If you quote solar jobs in Israel, your proposal must show the customer’s real tariff and any capacity charge. It must also reach the customer in a language they read. OpenSolar documents custom tariffs with demand charges, and its core app is free. Energy Toolbase lists PPA and lease financing. A PPA (power purchase agreement) means the customer pays for the power a system makes instead of buying the system. SurgePV documents roof modeling through proposals, priced per user. It states no Israel tariff output. No tool here names Israel on the pages we read, so ask each vendor to model one real Israel bill.
This is a desk comparison of what each vendor publishes, checked October 2026. We have not run side-by-side trials. Tool facts come from each vendor’s own site. This page makes no claim about Israel regulation, incentive programs or tariff levels, because we have not sourced them from an official body for this update. We removed the unsourced market figures from the earlier version of this page.
Criteria used: custom tariff entry, demand or capacity charge fields, Hebrew proposal language, lease or PPA financing, US dollar price, free tier.
We left Solargraf out of this update. Its site (solargraf.com) could not be read by automated tools in October 2026, so no claim about it can be sourced. Solargraf is not compared on this page.
Want to see SurgePV on your own project?
Book a guided demo and bring a real site. We walk through design, yield, finance and the proposal in one platform.
Book a Free DemoChecking cost first? See the SurgePV pricing page.
Best-For Picks for Israel
- A fixed shekel tariff you enter by hand, on a free core app: OpenSolar. Its help article lists flat, time-of-use, tiered and demand-charge rates, plus fixed and minimum charges. The core app is free, but API Access and connectors are charged from 16 April 2026. Hebrew is not on its list of 13 proposal languages.
- A PPA or lease offer for a commercial roof under the new mandate: Energy Toolbase. Its FAQ lists cash, PPA, loan and lease structures. The price comes on a demo call.
- A 25-year fixed-tariff quote on a tablet at the kitchen table: Aurora Solar. The vendor lists tablet-friendly sales proposals on its Basic plan. You can edit the rate on each project or create a custom rate with demand charges.
- A roof model carried through to the quote, priced per user in dollars: SurgePV. It documents roof modeling, shading, yield, financial modeling, bill of materials and proposals. Ask in a demo how it models a fixed export tariff over 25 years and a capacity charge. Its published scope names neither.
Comparison Table
Listed alphabetically. This is not a ranking; pick by the situation above. Prices checked October 2026 on each vendor’s own page, in the currency the vendor publishes.
| Tool | Best for | Price | Free or paid | Decisive Israel fact |
|---|---|---|---|---|
| Aurora Solar | Tablet-friendly proposals | $159 or $259 per user per month (monthly billing); $135 or $220 billed annually | Paid | Pricing page lists North America and Europe regions; Israel not named |
| Energy Toolbase | PPA and lease modeling for commercial deals | Price given on a demo call | Paid | Israel not named on the pages we read |
| OpenSolar | Custom tariffs with demand charges | Core app free of charge; API Access and connectors charged from 16 April 2026 | Free core app, paid API and connectors | 13 proposal languages; Hebrew is not on that list |
| SurgePV | Roof model to BOM and proposal, per user | $1,899 per user per year (1 user), in US dollars | Paid, guided demo | BOM and proposal generation in scope; no Israel item stated |
Israel Criteria Matrix
Each cell is Documented, Partial or Not stated. Documented means the vendor’s own page states it. Partial means the page states a related feature but not the full item. Not stated means the pages we read in October 2026 do not say. There are no scores or weights.
| Tool | Custom tariff entry | Demand or capacity charge fields | Hebrew proposal language | Lease or PPA financing | US dollar price | Free tier |
|---|---|---|---|---|---|---|
| Aurora Solar | Documented (configure your own rates) | Documented (help article on custom rates adds demand charges) | Not stated | Documented (loan, lease, PPA or cash product in Sales Mode) | Partial ($ shown, currency not named) | Not stated |
| Energy Toolbase | Documented (help center: create your own custom rate schedules) | Partial (FAQ: models demand charge reduction with storage) | Not stated | Documented (cash, PPA, loan, lease) | Not published for ETB Developer (demo call) | Not stated |
| OpenSolar | Documented (custom tariff form) | Documented (demand charges in the form) | Partial (13 languages; Hebrew is not on that list) | Partial (options depend on market and provider) | Documented (core app free; paid services in US$) | Documented |
| SurgePV | Not stated | Not stated | Not stated | Not stated | Documented ($1,899 per user per year, 1 user) | Not stated (guided demo) |
Two things stand out. No page we read names a Israel tariff. The OpenSolar and Aurora help articles both describe custom rates with demand charges. A tool that does not state an item may still support it. Ask each vendor to model one real Israel bill before you buy.
Tool Entries
Aurora Solar
Best for: Israeli installers who sell with a tablet and want to edit or create a rate for each customer’s bill.
Not the right choice if: you need an Israeli tariff preloaded or Hebrew proposals. The pricing page and the help articles we read do not name Israel or list Hebrew, so a fixed 25-year tariff has to be built by hand.
