This page is for installers and EPC teams quoting Hungarian homes and businesses. Short answer: OpenSolar when you need to show a household how production follows the year; Aurora Solar when the quote needs a fixed export rate.
A Hungarian quote should open with a number the customer can check and then show the monthly curve, which the PVGIS section below builds for Budapest and Debrecen. No vendor page names Hungary, so the comparison is about what you can enter and print. OpenSolar’s free core app takes a custom tariff. Aurora has a fixed export rate field. Energy Toolbase compares cash, loan, lease and PPA structures (a PPA, power purchase agreement, means the customer buys the power rather than the system). SurgePV covers roof model to proposal, billed per user. No vendor lists a forint price on the pages we read.
Method: a desk comparison of vendor-published material dated October 2026, with no side-by-side runs. SurgePV publishes this page and is a vendor on this list. The PVGIS figures are our own runs with the settings stated below. Hungarian tariff and settlement rules were not sourced, so enter them from the customer’s bill.
Solargraf, in an earlier version, is dropped: solargraf.com returned HTTP 403 to automated reads in October 2026.
The five criteria are tariff entry, export-credit setting, local-language proposals, price in a published currency and free start.
Want to see SurgePV quote a Hungary project?
Book a guided demo and bring a real Hungary site. We walk through design, yield, finance and the proposal in one platform.
Book a Free DemoChecking cost first? See the SurgePV pricing page.
Best-For Picks for Hungary
- Showing a Hungarian household how production follows the year: OpenSolar. Enter the client’s own tariff, including time-of-use or tiered rates, and print monthly production. Its core app is free. Hungarian is not among its 13 proposal languages.
- A fixed export rate on the quote: Aurora Solar. Its utility-rate help article has a Fixed export rate field in dollars per kWh, so see how a forint figure prints.
- A company comparing purchase with a PPA, loan or lease: Energy Toolbase. Its FAQ lists those structures. Price is not published for ETB Developer.
- One file from roof to quote: SurgePV. It is billed per user. Ask for a sample Hungarian proposal showing monthly production and the currency you invoice in.
Hungary Solar Proposal Software Comparison Table
Alphabetical, not ranked. Prices come from each vendor’s own page, read in October 2026.
| Tool | Best for | Price | Free or paid | Decisive scope fact |
|---|---|---|---|---|
| Aurora Solar | Fixed export rate and custom rates | Basic $159 per user per month (monthly billing); $135 billed annually | Paid | Compensation policy: net billing or feed-in tariff |
| Energy Toolbase | Cash, loan, lease and PPA comparisons | Not published (book a demo) | Paid | Works with partner design tools |
| OpenSolar | Custom tariff, free core app | Core app free of charge; API Access and connectors charged from 16 April 2026 | Free core app, paid API and connectors | 13 proposal languages |
| SurgePV | Roof model to BOM and proposal, per user | $1,899 per user per year (1 user), in US dollars | Paid, guided demo | BOM and proposal generation in scope |
Hungary Criteria Matrix
Documented means the vendor’s page states the item. Partial means only part is stated, or it is stated for other countries. Not stated means the pages read in October 2026 do not mention it. There are no scores or weights.
| Tool | Tariff entry | Export-credit setting | Local-language proposals | Price in a published currency | Free start |
|---|---|---|---|---|---|
| Aurora Solar | Documented (custom rates, or Genability and Aurora rates) | Documented (fixed export rate; net billing or feed-in tariff) | Not stated | Partial (dollar figures; currency not named) | Not stated |
| Energy Toolbase | Partial (utility rates team described; Hungary not named) | Not stated | Not stated | Not published for ETB Developer | Not stated |
| OpenSolar | Documented (custom tariff) | Partial (several credit options; none named for Hungary) | Partial (13 proposal languages; see the entry) | Documented (core app free) | Documented |
| SurgePV | Partial (financial modeling; no tariff entry described) | Not stated | Not stated | Partial (USD only) | Not stated (guided demo) |
No vendor page names Hungary, and the rows separate the tools mainly by whether you can enter a tariff and an export rate yourself. Not stated may still mean supported. Ask each vendor for one real Hungarian quote with the monthly production printed before you buy.
Tool Entries
Aurora Solar
Best for: teams that want one design tool with a fixed export rate and a choice of net billing or a feed-in tariff.
Not the right choice if: you need a forint price or a Hungarian-language proposal, neither of which appears on the pages read, or a free plan: the pages list paid tiers and a custom Enterprise plan.
What the vendor documents: on its pricing page, all plans list 3D roof modeling, proposal templates, custom pricing methods and a utility rate database. The page says you can “Configure your own rates or use rates from Genability and Aurora”. Web and PDF proposals and financing comparisons are listed too. Premium adds battery modeling and bankable shade reports. The help article says “With Feed-in tariff, Aurora credits all the energy the system produces at a tariff rate”.
