Lithuanian installers and EPC teams shopping for proposal software have four tools to compare below. A free core app with demand-charge tariffs points to OpenSolar, and commercial PPA, lease or loan comparisons point to Energy Toolbase.
Lithuanian quotes now deal with capped export and state support, so the proposal must show a support deduction, a self-consumed share and a battery case, all in a language the customer reads. Lithuanian is not on OpenSolar’s list of 13 proposal languages. OpenSolar documents custom tariffs with demand charges on a free core app, and Energy Toolbase lists PPA and lease financing. A PPA (power purchase agreement) has the customer pay for a system’s output rather than buy the system. SurgePV documents roof modeling through proposals at a per-user price and states no Lithuania tariff output. No vendor here names Lithuania, so run one real bill through each.
This is a desk comparison of vendor-published material read in October 2026, with no side-by-side trials. Tool facts are from each vendor’s site. Support and prosumer figures come from two LRT reports in the section below, and the page makes no claim on tariff levels. Earlier unsourced market figures were taken out.
Criteria applied: custom tariff entry, demand or capacity charge fields, Lithuanian proposals, lease or PPA financing, a US dollar price, and a free tier.
Solargraf is excluded from this update. solargraf.com could not be opened by automated tools in October 2026, so nothing about it could be sourced.
Want to see SurgePV quote a Lithuania project?
Book a guided demo and bring a real Lithuania site. We walk through design, yield, finance and the proposal in one platform.
Book a Free DemoChecking cost first? See the SurgePV pricing page.
Best-For Picks for Lithuania
- Free core app with demand-charge tariffs: OpenSolar. Its help article covers flat, time-of-use, tiered and demand-charge rates, plus fixed and minimum charges. The core app is free; API Access and connectors are charged from 16 April 2026. Lithuanian is not on the language list, so ask for a sample before committing.
- Commercial PPA, lease or loan modeling: Energy Toolbase. Its FAQ names cash, PPA, loan and lease structures, and the price comes on a demo call.
- Proposals shown on a tablet: Aurora Solar. The Basic plan lists tablet-friendly sales proposals, with rate editing per project or custom rates that include demand charges.
- Roof model, bill of materials and proposal in one per-user product: SurgePV. The vendor documents roof modeling, shading, yield, financial modeling, a bill of materials and proposals. Its published scope names no Lithuania tariff or capacity charge, so ask for both in a demo.
Lithuania Solar Proposal Software Comparison Table
Alphabetical and unranked, so choose by the situations above. Prices were read in October 2026 on each vendor’s page and are in that vendor’s currency.
| Tool | Best for | Price | Free or paid | Decisive Lithuania fact |
|---|---|---|---|---|
| Aurora Solar | Tablet-friendly proposals | $159 or $259 per user per month (monthly billing); $135 or $220 billed annually | Paid | Pricing page lists North America and Europe regions; Lithuania not named |
| Energy Toolbase | PPA and lease modeling for commercial deals | Price given on a demo call | Paid | Lithuania not named on the pages we read |
| OpenSolar | Custom tariffs with demand charges | Core app free of charge; API Access and connectors charged from 16 April 2026 | Free core app, paid API and connectors | 13 proposal languages; Lithuanian is not on that list |
| SurgePV | Roof model to BOM and proposal, per user | $1,899 per user per year (1 user), in US dollars | Paid, guided demo | BOM and proposal generation in scope; no Lithuania item stated |
Lithuania Criteria Matrix
Each cell reads Documented, Partial or Not stated. Documented: the vendor’s page says it. Partial: a related feature is stated but not the whole item. Not stated: the pages read in October 2026 are silent. No scores or weights.
| Tool | Custom tariff entry | Demand or capacity charge fields | Lithuanian proposal language | Lease or PPA financing | US dollar price | Free tier |
|---|---|---|---|---|---|---|
| Aurora Solar | Documented (configure your own rates) | Documented (help article on custom rates adds demand charges) | Not stated | Documented (loan, lease, PPA or cash product in Sales Mode) | Partial ($ shown, currency not named) | Not stated |
| Energy Toolbase | Documented (help center: create your own custom rate schedules) | Partial (FAQ: models demand charge reduction with storage) | Not stated | Documented (cash, PPA, loan, lease) | Not published for ETB Developer (demo call) | Not stated |
| OpenSolar | Documented (custom tariff form) | Documented (demand charges in the form) | Partial (13 languages; Lithuanian is not on that list) | Partial (options depend on market and provider) | Documented (core app free; paid services in US$) | Documented |
| SurgePV | Not stated | Not stated | Not stated | Not stated | Documented ($1,899 per user per year, 1 user) | Not stated (guided demo) |
Two points. No page names a Lithuania tariff, though the OpenSolar and Aurora help articles describe custom rates with demand charges. A tool that does not state an item may still support it, so put one real Lithuania bill through each vendor first.
