Back to Best Solar Software
Best ListBest-Of List5 tools compared

Solar Design Software for Greece: 5 Tools Compared (2026)

Five tools compared on what each vendor publishes for Greek rooftop, island and ground-mount work: program language, euro prices, off-grid design, plant layout and tariff modeling. Checked October 2026.

SurgePV publishes this list and sells solar design and proposal software, so we have a commercial interest in this category. This is a desk comparison of what each vendor publishes; we have not run side-by-side tests. Prices and vendor facts checked October 2026. How we evaluate software

Published Last updated
Rainer Neumann

Written by

Rainer Neumann

Editorial contributor · SurgePV

Keyur Rakholiya

Edited by

Keyur Rakholiya

CEO & Co-Founder · SurgePV

Greek projects raise four questions for design software. Does the program run in Greek? What does it cost in euros? Can it design an island or off-grid system? Can it lay out a large ground-mount plant? On the pages we read, none of the five tools lists Greek as a program language. Only PV*SOL premium publishes a euro price. PV*SOL premium and PVsyst document off-grid design with a battery and a backup generator. RatedPower describes utility-scale plant layout. OpenSolar’s core app is free, and the vendor charges for API Access (a way for other software to connect) and connectors from 16 April 2026. Pick by the situation below.

This is a desk comparison of what each vendor publishes, checked October 2026. We have not run side-by-side tests. Local rules below come from HEDNO, IPTO and RAAEY, the Greek network operators and regulator. Tool facts come from each vendor’s own site. This page links the operators directly.

Criteria used: Greek program language, euro price, off-grid or island design, utility-scale plant layout, P50 to P90 yield evidence, feed-in or export tariff modeling. P50 to P90 yield numbers come with a stated chance of being exceeded. A feed-in tariff is a set price paid for power you send to the grid.

Want to see SurgePV on your own project?

Book a guided demo and bring a real site. We walk through design, yield, finance and the proposal in one platform.

Book a Free Demo

Checking cost first? See the SurgePV pricing page.

Best-For Picks for Greece

  • Island or off-grid design with a backup generator, and a euro price: PV*SOL premium. Its help pages describe off-grid systems with a battery and a backup generator. The shop page shows 845 euro plus VAT for a named-user license for one year. It runs on Windows 10 and 11 only.
  • Stand-alone design and grid-connected yield evidence: PVsyst. Its help describes stand-alone systems and a back-up generator. Its P50 to P90 tool is not available for stand-alone systems. It runs on Windows only.
  • Free core app for small roof jobs: OpenSolar. The vendor says the core app is free for solar professionals. API Access and connectors are charged from 16 April 2026. Its off-grid help article uses a 0 kW export limit.
  • Utility-scale ground-mount layout: RatedPower. Its pages describe string sizing, medium-voltage routing, single-line diagrams and tracker layout. It lists no price.
  • Roof model to bill of materials and proposal in one product, priced per user: SurgePV. It documents roof modeling, shading, yield, financial modeling, bill of materials and proposals. Ask in a demo about Greek items. Its published scope states no language list, off-grid design or utility-scale layout.

Comparison Table

Listed alphabetically. This is not a ranking; pick by the situation above. Prices checked October 2026 on each vendor’s own page.

Tool Best for Price Free or paid Decisive scope fact
OpenSolar Free core app, small roofs Core app free of charge; API Access and connectors charged from 16 April 2026 Free core app, paid API and connectors Greek not in its 13-language list
PV*SOL premium Euro price, off-grid design EUR 845.00 per named user per year, plus VAT Paid, trial download Windows 10 and 11 only
PVsyst Stand-alone design, yield evidence CHF 700 per year (Professional) Paid, one-month trial P50 to P90 not for stand-alone
RatedPower Utility-scale plant layout Talk to sales Paid Utility-scale PV, storage and hybrid
SurgePV Roof model to BOM and proposal, per user $1,899 per user per year (1 user), in US dollars Paid, guided demo No language list, off-grid or plant layout stated

Greece Criteria Matrix

Each cell is Documented, Partial or Not stated, based on the vendor pages we read in October 2026. Documented means the vendor’s own page states it for this task. Partial means the page states a related item. Not stated means the pages we read do not mention it. There are no scores or weights.

