Off-grid and mini-grid work is a large part of Ethiopia’s solar plan. Off-grid means no connection to the national grid. Hybrid means solar plus batteries plus a diesel generator. Pick your tool by that job first. HOMER Pro sizes mini-grids, which are small local power networks. PVsyst and PV*SOL premium both describe stand-alone systems with a battery and a backup generator. OpenSolar’s core app is free, and its help article shows an off-grid workaround. SurgePV’s published scope covers rooftop design, bill of materials and proposals, and does not list off-grid or mini-grid design.
This is a desk comparison of what each vendor publishes, checked October 2026. We have not run side-by-side tests. Local rules below come from Ethiopia’s Petroleum and Energy Authority (PEA) and the Ministry of Water and Energy. Tool facts come from each vendor’s own site. This page compares five tools. Earlier versions also listed Aurora Solar, HelioScope and PVcase. They are not compared here, because this page focuses on off-grid and mini-grid work.
Criteria used: stand-alone system type, backup generator in the model, water pumping systems, weather data, published price currency, yield evidence.
Want to see SurgePV on your own project?
Book a guided demo and bring a real site. We walk through design, yield, finance and the proposal in one platform.
Book a Free DemoChecking cost first? See the SurgePV pricing page.
Best-For Picks for Ethiopia
- Size a mini-grid with solar, batteries and a diesel generator: HOMER Pro. Its page says it simulates a hybrid microgrid for a full year and compares many system options. It lists diesel generators, batteries and solar arrays as parts of the model. The pages we read do not list roof layouts or wiring diagrams.
- Yield report for a stand-alone system or a water pump: PVsyst. Its pages describe stand-alone systems with a backup generator (“Genset”) and sun-tracking pumping systems. They also describe P50 to P90 yield results. P50 is a yield level expected to be met or exceeded in 50% of years, and P90 in 90% of years. Its single line diagram works only for grid-connected systems today.
- Stand-alone design with a 3D roof model, priced in euros: PV*SOL premium. Its help pages list a stand-alone system type and one with a backup generator. Its product page says all other PV*SOL design types are also in premium. It runs on Windows only.
- Free tool for a small off-grid quote: OpenSolar. The core app is free. Its help article says to set the export limit to 0 kW and use an off-grid proposal template. API Access (a way for other software to connect) and connectors are charged from 16 April 2026. It is not a mini-grid sizing tool.
- Rooftop jobs, from roof model to bill of materials (a parts list) and proposal, priced per user: SurgePV. Ask in a demo whether it uses weather data for your Ethiopian site. Its published scope does not say.
Comparison Table
Listed alphabetically. This is not a ranking; pick by the situation above. Prices checked October 2026 on each vendor’s own page.
| Tool | Best for | Price | Free or paid | Decisive scope fact |
|---|---|---|---|---|
| HOMER Pro | Mini-grid and hybrid sizing | Base $1,575 billed annually, or $187.50 per month (single user; currency not named) | Paid, free trial button | Models generators, batteries and solar; no roof layout listed |
| OpenSolar | Free small off-grid quotes | Core app free; API Access and connectors charged from 16 April 2026 | Free core app, paid API and connectors | Off-grid by setting export limit to 0 kW |
| PV*SOL premium | Stand-alone design with 3D shading | EUR 845.00 per named user per year, plus VAT | Paid, trial download | Stand-alone type with backup generator; Windows only |
| PVsyst | Stand-alone and pumping yield reports | CHF 700 per year (Professional) | Paid, one-month trial | Stand-alone, pumping and P50 to P90; Windows only |
| SurgePV | Rooftop design to proposal, per user | $1,899 per user per year (1 user) | Paid, guided demo | Roof model, BOM and proposals in scope; off-grid not listed |
Ethiopia Criteria Matrix
Each cell is Documented, Partial or Not stated, based on the vendor pages we read in October 2026. We list them under Sources and Dates. Documented means the page states it for this task. Partial means the page lists a related feature but not the whole item. Not stated means we did not find it on those pages. There are no scores or weights.
