Comparison2026
M
Multiple
VS
S
SurgePV

Best Solar Design Software: 10 Tools by Workflow

Compare 10 solar design tools by workflow, documented capabilities, licensing and required deliverables. Includes dated pricing and evaluation checks.

Keyur Rakholiya

Written by

Keyur Rakholiya

CEO & Co-Founder · SurgePV

Rainer Neumann

Edited by

Rainer Neumann

Editorial contributor · SurgePV

Best Solar Design Software: 10 Tools by Workflow: comparison cover

Quick answer

The best solar design software is the tool, or mix of tools, that produces the deliverables your project needs. SurgePV, Aurora Solar, HelioScope and OpenSolar list design plus proposals; PVsyst and PV*SOL focus on simulation; PVcase and RatedPower target utility-scale layout. Compare by deliverable and price basis. Checked November 2026.

Which design tool fits your workflow?

Bring one real project to a guided SurgePV demo and compare the outputs against the tools on this list.

Book a Free Demo

Checking cost first? See the SurgePV pricing page.

Publisher and method: SurgePV publishes this comparison and sells one of the listed products, so it is a vendor in this category. Descriptions below use vendor documentation checked in September 2026 and prices re-read in November 2026. They are vendor-reported capabilities, not a controlled test of speed, prediction error, ease of learning or customer outcomes. Listing order is not a performance ranking. Prices retain the vendor’s currency and billing basis; taxes, services and regional terms need confirmation.

Compare tools by the work you need to deliver

Start with the output the next person must use. A persuasive proposal, a reproducible energy study and an editable engineering drawing are different deliverables. A software label such as “all-in-one” does not prove that every required document, equipment model or external review is included.

Tool Documented workflow to investigate Evaluation question
SurgePV Roof modeling, layout, shading, yield, finances, electrical workflow, materials and proposals Can the available implementation produce your required outputs from one reviewed design basis?
Aurora Solar Solar design and sales proposals with plan-specific modeling, services and integrations Which capabilities, imagery and services are included in the quoted plan?
PVsyst Grid-connected and stand-alone PV simulation Can the study reproduce your inputs, losses and required report basis?
HelioScope Commercial solar-plus-storage design, simulation, financials and sales Do the project configuration and customer deliverables fit your actual use case?
OpenSolar Design and sales within a free core application Does your workflow stay in the app or require separately charged external connections?
PV*SOL premium 3D PV design, shading and simulation with consumption, storage and related loads Do the Windows workflow, equipment models and current edition fit the project?
PVcase Separate site-selection, AutoCAD design and yield products Which products and CAD licenses does the assignment require?
RatedPower Utility-scale PV/storage layout, electrical work, cost modeling and documents Which deliverables need reconciliation with yield-report or civil CAD tools?
SolarEdge Designer Design, stringing, simulation and proposals in the SolarEdge ecosystem Does the exact equipment and regional configuration meet the vendor’s design rules?
SketchUp 3D geometry, shadow and daylight analysis Which solar energy or electrical calculations need another model or extension?

What each tool contributes-and what to verify

SurgePV: evaluate a connected design-to-proposal workflow

SurgePV supports 3D roof modeling, array layout, shading analysis, energy-yield and financial modeling, electrical workflow support, bill-of-materials output and proposal generation. Explore the solar design workflow and proposal workflow using permitted project inputs.

Check the actual equipment selections, model assumptions, output formats and revision handling. A generated document does not replace approval by the responsible engineer, authority, utility, lender or insurer. Ask which steps and exports are available in the implementation being quoted; do not assume that every CAD, permitting or contractual requirement is covered.

SurgePV public website page, captured 29 October 2026
SurgePV public website capture, captured 29 October 2026. This shows the vendor's website, not a test inside the software.

Aurora Solar: check the plan and service boundary

Aurora’s pricing page describes design and sales capabilities. Basic and Premium list one user and 50 projects per month. Premium lists LiDAR-assisted modeling and battery modeling; Enterprise lists APIs, permissions and access to additional professional services. Confirm entitlements and service charges in the actual quote rather than interpreting access to services as every service being included.

Aurora Solar public website page, captured 29 October 2026
Aurora Solar public website capture, captured 29 October 2026. This shows the vendor's website, not a test inside the software.

