Answer
A solar sales funnel tracks defined steps from an accepted inquiry to a final outcome. Calculate each conversion rate as completed next-stage events divided by eligible prior-stage opportunities, multiplied by 100. Keep cohort membership, observation dates and unresolved records visible so your team can compare equivalent work instead of relying on a universal benchmark.
Last updated: November 2026
SurgePV publishes this post and sells solar design software.
A sales manager opens the dashboard and sees three versions of the truth. Marketing counts every form submission as a lead. Sales counts only records assigned to a representative. Design counts projects with enough site information to begin work. All three teams report a conversion rate, yet none uses the same starting population or timestamp.
The teams need shared event definitions before another dashboard can help.
A useful solar sales funnel is a versioned map of observable events. It shows how an eligible opportunity moves from an accepted inquiry to a defined outcome, who owns each handoff, how long records wait, and which denominator supports each rate. It does not turn a collection of stage labels into a universal performance benchmark.
Define what counts as a delivered solar proposal
Explore proposal generation in SurgePV and identify the reviewed output your sales funnel should record.
Book a DemoChecking cost first? See the SurgePV pricing page.
This guide gives solar sales managers a practical funnel contract, stage dictionary, conversion formulas, cohort method, leakage review, and copy-ready operating record. It does not provide an invented industry average. Public benchmark tables can combine different lead sources, geographies, products, time windows, qualification rules, and definitions of a close. A precise percentage without those boundaries can be less useful than no number at all.
The narrower job here is measurement. Use the sales conversion guide for broader process tactics, then build your baseline from your own defined events and reconciled records.
What is a solar sales funnel?
A solar sales funnel is a controlled sequence of customer and company events from accepted inquiry through a final outcome. Each stage needs an observable entry, an observable exit, an owner, a timestamp, and an exception path. Conversion describes movement between those events; pipeline describes the opportunities currently waiting within them.
The word “funnel” suggests that records simply narrow as buyers leave. Real solar workflows are messier. An opportunity can pause for a utility bill, return after a roof decision, split into multiple sites, merge with a duplicate household record, change from cash to financing, or move backward when a proposal assumption changes. The model must preserve that history instead of rewriting it to make the path look clean.
The United States Department of Energy identifies customer acquisition, sales, general administration, design, permitting, installation, interconnection, and financing among solar’s non-hardware or soft-cost areas. Its solar soft-cost overview supports the limited point that sales work belongs to the wider delivery economics of solar. It does not prescribe a private company’s stages, rate, or benchmark.
Use four layers, not one overloaded status field:
| Layer | Question it answers | Example record | What it must not imply |
|---|---|---|---|
| Lifecycle state | Where is the opportunity now? | Discovery complete | That the buyer is qualified or likely to sign |
| Work queue | Who owes the next action? | Design intake review | That work has begun or passed review |
| Evidence state | What inputs are available? | Utility data received, roof evidence missing | That a proposal can be finalized |
| Outcome state | How did this path end? | Deferred by buyer | That the opportunity was competitively lost |
A stage should represent a meaningful change in evidence, commitment, or work authority. “Follow-up 2” is an activity, not necessarily a lifecycle stage. “Hot” is a judgment, not an event. “Proposal” is ambiguous unless the team distinguishes requested, in preparation, reviewed, delivered, viewed, discussed, revised, accepted, and expired where those distinctions matter.
The United States Department of Energy’s soft-cost basics page says slow or inefficient processes can increase soft costs and notes that customers can experience lag between purchase and installation. The page supports attention to process and delay. It does not prove that one response-time target, cadence, or CRM configuration improves a particular seller’s outcome.
Map the path at the level needed to make a decision. An executive view may show accepted, qualified, proposed, contracted, and closed. An operating view can preserve the smaller events that explain why an opportunity is stuck. The two views should roll up from the same source events rather than being manually reconciled after the meeting.
Which solar sales funnel stages should you define?
Define stages around accepted lead, contact, discovery, qualification, design readiness, proposal delivery, active decision, and final outcome, then adapt them to the actual selling motion. Every definition needs entry evidence, exit evidence, owner, clock rule, and exception. Keep activities, evidence status, and outcome reasons in separate fields rather than hiding them inside stage names.
