Solar Design Calculators
Free solar design calculators for installers and engineers. String sizing, wire sizing, voltage drop, inverter load, and more. No signup required.
Use the Solar Design Calculators
Enter your details below to get started.
Solar Design Calculators
Accurate solar design starts with accurate math. SurgePV’s solar design calculators give installers, engineers, and sales teams free access to 13 specialized tools — string sizing, wire sizing, voltage drop, inverter loading, battery sizing, and more. Every calculator runs in the browser, requires no signup, and returns code-aware results you can use in quotes, permit packages, and engineering reviews.
These are the same calculation engines that power SurgePV’s full design platform. Use them free here, then graduate to the integrated workflow when you are ready to go from a single number to a complete 3D design and proposal.
All 13 calculators on this page are part of SurgePV’s 36-tool library. Each tool is free, browser-based, and requires no account.
Electrical Calculators
Electrical calculators handle the NEC-driven side of a design — conductor sizing, voltage drop, string voltage windows, and load calculations. Run these before you submit a permit package or finalize a bill of materials.
| Calculator | What it computes | Best for |
|---|---|---|
| String Sizing Calculator | Max and min modules per string based on Voc, Vmp, and temperature extremes | Matching module strings to inverter MPPT windows |
| Wire Size Calculator | Conductor gauge from current, run length, and ampacity rules | Selecting DC and AC conductors that pass inspection |
| Voltage Drop Calculator | Percent voltage drop over a circuit run | Keeping DC and AC runs under the 2% rule of thumb |
| Inverter Load Calculator | Inverter capacity from connected loads | Sizing inverters for backup and off-grid systems |
| Busbar Size Calculator | Busbar ampacity and the 120% rule check | Verifying panel interconnection compliance |
Run the voltage drop calculator at 125% of expected current, not nameplate. Hot conductors and long runs push real-world drop higher than nameplate math suggests.
Sizing Calculators
Sizing calculators answer the question every customer asks first: how big should the system be? These tools convert loads, bills, and site data into concrete system, inverter, and battery capacities.
| Calculator | What it computes | Best for |
|---|---|---|
| System Size Calculator | Array kW from annual kWh usage and local sun hours | First-pass residential and commercial sizing |
| Battery Size Calculator | Battery kWh from critical loads and backup duration | Storage add-ons and backup system quotes |
| Inverter Load Calculator | Continuous and surge inverter capacity | Hybrid and off-grid inverter selection |
| AC Size Calculator | Cooling load in tons and BTU for a space | Estimating HVAC loads that drive system size |
| UPS Calculator | UPS capacity and runtime from connected equipment | Critical-load backup planning |
Production and Financial Calculators
Production and financial calculators turn a design into a business case. Use them to estimate generation, dollar savings, and equipment wattage before you build a full proposal.
| Calculator | What it computes | Best for |
|---|---|---|
| Solar Power Calculator | Expected kWh production from system size and location | Verifying production estimates for proposals |
| Solar Savings Calculator | Bill savings and payback from production and utility rates | Early-stage customer conversations |
| Wattage Calculator | Total wattage of appliances and devices | Building the load list behind any sizing decision |
System Design Calculators
System design calculators cover the geometry and site physics of a project — sun position, shading inputs, and the angles that determine real production.
| Calculator | What it computes | Best for |
|---|---|---|
| Sun Angle Calculator | Solar elevation and azimuth by date, time, and location | Tilt, row spacing, and shading analysis |
| String Sizing Calculator | Temperature-corrected string lengths | Final electrical layout before stamping |
For full shading, layout, and 3D modeling beyond these quick calculations, use SurgePV’s shading analysis tool and panel layout estimator.
How to Use These Calculators in Your Workflow
The calculators work in sequence, mirroring a real design process. Follow this order on your next project and each tool’s output feeds the next step.
- Start with the load. Use the wattage calculator to total the customer’s appliances, then the electricity bill data or system size calculator to set a target kW. For storage projects, run the battery size calculator on the critical-load list.
- Size the equipment. Run the string sizing calculator to match modules to the inverter MPPT window. Use the inverter load calculator to confirm capacity for hybrid or backup systems.
- Check the wiring. Enter each conductor run in the voltage drop calculator, then verify gauge and ampacity in the wire size calculator. Check panel interconnections with the busbar size calculator.
- Validate the site. Use the sun angle calculator to confirm tilt and row spacing assumptions before you commit a layout.
- Build the business case. Run the solar power calculator for production and the solar savings calculator for payback. Both outputs feed directly into your proposal numbers.
Free calculators are ideal for quick checks and early-stage quotes. When a project moves to contract, manual math becomes the bottleneck — SurgePV carries every one of these calculations through 3D design, shading simulation, and proposal generation automatically, so a number you compute once stays consistent from first quote to final permit set.
Done with one-off calculations? SurgePV runs every calculator on this page inside a single design workflow — from site model to signed proposal. Book a demo and see it on one of your own projects.
Frequently Asked Questions
Are these solar design calculators really free? Yes. All 13 calculators on this page are free, run in the browser, and require no signup or account. SurgePV offers 36 free tools in total across design, electrical, and financial categories.
Which calculator should I start with for a new project? Start with the system size calculator to set a target array size from the customer’s usage. Then run string sizing and voltage drop to validate the electrical design, and finish with the solar savings calculator for the financial case.
Do these calculators follow NEC requirements? The electrical tools apply NEC-driven rules, including conductor ampacity, voltage drop guidance, and the 120% busbar rule. They support design decisions, but a licensed engineer should verify final stamped drawings.
How accurate are the production estimates? The solar power calculator uses location-based sun hour data to estimate production. For bank-grade accuracy with shading, soiling, and system losses, use SurgePV’s full simulation engine, which models 3D shading scene by scene.
Can I use these calculators for commercial projects? Yes. String sizing, voltage drop, wire sizing, and busbar checks apply at commercial scale the same way they do residentially. Large projects benefit from the integrated platform, where calculations stay consistent across hundreds of strings.
What is the difference between the battery size calculator and the inverter load calculator? The battery size calculator determines storage capacity in kWh from your critical loads and desired backup hours. The inverter load calculator determines the power capacity in kW needed to run those loads at once, including surge.
Do the calculators save my results? No. Free tools compute results in the browser without storing data. For saved projects, version history, and shareable reports, run the same calculations inside a SurgePV account.
Ready to design solar projects
in minutes, not hours?
SurgePV combines AI-powered 3D roof modeling, bankable energy simulation, and white-label proposals in one platform. Used by solar installers to close deals faster.
Need More Than a Proposal Tool?
SurgePV combines solar design, financial analysis, and proposals into one integrated platform. Design, simulate, and close - all without switching tools.
No credit card required · Full access · Cancel anytime