🇦🇺 AustraliaTool8 min read

STC Zone Map & Calculator

STC calculator for Australian solar: find your zone rating by state and postcode, estimate certificate count by system size.

Rainer Neumann

Written by

Rainer Neumann

Editorial contributor · SurgePV

Keyur Rakholiya

Reviewed by

Keyur Rakholiya

CEO & Co-Founder · SurgePV

Published ·Last reviewed ·Regulator: Clean Energy Regulator

The STC discount is often the first question Australian solar customers ask — “how much is the rebate?” This guide provides the zone ratings, STC lookup tables by system size, and dollar value calculations to answer that question accurately for any Australian location and system size. See Solar Energy in Australia for more.

STC Formula
STCs = System kW × Zone Rating × Deeming Period (years)
Deeming Period (2026)
4 years (scheme ends December 31, 2030)
STC Market Price (approx.)
$35–40 AUD per STC (broker market, 2026)
Clearing House Price
$40 AUD (guaranteed floor — slower settlement)
Certificate Registry
recregistry.gov.au

STC Zone Map: Zone by State and Region

State/Territory Region STC Zone Zone Rating
Northern Territory All of NT (Darwin, Katherine, Alice Springs) Zone 1 1.622
Queensland Cairns, Townsville, Mt Isa, Mackay (far north) Zone 1 1.622
Queensland Brisbane, Gold Coast, Sunshine Coast, Toowoomba, Rockhampton Zone 2 1.536
South Australia Outback and inland SA (Broken Hill area, Port Augusta) Zone 2 1.536
South Australia Adelaide metropolitan and coastal SA Zone 3 1.382
Western Australia Pilbara, Kimberley, inland WA Zone 2 1.536
Western Australia Perth metropolitan and SW coastal WA Zone 3 1.382
New South Wales Far west NSW (Broken Hill, Tibooburra) Zone 2 1.536
New South Wales Sydney, Newcastle, Wollongong, Central Coast Zone 3 1.382
Australian Capital Territory Canberra and surrounds Zone 3 1.382
Victoria Melbourne metropolitan, Geelong, Ballarat Zone 3 1.382
Victoria Gippsland, eastern highlands, southern VIC Zone 4 1.185
Tasmania All of Tasmania (Hobart, Launceston, Devonport) Zone 4 1.185

Note: Zone boundaries can vary within states. Use the Clean Energy Regulator’s postcode lookup for exact zone confirmation.

STC Count by System Size: Zone 3 (Sydney / Melbourne / Perth)

Deeming period: 4 years (2026). Zone rating: 1.382.

System Size STCs Created Value at $37/STC Value at $39/STC
3 kW 17 STCs $629 $663
5 kW 28 STCs $1,036 $1,092
6.6 kW 36 STCs $1,332 $1,404
10 kW 55 STCs $2,035 $2,145
13.2 kW 73 STCs $2,701 $2,847
20 kW 111 STCs $4,107 $4,329
30 kW 166 STCs $6,142 $6,474

STC Count by System Size: Zone 2 (Brisbane / Adelaide / Most of WA)

Deeming period: 4 years (2026). Zone rating: 1.536.

System Size STCs Created Value at $37/STC Value at $39/STC
3 kW 18 STCs $666 $702
5 kW 31 STCs $1,147 $1,209
6.6 kW 41 STCs $1,517 $1,599
10 kW 61 STCs $2,257 $2,379
13.2 kW 81 STCs $2,997 $3,159
20 kW 123 STCs $4,551 $4,797
30 kW 184 STCs $6,808 $7,176

STC Count by System Size: Zone 1 (Darwin / Far North QLD)

Deeming period: 4 years (2026). Zone rating: 1.622.

System Size STCs Created Value at $37/STC Value at $39/STC
3 kW 19 STCs $703 $741
5 kW 32 STCs $1,184 $1,248
6.6 kW 43 STCs $1,591 $1,677
10 kW 65 STCs $2,405 $2,535
13.2 kW 86 STCs $3,182 $3,354
20 kW 130 STCs $4,810 $5,070

STC Count by System Size: Zone 4 (Tasmania / Southern VIC)

Deeming period: 4 years (2026). Zone rating: 1.185.