| Tool | Stand-alone system | Backup generator in model | Water pumping | Weather data | Price currency | Yield evidence |
|---|---|---|---|---|---|---|
| HOMER Pro | Documented (remote power systems, microgrids) | Documented (diesel generators) | Partial (Advanced Load module lists pumping as a deferrable load) | Documented (solar data downloaded or imported) | Partial ($ shown, currency not named) | Not stated |
| OpenSolar | Partial (set export limit to 0 kW) | Not stated | Not stated | Partial (hourly typical-year weather data; sources by country not read) | Partial (core app free; API Access and connectors charged from 16 April 2026) | Partial (vendor accuracy page says output is within 0.1% to 1.9% of PVsyst estimates; no P50 to P90 stated) |
| PV*SOL | Documented (stand-alone system type) | Documented (stand-alone with backup generator) | Not stated | Documented (Meteonorm 9, any location worldwide) | Documented (EUR, plus VAT) | Partial (P50 and P90 in the Bankability help topic, full feed-in only) |
| PVsyst | Documented (stand-alone systems) | Documented (“Genset”) | Documented (pumping systems) | Documented (seven databases) | Documented (CHF) | Documented |
| SurgePV | Not stated | Not stated | Not stated | Not stated (energy-yield modeling listed) | Documented (USD) | Not stated |
Two things stand out. HOMER Pro, PV*SOL and PVsyst describe a backup generator in their models. OpenSolar and SurgePV do not on the pages we read. No price on this page is in Ethiopian birr (ETB). Prices come in dollars, euros and Swiss francs, so ask each vendor how it invoices in Ethiopia.
Tool Entries
HOMER Pro
Best for: engineers who must size a mini-grid or remote power system with solar, batteries and a diesel generator. They can then compare the cost of each option.
Not the right choice if: you need a roof layout, shading drawing or wiring diagram. The pages we read describe a simulation and optimization model. They do not list a roof layout editor or single line diagram. Also look elsewhere if you need a P50 to P90 yield report, because the Pro pages we read do not state one.
What the vendor documents: the HOMER Pro page says the base license simulates and optimizes systems. These can use solar PV, wind, batteries, diesel generators and simple grid connections. It simulates a year of operation in time steps from one minute to one hour. The features table allows up to 20 generators, 10 solar arrays and 10 batteries. It lists solar data as “Download from Internet or import”. Optional modules add more. The Advanced Load module covers loads you can delay, such as pumping. The Advanced Grid module covers off-grid systems where a grid extension is possible. The vendor is UL Solutions.
Price (checked October 2026): HOMER Pro Standard, single user license. Base is $187.50 per month or $1,575 billed annually, with no modules. Professional is $373.50 per month or $3,100 billed annually, with any 4 modules and 6-hour training. Expert is $568.50 per month or $4,650 billed annually, with all modules. The page shows “$” and does not name the currency. It offers 25% off for 4 or more licenses through the sales team. It has a “Try It Free” button and does not state the trial length.
Limitations: results depend on the inputs you enter, such as load, fuel cost and weather. The pages we read do not mention Ethiopian rules.
Vendor link: homerenergy.com.

OpenSolar
Best for: small installers who want a free core app for simple off-grid quotes with a battery. You must check battery size and generator needs yourself.
Not the right choice if: you need to size a mini-grid or model a backup generator. The help article we read for off-grid design does not mention a generator. It is also not right if you need a P50 to P90 yield report, because the pages we read do not state one.
What the vendor documents: the off-grid help article says to set the Export Limit to 0 kW in Design > Advanced Settings. It also says to build an off-grid proposal template and remove bill savings and financial figures. It suggests the Load Profile Analysis to size the battery. The output article says it uses PVWatts version 6. That uses hourly typical meteorological year (TMY) weather data, a set of hourly weather values for a typical year. It also offers the System Advisor Model. The language article lists 13 translations: English, Dutch, Swedish, Spanish, French, Norwegian, Thai, German, Polish, Portuguese, Italian, Danish and Finnish. Amharic is not in that list.
Price (checked October 2026): the core app is free of charge for solar professionals, per the vendor. From 16 April 2026 the vendor charges for API Access and supported connectors. Source: its February 2026 post.
Limitations: the off-grid article describes a workaround, not a dedicated off-grid design mode. The pages we read do not mention Ethiopian weather files or rules.
Vendor link: opensolar.com.

PV*SOL premium
Best for: designers who want a 3D roof model with shading, plus stand-alone system types, at a euro price.
Not the right choice if: you work on a Mac or in a browser, because the system requirements list Windows 10 and 11. It is also not right if you need Amharic, since the interface list on the product page does not include it.
What the vendor documents: the help page on system types lists a “Stand-alone PV System” and a “Stand-alone PV System with Backup Generator”. Its off-grid page says the PV system, battery and generator must cover the consumption. It also describes load shedding, which switches off less important loads when energy runs short. The product page says all other PV*SOL design types are available in premium. It lists 3D shading, a circuit diagram, climate data from Meteonorm 9 for any location worldwide, and reports in 24 languages. The interface comes in German, English, Spanish, French, Italian, Polish, Czech, Portuguese and Turkish.
Price (checked October 2026): EUR 845.00 plus VAT for a named-user license, one year. A free trial version is offered for download.
Limitations: the Bankability help topic gives P50 by default and a P90 or self-selected P-value, and says this relates only to full feed-in. The pages we read do not mention Ethiopian rules.