Tool Entries
Aurora Solar
Best for: teams wanting tablet-friendly proposals and a rate database to edit or extend. For Lithuania, build the quote so the self-consumed share can be shown with and without a battery.
Not the right choice if: you need a Lithuania rate preloaded or Lithuanian proposals. Neither the pricing page nor the help articles read here name Lithuania or list Lithuanian.
What the vendor documents: the pricing page lists 3D roof modeling, performance simulation, adders, discounts and incentives, and a utility rate database where you “configure your own rates or use rates from Genability and Aurora”. Premium adds LIDAR-assisted modeling, bankable shade reports and battery modeling. Its help article on editing rates says you can change the import rate, export rate, rate details and compensation policy for a project. Its help article on custom rates lets an admin create a rate with tiers, time-of-use periods and demand charges. Its financial analysis article says a loan, lease, PPA or cash product must be chosen in Sales Mode.
Price (checked October 2026): Basic $159 per user per month billed monthly, or $135 per user per month billed annually ($1,620 billed annually); Premium $259 per user per month, or $220 billed annually ($2,640 billed annually). Enterprise is custom, per project. The page shows “$” and does not name the currency.
Limitations: the pricing page names North America and Europe as regions without mentioning Lithuania, and no Lithuania rate shows up in the pages read.
Vendor link: aurorasolar.com.

Energy Toolbase
Best for: developers modeling PPA, lease or loan offers with storage for commercial customers. For Lithuania, see whether storage and a capped export can be modeled together.
Not the right choice if: a published price is required or Lithuania must be named. The pricing page has you book 30 minutes, with the demo and price given on the call.
What the vendor documents: its ETB Developer FAQ says the platform supports cash purchases, power purchase agreements, loans and leases. It says the platform has a built-in database of utility rates, incentives and tariffs, and that it models demand charge reduction with battery storage. It also says ETB Developer is web-based. The product page counts 120,000+ tracked utility rates and describes a fully custom proposal template builder.
Price (checked October 2026): no ETB Developer figure is published on the pricing page. The page also lists implementation and support packages with no price.
Limitations: Lithuania and the countries behind the rate database are unnamed in the pages read. The rate schedules help page says users can create custom rate schedules and that its rates database spans 50 states and 42 international territories.
Vendor link: energytoolbase.com.

OpenSolar
Best for: installers who want a free core app and a custom tariff with demand charges. For Lithuania, check a Lithuanian-language proposal sample first.
Not the right choice if: proposals must be in Lithuanian. The language article lists 13 supported languages, and Lithuanian is not among them.
What the vendor documents: its tariff article says you can create a custom tariff with a tariff type and compensation mechanism. The rate structures are flat, time-of-use, tiered and demand charges. You can add fixed and minimum charges. Its integrated finance page says the options depend on your market and provider, and may include loans, leases, PPAs and third-party ownership.
Price (checked October 2026): the core app is free of charge for solar professionals, per the vendor. From 16 April 2026 the vendor charges for API Access, which lets other software connect to OpenSolar, and for supported connectors. This comes from its 16 February 2026 post.
Limitations: a Lithuania tariff must be built by hand, and the pages read name none.
Vendor link: opensolar.com.

SurgePV
SurgePV is our product.
Best for: teams wanting roof modeling, shading, yield and financial modeling in one product, with a bill of materials (the parts list) and per-user proposals. Lithuania items are checked in a demo.
Not the right choice if: you need a self-serve trial, since a guided demo is the offer, or want a custom tariff form, demand charge fields and Lithuanian output in writing before a sales call. The published scope states none of them. Outputs support design and documentation but do not replace the responsible engineer, authority, lender or utility. A CRM (customer and sales tracking tool) is not in the published scope, and monitoring and ERP (business management software) are outside it. OpenSolar documents a custom tariff form that SurgePV’s scope does not.
What the vendor documents: 3D roof modeling, array layout, shading analysis, energy-yield modeling, financial modeling, electrical workflow support, bill-of-materials output and proposal generation. See solar proposal software for the product page.
Price (checked October 2026): $1,899 per user per year for 1 user, $1,499 per user for 3 seats, $1,299 per user for 5 seats, in US dollars.
Limitations: results depend on source data, assumptions and equipment models, and the published scope lists no tariff form, capacity charge field, Lithuanian output or PPA modeling.
Vendor link: surgepv.com.

Lithuanian Support and Prosumer Numbers for a Quote
A Lithuanian quote has to show what the customer gets when export is capped, and what state support applies. The figures below are as of the dates given per the news reports named, both citing ESO or the Energy Ministry.
State support for a capped plant. The LRT report of 19 September 2025 citing ESO says an Energy Ministry programme starting in October 2025 provides EUR 5,000 toward a 5 kW solar plant and a 10 kWh storage unit where the permitted generation is no more than 1 kW. The plant and storage must have been installed after 1 September 2025 to qualify. A quote for such a customer should show the support as a separate deduction with its conditions.
