Look at OpenSolar for a free core app with design, bill of materials (BOM, the parts list) and proposals. The vendor charges for API Access and connectors from 16 April 2026. For residential proposals, look at Aurora Solar. It lists your own pricing method, adders (extra items added to a price), discounts and financing. For commercial proposals, HelioScope Pro lists financial analysis and sales proposals. EnergyToolbase covers utility rate and incentive economics for solar-plus-storage. SurgePV suits teams that want a web application. It gives BOM output, financial modeling and proposals from one design. Its published scope does not list labor costing or margin tools.
This is a desk comparison of what each vendor publishes, checked October 2026. We have not run side-by-side tests.
Criteria used: cost inputs and BOM, proposal and quote output, financial and incentive modeling, published price and access, and fit by project type.
Solargraf is not compared on this page. Its site, solargraf.com, returned HTTP 403 (access refused) to automated reads. This included a headless browser, read October 2026. An earlier version of this page covered it. General construction takeoff suites and load-analysis tools are outside this list.
Disclosure and methodology: SurgePV publishes this page and is one of the tools on it, so it is a vendor with an interest in the result. Methodology: this is a desk comparison of what each vendor publishes on its own public pages, checked October 2026. See How We Ordered These Tools and Sources and Dates below.
Estimating solar jobs? See a BOM built from one design
Book a guided demo and bring a real site. We walk through design, yield, finance and the proposal in one platform.
Book a Free DemoChecking cost first? See the SurgePV pricing page.
Best-For Picks by Use Case
- Free core app for design, BOM and proposals with supplier pricing in the workflow: OpenSolar. Its core app is described as free of charge. The vendor charges for API Access and connectors from 16 April 2026. Auto BOM shows quantities, costs and sources.
- Residential proposals with your own pricing method, adders, discounts and financing: Aurora Solar. Its pricing page lists custom pricing methods, adders, discounts and incentives, and integrated and custom financing.
- Commercial proposals with financial analysis and a published price: HelioScope. Financial analysis tools, a Utility Rate Editor and sales proposals are listed on Pro and Enterprise, not on Basic.
- Rate, incentive and project economics analysis for solar-plus-storage proposals: EnergyToolbase. Its ETB Developer page lists up-to-date utility rates, financial analysis and a storage simulation engine.
- BOM, financial modeling and proposals from one design in a web application: SurgePV. Its published scope lists bill-of-materials output, financial modeling and proposal generation.
Comparison Table
Listed alphabetically. This is not a ranking; pick by the situation above.
| Tool | Best for | Cost inputs, BOM and proposals | Price (checked October 2026) | Access |
|---|---|---|---|---|
| Aurora Solar | Residential sales proposals | Custom pricing methods (PPW, per component or flat fee), adders, discounts and incentives, financing; no BOM feature on the pricing page | Basic $135 per user per month billed annually ($1,620 per year); Premium $220 per user per month billed annually ($2,640 per year) (aurorasolar.com) | Paid; trial not stated on the pricing page |
| EnergyToolbase | Solar-plus-storage economics | Utility rates, incentives, financial analysis, branded proposal templates; no BOM feature on the page read | Not published for ETB Developer; pricing given on a demo call (energytoolbase.com) | Paid; demo booking, no credit card needed to book |
| HelioScope | Commercial rooftop, carport and ground mount | Pro and Enterprise: financial analysis tools, Utility Rate Editor, customizable reports and sales proposals; BOM quantities in the production report (help center), not in the plan table | Basic $1,620 per license per year; Pro $2,640 per license per year (helioscope.aurorasolar.com) | Paid; free trial listed (14 days per the help center) |
| OpenSolar | Free design, BOM and proposals | Auto BOM with quantities, costs and sources; Shop for supplier pricing and stock; proposals and Quick Quote | Core app free; API Access and connectors charged from 16 April 2026 (opensolar.com) | Free core app, paid API and connectors |
| SurgePV | BOM, financial modeling and proposals from one design | BOM output, financial modeling, proposal generation; labor and margin tools not in the published scope | $1,899 per user per year (1 user); see /pricing | Paid; guided demo, no self-serve trial |
Every price above was read on the vendor’s own page in October 2026. Taxes, discounts and plan limits change, so confirm them with the vendor before you buy.
Tool-by-Tool Comparison
Listed alphabetically. This is not a ranking; pick by the situation above.
Aurora Solar
Aurora Solar sells a solar design and sales platform. HelioScope, listed below, describes itself as an Aurora Inc. company.
Best for: residential installers and sales teams. They want proposals that use their own pricing method, adders, discounts, incentives and financing.
