Answer
A marketing-to-design handoff should preserve the exact personalized campaign the customer saw, its data sources, displayed figures, offer terms and requested next step. Label each item as supplied, inferred, modeled or verified, pass along data-use restrictions, and ask design for one bounded task. A campaign response is not an approved roof, system size or savings forecast.
Last updated: November 2026
A personalized campaign may show a roof image, bill estimate, savings illustration, or suggested system size before a designer sees the project. The handoff must preserve what the customer saw and separate those campaign elements from verified design inputs.
This checklist covers the marketing-to-design transition. The broader sales-to-design handoff owns the customer conversation and requested project scope. A campaign response is not automatically a complete design request, permission to access a property, or acceptance of a quote.
Preserve the Campaign the Customer Actually Saw
Keep the campaign identifier, creative and landing-page version, offer wording, personalized fields, displayed assumptions, disclaimers, date, and requested next step. Save a representative rendering or controlled record of the actual personalized content, not only the generic template.
Record whether each element was customer-supplied, sourced from imagery, inferred, assumed, or modeled. An address match does not verify roof dimensions, structural suitability, available area, equipment compatibility, electricity usage, or ownership authority. A sample layout must remain labeled as a concept.
Keep a claim register: one row for each customer-specific price, production or savings statement, with its source and the date it was last checked. Advertising-substantiation rules differ by jurisdiction, so route the register to your legal reviewer instead of treating it as approval.
Key Takeaway
Design should be able to tell, for every number in the campaign, whether the customer supplied it, a tool inferred it, or a model produced it. A number without that label should be treated as unverified.
Turn campaign leads into reviewable design requests
See how a design workflow can take a bounded request and return layouts and outputs tied to one revision.
Book a DemoChecking cost first? See the SurgePV pricing page.
Transfer Evidence, Not Just a Lead Score
| Handoff field | What to retain | What not to infer |
|---|---|---|
| Site identity | Address source, customer correction and relevant identifiers | Roof geometry or authority to arrange work |
| Imagery or roof concept | Source date, represented objects, assumptions and limitations | Verified site survey or final design |
| Usage | Customer source, billing period, units and missing information | Metered annual or interval use from a marketing category |
| Capacity | DC or AC convention, assumed equipment basis and purpose | Approved system sizing |
| Energy or savings display | Model version, period, boundary and inputs | Guaranteed production, tariff eligibility or savings |
| Offer | Exact scope, exclusions, validity and issuer | Unstated financing or availability commitments |
| Contact and data use | Applicable permission record, purpose, restrictions and responsible route | Universal consent from a form submission |
| Requested output | Customer objective and authorized next step | A construction-ready package |
Label Every Customer-Specific Number
Keep capacity in its stated power unit separate from modeled energy in kWh over a named period. Savings require a defined consumption, tariff, export, cost, and financing basis. If those inputs are unavailable, transfer the unanswered question instead of converting a regional assumption into a customer fact.
PVWatts estimates grid-connected PV energy from its inputs and explicitly cautions that predictions contain assumptions and uncertainties. A general model or solar research link does not validate a personalized roof image or bill result, and it does not imply any integration with a campaign tool or SurgePV.
The PVWatts page shows its own default assumptions, which is a useful reminder of how much a quick estimate depends on them.
Sources: the PVWatts calculator (National Laboratory of the Rockies) and the U.S. Department of Energy’s homeowner’s guide to going solar, checked November 2026. The DOE guide also says heavy shade from nearby trees may make rooftop panels less than ideal, which is why an address-based concept needs a shading check before anyone quotes a layout.
Check Data Use and Customer Expectations
Identify which information the customer supplied, which was obtained elsewhere, what use was represented, and the applicable access and retention restrictions. Avoid forwarding full bills or unrelated personal information when a narrower approved record meets the design purpose.
NIST describes its Privacy Framework as a voluntary tool for managing privacy risk while protecting individuals’ privacy. It is not a permission rule for any jurisdiction. Check local requirements, channel rules, privacy notices, provider terms and legal advice before collection, sharing, remarketing or contact. This checklist authorizes no message sending.
Give Design a Bounded Request
Specify whether the next task is a roof-screening review, preliminary layout, scenario comparison, evidence request, or another agreed output. Name the review purpose and prohibited uses. Do not route a marketing concept directly to procurement or installation.
The designer should return one of three documented responses: accepted for the named preliminary task, additional evidence needed, or qualified escalation required. A receipt confirms delivery, not feasibility or approval. Keep questions about structural capacity, electrical configuration, interconnection, contractual promises, or regulated claims with the responsible reviewers.
Reconcile Changed Findings With the Campaign Promise
If a designer finds that a roof concept, suggested capacity, or displayed estimate cannot be supported, record the affected statement, new evidence, owner, and customer communication needed. Retain both the original representation and successor explanation. Do not silently overwrite the campaign and leave the prospect relying on its earlier promise.
Check the proposal pre-send review before issuing a later offer. It should use the current option and governed inputs, not a manually copied lead-form result.
Copy-Ready Marketing-to-Design Packet
Use this list as a template and replace each bracket with the real record.
- Campaign, creative and landing-page versions: [actual customer-facing record]
- Customer objective and requested next step: [source and date]
- Site identity and corrections: [source and limitations]
- Personalized fields: [provided, inferred, assumed, modeled or verified]
- Displayed capacity, energy and savings: [units, period, basis and prohibited uses]
- Offer scope and commercial issuer: [current written terms]
- Applicable data-use permissions and restrictions: [responsible record]
- Missing evidence and conflicts: [owner and required decision]
- Designer response: [named task, evidence request or escalation]
- Changed customer statements: [communication owner and successor version]
Check the Handoff Before Increasing Personalization
Sample real packets and check whether a designer can reconstruct the campaign context without guessing. Track missing source records, unsupported customer-specific claims, correction reasons, and the work required to resolve them. These are internal diagnostics, not proof of higher conversion or faster design.
When evaluating solar design software, demonstrate the actual import, field mapping, revision, and export route using an appropriately permitted example. Note which steps remain manual. Do not assume CRM synchronization, permission management, personalized marketing automation, or native savings validation from a shared interface.
Walk a campaign packet through a design workflow
Bring a campaign record and a bounded design request, and compare the demonstrated inputs and outputs with your evidence requirements.
Book a DemoChecking cost first? See the SurgePV pricing page.
Pro Tip
Add a screenshot of what the customer saw to every packet. Designers resolve conflicts faster when they can see the exact personalized figure than when they read a description of it. For the step after design, see the proposal pre-send checklist.
Frequently Asked Questions
What should marketing hand over to design?
Transfer the actual campaign version, personalized content, customer objective, data sources, assumption status, displayed figures, offer terms, applicable data-use restrictions, missing evidence, and a bounded request for the next design task.
Does an address-based campaign verify the roof or system size?
No. An address match, imagery concept, inferred usage, or sample layout is not a verified survey, accepted design, or approved sizing decision. Retain its source and limitations and request the evidence needed for the named task.
What happens when design contradicts a campaign estimate?
Record the affected statement, new evidence, responsible decision, and customer communication needed. Preserve the original representation and the successor explanation rather than silently replacing the earlier promise.
Which campaign data-use restrictions should travel with a lead?
Pass along the permission record, the purpose the customer was told, any channel limits and retention rules. Share only the narrowest record that design needs, and avoid forwarding full bills or unrelated personal information.
Who owns the marketing-to-design handoff?
Assign one named owner on the marketing side who assembles the packet and one on the design side who accepts, returns or escalates it. The broader sales-to-design handoff still owns the customer conversation and requested project scope.