Production and self-use. The same report gives ESO’s estimate that a 5 kW plant produces about 21 kWh a day on average and that a home can directly use only about a quarter of it. With storage the surplus goes to the battery. A proposal should show the self-consumed share with and without the battery, because the difference is the case for storage.
Market size. The LRT report of 23 June 2026 citing ESO reports over 186,000 prosumers at the end of May 2026, about 93% of the government’s target of 200,000 by 2028, with about 160,000 private and over 24,000 business prosumers, and over 2.53 GW of installed prosumer capacity. In May alone ESO received over 3,500 new applications. Customers are comparing offers, so a clear quote counts.
What to ask a vendor. Ask for a sample quote for a 5 kW plant with a 10 kWh battery and a 1 kW export cap, with the support line and the currency in euros. Check whether the support amount and conditions can be edited, because the programme may change. SurgePV’s published scope is on its proposal software page, and pricing is on the pricing page. For export limits and equipment see the Lithuania design list.
What to Ask a Vendor Before Buying
Give each vendor the same real Lithuania electricity bill and ask for a complete sample proposal. Look at where the tariff and any fixed or capacity charge are entered, whether output can be in Lithuanian, which financing routes suit how your customers pay, and whether a support deduction can be shown. The matrix marks anything the pages read leave unsaid, and a demo is where to settle it. Permits and grid connection sit outside the vendor pages, so take them to the Lithuanian authorities. The support and prosumer section above holds what the two LRT reports state.
How We Ordered These Tools
Ordering method: no ranking was applied. Tools run alphabetically and the best-for picks follow from the matrix. SurgePV publishes this page and is one of the vendors on the list. It is listed by the same rules as the others and is not placed first.
- Custom tariff entry: a Lithuania bill rarely resembles a US rate, so the check is whether a tariff can be entered. Modeling accuracy was not assessed.
- Demand or capacity charge fields: larger customers may pay on capacity as well as energy. The tools’ arithmetic was not assessed.
- Lithuanian proposal language: buyers tend to prefer proposals in their own language. Translation quality was not assessed.
- Lease or PPA financing: commercial clients weigh owning against paying for output. Whether any tool can model a Lithuania deal was not assessed.
- US dollar price: a stated price allows planning before a call. Discounts and negotiated quotes were not assessed.
- Free tier: a free plan lets a small team try the workflow. Limits beyond what the page states were not assessed.
Sources and Dates
Lithuanian support and market facts were read in November 2026 from the LRT report of 19 September 2025 citing ESO and the LRT report of 23 June 2026 citing ESO. The ministry programme text itself was not read.
Vendor pages were read in October 2026 and the headline prices were rechecked on 3 November 2026. They are Aurora (pricing and three help articles), Energy Toolbase (pricing, FAQ and product page), OpenSolar (free page, 16 February 2026 post, and the tariff, language and finance pages linked above) and SurgePV (pricing). Screenshots are captures of each vendor’s public website from 29 October 2026.
See SurgePV on your Lithuania project
Book a guided demo and ask how it handles a Lithuania tariff and capacity charge.
Book a Free DemoMore Solar Software Guides to Compare
- Best solar software in Lithuania
- Solar design software for Lithuania
- Best solar proposal software, all markets
- Solar proposal software features and SurgePV pricing
Frequently Asked Questions
What is the best solar proposal software in Lithuania?
It depends on the job. OpenSolar documents custom tariffs with demand charges, and its core app is free. Energy Toolbase lists PPA and lease financing. Aurora Solar lists tablet-friendly proposals. SurgePV documents roof modeling through proposals but states no Lithuania output. No tool here names Lithuania on the pages we read, so ask each vendor to model one real Lithuania electricity bill.
Can proposal software handle electricity tariffs in Lithuania?
OpenSolar and Aurora Solar help articles describe custom rates with demand charges, and OpenSolar lists flat, time-of-use and tiered rates too. Energy Toolbase’s help center says users can create custom rate schedules. None of these pages names a Lithuania tariff, so enter the rate from the customer’s bill and check the result.
Is there free solar proposal software for Lithuania?
OpenSolar says its core app is free for solar professionals. From 16 April 2026 it charges for API Access and supported connectors. The other tools here are paid or priced on request.
Does solar proposal software support Lithuanian proposals?
OpenSolar lists 13 proposal languages: English, Dutch, Swedish, Spanish, French, Norwegian, Thai, German, Polish, Portuguese, Italian, Danish and Finnish. For Lithuania, Lithuanian is not on that list. The Aurora, Energy Toolbase and SurgePV pages we read do not list proposal languages for Lithuania. Ask each vendor if you must send proposals in Lithuanian.
How much does solar proposal software cost for an installer in Lithuania?
Prices are in US dollars, as each vendor shows them. OpenSolar’s core app is free. Aurora lists $159 per user per month for Basic billed monthly, or $135 per user per month billed annually. SurgePV lists $1,899 per user per year for one user. Energy Toolbase gives its price on a demo call.