Not the right choice if: you need a bill of materials from the tool. The pricing page we read lists no BOM feature. It is also not the right choice if you want a free tool. Basic and Premium cover one user each. Enterprise pricing is custom per project.
What the vendor documents: on the North America pricing page, the sales proposal features include customizable proposal templates and custom pricing methods (“Configure PPW, per component, or flat fee pricing”). PPW means price per watt. The features also include “Adders, discounts, and incentives”, a utility rate database, and integrated and custom financing. They include financing and energy bill comparisons, web and PDF proposals and proposal activity tracking. Design features include 3D roof modeling and trees and performance simulation. They also include a component database, automated panel placement and automated stringing. Premium adds LIDAR-assisted modeling, bankable shade reports and battery modeling.
Price (checked October 2026): Basic is $159 per user per month billed monthly. It is $135 per user per month billed annually ($1,620 billed annually). Premium is $259 per user per month billed monthly. It is $220 per user per month billed annually ($2,640 billed annually). Enterprise is custom per project. Basic and Premium include 50 projects per month and one user. Source: Aurora pricing.
Limitations: the pricing page lists no labor-hours or margin tool. LIDAR-assisted modeling, bankable shade reports and battery modeling are listed from Premium, not Basic.
Vendor link: aurorasolar.com.

EnergyToolbase
EnergyToolbase sells ETB Developer for modeling and proposals, alongside ETB Controller and ETB Monitor for operating storage assets.
Best for: solar and storage developers and installers. They need utility rate, incentive and project economics analysis inside a branded proposal.
Not the right choice if: you need a published price, or a BOM tool or deep roof layout. The ETB Developer page we read lists rate analysis, financial analysis and a storage simulation engine. It also lists proposal templates and engagement tracking. It does not list an in-app layout tool. It does list PV design partnerships with design software tools. It lists no BOM feature.
What the vendor documents: per the ETB Developer page, it lists “Up-to-date utility rates”, “Quick financial analysis” and an “Industry-leading energy storage simulation engine”. It also lists a library of proposal templates with a custom template builder. It lists notifications when prospects open a proposal. It also says you can “compare payment options, forecast system costs, and calculate incentives”. It lists PV design partnerships with design software tools. Its FAQ says it supports financing structures. These include cash purchases, loans, leases and power purchase agreements (PPAs, where the customer pays for the power a system makes).
Price (checked October 2026): not published for ETB Developer. The pricing page offers a 30-minute demo and says you leave “with a clear understanding of … what pricing looks like”.
Limitations: which countries and utilities the rate data covers is not stated on the page we read.
Vendor link: energytoolbase.com.

HelioScope
HelioScope’s footer reads “an Aurora Inc. Company”; Aurora’s menu lists it as its commercial product.
Best for: commercial designers and EPC (engineering, procurement and construction) estimators. They want financial analysis, a utility rate editor and sales proposals attached to a commercial design. Prices are on the page.
Not the right choice if: you need those financial tools on the cheapest plan. The plan table lists them on Pro and Enterprise but not Basic. It is also not the right choice if you design above 5 MW (DC), which needs Enterprise.
What the vendor documents: the plan table lists “Utility Rate Editor”, “Financial analysis tools” and “Customizable reports & sales proposals” on Pro and Enterprise. All plans list single-line diagrams (simple drawings of how the system is wired) and CAD export. They also list an 8760 production report (8760 is the number of hours in a year) and shade reports. Pro also lists storage modeling and P90, P95 and P99 values. The help center describes a production report that includes a bill of materials (module, wire and inverter quantities). It also describes DXF export of CAD files and single-line diagrams.
Price (checked October 2026): Basic is $159 per license per month, or $1,620 per license per year. Pro is $259 per license per month, or $2,640 per license per year. Each Basic and Pro license includes 1 user and 10 projects per month. That is 120 per year on the annual option. Enterprise is custom per-project pricing. Source: HelioScope pricing.
Limitations: the plan table lists no labor-costing feature. The BOM sits in the production report, not the plan table. A help article describes a standard 14-day free trial, one per customer, with Pro-level features.
Vendor link: helioscope.aurorasolar.com.

OpenSolar
OpenSolar says it is funded by partners rather than license fees.
Best for: installers who want design, BOM and proposals in one platform with a free core app. They can check supplier pricing and stock in the same workflow.
Not the right choice if: you plan to connect OpenSolar to other systems, such as a CRM (customer database) or accounting software. You would do this through API Access or connectors. These have carried charges since 16 April 2026. Quick Quote and proposal styles are also enabled by region. Check that they are on for your market.