The following stage dictionary is a starting template, not a claim that every residential, commercial, direct, referral, marketplace, or partner-led sale follows one path.
| Stage | Entry event | Exit event | Primary owner | Required record |
|---|---|---|---|---|
| Accepted lead | Valid record passes duplicate, territory, channel, and minimum-contact checks | Ownership is accepted or the record receives a terminal intake outcome | Lead operations | Source, received time, identity key, consent or preference state, owner |
| Contact attempt active | Owner has authority and enough information to attempt contact | Two-way contact occurs, the sequence ends, or an exception is recorded | Sales representative | Attempt time, channel, result, next action |
| Discovery complete | Two-way contact begins and discovery is authorized | Required discovery fields and open questions are recorded | Sales representative | Customer goal, site, usage evidence status, decision process, constraints |
| Qualified | Published qualification rule is evaluated | Opportunity passes, defers, or receives a named disqualification reason | Sales manager or assigned reviewer | Rule version, evidence, result, reviewer, expiry |
| Design ready | Sales has a qualified opportunity and seeks design work | Intake passes or returns with an exact missing-input request | Sales and design intake | Address or site identifier, source evidence, scope, assumptions, due purpose |
| Proposal delivered | Reviewed proposal is issued through an approved channel | Buyer acknowledges, requests revision, defers, declines, or accepts | Sales representative | Proposal revision, sent time, recipient, validity, assumptions, next meeting |
| Decision active | Buyer and seller have a defined open decision | Contract outcome, deferral, withdrawal, loss, or another terminal state is recorded | Account owner | Decision owner, issues, evidence requests, next commitment, age |
| Final outcome | A governed terminal event occurs | Reopen only through a new recorded event | Named outcome owner | Outcome type, reason, effective date, supporting record, successor ID if any |
An accepted lead should not mean “anything marketing captured.” Set the acceptance rule before measurement. Duplicates, test submissions, spam, out-of-territory inquiries, missing contact permissions, existing-customer service requests, and job applicants may need their own intake outcomes. The team should not erase them. It should record how they were classified and whether the acquisition denominator includes them.
Two-way contact should require evidence that the intended person or authorized representative engaged, not merely that an email was sent. Discovery complete should mean a declared minimum record exists. Qualified should point to the rule version used. Design ready should mean design intake accepted the package for its stated purpose, not that sales clicked a stage before the handoff.
Proposal delivery is especially easy to inflate. Draft creation, internal review, export, email send, buyer receipt, buyer view, and proposal discussion are different events. Select the event that matches the management question. If leadership wants to measure design-to-delivery time, the send event matters. If it wants to understand buyer engagement, a confirmed meeting or authenticated view may be more useful, subject to privacy and tool limitations.
Final outcomes deserve a controlled taxonomy. At minimum, separate contracted, unqualified, customer withdrew, unreachable after governed process, deferred to a review date, seller declined, duplicate or merged, competitively lost, and administratively closed. “Lost” alone encourages convenient cleanup and makes corrective action impossible.
For a focused intake method, use the solar lead qualification guide. For handoff design, use the sales-to-design handoff checklist. The funnel should reference those operating records rather than duplicate every rule inside a dashboard.
How do you calculate solar funnel conversion rates correctly?
Calculate each transition from a frozen eligible cohort: completed next-stage events divided by opportunities eligible to attempt that transition, multiplied by 100. Fix the observation cutoff, stage definitions, segment, and exclusions before calculation. Report unresolved members separately so an immature cohort does not look like failure and a live denominator does not keep changing beneath the result.
The basic formula is simple:
Stage conversion rate = completed next-stage events / eligible opportunities at the prior stage x 100
The difficult part is defining “completed” and “eligible.” As an illustrative denominator example, suppose 100 submitted records include 8 duplicates, 4 service requests, and 3 records outside the seller’s declared territory. If the metric is marketing-form quality, those records may remain in the intake denominator. If the metric is representative performance after valid assignment, they should not be attributed to a representative. Both calculations can be legitimate when they carry different names and reconciliation.
Use these related measures:
| Measure | Calculation | Operating use | Required warning |
|---|---|---|---|
| Stage conversion | Completed next stage / eligible prior stage | Compare movement at one boundary | Needs stable definitions and a mature cohort |
| Overall conversion | Defined successful outcomes / accepted cohort | Summarize end-to-end outcome | Hides where leakage occurred |
| Current stage share | Open opportunities in stage / all open opportunities | Show inventory distribution | Is not a conversion rate |
| Median stage age | Middle elapsed time among records currently in stage | Locate waiting work | Can hide an old tail |
| Age-band share | Open records beyond a declared age band / open records in stage | Find exceptions | Threshold is an internal decision, not an industry truth |
| Rework rate | Records returned across a boundary / records submitted across it | Inspect handoff quality | Requires a defined return event and reason |
| Data-completeness rate | Records meeting required-field rule / eligible records | Test measurement reliability | A filled field may still be wrong |
Use event timestamps instead of only the latest status. Store the first entry, valid exit, reversal, and final outcome events. A record that entered qualification twice should not quietly appear as two leads. Decide whether the analysis uses first passage, most recent passage, or every transition, and label it.
