Residential Solar

Residential Solar Design Software for Installers Who Sell More

Connect roof modeling, shade analysis, production estimates, and branded proposals in SurgePV's solar design software. Evaluate the workflow with a representative residential project during a guided demo.

Residential solar design software interface showing 3D roof modeling

3D

Roof and site modeling

Shade

Hourly shading workflow

Yield

Production modeling

PDF

Proposal output

01AI Roof Modeling

Build 3D Roof Models from Site Imagery

Reduce manual roof tracing. SurgePV uses imagery and project inputs to assist with roof planes, ridges, valleys, and obstructions, then prepares the model for panel placement. The designer remains responsible for checking geometry and source-data quality.

Automatic Roof Plane Detection

AI identifies pitch, azimuth, and usable area for each roof face. No manual measurements or CAD imports required.

Obstruction Recognition

Model chimneys, vents, skylights, and dormers and configure applicable setbacks for review.

Multi-Roof & Complex Geometry

Hip roofs, gables, L-shaped layouts, and multi-plane structures are handled in a single project without switching tools.

AI-powered 3D residential roof modeling in SurgePV
Residential solar shade analysis and irradiance mapping
02Shading & Irradiance

Accurate Shade Analysis and Production Estimates

Homeowners buy on confidence. SurgePV runs hourly shade simulations using 3D site geometry, tree lines, and neighboring buildings so every production estimate is grounded in real-world conditions.

Hourly Shading Simulation

Calculate shade losses for every hour of the year. Identify the modules that underperform and adjust layout before installation.

Irradiance & Temperature Maps

Visualize solar access across the roof with color-coded irradiance maps and temperature-adjusted production curves.

Field-Validated Accuracy

Production estimates incorporate weather, equipment, temperature, and shading assumptions. Review inputs and results for each project.

03Proposals & Sales

Branded Client Proposals Straight From Design

Turn any residential design into a solar proposal that sells. SurgePV auto-populates system specs, production charts, financing scenarios, and payback analysis into a branded document homeowners can understand and sign.

1 Click

Proposal generation

PDF + Link

Client delivery

Financing

Cash, loan, lease, PPA

E-Sign Ready

Close faster

Branded residential solar proposal generated in SurgePV
Use Cases

Residential Projects SurgePV Handles

From detached homes to retrofit additions, SurgePV adapts to the full range of residential solar work.

Single-Family Homes

Design pitched and flat-roof homes with fast AI modeling, accurate shade analysis, and homeowner-friendly proposals.

Townhouses

Handle shared walls, limited roof area, and HOA requirements with compact layouts and clear setback rules.

Multi-Family Buildings

Model apartment rooftops, allocate production across units, and generate proposals for landlords and property managers.

Retrofit & Addition

Add panels to existing systems, model roof additions, and re-run production estimates for expansion projects.

Comparison

Evaluate Residential Solar Design Platforms

Use the same representative project, source data, and review criteria when comparing SurgePV with another platform.

FeatureWhat to verifyEvidence to retain
AI 3D roof modelingGeometry quality and edit controlsSource imagery, measurements, and reviewer notes
Workflow timeTime the same project from import through reviewTest protocol, revisions, and reviewer time
Shade analysisInputs, timestep, and loss assumptionsSettings export and comparison output
Branded proposalsBrand controls and output formatsSample PDF and client-view test
Pricing modelCurrent quote and contract scopeWritten quote, renewal terms, and included services
Battery storage designSupported equipment and scenariosEquipment list and representative model
Onboarding & supportImplementation and support scopeService levels and onboarding plan in writing

Read the full solar design software comparison to see detailed feature breakdowns.

Evidence-first evaluation

Evaluate SurgePV with your own project

SurgePV does not publish customer names, quotations, or performance outcomes without retained consent and substantiation. Use a representative project during a guided demonstration and validate workflow, outputs, assumptions, and fit against your own requirements.

What is residential solar design software?

Residential solar design software helps installers model photovoltaic systems for homes. SurgePV combines AI roof modeling, shade analysis, production simulation, and proposal generation in one platform.

How does SurgePV speed up residential design?

SurgePV connects roof modeling, panel placement, production estimates, and financial assumptions in one workflow. Actual time depends on source data, roof complexity, configuration, revisions, and review.

Why choose SurgePV for residential projects?

SurgePV connects solar proposal software, shade analysis, and design workflows. Confirm current pricing, included capabilities, and implementation scope in a written quote.

Frequently Asked Questions

What is residential solar design software?

Residential solar design software is a digital platform that helps installers model rooftop PV systems for single-family homes, townhouses, and multi-family buildings. SurgePV combines AI roof modeling, shade analysis, production simulation, and branded proposal generation in one cloud-based tool.

How fast can I design a residential solar system in SurgePV?

SurgePV connects roof modeling, panel placement, production modeling, and proposal generation to reduce manual handoffs. Completion time depends on imagery, roof complexity, equipment selection, project inputs, and the review process.

Does SurgePV handle shading analysis for residential roofs?

Yes. SurgePV runs hourly shade simulations using 3D roof geometry, nearby trees, chimneys, and neighboring buildings. The output includes an irradiance map, shade loss percentage, and month-by-month production adjustments.

Can SurgePV generate client-ready residential proposals?

Yes. SurgePV turns any residential design into a branded proposal with system specs, energy production charts, financing options, and payback analysis. Proposals can be exported as PDF or shared via a client-facing link.

What roof types does SurgePV support for residential projects?

SurgePV supports pitched shingle roofs, tile roofs, metal roofs, flat roofs, hip roofs, and complex multi-plane geometries. The AI detects ridges, valleys, dormers, and obstructions automatically.

Is SurgePV suitable for small installer businesses?

SurgePV is intended for installer teams of different sizes. Pricing, implementation scope, onboarding time, and contract terms should be confirmed for the team during a guided demo and written quote.

How accurate are SurgePV production estimates for homes?

SurgePV production estimates use project inputs such as weather data, equipment parameters, temperature effects, and shading assumptions. Results depend on input quality and configuration and should be reviewed against the requirements of the project.

Can I design battery storage with residential solar in SurgePV?

Yes. SurgePV includes battery sizing and backup modeling for residential systems. You can compare self-consumption, time-of-use, and backup-power scenarios alongside the solar design.

Design More. Sell More. Build More.

See how SurgePV connects solar design, simulation, financial analysis, and proposals in one workflow.

Choose which optional technologies SurgePV may use. Essential storage remains active for security and requested features.