What the vendor documents: the pricing page lists 3D roof modeling, performance simulation, adders, discounts and incentives, and a utility rate database where you “configure your own rates or use rates from Genability and Aurora”. Premium adds LIDAR-assisted modeling, bankable shade reports and battery modeling. Its help article on editing rates says you can change the import rate, export rate, rate details and compensation policy for a project. Its help article on custom rates lets an admin create a rate with tiers, time-of-use periods and demand charges. Its financial analysis article says a loan, lease, PPA or cash product must be chosen in Sales Mode.
Price (checked October 2026): Basic $159 per user per month billed monthly, or $135 per user per month billed annually ($1,620 billed annually); Premium $259 per user per month, or $220 billed annually ($2,640 billed annually). Enterprise is custom, per project. The page shows “$” and does not name the currency.
Limitations: the pricing page lists North America and Europe regions and does not name Israel. We found no Israel rate named on the pages we read.
Vendor link: aurorasolar.com.

Energy Toolbase
Best for: developers who model PPA, lease or loan offers with storage for commercial customers, such as the non-residential buildings of 250 square metres or more that the mandate reaches.
Not the right choice if: you need a published price, or Israel named. The pricing page says you book 30 minutes and get a demo and pricing on the call.
What the vendor documents: its ETB Developer FAQ says the platform supports cash purchases, power purchase agreements, loans and leases. It says the platform has a built-in database of utility rates, incentives and tariffs, and that it models demand charge reduction with battery storage. It also says ETB Developer is web-based. The product page counts 120,000+ tracked utility rates and describes a fully custom proposal template builder.
Price (checked October 2026): no ETB Developer figure is published on the pricing page. The page also lists implementation and support packages with no price.
Limitations: the pages we read do not name Israel or the countries the rate database covers. Its rate schedules help page says users can create custom rate schedules, and that its rates database spans 50 states and 42 international territories.
Vendor link: energytoolbase.com.

OpenSolar
Best for: small Israeli installers who want a free core app and are willing to build the tariff form by hand, including any demand charge.
Not the right choice if: your customer needs a proposal in Hebrew. The language article lists 13 supported languages, and Hebrew is not among them.
What the vendor documents: its tariff article says you can create a custom tariff with a tariff type and compensation mechanism. The rate structures are flat, time-of-use, tiered and demand charges. You can add fixed and minimum charges. Its integrated finance page says the options depend on your market and provider, and may include loans, leases, PPAs and third-party ownership.
Price (checked October 2026): the core app is free of charge for solar professionals, per the vendor. From 16 April 2026 the vendor charges for API Access, which lets other software connect to OpenSolar, and for supported connectors. This comes from its 16 February 2026 post.
Limitations: the tariff has to be built by hand for Israel, and no Israel tariff is named on the pages we read.
Vendor link: opensolar.com.

SurgePV
SurgePV is our product.
Best for: teams that want one product from roof model to quote, with shading, yield, financial modeling, a bill of materials (the parts list) and proposals, priced per user. Israeli buyers should check the tariff and Hebrew items in a demo.
Not the right choice if: you want a self-serve trial (SurgePV offers a guided demo), a custom tariff form, capacity charge fields or Hebrew in writing before a sales call. Its published scope does not state them. Outputs support design and documentation but do not replace approval by the responsible engineer, authority, lender or utility. The published scope lists no CRM (customer tracking tool).
What the vendor documents: 3D roof modeling, array layout, shading analysis, energy-yield modeling, financial modeling, electrical workflow support, bill-of-materials output and proposal generation. See solar proposal software for the product page.
Price (checked October 2026): $1,899 per user per year for 1 user, $1,499 per user for 3 seats, $1,299 per user for 5 seats, in US dollars.
Limitations: results depend on source data, assumptions and equipment models. The published scope does not state a tariff form, a capacity charge field, Hebrew or PPA modeling.
Vendor link: surgepv.com.

Israeli Rooftop Tariffs a Proposal Has to Quote
Israel pays a fixed tariff for small rooftop systems and has been consulting on changes, so a proposal needs a date on every rate. These facts are as of November 2026, from the press reports named.
The existing tariff. A pv magazine report of 24 March 2025 gives the current tariff as 0.48 shekels per kWh, fixed for 25 years. A Globes report of 30 June 2025 says systems up to 15 kW receive 0.48 shekels per kWh, or 0.54 in large cities, locked for 25 years. The two reports differ on whether the rate is linked to the consumer price index, so a proposal should state indexation only as written in the customer’s signed agreement.
The proposal on the table. The pv magazine report says Israel’s Ministry of Energy and Infrastructure proposed two tracks. Track 1 would pay 0.6 shekels per kWh for five years and 0.3807 afterward, for systems up to 30 kW, with the higher rate on the first 15 kW only. Track 2 would pay 0.39 shekels per kWh adjusted with the consumer price index, for systems up to 15 kW. The consultation ran until 4 April 2025. This is a March 2025 press account of a proposal. No Electricity Authority or ministry decision was read, and the press reports do not say whether the tracks were adopted, so do not quote them as in force.