Price (checked October 2026): Basic $159 per user per month billed monthly, or $135 per user per month billed annually ($1,620 billed annually). Premium $259 per user per month, or $220 per user per month billed annually ($2,640 billed annually). Enterprise is custom, per project. The page shows a dollar sign and does not name the currency.
Limitations: the article gives the fixed export rate unit as “$ per kWh”, the pricing page lists North America and Europe regions, and Hungary is not named.
Vendor link: aurorasolar.com

Energy Toolbase
Best for: commercial buyers who compare cash, loan, lease and PPA offers, or add storage to the model.
Not the right choice if: you want a published price (the pricing page points to a demo booking) or a layout tool built in. The ETB Developer page lists “PV design partnerships with leading design software tools”, so ask the vendor how layout is handled.
What the vendor documents: the ETB Developer page lists proposals, quick financial analysis, “up-to-date utility rates” and lead management. It says the platform tracks “120k+” utility rates. Its FAQ says it supports “cash purchases, power purchase agreements (PPAs), loans, and leases”. It is web-based.
Price (checked October 2026): not published for ETB Developer. The pricing page says “Book 30 minutes” for a demo and pricing for your team size. Dollar figures on that page belong to its ETB Controller and ETB Monitor products.
Limitations: Hungary and forint pricing are not named, and the pages do not list the countries the utility rates cover.
Vendor link: energytoolbase.com

OpenSolar
Best for: small teams that want a free core app and will enter the Hungarian tariff by hand to print monthly production.
Not the right choice if: you need Hungarian as a proposal language. The language article lists English, Dutch, Swedish, Spanish, French, Norwegian, Thai, German, Polish, Portuguese, Italian, Danish and Finnish, and says a proposal template must be translated by hand.
What the vendor documents: a custom tariff with flat, time-of-use, tiered and demand rates, plus a choice of how exports are credited. The choices are Net Billing, Net Billing with Credit Carryover, Buy All, Sell All and Net Energy Metering. The article does not say which one fits a given country’s program.
Price (checked October 2026): the core app is free of charge for solar professionals, per the vendor. From 16 April 2026 the vendor charges for API Access, a per-project fee, and for supported connectors, a flat monthly subscription. Source: its 16 February 2026 post and its API page.
Limitations: Hungary and forint pricing are not named on the pages read.
Vendor link: opensolar.com

SurgePV
SurgePV is our product.
Best for: teams that want roof modeling, array layout, shading, yield, financial modeling, electrical workflow support, bill of materials and proposals in one product, billed per user, and will go through the Hungarian items in a demo. Product page: solar proposal software.
Not the right choice if: you need a self-serve trial (SurgePV runs a guided demo) or a forint price in writing before a sales conversation. Outputs support design and documentation. They do not replace approval by the responsible engineer, authority, lender or utility.
What the vendor documents: 3D roof modeling, array layout, shading analysis, energy-yield modeling, financial modeling, electrical workflow support, bill-of-materials output and proposal generation.
Price (checked October 2026): $1,899 per user per year for 1 user, $1,499 per user for 3 seats, $1,299 per user for 5 seats, in US dollars. Confirm any local-currency amount and taxes in a written quote.
Limitations: results depend on source data, assumptions and equipment models. The published scope names no Hungarian tariff, export-credit setting, Hungarian-language proposal or design size limit.
Vendor link: surgepv.com.

Putting Hungarian Production Numbers in a Quote
A quote in Hungary should open with a number the customer can check. We ran PVGIS, the European Commission Joint Research Centre solar tool in November 2026 for Budapest (47.50 N, 19.04 E) with 1 kWp of crystalline silicon, 14% system losses, fixed mounting, PVGIS horizon data, data years 2005 to 2023 at a 35 degree south tilt. The model gives 1,244 kWh per kWp per year. For Debrecen (47.53 N, 21.63 E) it gives 1,221. Use figures like these only as a cross-check on whatever your proposal tool prints for the same roof.
The monthly shape is what makes a proposal honest. In the Budapest run, production is 56.21 kWh per kWp in January, 44.65 in December, 135.43 in May, 137.69 in June and 144.70 in July. November to February give 18.6% of the year and May to August give 44.8%. So a household or business that uses most power in winter will see less cover than the annual figure suggests. Ask each tool whether its proposal prints monthly production beside monthly use, and show both.
Roof direction changes the quote. For Budapest, a 15 degree east roof gives 1,021 kWh per kWp and a west roof gives 1,012, against 1,244 for a 35 degree south roof. A 35 degree north roof gives 618. If the customer has an east-west roof, check that your proposal tool takes orientation into account rather than applying one standard yield.
