Back to Best Solar Software
Best ListBest-Of List5 tools compared

Best Solar Design Software in Portugal (2026): 5 Tools Compared

5 solar design software tools compared for Portugal on scope, language support and published price. SurgePV publishes this list and is one of the 5. Checked November 2026.

SurgePV publishes this list and sells solar design and proposal software, so we have a commercial interest in this category. This is a desk comparison of what each vendor publishes; we have not run side-by-side tests. Prices and vendor facts checked November 2026. How we evaluate software

Published Last updated
Rainer Neumann

Written by

Rainer Neumann

Editorial contributor · SurgePV

Keyur Rakholiya

Edited by

Keyur Rakholiya

CEO & Co-Founder · SurgePV

Portuguese design work starts from the UPAC power band: up to 700 W without injection is exempt, up to 30 kW needs a comunicacao previa, up to 1 MW a registo previo, and above that licences apply. Five tools are compared with that ladder in mind: Aurora Solar, HelioScope, OpenSolar, PVsyst and SurgePV. Facts come from each vendor’s public pages, and prices stay in each vendor’s own currency, unconverted.

The tool facts were read from vendor pages in October 2026 and the UPAC rules from ADENE’s legislative guide. No side-by-side runs were done. SurgePV publishes this page and is one of the 5 tools on it. For markets beyond Portugal use the global design list.

Criteria used: roof and array design, shading and yield, financial modeling and proposals, diagram and bill-of-materials output, Portuguese language support, and published price.

Disclosure and methodology: SurgePV publishes this page and is a vendor with an interest in the result. Only each tool’s own public pages are used for tool facts. See How We Ordered These Tools and Sources and Dates below.

Working on a Portuguese project? See SurgePV on it

Book a guided demo and bring a real site. We walk through design, yield, finance and the proposal in one platform.

Book a Free Demo

Checking cost first? See the SurgePV pricing page.

Best-For Picks for Portugal

  • Household plants up to 30 kW sold with financing: Aurora Solar. Aurora’s pricing page lists tablet-friendly proposals and integrated financing, the fit for a comunicacao previa sale. Its help pages give P50 yield only.
  • Registo previo plants from 30 kW to 1 MW with storage: HelioScope. HelioScope’s pricing page shows Basic up to 1.25 MW DC, which spans that whole band, and P90 values on Pro for the file the network operator reads.
  • Small comunicacao previa jobs on a free core app: OpenSolar. OpenSolar says the core app stays free and lists Portuguese among its proposal languages. Only API Access and supported connectors are charged.
  • Yield evidence for an ORD connection request or a lender: PVsyst. Its help describes P50 to P90 evaluations and its translations include Portuguese. Windows only.
  • A diagram and bill of materials a qualified technician can sign: SurgePV. One per-user design model, at $1,899, $1,499 or $1,299 per year by seat count on the pricing page. The termo de responsabilidade needs a named person to review the pack.

Comparison Table

Listed alphabetically. This is not a ranking; pick by the situation above.

Tool Best for Price (checked Oct 2026) Free or paid One decisive scope fact
Aurora Solar Residential sales and design Basic $159 per user per month, or $135 billed annually; Premium $259, or $220 billed annually. Aurora pricing Paid Basic and Premium each include 1 user and 50 projects per month
HelioScope Commercial solar-plus-storage Basic $159 per license per month or $1,620 per year; Pro $259 per month or $2,640 per year. HelioScope pricing Paid; vendor lists a free trial Designs up to 1.25 MW DC (Basic), 5 MW (Pro), 30 MW (Enterprise)
OpenSolar Teams that want a free core app Core app free; API Access and connectors charged from 16 April 2026. OpenSolar, 16 Feb 2026 Free core app, paid API and connectors Single line diagram generator and automatic bill of materials inside the app
PVsyst Yield evidence CHF 700 per year (PVsyst 8 Professional) Paid, one-month trial Documents P50 to P90 evaluations; Windows only
SurgePV Design plus proposals in one subscription Individual $1,899 per user per year (1 user); 3 seats $1,499 per user per year; 5 seats $1,299 per user per year. SurgePV pricing Paid; guided demo, no self-serve trial Roof modeling, layout, shading, yield, financial modeling, BOM, proposals

