Back to Best Solar Software
Best ListBest-Of List4 tools compared

Solar Proposal Software in Morocco: 4 Tools Compared (2026)

Four solar proposal tools compared on what each vendor publishes for quotes in Morocco: custom tariffs, local language, PPA and lease financing, price and free tier. Checked November 2026.

SurgePV publishes this list and sells solar design and proposal software, so we have a commercial interest in this category. This is a desk comparison of what each vendor publishes; we have not run side-by-side tests. Prices and vendor facts checked November 2026. How we evaluate software

Published Last updated
Nirav Dhanani

Written by

Nirav Dhanani

Co-Founder · SurgePV

Rainer Neumann

Edited by

Rainer Neumann

Editorial contributor · SurgePV

This page is for installers and EPC teams in Morocco choosing solar proposal software. Short answer: for custom tariffs and a separate surplus line, on a free core app, pick OpenSolar; for PPA, lease or loan comparisons for commercial self-generators, pick Energy Toolbase.

A Moroccan quote has to carry the customer’s tariff and any capacity charge, and reach them in Arabic or French. Under Law 82-21, covered below, it also needs an export cap and a separate surplus rate. OpenSolar documents custom tariffs with demand charges on a free core app. Energy Toolbase lists PPA and lease financing; in a PPA (power purchase agreement) the customer pays for the power a system makes instead of buying it. SurgePV documents roof modeling through proposals, priced per user, and states no Morocco tariff output. None of the four names Morocco, so each vendor should be handed a real Moroccan bill.

This is a desk comparison drawn from vendor pages as of October 2026, with no side-by-side trials run. Tool facts come from each vendor’s own site. Moroccan surplus and network-charge rules come from Law 82-21 and ANRE, linked in the section below. No tariff level is quoted.

Criteria applied: custom tariff entry, demand or capacity charge fields, Arabic or French proposal language, lease or PPA financing, US dollar price, free tier.

Solargraf is excluded from this update. Automated tools could not open solargraf.com in October 2026, so nothing about it can be sourced, and it is not compared here.

Want to see SurgePV quote a Morocco project?

Book a guided demo and bring a real Morocco site. We walk through design, yield, finance and the proposal in one platform.

Book a Free Demo

Checking cost first? See the SurgePV pricing page.

Best-For Picks for Morocco

  • Custom tariffs plus a separate surplus line, free core app: OpenSolar. The help article names flat, time-of-use, tiered and demand-charge rates, plus fixed and minimum charges. API Access and connectors are charged from 16 April 2026. French appears among its proposal languages; Arabic does not.
  • PPA, lease or loan comparisons for commercial self-generators: Energy Toolbase. The FAQ names cash, PPA, loan and lease structures, and the price is quoted on a demo call.
  • Tablet proposals on a site visit: Aurora Solar. Basic includes tablet-friendly sales proposals. Rates are editable per project, or can be created with demand charges.
  • One product from roof model to parts list and proposal: SurgePV. Priced per user, with roof modeling, shading, yield, financial modeling, bill of materials and proposals in scope. Ask in a demo how it handles a Morocco tariff and a capacity charge, because its scope names neither.

Morocco Solar Proposal Software Comparison Table

Alphabetical, not ranked. Pick using the situations above. Prices come from each vendor’s own page, read in October 2026, in the currency the vendor publishes.

Tool Best for Price Free or paid Decisive Morocco fact
Aurora Solar Tablet-friendly proposals $159 or $259 per user per month (monthly billing); $135 or $220 billed annually Paid Pricing page lists North America and Europe regions; Morocco not named
Energy Toolbase PPA and lease modeling for commercial deals Price given on a demo call Paid Morocco not named on the pages we read
OpenSolar Custom tariffs with demand charges Core app free of charge; API Access and connectors charged from 16 April 2026 Free core app, paid API and connectors 13 proposal languages; French is on that list but Arabic is not
SurgePV Roof model to BOM and proposal, per user $1,899 per user per year (1 user), in US dollars Paid, guided demo BOM and proposal generation in scope; no Morocco item stated

Morocco Criteria Matrix

Each cell reads Documented, Partial or Not stated. Documented means the vendor’s page says it outright. Partial means a related feature is described, not the full item. Not stated means the October 2026 pages are silent. No scores or weights.