Vendor link: valentin-software.com.

PVsyst
Best for: yield simulations for stand-alone systems and water pumps, and for larger projects where a lender or investor wants a P50 to P90 report.
Not the right choice if: you need a wiring diagram for a stand-alone system. The single line diagram help page says the diagram is only available for grid-connected systems. It adds that stand-alone and pumping systems “will follow in a future PVsyst version”. It is also not right if you work on a Mac or need proposals, because the pages we read describe none. The requirements page says it runs only under Windows.
What the vendor documents: the stand-alone page says these systems are built around battery storage. It says the controller may start a back-up generator (Genset) when the battery is empty and the sun gives too little. The product page lists stand-alone and pumping systems. It lists weather data from Meteonorm 9, NASA-Power, PVGIS-TMY, NLR/NSRDB TMY, Solcast TMY, Solar Anywhere TGY and Solargis. The P50 to P90 page calls them exceedance values: the yield has a 50% probability of exceeding P50 and a 90% probability of exceeding P90. The languages page lists English plus 11 translations. Amharic is not among them.
Price (checked October 2026): CHF 700 per year for PVsyst 8 Professional. Grouped-order discounts are 5% for 2 to 4 licenses, 15% for 5 to 9 and 20% for 10 or more. The product page offers a one-month free trial.
Limitations: the vendor pages we read do not mention Ethiopian rules or birr prices.
Vendor link: pvsyst.com.

SurgePV
SurgePV is our product.
Best for: teams that want roof modeling, shading, yield, financial modeling, bill of materials and proposals in one product for rooftop jobs, priced per user. Confirm Ethiopian weather data and outputs in a demo.
Not the right choice if: you design off-grid or mini-grid systems. SurgePV’s published scope does not list them. Choose HOMER Pro, PVsyst or PV*SOL premium for that work. It is also not right if you want a self-serve trial (SurgePV offers a guided demo). Nor is it right if you want a free tool for small jobs, where OpenSolar’s core app is free. Outputs support design and documentation but do not replace approval by the responsible engineer, authority, lender or utility. SurgePV’s published product scope does not list a CRM (customer tracking tool). It is not a monitoring or ERP (business management software) product.
What the vendor documents: 3D roof modeling, array layout and shading analysis. It also lists energy-yield modeling, financial modeling, electrical workflow support, bill-of-materials output and proposal generation. See solar design software for the product page.
Price (checked October 2026): $1,899 per user per year for 1 user. The 3-seat price is $1,499 per user, and the 5-seat price is $1,299 per user. All prices are in US dollars.
Limitations: results depend on source data, assumptions and equipment models. The published scope does not state off-grid design, a backup generator model, P50 to P90 outputs, Ethiopian weather data or a birr price.
Vendor link: surgepv.com.

Ethiopian Rules That Shape the Choice
Off-grid is a large part of the plan. The Ministry of Water and Energy (MoWE) says the National Electrification Program, launched in November 2017, targets universal access by 2025. It targets 65 percent of access with grid solutions and 35 percent with off-grid technologies, meaning solar off-grid systems and mini-grids. A survey cited in the same brief puts access at 44 percent, with 33 percent from the grid and 11 percent from off-grid solutions. The brief also lists the ADELE project. It includes solar-hybrid mini-grids, solar home systems and stand-alone solar for health and education sites (MoWE, Ethiopian Energy Sector Brief, January 2026). This is why the first criteria on this page are about stand-alone systems.
Who may do what. The same brief says private investors are allowed to operate off-grid PV systems for electricity. It says the Ethiopian Electric Utility (EEU) is the main agent for the grid program. It adds that transmission and supply through the integrated national grid is reserved for the government. It also says EEU has been developing solar mini-grids in nine regions since 2012 E.C. (the Ethiopian calendar), with 8,904 families connected.
Licenses. Energy Proclamation No. 810/2013, published on the PEA site, sets two paths in Article 6. A person who generates, distributes or sells electricity for commercial purposes needs a license. A person who generates electricity for non-commercial purposes must tell the Authority in advance. That person must also show documents that prove the environmental protection and safety conditions are met. Article 24 sets penalties for commercial work without a license. The MoWE brief says Energy Regulation No. 447/2019 deals with licenses and certificates of competency in more detail, and with electricity and grid access. We read the 2013 text only. Check with the PEA whether a later amendment changed it.
What we did not find. We found no rule on net metering or rooftop export in the sources above. Other papers mention a mini-grid directive. We did not find its text on the official sites we read, so we do not state its rules here. Ask the PEA for the current text before you plan a mini-grid.
