This list is for owners, operators and asset managers of commercial and utility solar plants. It does not cover the apps homeowners use for one system. Do you need contracts, invoices and compliance tasks next to performance data? Power Factors, meteocontrol and Amperecloud each document a module for that. AlsoEnergy PowerTrack suits teams that start from monitoring and want third-party data in one app. Its asset managers page lists portfolio financial reports, invoicing and PPA management. A PPA (power purchase agreement) is a contract to sell power at an agreed price. Raptor Maps and Sitemark start from inspection and field data. None of the six publishes a price on the pages we read.
This is a desk comparison of what each vendor publishes, checked October 2026. We have not run side-by-side tests.
Criteria used: contracts, invoices and reports; performance monitoring; maintenance and field workflow; published price.
Three tools from the earlier version of this list are not compared here. They are 3megawatt, Skyfri and Arbox. The reasons are in the section after the entries. Is your main need maintenance ticketing, not portfolio oversight? Then see our solar operations and maintenance (O&M) software list. O&M means the upkeep and repair work on a plant.
SurgePV publishes this page and is one of the vendors on this list.
Want to see SurgePV on your own project?
Book a guided demo and bring a real site. We walk through design, yield, finance and the proposal in one platform.
Book a Free DemoChecking cost first? See the SurgePV pricing page.
Best-For Picks by Use Case
- Contracts, invoices and compliance tasks in one platform: Power Factors. Its commercial asset management page lists plants, contracts, compliance requirements and financials in one place. It lists invoice and rate-schedule workflows.
- PPA billing, loan service and investor reporting for a PV portfolio: meteocontrol. Its mc Assetpilot page lists those workflows. The same vendor sells the VCOM Cloud monitoring platform.
- Investor reports and yield-loss claims tied to the KPIs in your O&M contract: Amperecloud. Its commercial asset management page lists custom KPIs per contract. KPIs (key performance indicators) are numbers that measure how well a plant is doing. The page lists a yield-loss calculation in money.
- Monitoring-led teams with utility, commercial and industrial (C&I) or aggregated residential assets: AlsoEnergy PowerTrack. Its page says it is hardware agnostic. That means it works with equipment from many makers. It takes non-native data from third-party vendors. That is data that does not come from AlsoEnergy’s own devices.
- Drone and robot inspection data feeding a digital twin: Raptor Maps. Its platform page covers an equipment-level digital twin. That is a computer copy of the plant. It also covers field-work workflows.
- Construction-to-operations records with inspections and work orders: Sitemark. Its pages cover both phases in one platform.
Comparison Table
Listed alphabetically. This is not a ranking. Pick by the situation above.
| Tool | Best for | Price (checked October 2026) | Demo or trial | Decisive scope fact |
|---|---|---|---|---|
| AlsoEnergy PowerTrack | Monitoring-led teams | Not published (home.alsoenergy.com) | Demo offered | Hardware agnostic; takes third-party data |
| Amperecloud | Investor reports and contract KPIs | “Price available on request during the demo presentation” (amperecloud.com) | Demo offered | Commercial asset management module with investor reports |
| meteocontrol | PV financial management plus monitoring | Not published (meteocontrol.com) | Demo offered | mc Assetpilot for contracts, billing and investor reporting |
| Power Factors | Contracts, invoices and compliance | Not published (powerfactors.com) | Demo offered | Solar, wind and storage in one performance module |
| Raptor Maps | Inspection data and digital twin | Not published (raptormaps.com) | Tour and contact form offered | Autonomous drone missions and field workflows |
| Sitemark | Construction-to-operations records | Not published; packages depend on site count (sitemark.com) | Demo offered | Operations and construction phases in one platform |
We looked for prices on each vendor’s own site in October 2026. “Not published” means the pages we read show no price. Ask the vendor for a quote.
Criteria Matrix
“Documented” means the vendor’s own page says so. “Partly” means the page says it only for part of the criterion. “Not stated” and “Not published” mean the pages we read do not say.
| Tool | Contracts, invoices and reports | Performance monitoring | Maintenance and field workflow | Price published |
|---|---|---|---|---|
| AlsoEnergy PowerTrack | Documented | Documented | Partly | Not published |
| Amperecloud | Documented | Documented | Documented | Not published |
| meteocontrol | Documented | Documented | Documented | Not published |
| Power Factors | Documented | Documented | Documented | Not published |
| Raptor Maps | Not stated | Partly | Documented | Not published |
| Sitemark | Partly | Documented | Documented | Not published |
The matrix records what is documented, not how well it works. A “Documented” cell is a statement on the vendor’s page that we did not test.
Tool-by-Tool Comparison
Listed alphabetically. This is not a ranking. Pick by the situation above.
AlsoEnergy PowerTrack
PowerTrack is AlsoEnergy’s app. The page says it is now on Stem’s Athena platform.
Best for: teams that start from monitoring and control. They want utility, C&I and aggregated residential assets in one app. Aggregated residential means many home systems grouped together.
Not the right choice if: you want a dedicated module for contracts, compliance tasks and investor reports. AlsoEnergy lists portfolio financial reports, invoicing, PPA management and a documents and contracts folder. It gives each one a single line. Ask to see them on your own data.
What the vendor documents: a hardware-agnostic app with non-native data ingest from third-party vendors. The page lists remote troubleshooting. It lists a Portfolio View of all sites. The view helps you identify and prioritize the sites with the most severe energy losses. It lists a Site Overview with actual versus weather-adjusted production. The page lists customizable dashboards. It lists site documents and contracts in one folder with controlled permissions. It lists integration with third-party CMMS and BI apps. A CMMS (computerized maintenance management system) is software that tracks repair jobs. BI (business intelligence) tools build reports and charts. For utility sites it offers PowerTrack SCADA for real-time control. SCADA is a system that monitors and controls a plant from a distance. The asset managers page lists “Portfolio-level financial reports, charts, and invoicing”. It lists “Power Purchase Agreement management”. It lists templated financial charting. The charting includes PPA information and revenue. It lists warranty duration and RMA services for AlsoEnergy edge solutions. RMA services handle returns of faulty equipment.
Price: Not published. Contact AlsoEnergy.
Limitations: the page does not list which third-party brands it takes in. Confirm your inverter and data logger models with AlsoEnergy. An inverter turns panel power into grid power. A data logger records plant data. Both pages read as a monitoring app with asset-owner reporting. They describe invoicing and contracts only briefly.
Vendor link: AlsoEnergy PowerTrack

