An Estonian solar quote has to carry a connection fee and an export price, so the useful question is which tool lets you type those in yourself. OpenSolar’s free core app accepts a custom tariff. Aurora Solar has a fixed export rate field. Energy Toolbase compares cash, loan, lease and PPA (power purchase agreement) offers. SurgePV lists proposal generation alongside roof modeling on a per-user plan. None of them lists a euro price, which is what an Estonian customer would see on an invoice.
Vendor pages were read in October 2026, without side-by-side trials. SurgePV publishes this page and is a vendor on this list, one of four. The quote section below uses the Elektrilevi connection-fee methodology and Estonian press reports. Vendor pages themselves name no Estonian rule, so tariffs and incentives come from the utility and the authorities.
Solargraf, listed in an earlier version, is left out because solargraf.com returned HTTP 403 to automated reads in October 2026.
What the matrix covers: tariff entry, export-credit setting, proposals in the client’s language, price in a published currency, and whether a free start exists.
Want to see SurgePV on your own project?
Book a guided demo and bring a real site. We walk through design, yield, finance and the proposal in one platform.
Book a Free DemoChecking cost first? See the SurgePV pricing page.
Best-For Picks for Estonia
- A fixed export rate field: Aurora Solar. Its help article offers “Fixed export rate” with the unit “$ per kWh”, so see how a euro cent price would print.
- Cash, loan, lease and PPA side by side: Energy Toolbase. Its FAQ lists “cash purchases, power purchase agreements (PPAs), loans, and leases”. No price is published.
- Your own tariff in a free core app: OpenSolar. Its tariff article covers flat, time-of-use, tiered and demand rates with several export-credit methods. API Access and connectors are charged from 16 April 2026.
- Roof model, parts list and proposal on a per-user plan: SurgePV. Roof modeling, shading, yield, finance, bill of materials and proposals are listed. Ask in a demo how an Estonian tariff and a euro price are handled, as its published scope mentions neither.
Comparison Table
The tools are in alphabetical order. This is not a ranking. Pick by the situation above. Prices checked October 2026 on each vendor’s own page.
| Tool | Best for | Price | Free or paid | Decisive scope fact |
|---|---|---|---|---|
| Aurora Solar | Fixed export rate and custom rates | Basic $159 per user per month (monthly billing); $135 billed annually | Paid | Compensation policy: net billing or feed-in tariff |
| Energy Toolbase | Cash, loan, lease and PPA comparisons | Not published (book a demo) | Paid | Works with partner design tools |
| OpenSolar | Custom tariff, free core app | Core app free of charge; API Access and connectors charged from 16 April 2026 | Free core app, paid API and connectors | 13 proposal languages |
| SurgePV | Roof model to BOM and proposal, per user | $1,899 per user per year (1 user), in US dollars | Paid, guided demo | BOM and proposal generation in scope |
Estonia Criteria Matrix
Each cell is marked Documented, Partial or Not stated. Documented: the vendor’s own page says it. Partial: only part of the item, or only for other countries. Not stated: silent in the pages read in October 2026. No scores or weights are used.
| Tool | Tariff entry | Export-credit setting | Local-language proposals | Price in a published currency | Free start |
|---|---|---|---|---|---|
| Aurora Solar | Documented (custom rates, or Genability and Aurora rates) | Documented (fixed export rate; net billing or feed-in tariff) | Not stated | Partial (dollar figures; currency not named) | Not stated |
| Energy Toolbase | Partial (utility rates team described; Estonia not named) | Not stated | Not stated | Not published for ETB Developer | Not stated |
| OpenSolar | Documented (custom tariff) | Partial (several credit options; none named for Estonia) | Partial (13 proposal languages; see the entry) | Documented (core app free) | Documented |
| SurgePV | Partial (financial modeling; no tariff entry described) | Not stated | Not stated | Partial (USD only) | Not stated (guided demo) |
Two points stand out. No page read mentions Estonia, and the real split is whether you can enter a tariff and an export rate yourself. A Not stated cell may still be a working feature, so have each vendor build one Estonian quote, with the connection fee and export price editable.
Tool Entries
Aurora Solar
Best for: installers who want a fixed export rate and the choice between net billing and a feed-in tariff inside the design tool.