What the vendor documents: per its Auto BOM page, the BOM is built “from the system you design in OpenSolar”. You “review the components, quantities and costs as the design develops”. Panels, inverters, batteries and mounting hardware can be included. So can balance of system components (wiring and other parts that depend on the layout). The page also says “Shop lets you check supplier pricing and stock before you order”. The Sales Machine Proposal page lists Swipe, Scroll and Bespoke proposals. It also lists a Quick Quote for simpler jobs such as EV chargers, heat pumps, roofing and repairs.
Price (checked October 2026): the core app is free of charge for solar professionals, per the vendor. The 16 February 2026 post says the vendor charges for API Access and for supported connectors. This starts on 16 April 2026. API Access is a per-project fee. The per-project API fee is on OpenSolar’s API page. Connectors are a flat monthly subscription. API Access lets other software connect to OpenSolar. The post also says “there’s no charge for the core OpenSolar app” if you do not use them. Optional paid Enterprise Services: Support US$500 per month, Customize US$1,350 per month, Enterprise custom. Premium imagery is pay per image (price shown in the app). OpenSolar says its partners “all pay us to be a part of the platform”. It lists product manufacturers, finance companies and distributors among them (opensolar.com/free).
Limitations: the pages we read do not describe a labor-hours or margin calculator.
Vendor link: opensolar.com.

SurgePV
SurgePV is our product. We publish this list and sell this software.
Best for: installers and EPC teams. They want the BOM, financial model and proposal to come from the same design in one web application.
Not the right choice if:
- you need a self-serve trial. SurgePV offers a guided demo and does not advertise one.
- you need labor-hours costing or margin tools. SurgePV’s published scope lists BOM output, financial modeling and proposal generation. It does not name labor costing or margin tools.
- you need utility rate and incentive modeling for storage in depth. EnergyToolbase lists it; this page claims no storage modeling for SurgePV.
- you want a free core app. OpenSolar describes its core app as free of charge. The vendor charges for API Access and connectors from 16 April 2026.
- you need approval from an engineer, authority, lender, insurer or utility. SurgePV outputs support design and documentation but do not replace that approval.
- you need a full CRM, monitoring or ERP product. SurgePV’s published product scope does not list a CRM. Monitoring and ERP are outside its published scope.
What the vendor documents: SurgePV’s published scope is 3D roof modeling, solar array layout, shading analysis, energy-yield modeling, financial modeling, electrical workflow support, bill-of-materials output and proposal generation. The pricing page lists unlimited projects, generation and financial analysis, and proposal generation under “Everything included”. See the proposal workflow and the generation and financial tool.
Price (checked October 2026): $1,899 per user per year for one user. It is $1,499 per user per year for 3 seats. It is $1,299 per user per year for 5 seats. Access starts with a guided demo.
Limitations: results depend on source data, assumptions and equipment models. Pricing, access and scope are confirmed in a written quote.
Vendor link: SurgePV solar proposals.
See a BOM and proposal built from one design
Book a guided demo and bring a project you have already estimated by hand.
Book a Free Demo
What a Solar Estimate Has to Contain
An estimate turns a design into a price. Most bid prices are built from the same lines. Each tool above covers only some of them:
- Equipment: modules, inverters, batteries and mounting hardware, with quantities taken from the design. This is the bill of materials.
- Balance of system: wiring, disconnects, conduit and other parts that depend on the layout.
- Labor, permits and fees: hours and rates are specific to your crew and jurisdiction.
- Overhead and margin: set by your business, not by the design.
- Customer economics: savings, incentives and financing terms, which depend on the utility rate. They also depend on the incentives available when the quote is sent.
Cost per watt is the total price divided by the system size in watts. It lets you compare bids of different sizes. We have not added a worked estimate with numbers. Any figure would be invented without a real project’s equipment and labor inputs.
When You May Not Need Dedicated Estimating Software
A spreadsheet can hold the lines above if you quote a handful of standard systems a year. This works when you quote from a distributor price list. A design tool earns its place when the quote must follow a changing layout. It also helps when several people send quotes. It helps too when the proposal and financial model must match the price. For related lists, see best solar quoting software and best solar proposal software.
