Back to Best Solar Software
Best ListBest-Of List4 tools compared

Solar Proposal Software in Kazakhstan: 4 Tools Compared (2026)

Four solar proposal tools compared on what each vendor publishes for quotes in Kazakhstan: custom tariffs, local language, PPA and lease financing, price and free tier. Checked October 2026.

SurgePV publishes this list and sells solar design and proposal software, so we have a commercial interest in this category. This is a desk comparison of what each vendor publishes; we have not run side-by-side tests. Prices and vendor facts checked October 2026. How we evaluate software

Published Last updated
Nirav Dhanani

Written by

Nirav Dhanani

Co-Founder · SurgePV

Rainer Neumann

Edited by

Rainer Neumann

Editorial contributor · SurgePV

Kazakhstan installers and EPC teams picking solar proposal software can weigh four tools below. A free core app with demand-charge tariffs points to OpenSolar, while PPA, lease or loan comparisons for commercial work point to Energy Toolbase.

A Kazakhstan quote has to speak to a net-metering framework capped at 200 kW and to customers who may read Kazakh or Russian. Neither language is on OpenSolar’s list of 13 proposal languages. OpenSolar documents custom tariffs with demand charges on a free core app, and Energy Toolbase lists PPA and lease financing. A PPA (power purchase agreement) means paying for the power a system produces rather than purchasing the system. SurgePV documents roof modeling through proposals at a per-user price and states no Kazakhstan tariff output. None of the vendors names Kazakhstan, so test one real bill in each.

This desk comparison draws on vendor-published material read in October 2026, with no side-by-side trials. Tool facts are from each vendor’s site. Net-metering facts come from two news reports covered in their own section below, and the page claims nothing on tariff levels. Unsourced market figures from the earlier version have been dropped.

Criteria applied: custom tariff entry, demand or capacity charge fields, Kazakh or Russian proposals, lease or PPA financing, a US dollar price, and a free tier.

Solargraf is not compared in this update. solargraf.com could not be opened by automated tools in October 2026, so no claim about it could be sourced.

Want to see SurgePV quote a Kazakhstan project?

Book a guided demo and bring a real Kazakhstan site. We walk through design, yield, finance and the proposal in one platform.

Book a Free Demo

Checking cost first? See the SurgePV pricing page.

Best-For Picks for Kazakhstan

  • Free core app with demand-charge tariffs: OpenSolar. Its help article covers flat, time-of-use, tiered and demand-charge rates, plus fixed and minimum charges. The core app is free; API Access and connectors are charged from 16 April 2026. Neither Kazakh nor Russian is on the language list, so a bilingual market needs a vendor answer.
  • Commercial PPA, lease or loan modeling: Energy Toolbase. Its FAQ names cash, PPA, loan and lease structures and the price comes on a demo call.
  • Proposals shown on a tablet: Aurora Solar. The Basic plan lists tablet-friendly sales proposals, with per-project rate editing or custom rates that include demand charges.
  • Roof model, bill of materials and proposal in one per-user product: SurgePV. The vendor documents roof modeling, shading, yield, financial modeling, a bill of materials and proposals. Ask in a demo for a Kazakhstan tariff and a capacity charge, since the published scope names neither.

Kazakhstan Solar Proposal Software Comparison Table

Alphabetical, so not a ranking. Pick using the situations above. Prices were read in October 2026 on each vendor’s page, in the vendor’s own currency.

Tool Best for Price Free or paid Decisive Kazakhstan fact
Aurora Solar Tablet-friendly proposals $159 or $259 per user per month (monthly billing); $135 or $220 billed annually Paid Pricing page lists North America and Europe regions; Kazakhstan not named
Energy Toolbase PPA and lease modeling for commercial deals Price given on a demo call Paid Kazakhstan not named on the pages we read
OpenSolar Custom tariffs with demand charges Core app free of charge; API Access and connectors charged from 16 April 2026 Free core app, paid API and connectors 13 proposal languages; Kazakh and Russian are not on that list
SurgePV Roof model to BOM and proposal, per user $1,899 per user per year (1 user), in US dollars Paid, guided demo BOM and proposal generation in scope; no Kazakhstan item stated

Kazakhstan Criteria Matrix

Cells read Documented, Partial or Not stated. Documented: the vendor’s page says it. Partial: a related feature is stated but not the whole item. Not stated: the pages read in October 2026 are silent. There are no scores or weights.

