Comparison2026
S
SurgePV
VS
S
Solargis

SurgePV vs Solargis 2026: Design Tool vs Solar Data

SurgePV vs Solargis compared on solar data, design, simulation and published price, from vendor pages checked November 2026. See which fits your workflow.

Keyur Rakholiya

Written by

Keyur Rakholiya

CEO & Co-Founder · SurgePV

Rainer Neumann

Edited by

Rainer Neumann

Editorial contributor · SurgePV

SurgePV vs Solargis 2026: Design Tool vs Solar Data: comparison cover

Quick answer

SurgePV is a per-user solar design and proposal platform from $1,899 per user per year. Solargis is a solar data and simulation provider: Prospect plans are EUR 2,400 or 4,800 per year, and its Evaluate product adds a 3D designer and bankable-simulation reports. Choose SurgePV for roof-to-proposal work, Solargis when the project needs its irradiance data. Checked November 2026.

Comparing SurgePV with Solargis?

See what a roof-to-proposal project looks like in SurgePV, then decide if you also need a data provider.

Book a Free Demo

Checking cost first? See the SurgePV pricing page.

SurgePV publishes this page and is one of the two products compared. The Solargis facts come from solargis.com pages checked 4 November 2026; the SurgePV facts come from its pricing page and published product scope.

What do SurgePV and Solargis each do?

SurgePV designs and proposes solar projects; Solargis supplies solar data and simulation. Solargis lists Prospect (quick estimate of a site’s solar potential), Evaluate (data, design and PV simulation in one solution), Monitor and Forecast. SurgePV lists 3D roof modeling, array layout, shading analysis, energy-yield modeling, financial modeling, electrical workflow support, bill-of-materials output and proposals.

Solargis public website page, captured 4 November 2026
Solargis public website capture, captured 4 November 2026. This shows the vendor's website, not a test inside the software.
SurgePV public website page, captured 29 October 2026
SurgePV public website capture, captured 29 October 2026. This shows the vendor's website, not a test inside the software.

SurgePV vs Solargis: feature comparison

Feature SurgePV Solargis
Main job Design, yield, financials, proposals Solar and meteo data, site assessment, simulation
Data Not detailed on the pricing page 250 m spatial resolution, 1-minute or 15-minute data, 30+ years
Design 3D roof modeling and array layout Evaluate: 3D Energy System Designer, 150+ parameters, terrain and row spacing
Simulation Energy-yield modeling; P50/P75/P90 scenarios Evaluate: ray tracing, Perez sky model; Prospect: fixed-tilt PV modeling
Reports Proposals and project documents Stakeholder reports on resource, yield, losses and long-term forecast
Bankability Outputs do not replace lender approval Describes its data and Evaluate results as bankable
Proposals Proposal generation Not listed on pages read
Price $1,899 per user per year, 1 user Prospect EUR 2,400 or 4,800 per year; Evaluate EUR 12,000 subscription

Sources: Solargis home page, Solargis pricing and Solargis Evaluate, checked 4 November 2026. SurgePV: pricing.

How much do SurgePV and Solargis cost?

Solargis publishes euro prices for Prospect; SurgePV publishes US dollar prices per user. The units differ: Solargis plans cap users and new projects, while SurgePV lists unlimited projects per user.

Product Published price Includes
Solargis Prospect Basic EUR 2,400 per year Up to 5 users, 500 new projects a year, fixed-tilt PV modeling, PDF reports
Solargis Prospect Professional EUR 4,800 per year Up to 10 users, 1,000 new projects a year; adds bifacial albedo data, 1-axis trackers, floating solar
Solargis Evaluate EUR 12,000 subscription (period not stated on the page read) 60 early-stage projects, unlimited designs and collaborators
Solargis Enterprise Not published Dedicated account manager
SurgePV $1,899 / $1,499 / $1,299 per user per year (1 / 3 / 5 users) Unlimited projects listed; +18% GST
Solargis Prospect plan list prices (EUR per year)
  • Prospect BasicEUR 2,400
  • Prospect ProfessionalEUR 4,800

Source: Solargis pricing page, checked November 2026.