Google Analytics’ funnel exploration documentation distinguishes open funnels, where users may enter at any step, from closed funnels, where users must enter at the first step, and explains that configured sequence rules affect counting. That documentation describes Google’s analytics product, not a solar CRM standard. The transferable lesson is that entry and sequence rules change the number.
Closed-cohort reporting is usually clearer for a management benchmark. Select opportunities accepted during a stated date window, wait through a declared maturity period, and measure what happened by the observation cutoff. A live pipeline view remains useful for workload, but it should not be presented as the same thing.
Pro Tip
Put the numerator, denominator and observation date beside every conversion rate. A reviewer should be able to reconstruct the percentage from those fields without opening another dashboard.
Do not average percentages across representatives when denominators differ. If one representative converted 1 of 2 eligible opportunities and another converted 20 of 100, the simple average of their two rates is 35 percent. The combined result is 21 of 102, or about 20.6 percent. Show both representative-level distribution and the volume-weighted total when each answers a real question.
Also resist multiplying stage rates from mismatched cohorts. The contact rate from January leads, qualification rate from all opportunities currently visible in March, and close rate from last year’s proposals cannot produce a coherent January end-to-end rate. Keep the cohort key attached to every result.
How do you build an internal solar sales benchmark?
Build an internal benchmark by freezing definitions, auditing event quality, selecting complete cohorts, segmenting only where volume supports interpretation, and publishing a baseline with uncertainty and exclusions. Compare future like-for-like cohorts to that baseline. Do not label a mixed historical average an industry standard or use a short-term change as proof that one intervention caused it.
NIST says value stream mapping can visualize manufacturing processes and information flows and outlines current-state mapping, diagnosis, future-state definition, and implementation. Solar sales is not the manufacturing example on that page, but the process-mapping discipline is useful: observe the real path before designing the dashboard.
Use this seven-step process:
- Name the decision. State whether the benchmark will guide staffing, channel mix, coaching, design capacity, forecast review, or data cleanup. A metric without a decision becomes decoration.
- Freeze the funnel dictionary. Assign a version, effective date, event definitions, owners, exception states, and reopen rules. Do not retroactively relabel history without preserving the old definition.
- Audit event capture. Sample records from each stage. Confirm timestamps reflect observable events, required evidence exists, owners are valid, and terminal outcomes reconcile to the cohort.
- Choose a cohort and cutoff. Define accepted dates, geography, product or project class, source, sales motion, and observation date. Explain how much time members had to progress.
- Reconcile every record. Each cohort member must be open in one current state, terminal in one outcome, merged through an explicit identity record, or flagged as unresolved. Never make missing records disappear.
- Calculate rates and age together. Publish numerator, denominator, percentage, unresolved count, median or age bands, and data-quality exceptions. A clean percentage can hide a growing queue.
- Review causes before actions. Test changes in source mix, project mix, staffing, rule version, season, offer, data capture, and maturity. Assign an experiment or corrective action with an owner and review date.
Start broad. Lead source, residential or commercial segment, territory, offer, representative, and campaign may all matter, but small slices create unstable percentages and privacy concerns. Publish the raw counts beside every rate. Suppress or combine segments that do not support a responsible business decision.
Keep benchmark versions. “Baseline 2026-Q3, funnel dictionary v1.2, accepted leads from April through June, observed through August 29” is reviewable. “Normal close rate” is not. The baseline should state which opportunities were excluded, why, who approved the method, and when it expires.
Google Analytics’ cohort exploration documentation provides product-specific ways to group users by acquisition criteria and observe later behavior. It does not define a sales cohort for an installer. Use the general idea only: cohort membership should be explicit and subsequent events should be observed over a declared period.
An internal benchmark is descriptive. It says what happened under a defined operating state. It does not prove what would happen under another channel, territory, price, financing environment, incentive regime, team, or customer mix.
