Intent note: this list covers quotes and customer proposals for Cyprus. For layout, diagram and yield tools, see the design list for Cyprus.
A Cyprus quote must name its compensation scheme, since net metering, net billing and virtual net billing are separate schemes. So the useful question is what you can enter yourself. OpenSolar’s core app is free and takes a custom tariff. Aurora Solar lets you enter a fixed export rate. Energy Toolbase compares cash, loan, lease and PPA (power purchase agreement) options. SurgePV lists proposal generation with roof modeling, priced per user. No vendor lists a euro price on the pages we read.
This is a desk read of public vendor pages, checked October 2026, with no side-by-side runs. SurgePV publishes this page and is one of the four tools on it. We did not read Cyprus utility or regulator pages for the vendor entries, so take local tariffs, incentives and rules from your utility or regulator.
Solargraf, which an earlier version of this page listed, is not compared here. Its site, solargraf.com, returned HTTP 403 to automated reads in October 2026.
Criteria used: tariff entry, export-credit setting, Greek or English proposal language, price in a published currency, free start.
Want to see SurgePV on your own project?
Book a guided demo and bring a real site. We walk through design, yield, finance and the proposal in one platform.
Book a Free DemoChecking cost first? See the SurgePV pricing page.
Best-For Picks for Cyprus
- A Cyprus quote that must state the compensation scheme: a tool with editable export and credit settings. The European Commission’s Cyprus solar page describes net metering, net billing and virtual net billing as separate schemes, so a quote has to name which one it assumes.
- Entering a fixed export rate: Aurora Solar. Its help article has a “Fixed export rate” field. It gives the unit as “$ per kWh”, so check how it handles local-currency.
- Comparing cash, loan, lease and PPA options: Energy Toolbase. Its FAQ says the platform supports “cash purchases, power purchase agreements (PPAs), loans, and leases”. It does not publish a price.
- Entering your own tariff in a free core app: OpenSolar. Its tariff article lists flat, time-of-use, tiered and demand rates, and several ways to credit exports. The core app is free. The vendor charges for API Access and connectors from 16 April 2026.
- Roof model to bill of materials and proposal in one product, priced per user: SurgePV. It lists roof modeling, shading, yield, financial modeling, bill of materials and proposals. Ask in a demo how it handles a Cyprus tariff and local-currency. Its published scope names neither.
Comparison Table
The tools are in alphabetical order. This is not a ranking. Pick by the situation above. Prices checked October 2026 on each vendor’s own page.
| Tool | Best for | Price | Free or paid | Decisive scope fact |
|---|---|---|---|---|
| Aurora Solar | Fixed export rate and custom rates | Basic $159 per user per month (monthly billing); $135 billed annually | Paid | Compensation policy: net billing or feed-in tariff |
| Energy Toolbase | Cash, loan, lease and PPA comparisons | Not published (book a demo) | Paid | Works with partner design tools |
| OpenSolar | Custom tariff, free core app | Core app free of charge; API Access and connectors charged from 16 April 2026 | Free core app, paid API and connectors | 13 proposal languages |
| SurgePV | Roof model to BOM and proposal, per user | $1,899 per user per year (1 user), in US dollars | Paid, guided demo | BOM and proposal generation in scope |
Cyprus Criteria Matrix
Each cell says Documented, Partial or Not stated. Documented means the vendor’s own page states it. Partial means the page states only part of it, or states it for other countries. Not stated means the pages we read in October 2026 do not mention it. There are no scores or weights.
| Tool | Tariff entry | Export-credit setting | Local-language proposals | Price in a published currency | Free start |
|---|---|---|---|---|---|
| Aurora Solar | Documented (custom rates, or Genability and Aurora rates) | Documented (fixed export rate; net billing or feed-in tariff) | Not stated | Partial (dollar figures; currency not named) | Not stated |
| Energy Toolbase | Partial (utility rates team described; Cyprus not named) | Not stated | Not stated | Not published for ETB Developer | Not stated |
| OpenSolar | Documented (custom tariff) | Partial (several credit options; none named for Cyprus) | Partial (13 proposal languages; see the entry) | Documented (core app free) | Documented |
| SurgePV | Partial (financial modeling; no tariff entry described) | Not stated | Not stated | Partial (USD only) | Not stated (guided demo) |
Two things stand out. No vendor page we read names Cyprus. The tools differ most on whether you can enter a tariff and an export rate yourself. A tool that is Not stated on a row may still do it, so ask each vendor to build one real Cyprus quote before you buy.
Tool Entries
Aurora Solar
Best for: a Cyprus team that must name net billing or a feed-in tariff in the quote and wants a fixed export rate field in a design tool.
Not the right choice if: the client expects a Greek-language proposal or a euro price. Neither appears on the pages we read, which show dollar figures only. Aurora also has no free plan; the pages list paid plans and a custom Enterprise plan.