Tool Custom tariff entry Demand or capacity charge fields Arabic or French proposal language Lease or PPA financing US dollar price Free tier
Aurora Solar Documented (configure your own rates) Documented (help article on custom rates adds demand charges) Not stated Documented (loan, lease, PPA or cash product in Sales Mode) Partial ($ shown, currency not named) Not stated
Energy Toolbase Documented (help center: create your own custom rate schedules) Partial (FAQ: models demand charge reduction with storage) Not stated Documented (cash, PPA, loan, lease) Not published for ETB Developer (demo call) Not stated
OpenSolar Documented (custom tariff form) Documented (demand charges in the form) Partial (13 languages; French is on that list but Arabic is not) Partial (options depend on market and provider) Documented (core app free; paid services in US$) Documented
SurgePV Not stated Not stated Not stated Not stated Documented ($1,899 per user per year, 1 user) Not stated (guided demo)

Two observations. No page names a Morocco tariff, and the OpenSolar and Aurora help articles both describe custom rates with demand charges. A silent page does not prove a missing feature, so ask each vendor to price one real Moroccan bill before you commit.

Tool Entries

Aurora Solar

Best for: Moroccan sales teams that sell on a tablet and need a rate database they can edit or extend.

Not the right choice if: Morocco must already be loaded as a rate, or proposals must be in Arabic or French. The pricing page and help articles checked name neither Morocco nor those languages.

What the vendor documents: the pricing page lists 3D roof modeling, performance simulation, adders, discounts and incentives, and a utility rate database where you “configure your own rates or use rates from Genability and Aurora”. Premium adds LIDAR-assisted modeling, bankable shade reports and battery modeling. Its help article on editing rates says you can change the import rate, export rate, rate details and compensation policy for a project. Its help article on custom rates lets an admin create a rate with tiers, time-of-use periods and demand charges. Its financial analysis article says a loan, lease, PPA or cash product must be chosen in Sales Mode.

Price (checked October 2026): Basic $159 per user per month billed monthly, or $135 per user per month billed annually ($1,620 billed annually); Premium $259 per user per month, or $220 billed annually ($2,640 billed annually). Enterprise is custom, per project. The page shows “$” and does not name the currency.

Limitations: its pricing page lists North America and Europe as regions and leaves Morocco unnamed. No Moroccan rate shows up in the pages consulted.

Vendor link: aurorasolar.com.

Aurora Solar public website page, captured 29 October 2026
Aurora Solar public website capture, captured 29 October 2026. This shows the vendor's website, not a test inside the software.

Energy Toolbase

Best for: commercial self-generators in Morocco who want PPA, lease and loan offers modeled alongside storage.

Not the right choice if: a posted price is required or Morocco has to be named. The pricing page says to book 30 minutes and receive a demo and pricing during the call.

What the vendor documents: its ETB Developer FAQ says the platform supports cash purchases, power purchase agreements, loans and leases. It says the platform has a built-in database of utility rates, incentives and tariffs, and that it models demand charge reduction with battery storage. It also says ETB Developer is web-based. The product page counts 120,000+ tracked utility rates and describes a fully custom proposal template builder.

Price (checked October 2026): no ETB Developer figure is published on the pricing page. The page also lists implementation and support packages with no price.

Limitations: Morocco and the countries covered by its rate database are not named in the pages consulted. Its rate schedules help page says users can write custom rate schedules, and that the rates database spans 50 states and 42 international territories.

Vendor link: energytoolbase.com.

Energy Toolbase public website page, captured 29 October 2026
Energy Toolbase public website capture, captured 29 October 2026. This shows the vendor's website, not a test inside the software.

OpenSolar

Best for: Moroccan installers after a free core app that can hold a custom tariff with demand charges.

Not the right choice if: Arabic proposals are mandatory. The language article lists 13 languages. French is among them for Morocco, but Arabic is not.

What the vendor documents: its tariff article says you can create a custom tariff with a tariff type and compensation mechanism. The rate structures are flat, time-of-use, tiered and demand charges. You can add fixed and minimum charges. Its integrated finance page says the options depend on your market and provider, and may include loans, leases, PPAs and third-party ownership.

Price (checked October 2026): the core app is free of charge for solar professionals, per the vendor. From 16 April 2026 the vendor charges for API Access, which lets other software connect to OpenSolar, and for supported connectors. This comes from its 16 February 2026 post.

Limitations: the Moroccan tariff and surplus line must be built by hand, and no Moroccan tariff is named on the pages consulted.

Vendor link: opensolar.com.