Not the right choice if: the proposal must be in Estonian or priced in euros, since neither appears on the pages read, or you want a free tool. Plans are paid, with a custom Enterprise tier.
What the vendor documents: on its pricing page, all plans list 3D roof modeling, proposal templates, custom pricing methods and a utility rate database. The page says you can “Configure your own rates or use rates from Genability and Aurora”. Web and PDF proposals and financing comparisons are listed too. Premium adds battery modeling and bankable shade reports. The help article says “With Feed-in tariff, Aurora credits all the energy the system produces at a tariff rate”.
Price (checked October 2026): Basic $159 per user per month billed monthly, or $135 per user per month billed annually ($1,620 billed annually). Premium $259 per user per month, or $220 per user per month billed annually ($2,640 billed annually). Enterprise is custom, per project. The page shows a dollar sign and does not name the currency.
Limitations: the fixed export rate unit is “$ per kWh”, and the pricing page offers North America and Europe regions without naming Estonia. Check how an Estonian cent-per-kWh price prints.
Vendor link: aurorasolar.com

Energy Toolbase
Best for: developers who must compare cash, loan, lease and PPA offers or model solar with storage.
Not the right choice if: a published price matters, as the pricing page sends you to a demo, or you need built-in roof design. The ETB Developer page lists “PV design partnerships with leading design software tools”, so ask about layout.
What the vendor documents: the ETB Developer page lists proposals, quick financial analysis, “up-to-date utility rates” and lead management. It says the platform tracks “120k+” utility rates. Its FAQ says it supports “cash purchases, power purchase agreements (PPAs), loans, and leases”. It is web-based.
Price (checked October 2026): not published for ETB Developer. The pricing page says “Book 30 minutes” for a demo and pricing for your team size. Dollar figures on that page belong to its ETB Controller and ETB Monitor products.
Limitations: the pages read do not say which countries its utility rates cover, and name neither Estonia nor euro pricing.
Vendor link: energytoolbase.com

OpenSolar
Best for: small teams who want a free core app and will key in the Estonian tariff by hand.
Not the right choice if: the proposal must be in Estonian. The language article lists English, Dutch, Swedish, Spanish, French, Norwegian, Thai, German, Polish, Portuguese, Italian, Danish and Finnish, and says a template must be translated by hand.
What the vendor documents: a custom tariff with flat, time-of-use, tiered and demand rates, plus a choice of how exports are credited. The choices are Net Billing, Net Billing with Credit Carryover, Buy All, Sell All and Net Energy Metering. The article does not say which one fits a given country’s program.
Price (checked October 2026): the core app is free of charge for solar professionals, per the vendor. From 16 April 2026 the vendor charges for API Access, a per-project fee, and for supported connectors, a flat monthly subscription. Source: its 16 February 2026 post and its API page.
Limitations: the export-credit choices are not tied to any country program, and the pages read name neither Estonia nor euro pricing.
Vendor link: opensolar.com

SurgePV
SurgePV is our product.
Best for: teams wanting roof modeling, layout, shading and yield with finance, parts list and proposals in one per-user product. Settle the Estonian items in a demo. See solar proposal software for the product page.
Not the right choice if: a self-serve trial is needed (a guided demo is offered) or you need a euro price in writing before speaking to sales. Outputs support design and documentation but do not replace sign-off by the responsible engineer, authority, lender or utility.
What the vendor documents: 3D roof modeling, array layout, shading analysis, energy-yield modeling, financial modeling, electrical workflow support, bill-of-materials output and proposal generation.
Price (checked October 2026): $1,899 per user per year for 1 user, $1,499 per user for 3 seats, $1,299 per user for 5 seats, in US dollars. Confirm any local-currency amount and taxes in a written quote.
Limitations: results depend on source data, assumptions and equipment models. The published scope names no Estonian tariff, export-credit setting, local-language proposal or design size limit.
Vendor link: surgepv.com.

What an Estonian Solar Quote Has to Cover
Beyond equipment, an Estonian quote answers two money questions: what the grid connection costs and what exported power earns. Each fact below carries the date of its source.