Need a design and proposal tool, not only data?

Bring a real site to a SurgePV demo and see layout, shading, yield and the proposal in one project.

Book a Free Demo

Checking cost first? See the SurgePV pricing page.

Who should pick which?

  • Installers and EPCs who quote rooftop and ground projects: SurgePV, for layout, shading, financials and proposals.
  • Developers who need long-term irradiance data and site assessment: Solargis.
  • Teams that need both: start with the design tool and add Solargis when a lender or engineer asks for its data.
  • Early-stage screening of many sites: compare Solargis Prospect with a design tool you already use.

Pros and cons

SurgePV

  • Pro: design, shading, yield, financial modeling and proposals in one per-user plan.
  • Pro: unlimited projects and free onboarding listed on the pricing page.
  • Con: irradiance data source not detailed on its pricing page; guided demo only.
  • Con: outputs do not replace engineer, authority or lender approval.

Solargis

  • Pro: 250 m, 30+ years of data and a 3D designer in Evaluate.
  • Pro: published Prospect prices and plan limits.
  • Con: Evaluate and Enterprise terms need sales detail; no proposals listed.
  • Con: plans cap users and new projects.

Bottom line

SurgePV is for designing and selling projects; Solargis is for solar data and assessment, with a design layer in Evaluate. If you sell solar projects, book a SurgePV demo or see pricing. Related: solar design software and PVsyst vs SurgePV.

Sources

Frequently Asked Questions

What is the difference between SurgePV and Solargis?

SurgePV is design and proposal software; Solargis is a provider of solar and meteorological data with simulation products. Solargis lists Prospect, Evaluate, Monitor and Forecast products, and its data is described as 250 m resolution with 30+ years of history (solargis.com, checked November 2026).

Does Solargis include solar design tools?

Yes, in its Evaluate product. Solargis describes a 3D Energy System Designer with over 150 customizable parameters, ray-tracing simulation and reports (Solargis Evaluate page, checked November 2026). It does not list roof modeling from address or customer proposals on the pages we read.

How much does Solargis cost?

Solargis Prospect Basic is EUR 2,400 per year for up to 5 users and 500 new projects a year, and Professional is EUR 4,800 per year for up to 10 users and 1,000 projects. Its homepage also mentions a EUR 12,000 Evaluate subscription. Enterprise is not published (Solargis pricing page, checked November 2026).

How much does SurgePV cost?

SurgePV is $1,899 per user per year for 1 user, $1,499 per user for 3 and $1,299 per user for 5, in US dollars plus 18% GST (surgepv.com/pricing, checked November 2026).

Can I use SurgePV and Solargis together?

Possibly, depending on the data you need. SurgePV is a design and proposal platform and Solargis supplies solar data and simulation. Ask both vendors how data and reports would move between them; neither page we read describes a direct connection.

Is Solargis data required by lenders?

That is up to each lender. Solargis describes its data and Evaluate results as bankable, but acceptance depends on the lender and engineer. Ask which data source and report they require before you choose (Solargis site, checked November 2026).

About the Contributors

Author
Keyur Rakholiya
Keyur Rakholiya

CEO & Co-Founder · SurgePV

Keyur Rakholiya is identified by SurgePV as its CEO and a company co-founder. His SurgePV author page lists only role information that can be tied to the public profile below; credentials, project totals, testing claims, media appearances, and speaking engagements are not asserted without retained evidence.

Editor
Rainer Neumann
Rainer Neumann

Editorial contributor · SurgePV

Rainer Neumann is credited as an editorial contributor on SurgePV content. This profile does not assert engineering credentials, project totals, software-testing experience, education, speaking engagements, or media citations because independent verification evidence is not retained in the publication record.

Ready to See the Difference?

Start a free trial and experience why solar teams are switching to SurgePV.

Choose which optional technologies SurgePV may use. Essential storage remains active for security and requested features.