Amperecloud
Amperecloud GmbH is based in Berlin, per its imprint.
Best for: operators who must report KPIs exactly as their O&M contracts define them. They also want yield losses valued in money.
Not the right choice if: you want a published price. The pricing page lists Professional and Enterprise packages. It says “Price available on request during the demo presentation”.
What the vendor documents: the commercial asset management page lists automated, scheduled investor reports as PDF by email. It lists custom KPIs for contractually agreed content. It lists a yield-loss calculation that includes losses from redispatch. Redispatch is when a grid operator orders a plant to change its output. The monitoring page lists alarm grouping, ticketing and freely configurable dashboards. The platform menu lists maintenance management. It lists ticket management, work scheduling and full asset history.
Price (checked October 2026): Not published. Source: Amperecloud pricing. The page lists CMMS, master data and reports as add-ons. It lists BESS analytics, satellite data and virtual power plant control as add-ons too. BESS means battery energy storage system. A virtual power plant links many small sites so they work as one plant.
Limitations: the pricing page lists the CMMS as an add-on. Confirm which modules your quote covers. The examples on the commercial page mention redispatch. They also mention grid-operator compensation. Check that they apply to your market.
Vendor link: amperecloud.com

meteocontrol
meteocontrol GmbH is based in Augsburg, Germany. It sells monitoring hardware as well as cloud software.
Best for: owners who want financial management of a PV portfolio. They also want a monitoring platform from the same vendor.
Not the right choice if: you want a single product with one price. The vendor lists separate cloud products: VCOM Cloud, VCOM CMMS and mc Assetpilot. It publishes no price for them on the pages we read.
What the vendor documents: the mc Assetpilot page covers a cloud platform. It is for financial management of renewable assets. It puts contracts, payments and stakeholders in one place. It lists dashboards across projects and SPVs. An SPV (special purpose vehicle) is a separate company that often owns one project. Its workflows run from PPA billing and loan service to revenue allocation and investor reporting. The VCOM Cloud page covers monitoring and technical operations management. It covers data hosting for single systems or portfolios. On the asset management page the vendor says detected faults can be delegated to service staff. They can then be tracked through its CMMS tool.
Price (checked October 2026): Not published on the cloud product pages we read. Contact meteocontrol.
Limitations: the cloud pages we read do not list which third-party loggers VCOM Cloud reads. The VCOM Monitoring page says it is compatible with data loggers from various manufacturers. It links an import compatibility list in the meteocontrol Help Center. Check your hardware there and with the vendor.
Vendor link: meteocontrol asset management