Tool Greek program language Euro price Off-grid or island design Utility-scale plant layout P50 to P90 yield evidence Feed-in or export tariff modeling
OpenSolar Not stated (13 languages listed; Greek not among them) Not published (core app free) Partial (0 kW export limit to mimic off-grid) Not stated Not stated Documented (help articles on tariffs and export rates by system size; no Greek rates stated)
PV*SOL premium Not stated (9 program languages listed; Greek not among them; shop page lists Greek under ‘Presentation’) Documented (EUR, plus VAT) Documented (help pages with backup generator) Partial (3D design up to 7,500 mounted modules) Partial (help topic; full feed-in only) Documented (feed-in tariff database and net-metering tariffs help page; Greek entries not stated)
PVsyst Not stated (12 languages listed; Greek not among them) Not published (CHF) Documented (stand-alone systems, back-up generator) Partial (tracking strategies in help; plant layout not described) Documented (grid-connected only) Documented (feed-in tariff and self-consumption help page)
RatedPower Not stated Not published (talk to sales) Not stated (standalone storage projects described) Documented Partial (customer quote mentions exceedance scenarios) Not stated
SurgePV Not stated Not published (USD) Not stated Not stated Not stated Partial (financial modeling listed)

Two things stand out. No vendor page we read mentions IPTO, HEDNO or a Greek grid-code output. The tools differ most on language, currency and whether they document off-grid design. A tool that does not state an item may still support it, so ask each vendor to run one Greek project for you.

Tool Entries

OpenSolar

Best for: small installers who want a free core app for roof designs and proposals. Check the output against what your customer and HEDNO need.

Not the right choice if: you need Greek as a program or proposal language. The vendor names 13 languages and Greek is not one. It is also not right if you need documented P50 to P90 yield evidence. It is also not the right choice if you need plant layout for a large ground-mount site. The pages we read describe none.

What the vendor documents: its language article lists English, Dutch, Swedish, Spanish, French, Norwegian, Thai, German, Polish, Portuguese, Italian, Danish and Finnish. It says a proposal template must be translated by hand to show another language. Its off-grid article sets the export limit to 0 kW so that no power counts as exported. It also advises removing grid-based savings from the proposal. Its help center has a Utility Tariffs section with articles on choosing a utility tariff and on export rates based on system size.

Price (checked October 2026): the core app is free of charge for solar professionals, per the vendor. From 16 April 2026 the vendor charges for API Access (a per-project fee) and supported connectors (a flat monthly subscription). Source: its 16 February 2026 post and its API page. No euro price is published.

Limitations: the pages we read state no Greek tariff, grid-code output or P50 to P90 report.

Vendor link: opensolar.com.

OpenSolar public website page, captured 29 October 2026
OpenSolar public website capture, captured 29 October 2026. This shows the vendor's website, not a test inside the software.

PV*SOL premium

Best for: designers who want a euro price and off-grid design with a battery and a backup generator, for example on an island site.

Not the right choice if: you work on a Mac or in a browser (the system requirements list Windows 10 and 11). It is also not right if you need a Greek program language. The product page lists German, English, Spanish, French, Italian, Polish, Czech, Portuguese and Turkish.

What the vendor documents: on the product page, 3D design with shading analysis, battery and EV modeling, and an automatic circuit diagram. It also lists a product database of over 30,000 modules, and a 20-year financial analysis that uses a feed-in tariff database. The page says reports come in 24 languages but does not list them. The shop page lists Greek among its ‘Presentation’ languages and does not define that label. The help center has an off-grid systems page and a backup generator page. Its Bankability (P50, P90) topic gives P50 by default and a P90 or chosen P-value for the profitability calculation. It says this relates only to full feed-in. The climate data come from Meteonorm.

Price (checked October 2026): EUR 845.00 plus VAT for a named-user license, one year. A trial version is offered for download.

Limitations: the pages we read do not say which countries the feed-in tariff database covers, and they name no Greek tariff or grid-code output.

Vendor link: valentin-software.com.