How Portugal’s UPAC Power Bands Shape Design Work

Portugal sorts self-consumption plants (UPAC) into bands by installed power, and each band needs different design paperwork. The rules below come from the ADENE Autoconsumo e Comunidade de Energia Renovavel: Guia Legislativo (Manual Digital, dated 19 October 2022). ADENE is the national energy agency. The guide predates this page, so check DGEG for later amendments before you fix a design scope.

The four bands. The guide lists exemption from prior control for plants up to 700 W with no injection into the public grid (RESP). Above 700 W and up to 30 kW it requires a comunicacao previa. Above 30 kW and up to 1 MW it requires registo previo and a certificado de exploracao. Above 1 MW, production and operating licences apply. For comunicacao previa, the guide says the applicant registers on the DGEG electronic platform, uploads supporting documents and receives an automatic proof of submission that lets installation begin. Once built, start-up is recorded on the platform together with a termo de responsabilidade signed by a qualified technician stating that the installation meets the applicable rules.

What that means for a design tool. A 9 kW home roof and a 250 kW industrial roof are different jobs. For the first, the design file feeds a short platform submission and a technician’s declaration. For the second, the file has to support a registration that asks the network operator (ORD) to rule on grid connection. The guide says the ORD has 20 days after validation to state whether technical connection conditions exist, in order of request, and that a refusal for lack of injection capacity should only occur if capacity cannot be allocated with restrictions or the applicant wants firm capacity. For 700 W to 30 kW plants with injection, DGEG asks the ORD for connection conditions within 30 days and the ORD supplies them with a quote within the following 60 days. A tool that models a clipped or limited export profile helps here, because the design may have to be adjusted to restricted injection capacity. Check that the tool lets you set an export limit and re-run yield.

Installer qualification. The guide says UPAC installations above 700 W must be carried out by a registered electrical installation entity or a responsible technician under Law 14/2015 and Decree-Law 96/2017. The design deliverable is therefore a document that a named, qualified person signs, so the single line diagram and bill of materials in the tool should be easy for that person to review and edit.

Storage and condominiums. The guide says that when production comes with storage, the prior-control procedure for production covers the storage activity, and stand-alone storage has its own procedure. Where the roof is a shared part of a building, it says prior communication to the condominium administration and the owner is needed. Titles go to the individual self-consumer, the condominium, the collective-self-consumption manager (EGAC) or the renewable energy community, so the design file may have to name the right holder.

Choosing by band. For plants up to 30 kW, speed from roof to diagram and bill of materials matters most, which favours OpenSolar’s free automatic bill of materials and diagram or SurgePV’s single-product design flow. Between 30 kW and 1 MW, HelioScope (up to 1.25 MW DC on Basic) or PVsyst’s P50 to P90 evaluation gives yield evidence for the registration file and a lender. None of the vendor pages we read states Portuguese regulatory output, so treat these as fit-by-feature matches, not endorsements.

Language Support for Portugal

Portuguese is the language that matters here. OpenSolar’s proposal language article and PVsyst’s languages page both list it. For Aurora, HelioScope and SurgePV the pages read state no interface or proposal languages. None of the pages names a Portuguese grid operator, tariff or permit rule; those come from DGEG, the network operator and the UPAC bands above. SurgePV’s published scope is on the solar design workflow and shading analysis pages.

Tool Entries

Listed alphabetically. This is not a ranking; pick by the situation above.

Aurora Solar

Best for: sales teams quoting Portuguese homes up to 30 kW who want financing and proposals in one tool.

Not the right choice if: you design commercial roofs (Aurora lists HelioScope for that) or need a P90 figure for an ORD request, since Aurora outputs P50 only.