On the commercial side, the proposal question is who owns the system. Energy Toolbase lists cash, PPA, loan and lease structures, and OpenSolar says financing options depend on market and provider. Neither page names Hungary. Currency is the second check: Aurora’s export-rate field is in dollars per kWh, and the vendors publish prices in US dollars or Swiss francs, so confirm which currency the proposal prints for the customer. OpenSolar’s proposal-language list does not include Hungarian, so a translated template is on you.
The design-focused list for Hungary covers tilt tables, ground-mount tools and diagrams. This list stays on the customer conversation: the tariff, the monthly curve, the roof direction and the language. We did not source Hungarian tariff levels, feed-in or settlement rules from a primary body, so enter them from the customer’s bill and the utility.
How We Ordered These Tools
The order is alphabetical, with no ranking. Best-for picks follow the matrix.
- Tariff entry: the monthly curve only helps if it is priced at the customer’s real rate. How any tool handles time-of-use or tiered rates was not assessed.
- Export-credit setting: exported power can earn a set rate or a credit. Whether a tool can model Hungarian settlement was not assessed, since that rule was not sourced.
- Local-language proposals: a Hungarian household reads a Hungarian quote best. Translation quality was not assessed.
- Price in a published currency: the vendors publish dollars or Swiss francs, not forints. Discounts and negotiated quotes were not assessed.
- Free start: a free plan lets a small installer try the flow. Plan limits beyond what a page states were not assessed.
Methodology and Disclosure
SurgePV is published by SurgePV, which is also one of the vendors on this list. Its entry follows the same vendor-page sources and fields as the others, read in October 2026. The Hungarian items are open questions for every vendor, SurgePV included. Where a page does not state a feature, it says Not stated here.
Sources and Dates
Vendor material is from the pages linked in each entry, read in October 2026. SurgePV details come from its pricing page and proposal software page.
Added in November 2026 from primary sources: PVGIS. The PVGIS figures were produced by us with the settings stated in the section above, so rerun them at the PVGIS link to check.
See SurgePV on your Hungary project
Book a guided demo and ask for the Hungary items you need in the quote.
Book a Free DemoMore Solar Software Guides to Compare
- Solar software in Hungary
- Solar design software for Hungary
- Best solar proposal software, all markets
- Aurora Solar alternatives
Frequently Asked Questions
What is the best solar proposal software in Hungary?
It depends on what the quote must show. The vendor pages we read do not name Hungary, so pick by what you can enter yourself. OpenSolar’s core app is free and takes a custom tariff. Aurora Solar lets you enter a fixed export rate. Energy Toolbase compares cash, loan, lease and PPA options. SurgePV lists proposal generation in one product with roof modeling, priced per user.
Is there free solar proposal software for Hungary?
OpenSolar says its core app is free for solar professionals. It charges for API Access and supported connectors from 16 April 2026. Its help article lists 13 proposal languages. The other tools here are paid, and the pages we read show no free plan for them. SurgePV offers a guided demo and no self-serve trial.
Can proposal software show Hungary tariffs and local currency?
No vendor page we read names Hungary tariffs or a Hungary price list. OpenSolar and Aurora Solar let you enter custom tariffs. Enter the rate for your client’s class from your utility, and check that the proposal prints the currency you want.
Which proposal tools support Hungary languages?
The pages we read do not say which tools offer a Hungary interface or proposal template. OpenSolar’s help article lists English, Dutch, Swedish, Spanish, French, Norwegian, Thai, German, Polish, Portuguese, Italian, Danish and Finnish, and says a proposal template must be translated by hand. Check the language list before you buy.
How much does solar proposal software cost for Hungary installers?
No vendor on this page lists a Hungary price on the pages we read. Aurora Solar Basic is $159 per user per month billed monthly, or $135 per user per month billed annually. Energy Toolbase does not publish a price for ETB Developer. OpenSolar’s core app is free. SurgePV Individual is $1,899 per user per year. Ask each vendor for a written quote.
How much solar electricity should a Hungary quote assume per kWp?
For Budapest with 14% system losses and a 35 degree south tilt, PVGIS from the European Commission Joint Research Centre returns 1,244 kWh per kWp per year. Debrecen returns 1,221. Use this to cross-check the figure in your proposal tool; your roof may differ.
Should a Hungarian solar proposal show monthly production?
Yes, where the tool allows it. In the Budapest PVGIS run, December is 44.65 kWh per kWp and July is 144.70, and November to February make 18.6% of the year. A customer using more power in winter will see less cover than an annual figure suggests.
Does roof direction change a Hungarian solar quote?
In the same run, a 15 degree east roof gives 1,021 kWh per kWp and a west roof 1,012, against 1,244 for a 35 degree south roof. A 35 degree north roof gives 618. Check that the proposal tool uses the real roof orientation.


