String Large Arrays Without Doing It by Hand

SurgePV assigns modules to strings and MPPT channels automatically, groups panels by tilt and azimuth to limit mismatch, and optimises cable routing. Every string is checked against inverter limits, NEC and IEC voltage rules, reverse-current protection and DC/AC ratio.

0

Hard electrical checks on every string

±2° / ±5°

Tilt and azimuth tolerance for grouping

0

Optimisation moves the engine can make

NEC 690.9

Reverse-current protection advisory

01Grouping first

Panels Are Grouped Before They Are Strung

Mismatch losses come from stringing modules together that do not see the same sun. So SurgePV groups before it assigns: every module is tagged with its tilt, azimuth, orientation and position, then neighbours sharing a tilt within 2° and an azimuth within 5° are flood-filled into a group.

Each group takes its own MPPT wherever inverter capacity allows. Cross-tilt stringing only happens when there are not enough MPPT channels to keep them separate — and then it is a deliberate fallback, not an accident.

Grouping relaxes fully when power optimisers are present, because per-module electronics remove the mismatch penalty that grouping exists to avoid. For tracker arrays it is switched off entirely and proximity governs instead.

Grouping priority

  1. High

    Tilt

    Within 2°

  2. High

    Azimuth

    Within 5°

  3. Medium

    Orientation

    Portrait or landscape — skipped when only one or two modules differ

  4. Tie-break

    Physical proximity

    Keeps cable runs short between modules that are otherwise equal

What the optimiser trades off

Cable length

Measured along real routes with 90° obstacle avoidance, not straight-line distance across a roof it cannot cross.

Mismatch

Each module's tilt and azimuth divergence from its string mean, summed across the array.

Unstrung modules

Weighted heaviest of the three. A module that ends up in no string is capacity you have paid for and cannot sell.

02Optimisation

A First Answer, Then a Better One

The engine makes a fast initial assignment, then refines it with simulated annealing — repeatedly perturbing the configuration, keeping every improvement and occasionally accepting a worse move so it does not settle in the first local optimum it finds. Six move types are available to it, from swapping a single module to reassigning an MPPT or merging and splitting strings.

It stops when further iterations stop helping, and reports how much it improved on its own first attempt. When the initial configuration was already the best available, it says so and changes nothing rather than churning the design for the sake of it.

An Optimisation Goal control lets you bias the result — minimise wire length, maximise production, or the balanced default between them. Refinement applies to string inverter configurations; micro-inverter branching is handled differently, below.

03Validation

Every String Is Checked, Every Time

Stringing by hand means the electrical checks happen when someone remembers to do them. Here they run on every configuration the engine produces, using the temperature-corrected string range already established for the module and inverter pair.

String voltage limits

Four hard checks per string: cold-temperature open-circuit voltage against both the inverter's maximum DC input and the system limit — 1000 V on rooftops, 1500 V on ground mounts — and hot and cold maximum-power voltage against the MPPT window.

Strings are also rated from best to worst on how centred they sit in the MPPT window and how much headroom is left at each end. The engine selects the highest-rated valid string length.

Reverse current — NEC 690.9

Three or more strings in parallel on the same MPPT, whether directly or through a combiner, raises a string-level fusing advisory naming the clause, with the overcurrent device rated at no more than 1.56 × Isc.

One or two parallel strings raise nothing. It is an advisory for your electrical engineer to act on, not a block on the design.

MPPT current and bifacial gain

Total MPPT current is checked against the channel's rating, then checked again with bifacial gain applied — rear-side irradiance can lift a module's effective short-circuit current well above its nameplate figure.

A design that passes on nameplate current but fails with bifacial gain gets a distinct warning, per MPPT, so the problem is not averaged away across the array.

Even strings per MPPT

Within a single MPPT every string carries the same module count — a hard rule, not a preference. Two length strategies decide how: fill each channel to its maximum and distribute the remainder, or divide evenly across all strings from the start.

Mixed string lengths on one channel are a classic source of underperformance that survives commissioning unnoticed.