What the vendor documents: on its pricing page, all plans list 3D roof modeling, proposal templates, custom pricing methods and a utility rate database. The page says you can “Configure your own rates or use rates from Genability and Aurora”. Web and PDF proposals and financing comparisons are listed too. Premium adds battery modeling and bankable shade reports. The help article says “With Feed-in tariff, Aurora credits all the energy the system produces at a tariff rate”.
Price (checked October 2026): Basic $159 per user per month billed monthly, or $135 per user per month billed annually ($1,620 billed annually). Premium $259 per user per month, or $220 per user per month billed annually ($2,640 billed annually). Enterprise is custom, per project. The page shows a dollar sign and does not name the currency.
Limitations: the article gives the fixed export rate unit as “$ per kWh”. The pricing page lists North America and Europe regions. The pages we read do not name Cyprus.
Vendor link: aurorasolar.com

Energy Toolbase
Best for: a Cyprus commercial or storage project where the owner wants cash, loan, lease and PPA options side by side.
Not the right choice if: you need a published price. The pricing page asks you to book a demo. It is also not right if you need a roof design tool you can confirm is built in. The ETB Developer page lists “PV design partnerships with leading design software tools”. Ask the vendor about layout.
What the vendor documents: the ETB Developer page lists proposals, quick financial analysis, “up-to-date utility rates” and lead management. It says the platform tracks “120k+” utility rates. Its FAQ says it supports “cash purchases, power purchase agreements (PPAs), loans, and leases”. It is web-based.
Price (checked October 2026): not published for ETB Developer. The pricing page says “Book 30 minutes” for a demo and pricing for your team size. Dollar figures on that page belong to its ETB Controller and ETB Monitor products.
Limitations: the pages we read do not name Cyprus or local-currency, and do not say which countries the utility rates cover.
Vendor link: energytoolbase.com

OpenSolar
Best for: a small Cyprus installer that will type in the local tariff by hand and wants a free core app with a choice of proposal languages.
Not the right choice if: you need a proposal language outside the list. The language article lists English, Dutch, Swedish, Spanish, French, Norwegian, Thai, German, Polish, Portuguese, Italian, Danish and Finnish. The article says a proposal template must be translated by hand.
What the vendor documents: a custom tariff with flat, time-of-use, tiered and demand rates, plus a choice of how exports are credited. The choices are Net Billing, Net Billing with Credit Carryover, Buy All, Sell All and Net Energy Metering. The article does not say which one fits a given country’s program.
Price (checked October 2026): the core app is free of charge for solar professionals, per the vendor. From 16 April 2026 the vendor charges for API Access, a per-project fee, and for supported connectors, a flat monthly subscription. Source: its 16 February 2026 post and its API page.
Limitations: the pages we read do not name Cyprus or local-currency.
Vendor link: opensolar.com

SurgePV
SurgePV is our product.
Best for: Cyprus teams that want roof modeling, array layout, shading and yield, then a bill of materials and proposal from the same model, priced per user. Settle the Cyprus tariff and euro questions in a demo. See solar proposal software for the product page.
Not the right choice if: you want a self-serve trial (SurgePV offers a guided demo) or a euro price in writing before talking to sales. Outputs support design and documentation and do not replace approval by the responsible engineer, authority, lender or utility.
What the vendor documents: 3D roof modeling, array layout, shading analysis, energy-yield modeling, financial modeling, electrical workflow support, bill-of-materials output and proposal generation.
Price (checked October 2026): $1,899 per user per year for 1 user, $1,499 per user for 3 seats, $1,299 per user for 5 seats, in US dollars. Confirm any local-currency amount and taxes in a written quote.
Limitations: results depend on source data, assumptions and equipment models. SurgePV’s published scope does not name a Cyprus tariff, an export-credit setting, local-language proposals or a design size limit.
Vendor link: surgepv.com.

Cyprus Compensation Schemes and Fees a Quote Has to Name
The European Commission’s clean energy islands database describes how Cyprus compensates rooftop and ground PV in its solar energy page. The page does not give an effective date for each detail, so the list below is a set of questions for the customer’s supplier, not a current rulebook.
Net metering. Timing caveat: the pv magazine report of 13 October 2025 says the net metering and net billing schemes end on 31 December 2025 and that a new CERA self-consumption framework starts on 1 January 2026, with the term set between consumer and retailer. The European Commission page is undated and does not show that change, and the CERA decision text was not read, so the figures below describe the earlier scheme. The page says net metering covers rooftop and ground PV for domestic and private users up to 10 kW and runs for 15 years, or 12 years for public schools. The application fee is listed as EUR 332.35 plus VAT. A proposal for a household should show the term, because payback is calculated over it.