PV*SOL premium public website page, captured 29 October 2026
PV*SOL premium public website capture, captured 29 October 2026. This shows the vendor's website, not a test inside the software.

PVsyst

Best for: engineers who need stand-alone design with a back-up generator, or yield evidence for a grid-connected project that a lender or insurer will read.

Not the right choice if: you need P50 to P90 numbers for a stand-alone system. The help says that tool is not available for them. It is also not right if you need proposals from the same tool, or a Greek program language. The languages page lists English plus French, German, Spanish, Portuguese, Italian, Turkish, Korean, Chinese, Japanese, Polish and Russian. The product page says it runs only on Windows.

What the vendor documents: the product page says you can design grid-connected, standalone or pumping systems. The help has a stand-alone systems definition and a back-up generator component. It also has a page on tracking strategies. Its P50 to P90 page says annual production has a 50% probability of exceeding the P50 value. It has a 90% probability of exceeding the P90 value. The economic evaluation page covers a fixed feed-in tariff over a contract period and self-consumption economics.

Price (checked October 2026): CHF 700 per year for PVsyst 8 Professional, with grouped-order discounts of 5% for 2 to 4 licenses, 15% for 5 to 9 and 20% for 10 or more. No euro price is published. The product page offers a one-month free trial.

Limitations: the pages we read describe no proposal output, no Greek tariff and no plant layout automation.

Vendor link: pvsyst.com.

PVsyst public website page, captured 29 October 2026
PVsyst public website capture, captured 29 October 2026. This shows the vendor's website, not a test inside the software.

RatedPower

Best for: developers and EPC teams (engineering, procurement and construction firms) that lay out utility-scale ground-mount plants, with or without storage.

Not the right choice if: your work is rooftops and small commercial roofs, because the pages we read describe utility-scale PV, storage and hybrid plants. It is also not right if you need a public price or a stated Greek program language. The pages we read give neither.

What the vendor documents: the home page describes design and engineering for utility-scale PV, storage and hybrid. The platform page lists string sizing, inverter and transformer selection, medium-voltage routing and single-line diagrams. It adds that storage can be standalone, DC-coupled or AC-coupled. It also lists a layout editor that moves trackers, roads and structures, and a module-by-module 3D ray-traced yield. A customer quote on that page mentions generation forecasts under different exceedance probability scenarios. The irradiance page says you can connect PVGIS, NASA POWER, SolarAnywhere, Solcast or Solargis, or bring your own file of typical-year weather data.

Price (checked October 2026): the pricing page lists Basic, Advanced and Enterprise plans, each as “Talk to sales”. No amount or currency is published.

Limitations: the pages we read describe no Greek tariff, grid-code output or off-grid PV design. They do describe standalone storage projects.

Vendor link: ratedpower.com.

RatedPower public website page, captured 29 October 2026
RatedPower public website capture, captured 29 October 2026. This shows the vendor's website, not a test inside the software.

SurgePV

SurgePV is our product.

Best for: teams that want roof modeling, shading, yield, financial modeling, bill of materials and proposals in one product, priced per user. They will confirm the Greek items in a demo.

Not the right choice if: you want a self-serve trial (SurgePV offers a guided demo). It is also not right if you need a euro price with VAT in writing before talking to sales. Ask for a quote, because this page quotes US dollars. Skip it too if you need documented off-grid design or P50 to P90 yield evidence. PV*SOL premium and PVsyst document them. The same goes for utility-scale plant layout, which RatedPower describes. Outputs support design and documentation. They do not replace approval by the responsible engineer, authority, lender or utility. SurgePV’s published product scope does not list a CRM. Monitoring and ERP are outside its scope.

What the vendor documents: 3D roof modeling, array layout and shading analysis. It also lists energy-yield modeling, financial modeling, electrical workflow support, bill-of-materials output and proposal generation. See solar design software for the product page.

Price (checked October 2026): $1,899 per user per year for 1 user, $1,499 per user for 3 seats, $1,299 per user for 5 seats, in US dollars.

Limitations: results depend on source data, assumptions and equipment models. The pricing page and published scope do not state a program language list, off-grid design, plant layout or a Greek grid-code output.