Tool Custom tariff entry Demand or capacity charge fields Kazakh or Russian proposal language Lease or PPA financing US dollar price Free tier
Aurora Solar Documented (configure your own rates) Documented (help article on custom rates adds demand charges) Not stated Documented (loan, lease, PPA or cash product in Sales Mode) Partial ($ shown, currency not named) Not stated
Energy Toolbase Documented (help center: create your own custom rate schedules) Partial (FAQ: models demand charge reduction with storage) Not stated Documented (cash, PPA, loan, lease) Not published for ETB Developer (demo call) Not stated
OpenSolar Documented (custom tariff form) Documented (demand charges in the form) Partial (13 languages; Kazakh and Russian are not on that list) Partial (options depend on market and provider) Documented (core app free; paid services in US$) Documented
SurgePV Not stated Not stated Not stated Not stated Documented ($1,899 per user per year, 1 user) Not stated (guided demo)

Two points stand out. No page names a Kazakhstan tariff, though the OpenSolar and Aurora help articles describe custom rates with demand charges. Silence is not proof of absence, so run one real Kazakhstan bill through each vendor before buying.

Tool Entries

Aurora Solar

Best for: teams that want tablet-friendly proposals and a rate database where rates can be edited or created. For Kazakhstan, model self-consumption first and show export income only where a supplier contract exists.

Not the right choice if: you need a Kazakhstan rate preloaded or Kazakh or Russian output. Neither the pricing page nor the help articles read here name Kazakhstan or list either language.

What the vendor documents: the pricing page lists 3D roof modeling, performance simulation, adders, discounts and incentives, and a utility rate database where you “configure your own rates or use rates from Genability and Aurora”. Premium adds LIDAR-assisted modeling, bankable shade reports and battery modeling. Its help article on editing rates says you can change the import rate, export rate, rate details and compensation policy for a project. Its help article on custom rates lets an admin create a rate with tiers, time-of-use periods and demand charges. Its financial analysis article says a loan, lease, PPA or cash product must be chosen in Sales Mode.

Price (checked October 2026): Basic $159 per user per month billed monthly, or $135 per user per month billed annually ($1,620 billed annually); Premium $259 per user per month, or $220 billed annually ($2,640 billed annually). Enterprise is custom, per project. The page shows “$” and does not name the currency.

Limitations: the pricing page lists North America and Europe regions without naming Kazakhstan, and none of the pages read names a Kazakhstan rate.

Vendor link: aurorasolar.com.

Aurora Solar public website page, captured 29 October 2026
Aurora Solar public website capture, captured 29 October 2026. This shows the vendor's website, not a test inside the software.

Energy Toolbase

Best for: developers modeling PPA, lease or loan offers with storage for commercial customers, who can test the same bill with and without export income.

Not the right choice if: you need a published price or Kazakhstan named. The pricing page has you book 30 minutes, with the demo and price given on that call.

What the vendor documents: its ETB Developer FAQ says the platform supports cash purchases, power purchase agreements, loans and leases. It says the platform has a built-in database of utility rates, incentives and tariffs, and that it models demand charge reduction with battery storage. It also says ETB Developer is web-based. The product page counts 120,000+ tracked utility rates and describes a fully custom proposal template builder.

Price (checked October 2026): no ETB Developer figure is published on the pricing page. The page also lists implementation and support packages with no price.

Limitations: the pages read name neither Kazakhstan nor the countries behind the rate database. The rate schedules help page says users can create custom rate schedules and that the rates database spans 50 states and 42 international territories.

Vendor link: energytoolbase.com.

Energy Toolbase public website page, captured 29 October 2026
Energy Toolbase public website capture, captured 29 October 2026. This shows the vendor's website, not a test inside the software.

OpenSolar

Best for: installers wanting a free core app and a custom tariff with demand charges. In Kazakhstan, the first check is a Kazakh or Russian proposal sample.

Not the right choice if: proposals must be in Kazakh or Russian. The language article lists 13 supported languages, and neither is among them.

