Comparison2026
S
SurgePV
VS
R
Reslink

SurgePV vs Reslink: Global Design vs India Mobile App

SurgePV vs Reslink compared on published price, platform, scope and limits from each vendor's pages. Checked November 2026.

Keyur Rakholiya

Written by

Keyur Rakholiya

CEO & Co-Founder · SurgePV

Rainer Neumann

Edited by

Rainer Neumann

Editorial contributor · SurgePV

SurgePV vs Reslink: Global Design vs India Mobile App: comparison cover

Quick answer

Reslink is 3D solar design software you can use from a phone, priced from $2,000 per year by project size. SurgePV is a web design and proposal platform priced per user from $1,299 to $1,899 per year. The deciding factor is how you work: Reslink for phone-first site visits and BOM drawings, SurgePV for a per-user web workflow. Checked November 2026.

Weighing SurgePV against Reslink?

Book a guided demo and run one real project to compare outputs, BOM and proposal side by side.

Book a Free Demo

Checking cost first? See the SurgePV pricing page.

SurgePV publishes this page and is a vendor in this category. This page compares SurgePV with Reslink, so SurgePV is one of the compared products. The facts here come from the vendors’ public pages, checked November 2026. Last checked: 4 November 2026.

SurgePV is priced per user per year and Reslink per year by project size band. The two models do not map one to one.

SurgePV Reslink
Pricing basis Per user per year Per year by project size band; user limit not stated
Entry price $1,899 per user (1 user) $2,000 per year (Starter, up to 100 kW)
Mid tiers $1,499 per user (3 seats), $1,299 per user (5 seats) $3,000 (up to 500 kW), $5,000 (up to 5 MW)
Top Enterprise: custom quote $10,000 per year (Developer, up to 100 MW)
Taxes 18% GST added Prices exclude applicable taxes
Trial Guided demo, no self-serve trial Demo buttons; trial answer not readable
Published annual price (USD per year; SurgePV per user, Reslink per plan)
  • SurgePV (5 seats, per user)$1,299
  • SurgePV (3 seats, per user)$1,499
  • SurgePV (1 user)$1,899
  • Reslink Starter$2,000 up to 100 kW
  • Reslink Scaler$3,000 up to 500 kW
  • Reslink Builder$5,000 up to 5 MW
  • Reslink Developer$10,000 up to 100 MW

Source: SurgePV and Reslink pricing pages; Reslink currency inferred from the $ sign, checked November 2026.

Reslink’s page offers Monthly and Yearly options with “Save up to 33%”, but monthly prices are not shown. A SurgePV team of three pays $4,497 per year; a Reslink plan is a flat fee, so compare against your seat count and project size.

Reslink is 3D solar design software for EPCs, particularly in India, covering site mapping, design, proposals and BOM, per its homepage. It emphasizes designing from a phone.

Reslink public website page, captured 29 October 2026
Reslink public website capture, captured 29 October 2026. This shows the vendor's website, not a test inside the software.
  • Roof detection and shadow simulation, auto stringing and automatic panel placement.
  • 100+ roof profiles, rooftop and ground-mount projects.
  • Electrical and structural BOM from the live design.
  • Single-line diagrams, PV and array layout drawings and BESS sizing.
  • OPEX, CAPEX and time-based tariff proposals as customer PDFs.
  • The site says 6,000+ solar EPCs and 20+ countries; these are vendor claims.

What does SurgePV do?

SurgePV is cloud solar design and proposal software. Its public scope lists 3D roof modeling, solar array layout, shading analysis, energy-yield modeling, financial modeling, electrical workflow support, bill-of-materials output and proposal generation.

SurgePV public website page, captured 29 October 2026
SurgePV public website capture, captured 29 October 2026. This shows the vendor's website, not a test inside the software.

See the solar designing, shadow analysis, financial tool and proposal pages for each module. Results depend on source data, assumptions and equipment models, and outputs do not replace approval by the responsible engineer, authority, lender, insurer or utility.

Need BOM and proposal from one design?

SurgePV lists bill-of-materials output and proposal generation next to shading and yield. Bring a rooftop project to a demo.

Book a Free Demo

Checking cost first? See the SurgePV pricing page.