Who pays. Globes reported in June 2025 that the Electricity Authority put a cost on the scheme that would be passed on to electricity bills, and that current subsidy arrangements end at the end of 2026, which matters for any customer deciding in late 2026. The Authority’s own estimate was not read, so no cost figures are quoted here.
The mandate. Globes says from December 2025, occupancy permits will require rooftop solar on every house with a roof above 100 square metres, starting at 5 kW, plus industrial and public buildings, and non-residential buildings at 250 square metres or more. TaiyangNews reports the same December 2025 start. For new builds the question is size and layout, not whether to install.
How to build the proposal. Show a 25-year income line from the signed tariff, a second line if the customer’s size band changes, and a sensitivity case where the tariff drops to the proposed 0.39. Ask each vendor, SurgePV included, to model a fixed export tariff over 25 years in a demo, and see plan details on the pricing page. For the Israeli market context, see the Israel solar software list.
What to Ask a Vendor Before Buying
Bring one real Israeli electricity bill and a signed-tariff scenario to each vendor. Look for a field for the 0.48 shekel style fixed tariff, a 25-year income line and a sensitivity case where the rate drops. Look for a place to add a capacity charge, proposal output in Hebrew if your customer needs it, and financing that matches how your customers pay. The vendor should state its own price in a currency you can invoice against. Where a page we read is silent on one of these, the matrix says Not stated, and a demo is where you check it. Permit and grid-connection rules come from the Israel authorities, because the vendor pages do not cover them.
How We Ordered These Tools
Methodology: we did not rank these tools. They are listed alphabetically, and the best-for picks come from the matrix above. SurgePV publishes this page and is one of the vendors on the list. It is listed by the same rules as the others and is not placed first.
- Custom tariff entry: a bill in Israel rarely matches a US rate. We did not assess how well any tool models a tariff you enter.
- Demand or capacity charge fields: larger customers may pay a charge based on capacity, not only on energy. We did not assess any tool’s math.
- Hebrew proposal language: many buyers read proposals in the local language. We did not assess translation quality.
- Lease or PPA financing: commercial buyers often compare buying with paying for the power. We did not assess whether any tool models a Israel deal.
- US dollar price: a published price lets you plan before a call. We did not assess discounts or negotiated quotes.
- Free tier: a free plan lets a small team try the workflow. We did not assess the limits of any free plan beyond what its page states.
Sources and Dates
Vendor pages were read in October 2026 and the headline prices were rechecked on 3 November 2026. They are Aurora (pricing and three help articles), Energy Toolbase (pricing, FAQ and product page), OpenSolar (free page, 16 February 2026 post, and the tariff, language and finance pages linked above) and SurgePV (pricing). Screenshots are captures of each vendor’s public website from 29 October 2026.
The Israel tariff and mandate facts come from the pv magazine report of 24 March 2025, the Globes report of 30 June 2025 and the TaiyangNews report of 2 July 2025, read in November 2026. They are press reports, not Electricity Authority decisions.
See SurgePV on your own project
Book a guided demo and ask how it handles a Israel tariff and capacity charge.
Book a Free DemoGo Deeper on a Category
- Best solar software in Israel
- Solar design software for Israel
- Best solar proposal software, all markets
- Solar proposal software features and SurgePV pricing
Frequently Asked Questions
What is the best solar proposal software in Israel?
It depends on the job. OpenSolar documents custom tariffs with demand charges, and its core app is free. Energy Toolbase lists PPA and lease financing. Aurora Solar lists tablet-friendly proposals. SurgePV documents roof modeling through proposals but states no Israel output. No tool here names Israel on the pages we read, so ask each vendor to model one real Israel electricity bill.
Can proposal software handle electricity tariffs in Israel?
OpenSolar and Aurora Solar help articles describe custom rates with demand charges, and OpenSolar lists flat, time-of-use and tiered rates too. Energy Toolbase’s help center says users can create custom rate schedules. None of these pages names a Israel tariff, so enter the rate from the customer’s bill and check the result.
Is there free solar proposal software for Israel?
OpenSolar says its core app is free for solar professionals. From 16 April 2026 it charges for API Access and supported connectors. The other tools here are paid or priced on request.
Does solar proposal software support Hebrew proposals?
OpenSolar lists 13 proposal languages: English, Dutch, Swedish, Spanish, French, Norwegian, Thai, German, Polish, Portuguese, Italian, Danish and Finnish. For Israel, Hebrew is not on that list. The Aurora, Energy Toolbase and SurgePV pages we read do not list proposal languages for Israel. Ask each vendor if you must send proposals in Hebrew.
How much does solar proposal software cost for an installer in Israel?
Prices are in US dollars, as each vendor shows them. OpenSolar’s core app is free. Aurora lists $159 per user per month for Basic billed monthly, or $135 per user per month billed annually. SurgePV lists $1,899 per user per year for one user. Energy Toolbase gives its price on a demo call.