Illustrative example: one cohort, three different truths
The following worked example is illustrative, not a customer case or an industry benchmark. Its purpose is to show how denominator choices and unresolved opportunities alter interpretation.
Assume a seller freezes a cohort of 240 raw website inquiries received during one illustrative calendar month. Intake review identifies 18 duplicates, 12 service requests, and 10 out-of-scope records. The marketing team wants to assess form and channel quality, so it retains all 240 in its acquisition-quality reconciliation. The sales manager wants to assess representative movement, so the representative denominator begins with the 200 records that passed the accepted-lead rule.
Of those 200 eligible records, 150 reached two-way contact. Of those 150, 108 completed discovery. Of the 108, 84 passed the declared qualification rule. Of those 84, 66 reached design-ready acceptance. Of those 66, 54 received a reviewed proposal by the observation cutoff. Of those 54, 18 had a contracted outcome, 12 had a non-success terminal outcome, and 24 remained active.
| Transition | Numerator | Denominator | Illustrative result | Interpretation boundary |
|---|---|---|---|---|
| Eligible lead to two-way contact | 150 | 200 | 75.0% | Representative-owned accepted records only |
| Contact to discovery complete | 108 | 150 | 72.0% | Does not include uncontacted records |
| Discovery to qualified | 84 | 108 | 77.8% | Depends on qualification rule version |
| Qualified to design ready | 66 | 84 | 78.6% | Measures intake acceptance, not completed design |
| Design ready to proposal delivered | 54 | 66 | 81.8% | Uses reviewed delivery event by cutoff |
| Delivered proposal to contracted by cutoff | 18 | 54 | 33.3% | Twenty-four proposals are still active |
| Eligible lead to contracted by cutoff | 18 | 200 | 9.0% | Cohort outcome at one observation date |
| Raw inquiry to contracted by cutoff | 18 | 240 | 7.5% | Includes duplicate and out-of-scope intake |
- Eligible leads200
- Two-way contact150
- Discovery complete108
- Qualified84
- Design ready66
- Proposal delivered54
- Contracted by cutoff18
Source: Worked example and table above; illustrative example, not market data, checked November 2026.
These are cumulative stage-reach counts within the example, not the number currently sitting in each stage. The chart therefore cannot be summed into a pipeline total.
Key Takeaway
Keep the 24 unresolved proposals in the proposal cohort. The contracted-by-cutoff rate is a snapshot, not a final close rate or a performance target.
Give each proposal event a reviewed document
Walk through a solar proposal workflow and decide which revision and delivery evidence belong in your sales record.
Book a DemoChecking cost first? See the SurgePV pricing page.
The 33.3 percent proposal-to-contract figure is not a final close rate because 24 proposals remain active. Calling every active proposal “lost” would understate eventual outcomes. Removing them from the denominator would overstate the completed-cohort result. The accurate label is “contracted by the August 29 observation cutoff,” followed by the active and terminal reconciliation.
Now inspect age. Suppose 8 of the 24 active proposals are 7 days old or less, 9 are 8 to 21 days old, and 7 are older than 21 days. Those bands are illustrative internal review bands, not prescriptions. They tell the manager where to inspect ownership, next actions, customer timing, missing evidence, proposal validity, or a needed deferral state.
If a new qualification rule began halfway through the cohort, do not blend the two versions silently. Either restate history under a defensible mapping with the original events preserved or publish separate subcohorts. A sudden improvement after the rule change may reflect a smaller denominator rather than better selling.
This example also shows why marketing and sales can both be correct while reporting different rates. Their questions differ. The remedy is not to force one denominator onto every decision. It is to name the metric, preserve the reconciliation, and prevent one percentage from borrowing a more favorable interpretation.
What commonly distorts solar sales funnel benchmarks?
Solar funnel benchmarks become misleading when teams mix sources, segments, time windows, stage definitions, repeated opportunities, and immature cohorts. Manual status changes, missing terminal reasons, retroactive cleanup, small samples, and incentives tied to stage movement add further bias. The correction is visible lineage: event, rule version, denominator, exclusion, owner, and cutoff for every published rate.