Each cell reflects what the vendor’s own pages state. Not stated means the pages read do not mention it, not that it is absent.

Feature SurgePV Reslink
3D roof design Listed Listed, from a phone
Shading or shadow simulation Shading analysis listed Shadow simulation listed
Auto stringing Not stated Listed
Bill of materials Bill-of-materials output Electrical and structural BOM
Single-line diagram Electrical workflow support Single-line diagrams listed
Financial modeling Financial modeling listed OPEX, CAPEX and tariff proposals listed
BESS sizing Not stated Listed
Proposals Proposal generation Customer-ready proposal PDFs
Ground-mount and large plants Not stated Up to 100 MW plan band
  • Pick Reslink if your sales team designs on site from a phone and wants BOM, SLD and layout drawings, particularly for India.
  • Pick SurgePV if you want a per-user web workflow from roof modeling to proposal with published prices.
  • Pick either only after a demo on one real project: neither page lists lender or utility acceptance.
Pros Cons
SurgePV Per-user prices published; shading, yield, financials and proposals in one scope Guided demo only; phone design not advertised
Reslink Phone-first design; BOM, SLD and layout drawings listed User limit and trial answer not readable; plan names inconsistent

Bottom line

Choose Reslink for phone-first design and drawings, and SurgePV for a per-user web workflow with proposals. Verify outputs on one project in each. Book a SurgePV demo or see the pricing page. Related pages: SurgePV vs OpenSolar, SurgePV vs Aurora Solar, solar design software India vs global and best solar design software in India.

Sources

Frequently Asked Questions

Neither is better for every team, and the deciding factor is workflow. Reslink emphasizes designing from a phone and lists BOM, single-line diagrams and layout drawings. SurgePV lists 3D roof modeling, shading, yield, financial modeling, BOM and proposals in a web workflow at published per-user prices. Checked November 2026.

Reslink’s pricing page lists Starter at $2,000 per year (up to 100 kW), Scaler at $3,000 (up to 500 kW), Builder at $5,000 (up to 5 MW) and Developer at $10,000 (up to 100 MW), excluding taxes. The currency is not named; the $ sign is shown. Checked November 2026.

SurgePV costs $1,899 per user per year for one user, $1,499 per user for three seats and $1,299 per user for five seats, plus 18% GST per its pricing page. Reslink prices by project size band instead of by user, so compare on your own team and project mix.

No free trial is stated on the Reslink pages read. The pricing page shows Request Demo, Book A Demo and Get 3D Access buttons and has a trial FAQ whose answer was not readable. SurgePV also offers a guided demo and advertises no self-serve trial.

Can SurgePV design from a mobile phone?

SurgePV’s public pages describe a web platform and do not advertise phone-based design. Reslink says you can design from a phone without a desktop. Test both on your own devices in a demo.

Reslink’s site lists electrical and structural BOM generation from the live design, single-line diagrams, PV and array layout drawings and BESS sizing. It also lists OPEX, CAPEX and time-based tariff proposals. SurgePV lists bill-of-materials output and electrical workflow support.

Which is better for Indian EPCs?

Reslink states it is aimed particularly at India and lists Delhi and Mumbai among its markets. No DISCOM, MNRE or subsidy workflow was verified on either vendor’s pages for this check, so ask each for India outputs in a demo.

About the Contributors

Author
Keyur Rakholiya
Keyur Rakholiya

CEO & Co-Founder · SurgePV

Keyur Rakholiya is identified by SurgePV as its CEO and a company co-founder. His SurgePV author page lists only role information that can be tied to the public profile below; credentials, project totals, testing claims, media appearances, and speaking engagements are not asserted without retained evidence.

Editor
Rainer Neumann
Rainer Neumann

Editorial contributor · SurgePV

Rainer Neumann is credited as an editorial contributor on SurgePV content. This profile does not assert engineering credentials, project totals, software-testing experience, education, speaking engagements, or media citations because independent verification evidence is not retained in the publication record.

Ready to See the Difference?

Start a free trial and experience why solar teams are switching to SurgePV.

Choose which optional technologies SurgePV may use. Essential storage remains active for security and requested features.