DC/AC ratio bands

Optimal

1.05 – 1.30

Accepted with no action

Acceptable

0.90 – 1.40

Accepted with a note

Permissible

0.70 – 1.60

Accepted with a warning

Error

Outside 0.70 – 1.60

Flagged before you proceed

The ratio limit is yours to set — the bands describe how SurgePV responds, not a ceiling on what you are allowed to design.

04Not just string inverters

Micro-Inverters and Optimisers Follow Their Own Rules

Applying string logic to module-level electronics produces confident nonsense. SurgePV branches and validates each topology on its own terms.

Micro-inverter branching

There is no DC string to size, so units are grouped into AC branches capped by the model's maximum branch length, then ordered by a nearest-neighbour walk out from the AC connection point.

Different inverter models are never mixed within one branch. On a pitched roof with a single orientation, branches follow the facet.

Voltage-based optimisers

For platforms that fix a per-module output voltage, the valid string length falls out of the MPPT window divided by that voltage — a 350–850 V window at 60 V per optimiser gives six to fourteen modules.

Read from the optimiser database, not entered by hand.

Current-based optimisers

For current-limiting devices the check is the module's short-circuit current against the MPPT's maximum input current, with the voltage test reduced to confirming the string sits inside the window.

Optimiser quantity follows the module count; any remainder is surfaced rather than silently dropped.

Evidence-first evaluation

Evaluate SurgePV with your own project

SurgePV does not publish customer names, quotations, or performance outcomes without retained consent and substantiation. Use a representative project during a guided demonstration and validate workflow, outputs, assumptions, and fit against your own requirements.

What is solar stringing software?

Solar stringing software decides how modules connect into series strings and which MPPT channel each string feeds. SurgePV does this inside the solar design itself, so the result carries into the single-line diagram and the bill of materials.

Can I string an array manually?

Yes. Automatic assignment is the starting point, not a constraint — manually branched units are excluded from re-grouping, and the same electrical checks apply to whatever configuration you end up with.

Does it handle bifacial modules?

MPPT current is evaluated twice — once on nameplate short-circuit current and once with a bifacial gain factor applied — because rear-side irradiance can push effective current above the figure on the datasheet.

Frequently Asked Questions

How does SurgePV decide which modules go in which string?

It groups modules that share a tilt within 2 degrees and an azimuth within 5 degrees, gives each group its own MPPT channel where inverter capacity allows, then assigns strings within those groups. Cross-tilt stringing happens only when there are not enough MPPT channels to keep the groups separate.

What electrical checks run on each string?

Cold open-circuit voltage against the inverter maximum DC input and against the 1000 V rooftop or 1500 V ground system limit; hot and cold maximum-power voltage against the MPPT window; MPPT current including bifacial gain; DC/AC ratio; and a reverse-current advisory under NEC 690.9 when three or more strings sit in parallel on one channel.

Does SurgePV support micro-inverters and power optimisers?

Yes, and each on its own terms. Micro-inverters are grouped into AC branches capped by the model maximum branch length, never mixing inverter models within a branch. Voltage-based optimisers derive string length from the MPPT window and the fixed per-module voltage; current-based optimisers are validated against MPPT input current.

What is the DC/AC ratio and where does SurgePV draw the line?

It is array DC capacity divided by inverter AC capacity. SurgePV treats 1.05 to 1.30 as optimal, accepts 0.90 to 1.40 with a note and 0.70 to 1.60 with a warning, and flags anything outside that range. You set the limit for your own designs; the bands govern how the software responds.

Will it warn me about string fusing?

When three or more strings connect in parallel to the same MPPT, directly or through a combiner, SurgePV raises a string-level fusing advisory citing NEC 690.9, with the overcurrent device rated at no more than 1.56 times short-circuit current. One or two parallel strings raise nothing. It is an advisory for your electrical engineer, not a block.

See It String One of Your Own Arrays

Bring a commercial layout to the walkthrough and watch the strings, MPPT assignment and electrical checks come out together.