Comparison2026
P
PV*SOL
VS
E
Energy Toolbase

PV*SOL vs Energy Toolbase 2026: Simulation vs Rates

PV*SOL vs Energy Toolbase in 2026: published prices, simulation scope, storage and rate modeling compared, with who should pick which. See the table.

Keyur Rakholiya

Written by

Keyur Rakholiya

CEO & Co-Founder · SurgePV

Rainer Neumann

Edited by

Rainer Neumann

Editorial contributor · SurgePV

PV*SOL vs Energy Toolbase 2026: Simulation vs Rates: comparison cover

Quick answer

PV*SOL premium simulates PV and batteries in 3D for 845.00 EUR plus VAT per year on Windows. Energy Toolbase models solar and storage finances against utility rates, with ETB Developer priced after a demo (both checked November 2026). Pick PV*SOL for energy yield and shading, and Energy Toolbase for rate and demand-charge economics.

Comparing PV*SOL with Energy Toolbase?

See design, yield and proposals in one SurgePV workflow with a guided demo.

Book a Free Demo

Checking cost first? See the SurgePV pricing page.

SurgePV publishes this page and is a vendor in this category. SurgePV is not one of the two products compared; it appears as a third option near the end. The facts come from the vendors’ public pages, checked November 2026.

PV*SOL vs Energy Toolbase: simulation or rate analysis?

PV*SOL premium simulates PV systems, including batteries, on a Windows desktop. Energy Toolbase models solar and storage finances against utility rates. If you are choosing between them, decide first whether your open question is energy or money.

PV*SOL premium Energy Toolbase
Core job Dynamic simulation with 3D visualization and shading, per its product pageETB Developer: financial modeling for solar and storage, per its homepage
Price 845.00 EUR plus VAT, one-year named-user license ETB Developer quoted after a demo; ETB Monitor from $4,700; ETB Controller from $12,400, per the pricing page
Platform Windows 10 or 11 (64-bit) Not stated on the pages read
Storage Battery design, inverter and charging strategy Storage controls (ETB Controller) and monitoring (ETB Monitor)
Financial 20-year analysis with feed-in tariffs from database Utility rates (120k+ listed), solar and storage financial models
Weather data Meteonorm 9 worldwide, PVGIS, Solcast, SolarAnywhere Not stated on the pages read
Layout 3D scene up to 7,500 mounted modules Not described on the pages read
845 EUR
PV*SOL premium, one-year named-user license, plus VAT
$4,700
ETB Monitor, listed starting price
$12,400
ETB Controller, listed starting price
120k+
utility rates listed by Energy Toolbase

Key facts from the PV*SOL premium product page and the Energy Toolbase pricing page, checked November 2026. Currencies are not converted; ETB Developer is quoted after a demo.

PV*SOL premium public website page, captured 29 October 2026
PV*SOL premium public website capture, captured 29 October 2026. This shows the vendor's website, not a test inside the software.

What does PV*SOL premium cover?

It builds a 3D scene, calculates shading from 3D objects and simulates PV with batteries and electric vehicles. Its financial module uses a feed-in tariff database and system costs to produce a 20-year analysis, exportable as PDF or Word. This fits markets organized around feed-in tariffs. See the PV*SOL review.

Pros: 3D shading; storage modeling; published one-year price; many languages.

Cons: Windows only; the financial module described is tariff-based, not a utility rate and demand-charge model.

Energy Toolbase public website page, captured 29 October 2026
Energy Toolbase public website capture, captured 29 October 2026. This shows the vendor's website, not a test inside the software.

What does Energy Toolbase cover?

Energy Toolbase focuses on commercial solar and storage economics. Its homepage lists ETB Developer, Controller, Monitor and Consulting, 120k+ utility rates, 12+ storage hardware vendors and 10+ control strategies. Rate structures with demand charges are its natural fit. Also see the Energy Toolbase review.

Pros: rate-based modeling; storage controls and monitoring; consulting.

Cons: developer price not published; no PV loss simulation or 3D layout described.

Need layout and proposals as well?

Neither tool pitches proposals as its core. Bring a project to a SurgePV demo.

Book a Free Demo

Checking cost first? See the SurgePV pricing page.

Who should pick which?

  • Pick PV*SOL premium for a 3D shading and yield study with a fixed-tariff financial model.
  • Pick Energy Toolbase for commercial solar and storage cases decided by rates and demand charges.
  • Use both when yield feeds a rate model.
  • Consider an all-in-one for design plus proposals: Energy Toolbase vs SurgePV and PV*SOL vs SurgePV.

Where does SurgePV fit?

SurgePV is a web platform covering 3D roof modeling, array layout, shading analysis, energy-yield modeling, financial modeling, electrical workflow support, bill of materials and proposals. List price is $1,899 per user per year for one user and $1,299 per user for five seats, billed annually before 18% GST (pricing).

SurgePV public website page, captured 29 October 2026
SurgePV public website capture, captured 29 October 2026. This shows the vendor's website, not a test inside the software.

It does not publish a utility-rate database size or storage dispatch optimizer, so Energy Toolbase stays the specialist for that. Book a demo to test design and proposals.

Bottom line

PV*SOL premium answers the energy question; Energy Toolbase answers the rate and storage question. For one web workflow from layout to proposal, see SurgePV pricing or book a demo.

Frequently Asked Questions

Is PV*SOL or Energy Toolbase better?

They do different jobs: PV*SOL premium simulates PV and batteries in 3D, and Energy Toolbase models solar and storage finances against utility rates. Pick by whether you need yield or rate economics (vendor pages, checked November 2026).

How much does PV*SOL premium cost?

A one-year named-user PV*SOL premium license costs 845.00 EUR plus VAT (Valentin Software product page, checked November 2026).

How much does Energy Toolbase cost?

ETB Developer is quoted after a demo, ETB Monitor starts at $4,700 and ETB Controller at $12,400 on its pricing page (checked November 2026).

Can Energy Toolbase replace PV*SOL?

No, the pages read describe Energy Toolbase as financial modeling and storage controls, not PV loss simulation or 3D shading.

Does PV*SOL model utility demand charges?

The product page describes a 20-year analysis using feed-in tariffs from a database and system costs, and does not mention demand charges. Energy Toolbase lists 120k+ utility rates.

Which is better for solar plus storage?

Both cover storage in different ways: PV*SOL premium designs battery systems and charging strategy, and Energy Toolbase sells storage controls, monitoring and financial modeling.

Sources

Last checked: 4 November 2026.

About the Contributors

Author
Keyur Rakholiya
Keyur Rakholiya

CEO & Co-Founder · SurgePV

Keyur Rakholiya is identified by SurgePV as its CEO and a company co-founder. His SurgePV author page lists only role information that can be tied to the public profile below; credentials, project totals, testing claims, media appearances, and speaking engagements are not asserted without retained evidence.

Editor
Rainer Neumann
Rainer Neumann

Editorial contributor · SurgePV

Rainer Neumann is credited as an editorial contributor on SurgePV content. This profile does not assert engineering credentials, project totals, software-testing experience, education, speaking engagements, or media citations because independent verification evidence is not retained in the publication record.

Ready to See the Difference?

Start a free trial and experience why solar teams are switching to SurgePV.

Choose which optional technologies SurgePV may use. Essential storage remains active for security and requested features.