What the vendor documents: 3D roof modeling and trees, performance simulation and automated panel placement. It also lists tablet-friendly proposals and integrated financing. It has an AHJ database of more than 25,000 US jurisdictions. AHJ means the local permit office. Premium adds LIDAR-assisted modeling (laser measuring of the site), bankable shade reports and battery modeling. Enterprise adds unlimited users and a contract manager (the pricing page tooltip says e-signature tools). It also adds APIs (links that let other software connect). Enterprise also adds drone mapping, dealer and team configurations, and advanced user permissions. It adds access to plan sets, engineering stamps and professional services. Aurora’s help centre lists a DXF export, a file other drawing programs can open. It also lists a Single-Line Diagram Editor. A single-line diagram is a simple drawing of how the system is wired. The article says the editor is only available in Europe.

Price (checked October 2026): Basic $159 per user per month billed monthly, or $135 billed annually ($1,620 per year). Premium $259 monthly, or $220 billed annually ($2,640 per year). Enterprise is custom. See Aurora’s pricing page.

Limitations: Plan sets and engineering stamps are add-ons, and Basic and Premium each include one user. Per its help article a P50 value is expected to be met in 50% of years, and P90 is not produced natively.

Vendor link: aurorasolar.com

Aurora Solar public website page, captured 29 October 2026
Aurora Solar public website capture, captured 29 October 2026. This shows the vendor's website, not a test inside the software.

HelioScope

Best for: installers handling Portuguese registo previo plants with carports or storage, within 1.25 MW DC on Basic.

Not the right choice if: homes and financing drive the sale. HelioScope’s site targets commercial work.

What the vendor documents: Rooftop, carport, ground-mount and battery layout on all plans. It also lists CAD (computer-aided design) export and single-line diagrams. It lists an 8760 production report (one result for each hour of the year) and shade reports too. The production report also lists a bill of materials with module, wire and inverter quantities (see the help article). Pro adds LIDAR-assisted modeling, storage modeling and financial analysis tools. Pro also adds customizable reports, sales proposals, and P90, P95 and P99 values. Enterprise adds single-axis trackers, designs up to 30 MW DC and export to PVsyst.

Price (checked October 2026): Basic $159 per license per month, or $1,620 per license per year. Pro $259 per month, or $2,640 per year. Enterprise is custom per project. See HelioScope’s pricing page. The standard free trial lasts 14 days, per its help article.

Limitations: One user per Basic or Pro license, 10 projects a month on Basic (120 on annual billing), and financials plus proposals only from Pro.

Vendor link: helioscope.aurorasolar.com

HelioScope public website page, captured 29 October 2026
HelioScope public website capture, captured 29 October 2026. This shows the vendor's website, not a test inside the software.

OpenSolar

Best for: small Portuguese installers that want design, proposal and bill of materials without a seat fee.

Not the right choice if: you push data to a CRM, accounting or reporting tool, because API Access and connectors are charged from 16 April 2026.

What the vendor documents: Two energy calculators, per its help center article. The calculators are PVWatts 6 at hourly resolution and the System Advisor Model with 3D shading. Its site lists an automatic bill of materials and a single line diagram generator. The generator has templates for Australia, the US, the UK, Germany, Italy and Spain on its marketing page. Its help article lists templates for Australia, New Zealand, the US, Canada, the UK, France, Germany, Italy, Spain and India. The site also lists Sales Machine proposals and Auto Design, which it labels beta. It also lists the ability to design and sell commercial systems.

Price (checked October 2026): The core app is free of charge for solar professionals, per the vendor. The vendor says partners fund it (Why Free page). From 16 April 2026 the vendor charges for API Access and supported connectors. API Access lets other software connect, and it is a per-project fee. The per-project API fee is on OpenSolar’s API page. Supported connectors are a monthly fee per organization. The 16 February 2026 post says accounting connectors are billed as a monthly fee per organization. Optional paid Enterprise Services: Support US$500 per month, Customize US$1,350 per month, Enterprise custom (Enterprise Services page). Premium imagery is pay per image (price shown in the app).