Net billing. The page says net billing applies to systems installed on the premises of individuals or entities for self-consumption. For households it applies where a subsidy is received under the Energy Efficiency, Upgrading of Domestic Buildings scheme, with rooftop PV up to 10 kW eligible for that subsidy. Commercial and industrial net billing is promoted without a subsidy.
Virtual net metering and net billing. A PV system can sit on a different building from the one using the energy. That changes a proposal, because the generation site and the billed meter differ. The page names residential, agricultural and wine-making uses for virtual net metering.
Subsidy categories. The page lists a scheme for rooftop PV under net metering with three categories: general, vulnerable people and “PVs for All”. A proposal that mentions a grant should name the category and ask the customer to check that it is open.
Energy communities. Under Article 37 of Law 107(I)/2022, communities may generate, consume, store and sell RES energy between themselves through renewable energy contracts. The page says the framework is still under development, so a shared-ownership quote needs a legal check.
What this means for tool choice. Cyprus has several compensation schemes, so the proposal tool must let you change the credit logic, the term and a grant line, and show output in the customer’s language. We have not verified which tools let you do that for each scheme, so test one real bill and one scheme in a demo.
How We Ordered These Tools
We did not rank these tools. They are alphabetical, and for a Cyprus quote the picks follow the matrix above.
- Tariff entry: a Cyprus quote must use the client’s tariff class. We did not assess how any tool prices time-of-use or tiered rates.
- Export-credit setting: net billing and net metering credit exports differently. We did not assess whether any tool can model the Cyprus schemes.
- Local-language proposals: Cypriot clients read Greek or English. We did not assess translation quality.
- Price in a published currency: a euro price would show what a Cyprus buyer pays. We did not assess discounts or negotiated quotes.
- Free start: a free plan lets a small installer try the workflow. We did not assess any plan limits beyond what a page states.
Methodology and Disclosure
SurgePV is published by SurgePV, which is also one of the vendors on this list. Its entry follows the same template and sources as the others: the vendor’s own public pages, read in October 2026. The Cyprus items are open questions for every vendor, SurgePV included. Where a page does not state a feature, we say Not stated.
Sources and Dates
Cyprus compensation facts come from the European Commission’s clean energy islands solar page, read in November 2026. The CERA and EAC sites were not readable by our fetch, so no figure is taken from them.
Vendor pages were read in October 2026. Sources are the vendor links and help articles in each entry above. SurgePV facts come from its own pricing page and proposal software page.
See SurgePV on your own project
Book a guided demo and ask for the Cyprus items you need in the quote.
Book a Free DemoGo Deeper on a Category
- Solar software in Cyprus
- Solar design software for Cyprus
- Best solar proposal software, all markets
- Aurora Solar alternatives
Frequently Asked Questions
Which compensation scheme should a Cyprus solar proposal assume?
The European Commission’s undated Cyprus solar page describes net metering (15 years for private users up to 10 kW, a listed EUR 332.35 plus VAT application fee), net billing and virtual net billing as separate schemes. As of October 2025, pv magazine reported that a new CERA self-consumption framework replaces net metering and net billing from 1 January 2026. A proposal should name one scheme, its term and any grant category, and the customer should check that scheme with the grid operator.
What is the best solar proposal software in Cyprus?
It depends on what the quote must show. The vendor pages we read do not name Cyprus, so pick by what you can enter yourself. OpenSolar’s core app is free and takes a custom tariff. Aurora Solar lets you enter a fixed export rate. Energy Toolbase compares cash, loan, lease and PPA options. SurgePV lists proposal generation in one product with roof modeling, priced per user.
Is there free solar proposal software for Cyprus?
OpenSolar says its core app is free for solar professionals. It charges for API Access and supported connectors from 16 April 2026. Its help article lists 13 proposal languages. The other tools here are paid, and the pages we read show no free plan for them. SurgePV offers a guided demo and no self-serve trial.
Can proposal software show Cyprus tariffs and local currency?
No vendor page we read names Cyprus tariffs or a Cyprus price list. OpenSolar and Aurora Solar let you enter custom tariffs. Enter the rate for your client’s class from your utility, and check that the proposal prints the currency you want.
Which proposal tools support Cyprus languages?
The pages we read do not say which tools offer a Cyprus interface or proposal template. OpenSolar’s help article lists English, Dutch, Swedish, Spanish, French, Norwegian, Thai, German, Polish, Portuguese, Italian, Danish and Finnish, and says a proposal template must be translated by hand. Check the language list before you buy.
How much does solar proposal software cost for Cyprus installers?
No vendor on this page lists a Cyprus price on the pages we read. Aurora Solar Basic is $159 per user per month billed monthly, or $135 per user per month billed annually. Energy Toolbase does not publish a price for ETB Developer. OpenSolar’s core app is free. SurgePV Individual is $1,899 per user per year. Ask each vendor for a written quote.