Connection fee. Under the Elektrilevi connection-fee methodology, in force from 1 May 2025, a new producer connection of up to 15 kW export capacity is charged at cost but not below the fee from the area’s fixed amp price. Changing production conditions without raising the main fuse is either cost-based or a fixed price for minor work. If actual cost proves lower than estimated, the fee is adjusted to actual cost, again not below the amp-price fee. The ERR report from spring 2025 adds that since May 2025 a microproducer pays all connection costs. Show the connection fee as its own quote line, labelled as the grid company’s estimate.
Exports are a weak selling point. The ERR report of May 2023 quotes a professor calling grid sales unprofitable at the prices then seen, with a daytime average near 10 cents per kWh and summer prices often close to zero. It also notes that an Eesti Energia calculator from 2020, promising a 13-year payback on selling most output, was withdrawn. These are 2023 statements, so a quote relying on exports should state the price used and its date.
Own use and batteries. The same article quotes an Eesti Energia manager recommending that most energy be used on site, with storage. List the self-consumed share and the battery effect as separate figures so the customer sees which one earns the money.
Vendor pages. None names an Estonian fee or price. Ask each vendor for a sample euro quote where connection fee, export price and self-consumption can be edited. SurgePV’s scope is on its proposal software page and prices on the pricing page. Connection classes and fuse rules are on the Estonia design list.
How We Ordered These Tools
No ranking is given: tools run alphabetically and picks follow the matrix.
- Tariff entry: the quote needs the rate for your client’s class. How any tool prices time-of-use or tiered rates was not assessed.
- Export-credit setting: exports may earn a fixed rate or a credit. Whether any tool can model a given national program was not assessed.
- Local-language proposals: clients read best in their own language, here Estonian. Translation quality was not assessed.
- Price in a published currency: a known currency shows what a buyer pays. Discounts and negotiated quotes were not assessed.
- Free start: a free plan lets a small team try the workflow. Its limits were not assessed beyond what the page states.
Methodology and Disclosure
SurgePV is published by SurgePV, which is also one of the vendors on this list. Its entry follows the same template and sources as the others: the vendor’s own public pages, read in October 2026. The Estonia items are open questions for every vendor, SurgePV included. Where a page does not state a feature, we say Not stated.
Sources and Dates
Estonian quote facts were read in November 2026 from the Elektrilevi connection-fee methodology, in force from 1 May 2025, the ERR report from spring 2025 and the ERR report of May 2023.
Vendor pages were read in October 2026. Sources are the vendor links and help articles in each entry above. SurgePV facts come from its own pricing page and proposal software page.
See SurgePV on your own project
Book a guided demo and ask for the Estonia items you need in the quote.
Book a Free DemoGo Deeper on a Category
- Solar software in Estonia
- Solar design software for Estonia
- Best solar proposal software, all markets
- Aurora Solar alternatives
Frequently Asked Questions
What is the best solar proposal software in Estonia?
It depends on what the quote must show. The vendor pages we read do not name Estonia, so pick by what you can enter yourself. OpenSolar’s core app is free and takes a custom tariff. Aurora Solar lets you enter a fixed export rate. Energy Toolbase compares cash, loan, lease and PPA options. SurgePV lists proposal generation in one product with roof modeling, priced per user.
Is there free solar proposal software for Estonia?
OpenSolar says its core app is free for solar professionals. It charges for API Access and supported connectors from 16 April 2026. Its help article lists 13 proposal languages. The other tools here are paid, and the pages we read show no free plan for them. SurgePV offers a guided demo and no self-serve trial.
Can proposal software show Estonia tariffs and local currency?
No vendor page we read names Estonia tariffs or a Estonia price list. OpenSolar and Aurora Solar let you enter custom tariffs. Enter the rate for your client’s class from your utility, and check that the proposal prints the currency you want.
Which proposal tools support Estonia languages?
The pages we read do not say which tools offer a Estonia interface or proposal template. OpenSolar’s help article lists English, Dutch, Swedish, Spanish, French, Norwegian, Thai, German, Polish, Portuguese, Italian, Danish and Finnish, and says a proposal template must be translated by hand. Check the language list before you buy.
How much does solar proposal software cost for Estonia installers?
No vendor on this page lists a Estonia price on the pages we read. Aurora Solar Basic is $159 per user per month billed monthly, or $135 per user per month billed annually. Energy Toolbase does not publish a price for ETB Developer. OpenSolar’s core app is free. SurgePV Individual is $1,899 per user per year. Ask each vendor for a written quote.


