asked Questions
What is the best solar proposal software in Albania?
It depends on what your Albanian quote must show. Self-producer connection fees under ERE’s regulation are small fixed amounts in lek (1,000 ALL study tariff for households, plus 1,500 ALL grid update and 1,000 ALL administration), so tariff entry and currency matter more. OpenSolar’s core app is free and takes a custom tariff. Aurora Solar lets you enter a fixed export rate. Energy Toolbase compares cash, loan, lease and PPA options. SurgePV builds proposals from the roof model.
Is there free solar proposal software for Albania?
OpenSolar says its core app is free for solar professionals. It charges for API Access and supported connectors from 16 April 2026. Its help article lists 13 proposal languages. The other tools here are paid, and the pages we read show no free plan for them. SurgePV offers a guided demo and no self-serve trial.
Can proposal software show Albania tariffs and local currency?
No vendor page we read names Albania tariffs or an Albania price list. OpenSolar and Aurora Solar let you enter custom tariffs. Enter the rate for your client’s class from your utility, and check that the proposal prints the currency you want.
Which proposal tools support Albania languages?
The pages we read do not say which tools offer an Albania interface or proposal template. OpenSolar’s help article lists English, Dutch, Swedish, Spanish, French, Norwegian, Thai, German, Polish, Portuguese, Italian, Danish and Finnish, and says a proposal template must be translated by hand. Check the language list before you buy.
How much does solar proposal software cost for Albania installers?
No vendor on this page lists an Albania price on the pages we read. Aurora Solar Basic is $159 per user per month billed monthly, or $135 per user per month billed annually. Energy Toolbase does not publish a price for ETB Developer. OpenSolar’s core app is free. SurgePV Individual is $1,899 per user per year. Ask each vendor for a written quote.
What connection fees go into an Albanian solar quote?
For self-producers up to 500 kWp, the ERE regulation sets a study tariff of 1,000 ALL for households, 5,000 ALL for non-household low voltage and 23,000 ALL for medium voltage. Distance and capacity tariffs are 0 ALL. The service tariff adds 1,500 ALL for grid update and 1,000 ALL for administration plus meter verification.