PVsyst: evaluate the simulation deliverable

PVsyst’s shop describes PVsyst 8 for grid-connected and stand-alone PV simulation, with a Professional license and separate command-line product. Identify which product and report format the project needs.

A lender or independent engineer may specify software, inputs, uncertainty treatment or a study method. Obtain those requirements directly. A software name alone does not prove that a particular report is accepted, that its inputs are correct or that debt providers accept every probability result without review.

PVsyst public website page, captured 29 October 2026
PVsyst public website capture, captured 29 October 2026. This shows the vendor's website, not a test inside the software.

HelioScope: commercial design extends beyond a yield-only description

HelioScope currently describes commercial rooftop, carport and ground-mount solar with storage, simulation and financials. Its positioning includes sales as well as design. Evaluate that current workflow instead of assuming it has no financial or customer-sales capability.

Ask for the applicable plan, equipment and project-size limits, report formats and required services. Vendor accuracy and speed statements need their underlying method and relevant project context; this comparison does not adopt a universal error percentage or completion time.

HelioScope public website page, captured 29 October 2026
HelioScope public website capture, captured 29 October 2026. This shows the vendor's website, not a test inside the software.

OpenSolar: distinguish free core work from paid connectivity

OpenSolar’s February 2026 announcement states that the core application remains free, with charges for API Access and supported connectors beginning on 16 April 2026. External connectivity is a different cost boundary from working inside the core app.

Check the workflow you actually need, including integrations and data-export arrangements. Free licensing does not prove inferior simulation, a smaller database or a need to upgrade to a fictional paid design tier. Neither does it remove the need to validate inputs and required outputs.

OpenSolar public website page, captured 29 October 2026
OpenSolar public website capture, captured 29 October 2026. This shows the vendor's website, not a test inside the software.

PV*SOL premium: 3D planning and simulation on Windows

Valentin Software describes 3D PV planning, shading, yield and scenarios involving consumption, storage, electric vehicles and thermal loads. Its listed system requirements include Windows 10 or 11, 64 bit. The product page currently distinguishes supported 3D module counts for mounted and roof-parallel arrangements; confirm the relevant configuration and version for a large project.

Check current equipment, climate and load data, economic inputs and export formats. A country-specific feature or database does not certify compliance with every current local requirement.

PV*SOL premium public website page, captured 29 October 2026
PV*SOL premium public website capture, captured 29 October 2026. This shows the vendor's website, not a test inside the software.

PVcase: identify the product rather than treating the portfolio as one cloud app

The PVcase product portfolio separates Prospect, Ground Mount, Roof Mount and Yield. Ground Mount and Roof Mount are described as AutoCAD-driven products; Roof Mount addresses commercial and industrial rooftops. The earlier description of PVcase as exclusively cloud-based ground-mount software would miss this distinction.

Confirm the product combination, compatible CAD environment, license cost and handoff formats. A portfolio capability is not automatically included in a single product or subscription.

PVcase public website page, captured 29 October 2026
PVcase public website capture, captured 29 October 2026. This shows the vendor's website, not a test inside the software.

RatedPower: utility-scale design with a clear downstream boundary

RatedPower’s platform page describes utility-scale PV and storage layout, electrical design, CAPEX, materials and document generation. It also describes DWG exchange and explicitly says the platform is not a replacement for a yield-report tool or civil CAD environment.

That boundary matters when evaluating consolidation. Test the actual site geometry, editable documents, exports and reconciliation process. Vendor examples and testimonials are not evidence that your project will achieve the same speed or outcome.

RatedPower public website page, captured 29 October 2026
RatedPower public website capture, captured 29 October 2026. This shows the vendor's website, not a test inside the software.

SolarEdge Designer: distinguish equipment rules from project approval

SolarEdge describes Designer as free within its ecosystem, with modeling, shading, automatic stringing, DC cabling, simulation and customer proposals. Its design-compliance statement concerns SolarEdge design rules.

Confirm the supported component combinations and regional documentation. Compliance with vendor configuration rules does not prove compliance with all applicable electrical, structural, permitting or utility requirements. A forecast is not measured generation or a guaranteed customer saving.