Limitations: The pages read show no maximum system size and no Portugal-specific output.

Vendor link: opensolar.com

OpenSolar public website page, captured 29 October 2026
OpenSolar public website capture, captured 29 October 2026. This shows the vendor's website, not a test inside the software.

PVsyst

Best for: projects where an ORD request or lender wants a simulation report in a Portuguese-capable interface.

Not the right choice if: you want proposals from the same tool, a diagram with storage, or a Mac. The requirements page says Windows only.

What the vendor documents: a P50 to P90 evaluation. P50 and P90 are yields with a 50% and 90% probability of being exceeded in a year. The languages page says English is the reference language. It lists French among the translations. The documentation itself is not translated. The single line diagram page describes an editor and viewer for PV strings, inverters and transformers. It covers grid-connected systems only, leaves out storage, and calls the feature “still work in progress”. The economic evaluation help page covers feed-in tariffs and self-consumption.

Price (checked October 2026): CHF 700 per year for PVsyst 8 Professional, with grouped-order discounts of 5% for 2 to 4 licences, 15% for 5 to 9 and 20% for 10 or more. The product page offers a one-month free trial.

Limitations: No proposal output is described, and the diagram editor handles grid-connected systems only.

Vendor link: pvsyst.com.

PVsyst public website page, captured 29 October 2026
PVsyst public website capture, captured 29 October 2026. This shows the vendor's website, not a test inside the software.

SurgePV

SurgePV is our product, and we publish this list.

Best for: installers and EPC teams that want one per-user model producing layout, shading, yield, finance, diagram, bill of materials and proposal. See the solar design workflow, shading analysis and proposal software.

Not the right choice if: you want a self-serve trial (SurgePV offers a guided demo) or an approved engineering package. Outputs support design and documentation but do not replace the technician, DGEG, the network operator, lender or insurer. Its scope lists no CRM, monitoring or ERP. OpenSolar lists a free core app, and PVcase lists AutoCAD ground-mount engineering.

What the vendor documents: 3D roof modeling, solar array layout, shading analysis, energy-yield modeling, financial modeling, electrical workflow support, bill-of-materials output and proposal generation.

Price (checked October 2026): Individual $1,899 per user per year (1 user). 3 seats $1,499 per user per year, or $4,497 a year in total. 5 seats $1,299 per user per year, or $6,495 a year in total. See SurgePV pricing.

Limitations: results depend on input data, assumptions and equipment models, and contract terms come in a written quote. Ground-mount coverage and size limits are not on the pages used, so those cells read Not stated. Ask in the demo, and ask for a Portuguese sample.

Vendor link: SurgePV and Book a Free Demo

SurgePV public website page, captured 29 October 2026
SurgePV public website capture, captured 29 October 2026. This shows the vendor's website, not a test inside the software.

What to Ask a Vendor Before Buying

Bring one Portuguese project per band you work in, for example a 9 kW home and a 250 kW roof. Look for an export limit you can set with yield re-run, an equipment database holding the modules and inverters you buy, a diagram and bill of materials from the same design, and Portuguese output if your client reads it. Then compare the price in your invoicing currency. Where a vendor page is silent this page says Not stated, and a demo or trial settles it.

See SurgePV on a Portuguese project

Book a guided demo and bring a roof, the equipment and the files you must deliver.

Book a Free Demo

Live project walkthrough · No credit card required

How We Ordered These Tools

Alphabetical, no score. Picks follow what each vendor documents.