These failures are more common than calculation mistakes:
| Distortion | How it appears | Why it misleads | Corrective record |
|---|---|---|---|
| Source-mix shift | Overall conversion changes after a campaign launch | Different channels may bring different intent and eligibility | Rate and counts by stable source taxonomy |
| Stage inflation | Representatives advance records before evidence exists | Dashboard movement no longer matches completed work | Entry evidence and sample audit |
| Survivor denominator | Only decided proposals remain in the calculation | Active or missing records vanish | Full proposal-cohort reconciliation |
| Duplicate identity | One buyer or site appears as several opportunities | Acquisition volume and attempted contacts inflate | Merge record and canonical opportunity ID |
| Cohort immaturity | Recent leads are compared with mature historical leads | Newer records had less time to progress | Common maturity window or outcome-at-cutoff label |
| Rule drift | “Qualified” changes during the period | Rates compare unlike gates | Rule version and effective date |
| Representative mix | New, specialist, and generalist books are averaged together | Assignment design becomes a performance claim | Segment and assignment context |
| Reopened outcomes | Old losses are overwritten as new opportunities | History and current work become inseparable | Reopen event or successor opportunity link |
| Missing outcome reasons | Closed records default to lost | Corrective causes cannot be separated | Controlled outcome taxonomy and required evidence |
| Percentage without counts | A small segment appears dramatically better | Ordinary variation looks decisive | Numerator, denominator, and uncertainty note |
Do not create a single “conversion benchmark” by scraping values from articles and averaging them. Before retaining an external number, ask whether the source discloses population, geography, acquisition channel, sales motion, project type, stage definitions, period, denominator, sample size, data collection, exclusions, sponsorship, and update date. If those fields are absent, the number cannot carry a management decision.
The same caution applies to claims made in proposals and marketing. The Federal Trade Commission’s advertising guidance for small businesses states that advertising must be truthful and non-deceptive and that advertisers need evidence to support claims. That is United States general guidance, not legal advice for a particular campaign or jurisdiction. Have appropriate reviewers evaluate applicable claims.
Measurement incentives can also corrupt the funnel. If representatives are rewarded for proposals sent, drafts may move forward before review. If marketing is rewarded for leads, duplicate or low-information records may remain unclassified. If managers are rewarded for close rate, they may narrow qualification or hide unresolved records. Pair every movement metric with data quality, age, rework, and outcome reconciliation.
Missing information needs a first-class state. “Unknown source,” “unresolved identity,” and “outcome pending” are better than convenient guesses. Assign an owner, next evidence, due date, and reporting treatment. A dashboard should make uncertainty visible without allowing unknown records to sit forever.
How should a sales manager review the funnel?
Review the funnel in two passes: first protect current opportunities by resolving owner, evidence, next-action, and age exceptions; then examine mature cohorts for conversion patterns. Separate queue management from performance judgment. Record the decision, evidence, owner, due date, and measurement effect so next week’s dashboard reflects completed work rather than meeting-room recollection.
A weekly review can be short if the underlying record is strong. Work from exceptions, not a recital of every opportunity.
- Reconcile new intake. Resolve duplicates, routing, consent or contact preferences, source classification, and records outside the accepted-lead rule.
- Inspect ownerless work. Every active opportunity and evidence request needs one current accountable owner, even when several teams contribute.
- Review age by stage. Open the oldest or policy-defined exception bands and distinguish buyer timing, missing evidence, internal queue, proposal revision, and absent next action.
- Test handoffs. Sample discovery-to-qualification, qualification-to-design, and design-to-proposal transitions against entry evidence and return reasons.
- Reconcile outcomes. Require one terminal state, reason, effective date, and source record. Move genuine future timing to deferred with a review date rather than hiding it in active work.
- Review mature cohorts. Publish numerator, denominator, rate, active remainder, definition version, and observation cutoff by the minimum useful segments.
- Assign one corrective experiment. State the suspected mechanism, action, eligible population, safeguard, owner, start date, and decision date. Do not change several stages and then claim one cause.
Keep coaching separate from data repair. A representative should be able to flag an incorrect source, duplicate identity, or missing event without that correction being treated as manipulation. Conversely, managers should not rewrite historical stages simply to simplify a slide.
Use a review horizon that fits the decision. Queue review may happen frequently because ownership failures need prompt action. Cohort conversion may need a longer window so opportunities mature. Forecasting, capacity, marketing allocation, and coaching may each require different cuts of the same governed event history.
For operating tactics around stalled opportunities, refer to the solar sales pipeline stages guide. For response controls, use the solar lead response workflow. This article retains ownership of measurement definitions and cohort comparison.