SolarEdge Designer public website page, captured 29 October 2026
SolarEdge Designer public website capture, captured 29 October 2026. This shows the vendor's website, not a test inside the software.

SketchUp: geometry and sunlight studies have a different output boundary

SketchUp’s current analysis documentation describes Advanced Shadows and additional Public Labs analysis types. These address sunlight, shadows and daylight rather than establishing a complete PV electrical or annual-energy study.

Evaluate the exact desktop or web product and any required extensions. A useful 3D or shadow view can support a design conversation, but it should not be relabeled as verified AC generation, an electrical design or an approved installation drawing.

SketchUp public website page, captured 4 November 2026
SketchUp public website capture, captured 4 November 2026. This shows the vendor's website, not a test inside the software.

Dated pricing examples

These are published examples checked on 30 September 2026, not equivalent offers or a total-cost ranking. Keep currencies separate unless an exchange-rate date and conversion method are stated.

Product or plan Published billing example Cost boundary to preserve
SurgePV Individual USD 1,899 per user per year One seat; confirm current written quote
SurgePV three-seat team USD 1,499 per user per year; USD 4,497 total Three seats, not USD 1,499 for the team
SurgePV five-seat team USD 1,299 per user per year; USD 6,495 total Five seats, not the individual price
Aurora Basic USD 159/user/month monthly; USD 1,620/user/year annually Annual equivalent is USD 135/month; listed project limit and services still matter
Aurora Premium USD 259/user/month monthly; USD 2,640/user/year annually Annual equivalent is USD 220/month; confirm extras
PVsyst 8 Professional CHF 700/year Product and license basis differ from proposal platforms
PV*SOL premium EUR 845 for a one-year named-user license, plus VAT Confirm region and renewal terms
OpenSolar core No core application subscription charge per announcement API Access and supported connectors have separate charges
SolarEdge Designer No license or subscription fees per product page Ecosystem and exact equipment suitability still matter
HelioScope, PVcase, RatedPower, SketchUp Verify the relevant current plan with each vendor No unverified price or trial promise is assigned here
Published annual price in USD (per user or per license) (USD per year)
  • SurgePV 5 seats (per user)$1,299
  • SurgePV 3 seats (per user)$1,499
  • Aurora Basic (per user, annual)$1,620
  • HelioScope Basic (per license)$1,620
  • SurgePV Individual (per user)$1,899
  • Aurora Premium (per user, annual)$2,640
  • HelioScope Pro (per license)$2,640

Source: SurgePV, Aurora Solar and HelioScope pricing pages, checked November 2026.

SurgePV pricing comes from its published pricing page; the external prices come from the vendor pages linked above. Do not add CHF, EUR and USD amounts together as though they were one annual total.

Ready to run the acceptance test?

Use your own permitted project in a SurgePV demo and check the design, yield and proposal outputs against your list.

Book a Free Demo

Checking cost first? See the SurgePV pricing page.

Use a project acceptance test before choosing a stack

Prepare one representative, permitted project and a deliverable list. Include the difficult conditions your real pipeline contains: uncertain geometry, several equipment options, storage, tariff inputs, a CAD handoff or a strict review package. State which inputs are measured, supplied, modeled or still unknown.

  1. Define the deliverables. Name the customer proposal, reproducible energy record, material output, electrical document and editable export that the receiving roles need.
  2. Set a common basis. Use the same source geometry, equipment, weather, losses and financial assumptions where appropriate. Document intentional differences.
  3. Inspect the output. Check units, model settings, missing inputs, warnings and revision identifiers. Two similar annual totals do not validate each other.
  4. Review the handoff. Ask the intended recipient to open the export, reproduce the relevant calculation and identify conditions requiring further approval.
  5. Measure the work. Record preparation, correction, review and data-transfer time separately. Include errors and failed exports rather than counting only a successful demonstration.
  6. Compare the cost boundary. Include seats, projects, services, integrations, CAD, training and retained specialist tools. Separate labor capacity from cash savings.
  7. Record the decision. Choose, reject or request evidence against each requirement. State which tool remains responsible for each output and what would reopen the decision.

For example, two hours of measured transfer work per week across 52 working weeks equals 104 hours of labor capacity. That hypothetical arithmetic does not show 104 hours of cash savings, identify the work a new tool would eliminate or prove a payback period. Use your own observed weeks and redeployment assumptions.