Vendor link: surgepv.com.

SurgePV public website page, captured 29 October 2026
SurgePV public website capture, captured 29 October 2026. This shows the vendor's website, not a test inside the software.

Greek Rules That Shape the Choice

Who runs the grid. IPTO describes itself as the Independent Power Transmission Operator (IPTO or ADMIE). HEDNO says it is the Operator of the Electricity Distribution Network and plays a leading role in integrating renewable energy sources (HEDNO, renewable energy sources). RAAEY is the Regulatory Authority for Energy, Waste and Water. Its about page says it is the national regulatory authority for electricity and natural gas. Its renewables licensing pages list applications for Electricity Production Certificates (RAAEY, RES licensing). The size limits for that process are not on the English pages we read, so check them before you design a large plant.

Islands have their own systems. HEDNO says Greece has 28 Non-Interconnected Power Systems, which include islands or clusters of islands. HEDNO is the operator of those systems and applies the NII Management Code (HEDNO, non-interconnected islands). So an island project follows different rules from a mainland one, and some sites may need battery or hybrid design. None of the five vendors says it follows the NII Management Code.

Grid capacity comes first. HEDNO runs a web tool in Greek. It shows the indicative capacity of the interconnected grid to absorb power from renewable and CHP stations, by area (HEDNO capacity tool). HEDNO says the data are for information only and do not replace its connection studies. HEDNO also lists a joint IPTO and HEDNO table of voltage limits for PV stations in rural areas. It is by regional unit, with editions up to August 2025 (HEDNO, voltage limits). A design tool cannot tell you whether the grid can take your plant, so read these before you design.

Offers expire. HEDNO issued a notice on stations under the “Photovoltaics on the Roof” and “Photovoltaics in the Field” Programmes. Stations not built by 1 August 2026, whose final connection offers had expired or whose grid capacity reservation had ended, could be reinstated. The owner had to pay a fee to DAPEEP and file a request by 15 September 2026. HEDNO says reinstated stations are not eligible for funding, because the Recovery and Resilience Facility deadlines have expired (HEDNO announcement). If you quote a client under either program, ask HEDNO for the status of the connection offer first.

Net metering and self-supply. HEDNO keeps connection forms for self-producers under Net Metering and Virtual Net Metering. Its application lists run up to October 2026 (HEDNO, net metering). Net metering counts the power you send to the grid against the power you take. Rules for new applicants have changed in recent years. We found no official English page that states the current export price, so this page prints none. Ask the customer’s supplier for the written terms, and use a tool that lets you enter your own rate.

Not covered here. This page does not cover building permits, fire rules or electrical standards for rooftop PV. We found no official English source for them. Ask your engineer and the local authority.

What to Ask a Vendor Before Buying

Ask each vendor for one sample project on a Greek roof or an island site. Then look for these items. First, whether the program and the report run in Greek. Second, a price in the currency you will be invoiced in. Third, off-grid or hybrid design if you work on islands. Fourth, a way to enter your supplier’s export rate. Fifth, yield evidence your lender will accept. Where a vendor does not publish a feature on the pages we read, the matrix says so. A demo or trial is the place to confirm it.

How We Ordered These Tools

SurgePV publishes this page and is a vendor on this list. Its entry uses the same vendor-page sources and template as every other tool here.

We did not rank these tools. They are listed alphabetically, and the best-for picks come from the matrix above.

  • Greek program language: a team that works in Greek saves time in a program it can read. We did not assess how complete any translation is.
  • Euro price: the currency shows what a Greek buyer will pay and whether VAT is added. We did not assess discounts or negotiated quotes.
  • Off-grid or island design: Greece has 28 island power systems that are not linked to the mainland grid. We did not assess whether any tool follows the NII Management Code.
  • Utility-scale plant layout: large ground-mount plants need layout, cable and transformer design. We did not assess how accurate any layout is.
  • P50 to P90 yield evidence: larger projects may need a report a lender or insurer will read. We did not assess acceptance by any Greek lender.
  • Feed-in or export tariff modeling: export income changes payback. We did not assess how any tool models Greek export terms.