Power Factors
Power Factors sells the Unity suite for solar, wind and storage. The vendor lists acquisitions of Inaccess, Greenbyte and 3megawatt.
Best for: owners and operators who want one vendor’s suite. They want contracts, compliance tasks, invoices and performance analysis in it.
Not the right choice if: you want a published price or a single-module purchase without a demo. The home page lists Unity as separate solutions. The pages we read show no price and offer a demo.
What the vendor documents: the commercial asset management page lists portfolio-wide visibility of plants, contracts, compliance and financials. It lists drag-and-drop custom reports, and contract and compliance automation with audit-ready logs. It lists invoice and rate-schedule workflows. It lists a log for commercial incidents, warranties and insurance claims. The asset performance management page lists solar, wind and storage performance in one place. It lists event categories for downtime, curtailment and underperformance. It lists loss waterfalls. Curtailment means a plant cuts its output on purpose. This can happen when the grid cannot take the power. Loss waterfalls are charts that show step by step where energy is lost. The home page lists a field service module with work order management, personnel scheduling and inventory.
Price (checked October 2026): Not published. Contact Power Factors.
Limitations: the suite also covers SCADA, power plant control and energy management. The scope is wider than asset management. Confirm which modules your quote includes.
Vendor link: Power Factors Unity

Raptor Maps
The page title for this product is “Solar Asset Management Software to Improve Project Returns”.
Best for: owners and O&M teams. They want drone and sensor data turned into a digital twin and field tasks.
Not the right choice if: you need contract, invoice or investor-report workflows. The platform page covers the digital twin, analytics, autonomous drone missions and mobile field checklists. It does not describe those workflows.
What the vendor documents: the solar asset management platform page covers a digital twin. The twin reconstructs a plant at equipment-level granularity. It covers analytics on DC health and balance of system. DC health is the state of the direct-current side of the plant. Balance of system means all the parts of a plant besides the panels. The page covers orchestration of field work across human and robotic workers. It covers remotely operated autonomous drones. It covers a mobile app with checklists that works without cell signal. Orchestration here means coordinating who does which job.
Price (checked October 2026): Not published on the pages we read. Contact Raptor Maps.
Limitations: the pages we read present the product through inspection and field data. They do not describe how it connects to monitoring or finance systems. Ask in a demo.
Vendor link: Raptor Maps platform

Sitemark
Sitemark lists a European headquarters in Heverlee, Belgium.
Best for: teams that want construction progress, inspections, work orders and portfolio records in one platform.
Not the right choice if: you want a published price. The pricing page says packages depend on the number of sites and other variables.
What the vendor documents: the asset management page lists comparing data across sites, and spotting underperformance early. It lists benchmarking historical trends. It also lists a digital record of inspections and performance. It adds structured data for reporting and compliance. The work management page lists tasks, work orders and maintenance in one system. It adds mobile workflows and automated reports on completion rates and response times. The site menu lists construction-phase tools for progress tracking, quality control and commissioning. Commissioning means testing and starting up a new plant.
Price (checked October 2026): Not published. Source: Sitemark pricing.
Limitations: the asset management page covers reporting and compliance records. It does not list contract or invoice workflows.
Vendor link: sitemark.com

SurgePV
SurgePV is our product. It is shown here for context and is not ranked as an asset management tool.
Best for: teams that want the design and proposal layer: 3D roof modeling, array layout, shading analysis, energy-yield modeling, financial modeling, electrical workflow support, bill-of-materials output and proposals, priced per user.
Not the right choice if: you need an asset management tool. SurgePV’s published product scope does not list a CRM, monitoring or ERP (business management software). It starts with a guided demo, not a self-serve trial.
What the vendor documents: the published product scope is 3D roof modeling, array layout, shading analysis and energy-yield modeling. It also lists financial modeling, electrical workflow support, bill-of-materials output and proposal generation. See solar design software.
Price (checked October 2026): $1,899 per user per year for 1 user, $1,499 per user for 3 seats, $1,299 per user for 5 seats, in US dollars.
Limitations: results depend on source data, assumptions and equipment models. Outputs support design and documentation but do not replace approval by the responsible engineer, authority, lender or utility.
Vendor link: surgepv.com.