What the vendor documents: its tariff article says you can create a custom tariff with a tariff type and compensation mechanism. The rate structures are flat, time-of-use, tiered and demand charges. You can add fixed and minimum charges. Its integrated finance page says the options depend on your market and provider, and may include loans, leases, PPAs and third-party ownership.

Price (checked October 2026): the core app is free of charge for solar professionals, per the vendor. From 16 April 2026 the vendor charges for API Access, which lets other software connect to OpenSolar, and for supported connectors. This comes from its 16 February 2026 post.

Limitations: a Kazakhstan tariff must be built by hand, and none is named in the pages read.

Vendor link: opensolar.com.

OpenSolar public website page, captured 29 October 2026
OpenSolar public website capture, captured 29 October 2026. This shows the vendor's website, not a test inside the software.

SurgePV

SurgePV is our product.

Best for: teams wanting roof modeling, shading, yield and financial modeling in one product, with a bill of materials (the parts list) and per-user proposals. Kazakhstan items are checked in a demo.

Not the right choice if: you require a self-serve trial, since a guided demo is the offer, or want a custom tariff form, demand charge fields or Kazakh or Russian output in writing ahead of a sales call. The published scope states none of them. Outputs support design and documentation but do not replace the responsible engineer, authority, lender or utility. No CRM (customer and sales tracking tool) is in the published scope, and monitoring and ERP (business management software) are outside it. OpenSolar documents a custom tariff form that SurgePV’s scope does not.

What the vendor documents: 3D roof modeling, array layout, shading analysis, energy-yield modeling, financial modeling, electrical workflow support, bill-of-materials output and proposal generation. See solar proposal software for the product page.

Price (checked October 2026): $1,899 per user per year for 1 user, $1,499 per user for 3 seats, $1,299 per user for 5 seats, in US dollars.

Limitations: results depend on source data, assumptions and equipment models, and the published scope lists no tariff form, capacity charge field, Kazakh or Russian output or PPA modeling.

Vendor link: surgepv.com.

SurgePV public website page, captured 29 October 2026
SurgePV public website capture, captured 29 October 2026. This shows the vendor's website, not a test inside the software.

Kazakhstan Net Metering Numbers for a Proposal

For a Kazakh proposal, the key facts are who may export and how big the programme is. These are as of November 2026.

Who can export. A pv magazine report of 3 August 2026, based on a Ministry of Energy update, says Kazakhstan has a net-metering framework for citizens and businesses with renewable systems up to 200 kW, letting them sell surplus electricity to the grid. The Astana Times report of 7 June 2024 on the underlying law amendment says households can sell excess through their local energy supply organization.

The programme is growing from a small base. The pv magazine report says contracts under the mechanism rose from 103 to 172 in 2025, and capacity rose from 6.2 MW to 12.66 MW. That is about 74 kW per contract by the end of 2025, so the average participant is a business or a large home, not a typical house. Use this when judging how common your customer’s size is.

What the sources leave out. Neither article states the surplus price, the tariff basis or a settlement period. A proposal should therefore show export income only if the customer has a signed contract with its supplier, and otherwise present self-consumption savings as the base case. The Astana Times quotes the Deputy Energy Minister saying a household typically uses 15 to 20 kW and that a 200 kW system could cover consumption fully, which is an official’s remark, not a sizing rule.

Present the ceiling clearly. Show the 200 kW limit on the cover page for larger commercial roofs, since a bigger array falls outside the framework described.

Choosing a tool. Ask vendors, SurgePV included, to model a bill with and without export income in a demo, and read what each plan includes on the pricing page. Connection and sizing matters are on the Kazakhstan design software list.

What to Ask a Vendor Before Buying

Hand each vendor the same real Kazakhstan electricity bill and request a finished sample proposal. Check where the tariff and any fixed or capacity charge go in, whether output can be in Kazakh or Russian, which financing routes match how your customers pay, and whether the price is in your invoicing currency. The matrix flags what the pages read leave unsaid, and a demo is where to settle it. Permits and grid connection are not covered by the vendor pages, so take them to the Kazakhstan authorities. The net-metering section above lists what the two news reports state.

How We Ordered These Tools

How the list was ordered: no ranking was applied. Tools appear alphabetically and the best-for picks come from the matrix. SurgePV publishes this page and is one of the vendors on the list. It is listed by the same rules as the others and is not placed first.