Sun and weather data. The MoWE brief gives a multiyear average of 3.74 kWh/m2 per day for the country. It says annual radiation exceeds 2,100 kWh/m2 in the central part of North Ethiopia. Weather data matters for every tool above. Check which database your tool uses for your site.
Language and currency. The language lists we read for PVsyst, PV*SOL and OpenSolar do not include Amharic. The currency is the Ethiopian birr, and no price on this page is in birr.
What to Ask a Vendor Before Buying
Ask each vendor for one sample project, such as a 25 kW hybrid system for a health clinic. Then look for these items. First, the system type: stand-alone, hybrid or grid-connected. Second, whether the model includes a backup generator and how it is dispatched. Third, the weather data source for your exact site. Fourth, the price in the currency you will pay, with tax. Fifth, the language of the interface and the reports. A demo or trial is the place to confirm each item.
How We Ordered These Tools
SurgePV publishes this page and is a vendor on this list. Its entry uses the same vendor-page sources and template as every other tool here.
We did not rank these tools. They are listed alphabetically, and the best-for picks come from the matrix above.
- Stand-alone system: off-grid and mini-grid work is a stated priority of the national electrification plan. We did not assess how accurate any tool’s battery model is.
- Backup generator in model: hybrid systems often use a diesel generator. We did not assess whether any tool dispatches the generator well.
- Water pumping: the MoWE brief mentions solar water lifting for some households and farms. We did not assess pump libraries.
- Weather data: yield results depend on the weather file. We did not assess how accurate any database is for Ethiopia.
- Price currency: the currency shows what an Ethiopian buyer will pay and whether tax is added. We did not assess discounts or negotiated quotes.
- Yield evidence: larger projects may need a report a lender will read. We did not assess acceptance by any lender.
Sources and Dates
Vendor pages were read in October 2026. HOMER Pro (product, pricing, features). OpenSolar (free, off-grid article, languages). PV*SOL (premium, Bankability help topic). PVsyst (shop, product). SurgePV (pricing). Ethiopian sources are the Ministry of Water and Energy sector brief of January 2026 and Energy Proclamation No. 810/2013 on the Petroleum and Energy Authority site. Both are linked above and were read in October 2026. The proclamation scan is partly unclear, so we read Article 6 and Article 24 in the English column.
See SurgePV on your own project
Book a guided demo and ask for the outputs you need in Ethiopia.
Book a Free DemoGo Deeper on a Category
- Proposal software for Ethiopian installers
- Solar software in Ethiopia, all categories
- Off-grid solar design software, the topic list for stand-alone systems
- Solar design software in Kenya, a nearby country list
- Best solar design software, all markets
Frequently Asked Questions
What is the best solar design software for off-grid work in Ethiopia?
It depends on the job. HOMER Pro sizes mini-grids and hybrid systems with a diesel generator. PVsyst describes stand-alone and pumping systems and gives P50 to P90 yield results. PV*SOL premium lists stand-alone system types and has a euro price. OpenSolar’s core app is free and uses a 0 kW export workaround for off-grid quotes. SurgePV’s published scope does not list off-grid design.
Can I model a mini-grid with a diesel generator?
HOMER Pro lists diesel generators, batteries and solar arrays in its model. PVsyst and PV*SOL premium also describe a backup generator in a stand-alone system. The OpenSolar off-grid article we read does not mention a generator. SurgePV’s published scope does not list one.
Do I need a license to build a solar system in Ethiopia?
Energy Proclamation No. 810/2013 says commercial generation needs a license. For non-commercial generation you must tell the Authority in advance and show proof of environmental and safety conditions. The rules for mini-grids may add more steps. Ask the Petroleum and Energy Authority for the current text.
Which of these tools offer Amharic?
The language lists we read for PVsyst, PV*SOL premium and OpenSolar do not include Amharic. PVsyst lists 12 languages including English, and PV*SOL lists nine interface languages. OpenSolar lists 13 proposal translations. We found no language list for HOMER Pro or SurgePV, so ask them.
How much does solar design software cost for an Ethiopian business?
No price on this page is in Ethiopian birr. OpenSolar’s core app is free, but the vendor charges for API Access and supported connectors from 16 April 2026. HOMER Pro Base is $1,575 billed annually for one user. PV*SOL premium is 845 euro plus VAT (value-added tax) per named user per year. PVsyst Professional is 700 Swiss francs per year. SurgePV lists 1,899 US dollars per user per year for one user.
What weather data can I use for an Ethiopian site?
PVsyst lists seven weather databases, including Meteonorm 9, NASA-Power and PVGIS-TMY. PV*SOL premium uses Meteonorm 9 for any location worldwide. HOMER Pro lists solar data that you download from the internet or import. OpenSolar’s output article describes hourly typical-year weather data. SurgePV’s published scope does not name a weather source.