
Quick answer
Powerlily is the broader platform; SurgePV is the narrower design and proposal tool. Powerlily's paid plans run $20.83 to $233.33 per month, paid annually, with unlimited users and a CRM. SurgePV lists $1,899 per user per year for one user. The deciding factor is whether you need CRM and operations tools. Checked November 2026.
Comparing SurgePV with Powerlily?
Bring one real project to a guided demo and judge the 3D design, shading and proposal output side by side.
Book a Free DemoChecking cost first? See the SurgePV pricing page.
Last checked: November 2026. SurgePV publishes this page and is a vendor in this category. The page compares SurgePV with Powerlily. The facts here come from the vendors’ public pages, checked November 2026.
SurgePV vs Powerlily: scope and price at a glance
The short version: SurgePV lists design, simulation and proposals, while Powerlily’s pages add CRM, scheduling, invoicing and fleet monitoring to its design tools.
| SurgePV | Powerlily | |
|---|---|---|
| What it is | Solar design and proposal software | Design, proposal and business-operations platform |
| Design scope listed | 3D roof modeling, array layout, shading analysis, energy yield, financial modeling, electrical workflow support, bill of materials, proposals | 3D design with shade, stringing and per-panel hourly production; branded web proposals; single-line diagram and plan sets on Pro |
| CRM, invoicing, monitoring | Not in the listed scope | CRM, invoicing and fleet monitoring (Enphase, SolarEdge, APsystems, Tesla) per its site |
| Users | Priced per user | Unlimited seats, branches and quotes on paid plans |
| Price (USD) | $1,899 per user per year (1 user); $1,499 per user (3 seats); $1,299 per user (5 seats) | Go $20.83, Essentials $108.33, Standard $166.66, Pro $233.33 per month, paid annually |
| Access | Guided demo | Plans sold on its pricing page |
How much do SurgePV and Powerlily cost?
Powerlily lists four paid plans from $20.83 to $233.33 per month paid annually, with unlimited users. SurgePV lists $1,899 per user per year for one user, falling to $1,299 per user at five seats (SurgePV pricing page, November 2026).
- SurgePV, 3 seats$4,497 $1,499 x 3 users
- Powerlily Go$250 unlimited users, no 3D studio listed
- Powerlily Essentials$1,300 unlimited users
- Powerlily Standard$2,000 unlimited users
- Powerlily Pro$2,800 unlimited users
Source: SurgePV pricing page and Powerlily pricing page (Powerlily monthly price paid annually, times 12, rounded), checked November 2026.
Powerlily’s pricing page also shows Standard at $199.99 per month in its calculator with no billing period stated, against $166.66 per month paid annually in the plan table. The chart uses the annual figure. The two tools sell different scopes, so a lower price is not a like-for-like saving.
What does SurgePV do?
SurgePV is web-based design and proposal software. Its listed scope covers 3D roof modeling, array layout, shading analysis, energy-yield and financial modeling, electrical workflow support, bill-of-materials output and proposal generation. Its listed scope does not include a CRM, invoicing or fleet monitoring.

Pros: one workspace from roof model to proposal; per-user pricing that stays small when only designers need seats.
Cons: no CRM or scheduling in the listed scope; access is through a guided demo, not a self-serve sign-up.
What does Powerlily do?
Powerlily is a solar design, proposal and operations platform. Its site lists a CRM with pipelines, a mobile canvassing app, 3D design with shade and stringing, branded web proposals, invoicing, crew scheduling, a client portal and fleet monitoring for Enphase, SolarEdge, APsystems and Tesla. Its pricing page says single-line diagrams and plan sets come with Powerlily Pro.

Pros: unlimited seats on every paid plan; CRM, field app and monitoring under one login; onboarding included on the site.
Cons: the pages read give no yield-accuracy or shading method detail; the Standard plan price appears two ways on its pricing page.
Done comparing platforms and ready to see the design workflow?
Book a demo and walk through roof model, shading and proposal on your own address.
Book a Free DemoWho should pick which?
- Pick SurgePV if design and proposal quality is the bottleneck and a separate CRM already works for the team.
- Pick Powerlily if you want CRM, canvassing, invoicing and monitoring in one subscription and several people need access.
- Pick neither yet if you need permit plan sets only: Powerlily lists them on its Pro plan, so check that tier.
Bottom line
Powerlily is the broader platform and, for a team of several people, the lower sticker price. SurgePV is the narrower design-and-proposal tool. If your priority is the 3D design and proposal step, book a SurgePV demo with a live project, or review the pricing first. Browse the design software list for other options.
Sources
- Powerlily homepage: feature list, unlimited users, integrations (checked November 2026).
- Powerlily pricing: plan prices in USD paid annually, Standard calculator figure (checked November 2026).
- SurgePV pricing: per-user yearly prices and listed scope (checked November 2026).
Frequently asked questions
Is SurgePV better than Powerlily?
It depends on the job: SurgePV is the narrower design and proposal tool, and Powerlily is the broader platform. Powerlily’s site lists CRM, scheduling, invoicing and fleet monitoring, which SurgePV’s listed scope does not include (checked November 2026).
How much does Powerlily cost?
Powerlily lists Go at $20.83, Essentials at $108.33, Standard at $166.66 and Powerlily Pro at $233.33 per month, paid annually, in USD. Its pricing page also shows a $199.99 per month Standard figure with no billing period (checked November 2026).
How much does SurgePV cost compared with Powerlily?
SurgePV lists $1,899 per user per year for one user, $1,499 per user for 3 seats and $1,299 per user for 5 seats. Powerlily’s paid plans include unlimited seats, so a team of several people pays less on Powerlily’s sticker price (checked November 2026).
Does Powerlily have a built-in CRM?
Yes. Powerlily’s site lists a CRM with pipelines, tasks and lead routing, and its Go plan includes a full CRM. SurgePV’s listed scope does not include a CRM.
Which is better for a team that only needs design and proposals?
SurgePV fits a team that only needs design and proposals and already has a CRM, because its scope is limited to those steps. Powerlily also covers design and proposals, so compare both on your own project before paying for CRM features you will not use.
Can I try SurgePV before buying?
SurgePV is offered through a guided demo, and no self-serve trial is advertised. Book a demo and bring a real project.