How We Ordered These Tools
The tools are listed alphabetically. The matrix records what each vendor documents, not what we saw in use. “Listed” means a vendor page we read names the feature. “Not stated” means the pages we read did not say. The feature may still exist. “Not in scope” means the vendor’s published scope for this page does not include it.
| Tool | BOM | Pricing method or cost inputs | Financial and incentive modeling | Proposal output | Price published |
|---|---|---|---|---|---|
| Aurora Solar | Not stated | Listed (PPW, per component or flat fee) | Listed (adders, discounts, incentives, financing) | Listed | Yes, USD per user per month |
| EnergyToolbase | Not stated | Not stated | Listed (rates, incentives, financial analysis) | Listed | No, given on a demo call |
| HelioScope | Listed (module, wire and inverter quantities in the production report, per a help article) | Not stated | Listed on Pro and Enterprise | Listed on Pro and Enterprise | Yes, USD per license per year |
| OpenSolar | Listed (Auto BOM) | Listed (costs and sources in the BOM; supplier pricing in Shop) | Listed (savings views and key financial figures in proposals) | Listed | Core app free; API and connectors charged from 16 April 2026 |
| SurgePV | Listed (BOM output) | Not in scope | Listed (financial modeling) | Listed (proposal generation) | Yes, USD per user per year |
BOM. It matters because quantities taken from the design cut ordering errors. We did not open a sample BOM or compare quantities on one project.
Pricing method or cost inputs. It matters because a quote is only as good as the prices and markups behind it. We did not test whether any tool handles labor, permits or margin.
Financial and incentive modeling. It matters because customers compare savings and payback. We did not check any tool’s incentive or rate data for accuracy.
Proposal output. It matters because the proposal is what the customer signs. We did not compare templates, e-signature or branding.
Price published. It matters because a printed price lets you plan a budget. We did not negotiate quotes, and we left out add-ons, taxes and volume discounts.
SurgePV sits in the alphabetical list like the other four. The matrix shows where it differs. It lists BOM output, financial modeling and proposals under one price. Its scope does not include labor or margin tools. That is why SurgePV is the best-for pick only when you want a BOM, financial model and proposal from one design. Other tools are the picks for free use, residential pricing methods and storage economics.
Sources and Dates
Vendor pages were read in October 2026. Tool facts come from each vendor’s own public pages, linked here by tool. Aurora Solar (pricing page). EnergyToolbase (ETB Developer page, FAQ, pricing page). HelioScope (plan table, production report, DXF export of CAD files and single-line diagrams, help article, helioscope.aurorasolar.com). OpenSolar (Auto BOM page, Sales Machine Proposal page, 16 February 2026 post, OpenSolar’s API page, Enterprise Services, opensolar.com/free, opensolar.com). SurgePV (SurgePV pricing).
Frequently Asked Questions
What is the best solar estimating software?
It depends on the job. OpenSolar’s core app is free and lists a design, bill of materials (BOM) and proposal workflow. The vendor charges for API Access and supported connectors from 16 April 2026. Aurora Solar lists proposals with your own pricing method, adders, discounts and financing. HelioScope Pro and EnergyToolbase document financial analysis and proposals for commercial and solar-plus-storage work. SurgePV lists BOM output, financial modeling and proposals from one design.
Is there free solar estimating software?
OpenSolar says its platform is free of charge. Partners such as manufacturers, finance companies and distributors fund it. Since 16 April 2026 it charges for API Access and supported connectors. The core app stays free if you do not use them. The other tools on this list are paid or quoted on request.
What software is used for commercial solar estimating and bidding?
HelioScope Pro lists financial analysis tools and a Utility Rate Editor. It also lists sales proposals for designs up to 5 MW (DC). EnergyToolbase lists rate, incentive and project economics analysis for solar-plus-storage proposals. SurgePV lists BOM output, financial modeling and proposals. None of the pages we read describes a bid form with labor and margin lines. Ask each vendor how a bid is built.
Can solar estimating software produce a bill of materials?
OpenSolar lists Auto BOM. It builds the hardware list from your design and shows quantities, costs and sources. SurgePV lists bill-of-materials output in its scope. HelioScope’s help center describes a bill of materials (module, wire and inverter quantities) in its production report. The Aurora Solar pricing page we read lists no bill of materials feature. Confirm that with Aurora if you need one.
How much does solar estimating software cost?
Prices differ by unit. OpenSolar’s core app is free. The vendor charges for API Access and supported connectors from 16 April 2026. Aurora Solar Basic is $135 per user per month billed annually. Premium is $220. HelioScope Basic is $1,620 per license per year. Pro is $2,640. SurgePV is $1,899 per user per year for one user. EnergyToolbase gives pricing on a call.
Does solar estimating software include labor costs?
The vendor pages we read do not describe a labor-hours or margin calculator. Aurora Solar lists custom pricing methods (price per watt, per component or flat fee) and adders. OpenSolar shows costs in its BOM. Add labor, permits and margin through your pricing method. Ask each vendor in a demo how a full bid price is built.