System Size STCs Created Value at $37/STC Value at $39/STC
3 kW 14 STCs $518 $546
5 kW 24 STCs $888 $936
6.6 kW 31 STCs $1,147 $1,209
10 kW 47 STCs $1,739 $1,833
13.2 kW 63 STCs $2,331 $2,457
20 kW 95 STCs $3,515 $3,705

How Deeming Period Reduction Affects Value

The reduction in STC value as the scheme approaches 2030 is significant for customer decision-making:

Year Deeming Period STCs (6.6 kW, Zone 3) Value at $38/STC
2026 4 years 36 STCs $1,368
2027 3 years 27 STCs $1,026
2028 2 years 18 STCs $684
2029 1 year 9 STCs $342

A customer who delays solar from 2026 to 2027 loses approximately $342 in STC value on a 6.6 kW Zone 3 system. This is a factual and legitimate point to include in proposals.

Pro Tip: STC Value Should Be Shown as a Separate Line in Every Proposal

Show the STC calculation transparently: “36 STCs × $38 = $1,368 STC discount.” Customers who understand exactly how the discount is calculated are more confident buyers than customers who see a vague “government rebate.” Use solar proposal software that automatically calculates STC count by zone and displays the value clearly in the financial summary.

Net System Cost Examples After STC Discount

Using a gross installed cost of $1,000/kW (mid-market 2026 pricing for a standard grid-connected system with quality components):

System Location Gross Cost STC Value Net Cost
6.6 kW Sydney (Zone 3) $6,600 $1,368 $5,232
6.6 kW Brisbane (Zone 2) $6,600 $1,558 $5,042
6.6 kW Darwin (Zone 1) $6,600 $1,636 $4,964
10 kW Sydney (Zone 3) $10,000 $2,090 $7,910
10 kW Brisbane (Zone 2) $10,000 $2,318 $7,682
13.2 kW Melbourne (Zone 3) $13,200 $2,774 $10,426

Payback Period with STC Discount

Using the net cost after STC and typical annual savings:

System Location Net Cost Annual Savings (est.) Payback
6.6 kW Sydney $5,232 $1,800–2,200 2.4–2.9 years
6.6 kW Brisbane $5,042 $1,900–2,300 2.2–2.7 years
6.6 kW Melbourne $5,232 $1,600–2,000 2.6–3.3 years
10 kW Sydney $7,910 $2,700–3,300 2.4–2.9 years

Annual savings assume retail electricity rate of $0.28–0.35/kWh, 70–80% self-consumption, feed-in tariff of $0.06–0.10/kWh for export.

Calculate Accurate STC Values for Every Australian Solar Proposal

SurgePV calculates the correct STC count by zone and deeming period, incorporates the STC discount into the financial model, and shows customers net cost, payback period, and 25-year savings in a single proposal output.

Book a Demo

No commitment required · 20 minutes · Live project walkthrough

Frequently Asked Questions

How do I calculate my STC count?

System kW × zone rating × 4 (deeming period in 2026). Zone 1: 1.622; Zone 2: 1.536; Zone 3: 1.382; Zone 4: 1.185.

What is the STC dollar value?

STCs × current market price (~$35–40 in 2026). A 6.6 kW Sydney system creates about 36 STCs worth approximately $1,300–1,400.

Does the STC value reduce each year?

Yes — by approximately 25% per year as the deeming period reduces from 4 (2026) to 1 (2029). Systems installed in 2026 receive the highest remaining STC value.

Can I sell my STCs myself?

Yes, through the REC Registry and clearing house. Most customers assign to the installer for an immediate upfront discount instead.

What zone is my postcode?

Use the Clean Energy Regulator’s postcode lookup at cleanenergyregulator.gov.au for the exact zone. The table above gives guidance by region — confirm with the official tool for any customer proposal.

About the Contributors

Author
Rainer Neumann
Rainer Neumann

Editorial contributor · SurgePV

Rainer Neumann is credited as an editorial contributor on SurgePV content. This profile does not assert engineering credentials, project totals, software-testing experience, education, speaking engagements, or media citations because independent verification evidence is not retained in the publication record.

Editor
Keyur Rakholiya
Keyur Rakholiya

CEO & Co-Founder · SurgePV

Keyur Rakholiya is identified by SurgePV as its CEO and a company co-founder. His SurgePV author page lists only role information that can be tied to the public profile below; credentials, project totals, testing claims, media appearances, and speaking engagements are not asserted without retained evidence.

STC calculator AustraliaSTC zone map Australiasolar rebate calculator Australiahow many STCs will I getSTC value 2026 Australiasolar certificate calculator Australia

Solar Compliance Updates in Your Inbox

Join 2,000+ solar professionals. Regulatory changes, code updates, and design tips — weekly.

No spam · Unsubscribe anytime

Choose which optional technologies SurgePV may use. Essential storage remains active for security and requested features.