Single-Line Diagrams, Generated From Your Design
SurgePV builds the SLD from the system you have already designed — devices, strings, conductors and cable schedule. IEC 60617 or ANSI symbols depending on your region. Export to PDF or DXF without redrawing anything in AutoCAD.
0
Region packs — India, US, Germany, Australia, South Africa, UK
IEC + ANSI
Symbol standards, selected by project region
0
Component types in the symbol library
0
Export formats — PDF, DXF, SVG, PNG, BOM CSV
The Diagram Comes Out of the Design You Already Built
Most teams draft the SLD by hand in AutoCAD after the design is finished, then reconcile the two by eye. SurgePV skips that step. Opening the SLD reads the current topology from the 3D canvas — every component, every connection — and projects a diagram from it. The design canvas stays the source of truth, so the drawing cannot drift from the system it documents.
One component row per canvas object
Panels, inverters, combiners, switchboards, meters and protection devices arrive already placed, with their library specifications attached.
Cable lengths from real geometry
Each run is measured from the 3D distance between component endpoints and multiplied by a route factor, so lengths reflect the way cable is actually pulled rather than a straight line on a page.
No inverter, no diagram
A design without an inverter has no electrical topology to draw, so SurgePV shows an empty state rather than an empty canvas. It is a deliberate guard against issuing a drawing that documents nothing.
What happens when you open the SLD
- 1
Read the latest topology snapshot from the design canvas.
- 2
Load the region pack for the project's country.
- 3
Create a component for each object and a cable run for each connection.
- 4
Insert any protection devices the region requires but the design is missing.
- 5
Size every conductor, then render the diagram and the cable schedule.
Mandatory device engine
Each region pack declares the protection that must exist between two component types. Where a design is missing one, SurgePV inserts it, marks it as required, and frames it so a reviewer can see at a glance what the software added and what the designer drew.
Delete one and it warns, but it will not stop you.
The advisory names the device and the standard behind it — "Required by IS 732 (India). Re-insert or document a waiver" — and follows through to a compliance-warnings section in the exported PDF. Experienced engineers document unusual designs all the time; the tool records the deviation instead of blocking it.
The Right Symbols and the Right Protection, by Region
A drawing that uses IEC glyphs for a US permit submission gets sent back. SurgePV picks the symbol system from the project's region — IEC 60617 for India, the UK, Australia, South Africa and Germany, ANSI Y32 for the United States — across a library covering 21 component types, from PV arrays and hybrid inverters through to MEN links, NA-Schutz relays and rapid-shutdown initiators.
The equipment picker filters the same way. An Indian project sees IS-conforming records; a US project sees UL-listed ones. Nobody has to remember which catalogue applies where.
Six Region Packs, One Engine
Each pack carries its own symbol system, default voltages, voltage-drop budgets, cable nomenclature, mandatory devices and regulatory plaques. Adding a region means authoring a pack — not changing the diagram engine, the conductor sizing, the PDF renderer or the interface.
| Region | Symbols | 3-phase | DC Vdrop | AC Vdrop | Standards basis |
|---|---|---|---|---|---|
| India | IEC 60617 | 415 V | 1% | 2% | IS 732, IS 3043, CEA Regulations |
| United States | ANSI Y32 | 480 V | 2% | 3% | NEC 2023 Articles 690, 705, 310 |
| Germany | IEC 60617 | 400 V | 1% | 1% | DIN VDE 0100, VDE-AR-N 4105 |
| Australia | IEC 60617 | 400 V | 3% | 2% | AS/NZS 3000, 5033, 4777 |
| South Africa | IEC 60617 | 400 V | 1.5% | 3% | SANS 10142-1, NRS 097-2-1 |
| United Kingdom | IEC 60617 | 400 V | 1% | 3% | BS 7671, ENA G98/G99 |
US voltage-drop figures are NEC Informational Note recommendations rather than hard limits, so SurgePV raises them as warnings unless your team pins them as design limits. Every other region treats them as limits.
A Drawing Set, Not Just a Picture
The diagram is one part of what comes out. The schedule, the bill of materials and the title block are generated from the same model, so they agree with each other by construction.
Cable schedule
One sortable row per run, carrying ID, from, to, circuit type, region-formatted cable spec, length, number of runs, design current, voltage drop and pass status.
DC, AC and HT runs are separated and layered independently in the DXF.