  • Custom tariff entry: a Kazakhstan bill seldom resembles a US rate, so the check is whether a tariff can be entered. Modeling accuracy was not assessed.
  • Demand or capacity charge fields: large customers may pay on capacity as well as energy. The tools’ arithmetic was not assessed.
  • Kazakh or Russian proposal language: buyers often prefer a proposal in their everyday language. Translation quality was not assessed.
  • Lease or PPA financing: commercial clients weigh owning against paying for output. Whether any tool can model a Kazakhstan deal was not assessed.
  • US dollar price: a stated price allows planning before a call. Discounts and negotiated quotes were not assessed.
  • Free tier: a free plan lets a small team try the workflow. Limits beyond what the page states were not assessed.

Sources and Dates

Vendor pages were read in October 2026 and the headline prices were rechecked on 3 November 2026. They are Aurora (pricing and three help articles), Energy Toolbase (pricing, FAQ and product page), OpenSolar (free page, 16 February 2026 post, and the tariff, language and finance pages linked above) and SurgePV (pricing). Screenshots are captures of each vendor’s public website from 29 October 2026.

The Kazakhstan net-metering facts come from the pv magazine report of 3 August 2026 and the Astana Times report of 7 June 2024, read in November 2026.

See SurgePV on your Kazakhstan project

Book a guided demo and ask how it handles a Kazakhstan tariff and capacity charge.

Book a Free Demo

More Solar Software Guides to Compare

Frequently Asked Questions

What is the best solar proposal software in Kazakhstan?

It depends on the job. OpenSolar documents custom tariffs with demand charges, and its core app is free. Energy Toolbase lists PPA and lease financing. Aurora Solar lists tablet-friendly proposals. SurgePV documents roof modeling through proposals but states no Kazakhstan output. No tool here names Kazakhstan on the pages we read, so ask each vendor to model one real Kazakhstan electricity bill.

Can proposal software handle electricity tariffs in Kazakhstan?

OpenSolar and Aurora Solar help articles describe custom rates with demand charges, and OpenSolar lists flat, time-of-use and tiered rates too. Energy Toolbase’s help center says users can create custom rate schedules. None of these pages names a Kazakhstan tariff, so enter the rate from the customer’s bill and check the result.

Is there free solar proposal software for Kazakhstan?

OpenSolar says its core app is free for solar professionals. From 16 April 2026 it charges for API Access and supported connectors. The other tools here are paid or priced on request.

Does solar proposal software support Kazakh or Russian proposals?

OpenSolar lists 13 proposal languages: English, Dutch, Swedish, Spanish, French, Norwegian, Thai, German, Polish, Portuguese, Italian, Danish and Finnish. For Kazakhstan, Kazakh and Russian are not on that list. The Aurora, Energy Toolbase and SurgePV pages we read do not list proposal languages for Kazakhstan. Ask each vendor if you must send proposals in Kazakh or Russian.

How much does solar proposal software cost for an installer in Kazakhstan?

Prices are in US dollars, as each vendor shows them. OpenSolar’s core app is free. Aurora lists $159 per user per month for Basic billed monthly, or $135 per user per month billed annually. SurgePV lists $1,899 per user per year for one user. Energy Toolbase gives its price on a demo call.

About the Contributors

Author
Nirav Dhanani
Nirav Dhanani

Co-Founder · SurgePV

Nirav Dhanani is identified by SurgePV as a company co-founder. His SurgePV author page lists only role information that can be tied to the public profile below; credentials, project totals, conversion results, and market-expansion claims are not asserted without retained evidence.

Editor
Rainer Neumann
Rainer Neumann

Editorial contributor · SurgePV

Rainer Neumann is credited as an editorial contributor on SurgePV content. This profile does not assert engineering credentials, project totals, software-testing experience, education, speaking engagements, or media citations because independent verification evidence is not retained in the publication record.

Ready to Design and Propose Faster?

SurgePV covers solar design, energy-yield modeling, financial modeling, and proposals in one platform. Book a guided demo to see it on a project like yours.

Choose which optional technologies SurgePV may use. Essential storage remains active for security and requested features.