Tools From the Earlier Version of This List
- 3megawatt: its former address, 3megawatt.com, redirected to powerfactors.com when we checked in October 2026. Power Factors’ about page lists the acquisition of 3megawatt. We list Power Factors instead.
- Skyfri: its home page now covers a hardware-first device that monitors and controls solar assets. Its services page lists monitoring, a power plant controller and performance testing. The pages we read do not describe contract or invoice workflows. So it is not compared here.
- Arbox: we could not find a working official website for Arbox Renewable Energy in October 2026. It is not compared here.
Questions to Ask Before a Demo
- Where does your data live today? List every logger, portal and SCADA system in your fleet. Ask each vendor to confirm that it reads them.
- Who reads the reports? Owners, lenders and O&M teams need different outputs. Ask to see your own monthly or investor report built from real data.
- Technical, financial or both? Monitoring-led platforms start from performance. Contract-led platforms start from billing and obligations. Ask which modules your quote includes and which are add-ons.
- What does the quote cover? Ask for the unit, such as per site or per MW. MW (megawatt) is a measure of plant size. Also ask whether onboarding and integrations are included.
- What happens at contract end? Ask about data export rights for your performance history.
How We Ordered These Tools
The tools are listed alphabetically. The matrix records what each vendor documents, not what we saw in use.
- Contracts, invoices and reports: this matters most to owners with lenders and investors. Missed promises in contracts and late reports cost money. We did not test report accuracy or whether any lender accepts a given report.
- Performance monitoring: a platform has to show underperformance before you can fix it. We did not compare data coverage, alarm quality or loss calculations on one plant.
- Maintenance and field workflow: a finding only helps if it becomes a task. We did not test ticketing or mobile apps.
- Published price: it lets you compare cost before a sales call. We did not request quotes.
For this edition we did not research free or open-source asset management tools. We did not research data-access terms, cybersecurity or the size of the market for this category.
Where SurgePV Fits
SurgePV is our product. It is solar design and proposal software. It is not an asset management, monitoring or O&M product. That is why it is not ranked on this list. It supports roof modeling, layout, shading, yield, financial modeling and proposals before a system is built. Yield means how much energy a system makes. Its outputs support engineer, authority and lender approval but do not replace it. See solar design software, the pricing page or book a demo. It is a guided demo, not a self-serve trial.
See where SurgePV fits in your stack
Book a guided demo to see roof modeling through proposal generation on one of your own projects.
Book a Free DemoRelated Lists and Guides
For related comparisons, see best solar monitoring software and best solar energy management software. You can also see best solar management software. For background, see our solar asset management guide. The glossary has entries on asset management for solar projects and performance ratio.
Sources and Dates
Vendor pages were read in October 2026. Prices and features come from the vendor pages linked here and in the entries above. Each vendor page can change, so check the vendor before you buy.
- amperecloud.com: /en/prices, /en/platform/commercial-asset-management, /en/platform/asset-performance-monitoring, /en
- home.alsoenergy.com: /powertrack, /asset-managers/
- meteocontrol.com: /en/products/cloud/mc-assetpilot, /en/products/cloud/vcom-cloud, /en/applications/asset-management, /en/, /en/products/cloud/vcom-cloud/vcom-monitoring
- powerfactors.com: /unity/commercial-asset-management, /unity/asset-performance-management, home
- raptormaps.com: /products/solar-management-platform, home
- sitemark.com: /pricing/, /solutions/solar-asset-management/, /solutions/solar-work-management/
Frequently Asked Questions
What is solar asset management software?
It is software that gives the owner or operator of one or more PV plants one record. The record covers performance, contracts, invoices, reports and field work. A PV plant is a solar power plant. Some platforms start from monitoring data. Some start from contracts and finance. Some start from drone inspections. The six platforms on this page start in different places. Match the starting point to your main job.
What is solar asset performance management (APM) software?
It is the performance side of asset management. It covers monitoring, alarms, loss analysis and reports. Power Factors sells it as Unity Asset Performance Management. Amperecloud calls its version Asset Performance Monitoring. Both sell commercial asset management as a separate module. Check which modules your quote includes.
How is asset management different from O&M software?
O&M (operations and maintenance) software runs maintenance work: tickets, work orders and schedules. Asset management adds the owner’s view. That covers contracts, invoices, investor reports and portfolio performance. Several vendors on this page sell both. One example is Amperecloud, with its maintenance and commercial modules. Another is meteocontrol, with VCOM CMMS and mc Assetpilot.
How much does solar asset management software cost?
None of the six vendors publishes a price on the pages we read. Amperecloud says its price is available on request during the demo. Sitemark says its packages depend on the number of sites and other variables. Ask each vendor for a quote. Base it on your site count and the modules you need.
Which tools suit a solar farm owner who needs contracts and investor reports?
Power Factors lists contracts, compliance tasks, invoices and financial statements. They sit in its commercial asset management module. meteocontrol lists PPA billing, loan service and investor reporting in mc Assetpilot. Amperecloud lists automated investor reports and contract-specific KPIs. Confirm each one against your own contracts in a demo.
Does SurgePV offer asset management software?
No. SurgePV is solar design and proposal software. It covers roof modeling, layout, shading, yield, financial modeling and proposals before a system is built. It is not an asset management, monitoring or O&M product. That is why it is not ranked here.