Copy-ready solar funnel measurement record
Copy this worksheet into the system that governs your review. Add fields only when someone will maintain and use them.
| Field | Required entry |
|---|---|
| Metric name | Unambiguous transition or outcome, including “by cutoff” where applicable |
| Decision supported | Staffing, channel review, coaching, handoff, forecast, or another named decision |
| Funnel dictionary version | Version, effective date, approver, and change note |
| Cohort rule | Entry event, start and end dates, geography, segment, source, project class |
| Observation cutoff | Date and time through which events are included |
| Maturity treatment | Minimum observation period or explicit active remainder |
| Numerator | Count, event definition, and query owner |
| Denominator | Eligible count, event definition, and query owner |
| Exclusions | Count and reason for every exclusion category |
| Unresolved records | Count, owner, next evidence, and reporting treatment |
| Conversion result | Percentage with raw numerator and denominator beside it |
| Age view | Median plus chosen age bands for open records |
| Data-quality sample | Sample size, exceptions, reviewer, and review date |
| Comparison baseline | Matching prior cohort and reason it is comparable |
| Known confounders | Source mix, rule change, staffing, territory, offer, season, tool migration |
| Decision | Continue, investigate, change, stop, or defer |
| Action owner | One accountable person or role |
| Review date | Date and evidence required for the next decision |
Add a reconciliation below the metric: starting cohort, every current stage, every terminal outcome, duplicates or merges, unresolved records, and total. The rows should return to the starting cohort. A percentage that cannot be reconciled to records is not ready for an operating decision.
If privacy, consent, or sensitive consumer information is involved, use approved access, retention, and review practices. This worksheet is not a privacy or legal policy. Do not export personal data into a slide merely because it makes the metric easier to discuss.
SurgePV’s role and limits
SurgePV supports 3D roof modeling, solar array layout, shading analysis, energy-yield modeling, financial modeling, electrical workflow support, bill-of-materials output, and proposal generation within its documented product scope. Those capabilities can support solar proposal workflows after the seller has established a governed customer and project record.
The sales funnel still needs an authoritative system for lead identity, consent or channel preferences, ownership, event history, qualification, outcome, and cohort reporting. Teams should verify which system owns each field and how integrations preserve timestamps, revisions, failures, and access. Do not infer an unverified CRM or analytics capability from this article.
Modeled and proposal outputs remain dependent on source data, assumptions, equipment models, configuration, and review. They do not replace approval by the responsible engineer, authority, lender, insurer, or utility. The sales team also retains responsibility for current customer facts, claim substantiation, commercial terms, permissions, and accurate handoff.
Use the product for accepted design work and proposal preparation, then record the delivered revision in the system that owns the sales funnel. Software cannot decide whether a lead is genuine, a buyer is qualified, an advertising claim is lawful, a cohort is comparable, or a manager’s causal story is true.
Frequently Asked Questions
What stages should a solar sales funnel include?
Use stages that match observable work in your company. A practical starting set is accepted lead, contacted, discovery complete, qualified, design ready, proposal delivered, decision active, and final outcome. Define exact entry and exit events, owners, allowed exceptions, and terminal outcomes before comparing conversion rates.
What is a good solar sales funnel conversion rate?
There is no trustworthy universal rate for every installer, channel, market, and project type. Build a complete internal baseline by stage, source, segment, and cohort window. Then compare like with like, disclose small samples and missing data, and investigate changes in process or mix before labeling a rate good or poor.
How do I calculate stage conversion rate?
For a fixed cohort, divide opportunities that completed the next defined stage by opportunities eligible to attempt that transition, then multiply by 100. Freeze the cohort, observation cutoff, exclusions, and event rules. Do not divide today’s downstream count by a live upstream count that contains newly arrived, unresolved opportunities.
Should deferred and unqualified solar leads count as lost?
No, keep deferred, unqualified, withdrawn, unreachable, duplicate and competitively lost outcomes separate. Each state answers a different operating question. Reconcile every cohort member and document which states belong in each denominator.
How often should a solar sales manager review the funnel?
Review active queues often enough to catch ownership and aging problems, and compare conversion when cohorts have had a fair observation period. A weekly exception review and monthly cohort review are possible starting choices, not universal standards. Adjust the cadence to volume, sales-cycle length and the decisions being made.
Connect the funnel to its proposal evidence
Bring a proposal-stage handoff to a guided demo and review how SurgePV’s design and proposal outputs can support your event record.
Sources
Primary research and reference material used for this desk-research article.
Where this fits
This article is part of SurgePV's Solar Business & Operations hub, which works through the topic from first principles to the decisions a project team actually has to make.