  • Roof and array design. Layout is the base of the technician’s file. Layout speed and roof-model accuracy are not assessed.
  • Shading and energy yield. Yield supports the ORD request and the financing. Match to measured output is not assessed.
  • Financial modeling and proposals. Customer-ready documents for household sales. Proposal quality is not assessed.
  • Electrical and bill-of-materials outputs. The diagram and parts list a technician reviews. Acceptance by DGEG or an operator is not assessed.
  • Language support. Portuguese lists are only those the vendors publish. Translation quality is not assessed.
  • Published price. A number before a demo. Discounts and total cost are not assessed.

Sources and Dates

Vendor pages were read in October 2026. Portugal UPAC rules come from the ADENE Guia Legislativo (19 October 2022), read in November 2026. Tool facts come from each vendor’s own public pages, linked here by tool. Aurora Solar (DXF export, Single-Line Diagram Editor, Aurora’s pricing page, help article). HelioScope (HelioScope’s site, help article, HelioScope’s pricing page, help article). OpenSolar (help center article, automatic bill of materials, single line diagram generator, help article, Sales Machine proposals, Auto Design, free of charge, Why Free page, OpenSolar’s API page, 16 February 2026 post, Enterprise Services page, opensolar.com). PVsyst (requirements page, P50 to P90 evaluation, languages page, single line diagram page, economic evaluation help page, CHF 700 per year for PVsyst 8 Professional, product page, pvsyst.com). SurgePV (SurgePV pricing).

Frequently Asked Questions

What is the best solar design software in Portugal?

Choose by UPAC band. Up to 30 kW, OpenSolar (free core app, Portuguese proposals) and Aurora Solar (financing) fit household sales, and SurgePV offers one design model. From 30 kW to 1 MW, HelioScope covers up to 1.25 MW DC on Basic and PVsyst adds P50 to P90 evidence. Run a sample Portuguese project through your shortlist.

Is there free solar design software for Portugal?

OpenSolar’s core app stays free; API Access and connectors are charged from 16 April 2026. PVsyst has a one-month trial and the rest are paid.

Which solar design software works in the local language in Portugal?

OpenSolar lists Portuguese among its proposal languages and PVsyst lists Portuguese among its translations. Aurora, HelioScope and SurgePV state no languages on the pages read, so ask each for a Portuguese sample.

How much does solar design software cost for Portugal teams?

Published prices differ in currency and unit, so they are not converted. Aurora Basic is $135 per user per month billed annually. HelioScope Basic is $1,620 per license per year. OpenSolar’s core app is free, with charges for API Access and connectors from 16 April 2026. PVsyst 8 Professional is CHF 700 per year. SurgePV Individual is $1,899 per user per year.

Can solar design software replace local approvals in Portugal?

No. ADENE’s guide says plants above 700 W need an installer or responsible technician under Law 14/2015 and Decree-Law 96/2017, and a signed termo de responsabilidade at start-up. Design output supports that file but does not replace the technician, DGEG or the network operator.

Which Portugal UPAC band decides what the design file must contain?

Per ADENE’s guide: up to 700 W without injection is exempt, above 700 W up to 30 kW needs comunicacao previa, above 30 kW up to 1 MW needs registo previo and a certificado de exploracao, and above 1 MW needs licences. Check DGEG for later amendments.

About the Contributors

Author
Rainer Neumann
Rainer Neumann

Editorial contributor · SurgePV

Rainer Neumann is credited as an editorial contributor on SurgePV content. This profile does not assert engineering credentials, project totals, software-testing experience, education, speaking engagements, or media citations because independent verification evidence is not retained in the publication record.

Editor
Keyur Rakholiya
Keyur Rakholiya

CEO & Co-Founder · SurgePV

Keyur Rakholiya is identified by SurgePV as its CEO and a company co-founder. His SurgePV author page lists only role information that can be tied to the public profile below; credentials, project totals, testing claims, media appearances, and speaking engagements are not asserted without retained evidence.

Ready to Design and Propose Faster?

SurgePV covers solar design, energy-yield modeling, financial modeling, and proposals in one platform. Book a guided demo to see it on a project like yours.

Choose which optional technologies SurgePV may use. Essential storage remains active for security and requested features.