The software selection checklist provides a more detailed procurement record. The broader software roundup also covers preliminary yield calculators. Here, the focus is the licensed workflow and downstream deliverable you need to accept.

Which Solar Design Software Should You Choose?

Who should pick which

  • Residential installers selling proposals: SurgePV, Aurora Solar, OpenSolar and SolarEdge Designer list customer proposals; check the plan, imagery and price basis.
  • Commercial EPCs: HelioScope lists rooftop, carport and ground-mount design with storage; PV*SOL premium and PVcase Roof Mount list commercial work.
  • Yield studies for lenders: PVsyst and PV*SOL premium are simulation programs; use the one your reviewer names.
  • Utility-scale layout: PVcase Ground Mount and RatedPower list layout tools; neither publishes a price.

Use the Aurora Solar comparison, PVsyst comparison, HelioScope comparison or OpenSolar comparison when a two-product question needs closer examination. Confirm dates, publisher relationships and sources before relying on changing capabilities or prices.

Sources

Checked in September 2026 and prices re-read in November 2026. Each vendor’s own page is linked in its section above. Key pages:

Last checked: November 2026.

Frequently Asked Questions

What is the best solar design software for residential installers?

Shortlist tools against the actual roof, equipment, proposal and financial workflow. Check the available plan, imagery coverage, export requirements and customer-facing assumptions. A demonstration using permitted project data is more useful than a universal winner based on a feature count.

What is the best solar design software for commercial and industrial projects?

Compare the deliverables your team must produce: roof or ground layout, shading and yield, equipment configuration, financial scenarios, customer proposals and CAD handoffs. HelioScope describes commercial solar-plus-storage workflows; other tools cover different parts of that work. Verify limits and required approvals for your project.

What is the best free solar design software?

OpenSolar states that its core app remains free; API Access and supported external connectors are separately chargeable. SolarEdge describes Designer as free within its software ecosystem. Evaluate the supported equipment, data movement, project requirements and review process rather than assuming free software has inadequate simulation.

Can SurgePV replace multiple solar design tools?

It may cover several steps in a team’s workflow, but replacement must be checked against required inputs, calculations, exports and reviewer acceptance. SurgePV supports design, modeling, electrical workflow, materials and proposals. Confirm implementation scope and retain other tools where contractual or technical deliverables require them.

What is the most accurate solar design software?

This comparison names no accuracy winner. Agreement between two models is not proof that either predicts actual energy accurately. Compare input assumptions and loss treatment, investigate differences, and use relevant measured evidence and qualified review where the decision requires validation.

How much does solar design software cost per year?

Compare the same currency, billing term, seat count, plan and included services. SurgePV’s three-seat annual plan is USD 4,497 in total, not USD 1,499 for the team. Other tools use different currencies and license models. Dated examples below require confirmation before purchase.

Which solar design software includes proposal generation?

SurgePV, Aurora Solar, OpenSolar and SolarEdge describe customer proposal workflows. HelioScope also describes commercial design, financials and sales. Check the actual plan, permitted output formats, assumptions and review state; a customer proposal is a different deliverable from an approved engineering or construction package.

Evaluate the outputs your team needs

Bring permitted inputs and a deliverable checklist to a guided SurgePV demonstration. Confirm implementation scope, product access, pricing and contract terms in writing.

Request a guided demo

About the Contributors

Author
Keyur Rakholiya
Keyur Rakholiya

CEO & Co-Founder · SurgePV

Keyur Rakholiya is identified by SurgePV as its CEO and a company co-founder. His SurgePV author page lists only role information that can be tied to the public profile below; credentials, project totals, testing claims, media appearances, and speaking engagements are not asserted without retained evidence.

Editor
Rainer Neumann
Rainer Neumann

Editorial contributor · SurgePV

Rainer Neumann is credited as an editorial contributor on SurgePV content. This profile does not assert engineering credentials, project totals, software-testing experience, education, speaking engagements, or media citations because independent verification evidence is not retained in the publication record.

Ready to See the Difference?

Start a free trial and experience why solar teams are switching to SurgePV.

Choose which optional technologies SurgePV may use. Essential storage remains active for security and requested features.