OpenSolar public website page, captured 29 October 2026
OpenSolar public website capture, captured 29 October 2026. This shows the vendor's website, not a test inside the software.

SurgePV

SurgePV is our product.

Best for: Moroccan teams that want roof modeling, shading, yield and financial modeling together, plus a bill of materials (the parts list) and proposals, billed per user. The Morocco items get checked in a demo.

Not the right choice if: you want to try it without a call, because SurgePV offers a guided demo. It also fits poorly when a tariff form, demand charge fields or Arabic or French output must be known before talking to sales; the published scope states none. Outputs aid design and documentation, and do not replace approval by the responsible engineer, authority, lender or utility. The published scope lists no CRM (a tool to track customers and sales), and monitoring and ERP (business management software) are outside it. OpenSolar documents a custom tariff form that SurgePV’s published scope lacks.

What the vendor documents: 3D roof modeling, array layout, shading analysis, energy-yield modeling, financial modeling, electrical workflow support, bill-of-materials output and proposal generation. See solar proposal software for the product page.

Price (checked October 2026): $1,899 per user per year for 1 user, $1,499 per user for 3 seats, $1,299 per user for 5 seats, in US dollars.

Limitations: results hinge on source data, assumptions and equipment models. The published scope shows no tariff form, capacity charge field, Arabic or French output or PPA modeling.

Vendor link: surgepv.com.

SurgePV public website page, captured 29 October 2026
SurgePV public website capture, captured 29 October 2026. This shows the vendor's website, not a test inside the software.

Law 82-21 Terms a Moroccan Proposal Has to Model

Morocco regulates rooftop self-generation through Law 82-21 on self-generation, Bulletin Officiel no. 7400 (dahir of 10 February 2023, published 1 May 2025). It defines self-generation as production exclusively for the self-generator’s own consumption. A self-generator connected to the grid may sell the operator only a share not exceeding 20% of annual production as surplus. The tariff for that surplus is set by the national electricity regulator ANRE, and the cap can be revised at the self-generator’s request under conditions set by regulation. A proposal that credits all exported kWh at a retail price is therefore wrong by design. The model needs an export cap and a separate surplus rate.

The law adds two more cost lines. Besides the network use tariff, grid-connected self-generators pay a contribution for system services and distribution services, fixed by ANRE after the grid operators give an opinion. The smart meter can only be installed by the grid operator, and ANRE sets the metering period used for billing and for working out the surplus. The ANRE home page lists decision no. 04/26 on the tariff for surplus electricity under laws 40-19 and 82-21, with a regulation period from 1 March 2026 to 28 February 2027. The ANRE decision no. 04/26 (French PDF) is a scanned file and we could not read the rate from it, so this page quotes no tariff level. Read it before you fix a rate in a quote, and note the end date of the period in the proposal.

The law also sets which approval route a quote needs. A declaration to the distribution operator applies below a threshold set by regulation for low-voltage plants. A connection agreement applies from that threshold up to 5 MW on low or medium voltage, and an authorisation from the administration applies at 5 MW and above. The kilowatt threshold is not in the law text, so check it in the implementing regulation listed on the ANRE legislation page. Renewable self-generators are also subject to the grid’s hosting capacity, and the operator reserves capacity in order of the date and time it receives the declaration or request. So a proposal should show the filing date as a step.

For vendor choice: ANRE publishes the law in French and Arabic, and OpenSolar lists French but not Arabic among its proposal languages. None of the four vendor pages we read mentions the 20% cap, the system-service contribution or the ANRE surplus tariff. Ask each vendor to build one quote with an export cap, a surplus rate and a network charge as separate lines.

What to Ask a Vendor Before Buying

Hand each vendor one real Moroccan electricity bill and ask for a sample proposal. Four checks: tariff entry including fixed or capacity charges; Arabic or French output where the customer needs it; financing that mirrors how your customers pay; a price in your invoicing currency. The matrix records every gap in the vendor pages, and a demo settles them. Also ask each vendor to show how it applies the 20% surplus cap in Law 82-21, since the vendor pages say nothing about Moroccan rules.

How We Ordered These Tools

Methodology: no ranking was made. Tools appear alphabetically and the picks derive from the matrix. SurgePV publishes this page and is a vendor on this list. The same rules apply to it as to the others, and it is not placed first.