Bill of materials
Cable runs aggregate by specification with a 10% wastage allowance, alongside mandatory devices and combiner boxes as line items.
Exports to CSV and PDF.
Title block
Drawing number, revision, drawn-by, checked-by and approved-by, sheet size, scale, client and vendor details — with an organisation-wide default your admin sets once.
Plus region fields: CEIG and DISCOM numbers in India, CEC designer and DNSP in Australia, NERSA in South Africa, Marktstammdatenregister in Germany, AHJ and permit number in the US.
Export formats
Default. Includes compliance warnings.
DXF
AutoCAD R12, layered by circuit type.
SVG
Vector snapshot of the canvas.
PNG
2× resolution raster.
BOM CSV
Straight into procurement.
Select more than one and they arrive zipped. DXF output is written as R12 for the widest AutoCAD compatibility and opens in AutoCAD 2018 and later.
Automatic Is the Default, Not the Only Path
Projection gets you a correct diagram. Getting it to match how your practice draws is a separate job, and the SLD canvas is built for it: reposition and rotate any node, change the symbol, override the voltage, current and conductor text the sizing engine populated, switch a cable between orthogonal routing and manual waypoints, and add your own key-value labels with per-label control over what appears on the drawing.
Every override is written to an audit log, so a reviewer can always see what was changed from the generated state and by whom.
Canvas toggles, saved per project
- Specifications on nodesOn
- Wire labelsOn
- Mandatory device indicatorsOn
- MPPT assignmentOff
- GridOff
- Snap to gridOff
A regulatory plaque editor sits alongside them: pick the plaque, fill the templated fields, preview it, and place it on the drawing.
Evidence-first evaluation
Evaluate SurgePV with your own project
SurgePV does not publish customer names, quotations, or performance outcomes without retained consent and substantiation. Use a representative project during a guided demonstration and validate workflow, outputs, assumptions, and fit against your own requirements.
What is solar SLD software?
Solar SLD software produces the single-line diagram for a PV system — the drawing that shows how modules, inverters, protection devices and the point of connection relate electrically. SurgePV generates it from the solar design rather than asking an engineer to redraw the system in a CAD package.
Can I export the SLD to AutoCAD?
Yes. SurgePV exports DXF in the AutoCAD R12 format, with components as block references and cables layered by circuit type. It opens in AutoCAD 2018 and later. See the AutoCAD integration page for how it fits a CAD workflow.
Will the diagram satisfy my permit office?
SurgePV applies the symbol standard, mandatory devices and title-block fields your region expects, and flags deviations in the export. Acceptance is decided by the authority, utility or responsible engineer reviewing the submission — the software supports the documentation, it does not approve it.
Frequently Asked Questions
How does SurgePV generate a single-line diagram?
It reads the topology of the design you built in the 3D studio — every component and every connection — loads the region pack for the project, inserts any protection the region requires, sizes each conductor, and renders the diagram together with a cable schedule. Nothing is redrawn by hand.
Does SurgePV export DWG?
The SLD exports as PDF, DXF (AutoCAD R12), SVG, PNG and a BOM CSV. DXF is the CAD interchange format; it opens in AutoCAD 2018 and later and in every major CAD package.
Which symbol standards are supported?
IEC 60617 for India, the United Kingdom, Australia, South Africa and Germany, and ANSI Y32 for the United States. The standard follows the project region, so the drawing matches what the reviewing authority expects. Where the two standards use an identical glyph, the shared symbol is used.
Can I edit the generated diagram?
Yes. Reposition, rotate and rescale nodes, swap symbols, override the voltage, current and conductor text, switch cables between orthogonal routing and manual waypoints, and add custom labels. Overrides are recorded in an audit log so the difference from the generated state stays visible.
What happens if a required protection device is missing?
SurgePV inserts it, marks it as required by the region pack, and highlights it on the canvas. If you remove it, a persistent advisory names the device and the standard behind it and carries through to a compliance-warnings section in the exported PDF. It warns rather than blocks.
Does the cable schedule feed the bill of materials?
Yes. Cable runs aggregate by specification with a 10% wastage allowance, and mandatory devices and combiner boxes are added as line items. The result exports to CSV and PDF alongside the drawing.
See the Diagram Come Out of the Design
Book a walkthrough and we will generate an SLD from one of your own projects, region pack and all.