Sources and Dates

Vendor pages were read in October 2026. OpenSolar (free, language and off-grid help articles above). PV*SOL (shop, product page, help pages above). PVsyst (shop, product page and help pages above). RatedPower (pricing, platform and irradiance pages above). SurgePV (pricing). Greek sources are the HEDNO, IPTO and RAAEY pages linked above, all read in October 2026. The HEDNO capacity tool is in Greek, and we read its terms of use. Several vendor sites load their text with scripts, and we read them in a browser. Aurora, HelioScope and PVcase are not compared here, so this list is narrower than every tool a Greek installer might meet.

See SurgePV on your own project

Book a guided demo and ask for the Greek items you need.

Book a Free Demo

Go Deeper on a Category

Frequently Asked Questions

What is the best solar design software in Greece?

It depends on the job. From what the vendors publish, PV*SOL premium has a euro price and documents off-grid design with a battery and a backup generator. PVsyst documents stand-alone systems and P50 to P90 yield evidence for grid-connected systems. OpenSolar’s core app is free. RatedPower describes utility-scale plant layout. SurgePV documents roof modeling, bill of materials and proposals in one product, priced per user. None of the five lists Greek as a program language on the pages we read.

Is there solar design software in Greek?

Not as a program language on the pages we read. PVsyst lists 12 languages and Greek is not one of them. PV*SOL premium lists 9 program languages, and Greek is not one of them. Its shop page lists Greek under ‘Presentation’ languages and does not define that label. OpenSolar lists 13 languages for proposals, and Greek is not one of them. RatedPower and SurgePV list no languages on the pages we read. Ask each vendor before you buy, because language lists change.

How much does solar design software cost in Greece?

Prices come in different currencies. OpenSolar’s core app is free, but the vendor charges for API Access and supported connectors from 16 April 2026. PV*SOL premium is 845 euro plus VAT (value-added tax) for a named-user license for one year. PVsyst 8 Professional is 700 Swiss francs per year. RatedPower says talk to sales. SurgePV lists 1,899 US dollars per user per year for one user. Only PV*SOL publishes a euro price.

Can solar design software handle Greek island and off-grid systems?

Some can. HEDNO, the distribution network operator, says Greece has 28 non-interconnected power systems, which include islands or clusters of islands. PV*SOL premium has help pages on off-grid systems with a backup generator. PVsyst documents stand-alone systems and a back-up generator component. Its help says the P50 to P90 tool is not available for stand-alone systems. OpenSolar’s help article sets the export limit to 0 kW to mimic an off-grid system.

Which software designs large ground-mount plants in Greece?

RatedPower describes itself as design and engineering software for utility-scale PV, storage and hybrid plants. Its pages list string sizing, medium-voltage routing, single-line diagrams and tracker layout. PVsyst documents tracking strategies for yield simulation. The pages we read for the other tools do not describe plant layout automation. None of the five states a Greek grid-code output.

Does design software check Greek grid capacity?

Not on the pages we read. HEDNO publishes its own tools. One shows indicative capacity of the interconnected grid by area, and the operator says it does not replace its connection studies. HEDNO and IPTO also publish a table of voltage limits for PV stations in rural areas by regional unit. Check those first, because a good design still needs a connection offer.

About the Contributors

Author
Rainer Neumann
Rainer Neumann

Editorial contributor · SurgePV

Rainer Neumann is credited as an editorial contributor on SurgePV content. This profile does not assert engineering credentials, project totals, software-testing experience, education, speaking engagements, or media citations because independent verification evidence is not retained in the publication record.

Editor
Keyur Rakholiya
Keyur Rakholiya

CEO & Co-Founder · SurgePV

Keyur Rakholiya is identified by SurgePV as its CEO and a company co-founder. His SurgePV author page lists only role information that can be tied to the public profile below; credentials, project totals, testing claims, media appearances, and speaking engagements are not asserted without retained evidence.

Ready to Design and Propose Faster?

SurgePV covers solar design, energy-yield modeling, financial modeling, and proposals in one platform. Book a guided demo to see it on a project like yours.

Choose which optional technologies SurgePV may use. Essential storage remains active for security and requested features.