  • Custom tariff entry: a Moroccan bill rarely looks like a US rate. How well a tool computes a tariff you enter was not assessed.
  • Demand or capacity charge fields: big customers can pay on capacity as well as energy. No tool’s calculations were assessed.
  • Arabic or French proposal language: customers often read in their own language. Translation quality was not assessed.
  • Lease or PPA financing: commercial buyers weigh purchase against paying for output. Whether any tool models a Morocco deal was not assessed.
  • US dollar price: a published figure lets you plan before a call. Discounts and negotiated quotes were not assessed.
  • Free tier: a free plan lets a small team try the workflow. Limits beyond what the page says were not assessed.

Sources and Dates

Moroccan regulatory sources, read in November 2026: the Law 82-21 on self-generation, Bulletin Officiel no. 7400, the ANRE home page, the ANRE decision no. 04/26 (French PDF) and the ANRE legislation page.

Vendor pages were read in October 2026 and the headline prices were rechecked on 3 November 2026. They are Aurora (pricing and three help articles), Energy Toolbase (pricing, FAQ and product page), OpenSolar (free page, 16 February 2026 post, and the tariff, language and finance pages linked above) and SurgePV (pricing). Screenshots are captures of each vendor’s public website from 29 October 2026.

See SurgePV on your Morocco project

Book a guided demo and ask how it handles a Morocco tariff and capacity charge.

Book a Free Demo

More Solar Software Guides to Compare

Frequently Asked Questions

What is the best solar proposal software in Morocco?

It depends on the job. OpenSolar documents custom tariffs with demand charges, and its core app is free. Energy Toolbase lists PPA and lease financing. Aurora Solar lists tablet-friendly proposals. SurgePV documents roof modeling through proposals but states no Morocco output. No tool here names Morocco on the pages we read, so ask each vendor to model one real Morocco electricity bill.

Can proposal software handle electricity tariffs in Morocco?

OpenSolar and Aurora Solar help articles describe custom rates with demand charges, and OpenSolar lists flat, time-of-use and tiered rates too. Energy Toolbase’s help center says users can create custom rate schedules. None of these pages names a Morocco tariff, so enter the rate from the customer’s bill and check the result.

Is there free solar proposal software for Morocco?

OpenSolar says its core app is free for solar professionals. From 16 April 2026 it charges for API Access and supported connectors. The other tools here are paid or priced on request.

Does solar proposal software support Arabic or French proposals?

OpenSolar lists 13 proposal languages: English, Dutch, Swedish, Spanish, French, Norwegian, Thai, German, Polish, Portuguese, Italian, Danish and Finnish. For Morocco, French is on that list but Arabic is not. The Aurora, Energy Toolbase and SurgePV pages we read do not list proposal languages for Morocco. Ask each vendor if you must send proposals in Arabic or French.

How much does solar proposal software cost for an installer in Morocco?

Prices are in US dollars, as each vendor shows them. OpenSolar’s core app is free. Aurora lists $159 per user per month for Basic billed monthly, or $135 per user per month billed annually. SurgePV lists $1,899 per user per year for one user. Energy Toolbase gives its price on a demo call.

How much surplus power can a Moroccan self-generator sell?

Law 82-21 says a self-generator can sell the grid operator a proportion not exceeding 20% of annual production as surplus. ANRE sets the surplus tariff, and the cap can be revised at the self-generator’s request under conditions set by regulation.

What charges does Law 82-21 add for grid-connected self-generators in Morocco?

Besides the network use tariff, the law requires a contribution for system services and distribution services, fixed by ANRE after the grid operators give an opinion. ANRE decision no. 04/26 covers the surplus tariff for 1 March 2026 to 28 February 2027.

About the Contributors

Author
Nirav Dhanani
Nirav Dhanani

Co-Founder · SurgePV

Nirav Dhanani is identified by SurgePV as a company co-founder. His SurgePV author page lists only role information that can be tied to the public profile below; credentials, project totals, conversion results, and market-expansion claims are not asserted without retained evidence.

Editor
Rainer Neumann
Rainer Neumann

Editorial contributor · SurgePV

Rainer Neumann is credited as an editorial contributor on SurgePV content. This profile does not assert engineering credentials, project totals, software-testing experience, education, speaking engagements, or media citations because independent verification evidence is not retained in the publication record.

Ready to Design and Propose Faster?

SurgePV covers solar design, energy-yield modeling, financial modeling, and proposals in one platform. Book a guided demo to see it on a project like yours.

Choose which optional technologies SurgePV may use. Essential storage remains active for security and requested features.