Swiss rooftop work has three steps outside your design tool. You tell the grid operator before work starts and send a safety certificate when it ends. You apply to Pronovo for the Einmalvergütung (EIV), a one-time federal payment for a solar plant. In most building zones you report the system instead of getting a building permit. Pronovo says it handles the federal funding programs for new renewable power, including the EIV for PV plants. None of the five vendors says it works out the Pronovo amount. So pick by what each tool does show. Polysun SPT lists snow and wind load calculations, string plans and CAD export of roof plans. PVsyst and PV*SOL name German, French and Italian among their interface languages. PVsyst describes P50 and P90 yield levels. OpenSolar’s core app is free. SurgePV covers roof modeling, bill of materials (a parts list) and proposals in one product, priced per user.
This is a desk comparison of what each vendor publishes, checked October 2026. We have not run side-by-side tests. Local rules come from Swiss federal law on Fedlex, Pronovo and ESTI. Tool facts come from each vendor’s own site. This page compares five tools. Aurora Solar and HelioScope, named on an older version of this page, are not compared here.
Criteria used: German, French and Italian, circuit diagram or string plan, feed-in and self-consumption settings, roof load planning, price currency.
Working on a Swiss project? See SurgePV on it
Book a guided demo and bring a real site. We walk through design, yield, finance and the proposal in one platform.
Book a Free DemoChecking cost first? See the SurgePV pricing page.
Best-For Picks for Switzerland
- Roof mounting and string plans: Polysun SPT. Its page lists seven roof types, snow and wind load calculations, string planning and CAD export of roof plans and string layouts. It does not name the load standard. Ask which one it uses.
- German, French or Italian screens and reports: PVsyst or PV*SOL. Both name all three among their interface languages. PV*SOL also offers project reports in 24 languages. Polysun SPT lists 11 languages and does not name them.
- Yield evidence for a larger project: PVsyst. Its help says the annual production has a 50% probability of exceeding the P50 value and a 90% probability of exceeding the P90 value. It runs on Windows only. The pages we read describe no quote or proposal output.
- A free core app for a small job: OpenSolar. The vendor says the core app is free for solar professionals. API Access and connectors are charged from 16 April 2026. A proposal in German, French or Italian needs a template you translate by hand. Its diagram template list does not include Switzerland.
- Roof model, bill of materials and proposal in one product: SurgePV. It is priced per user in US dollars. Ask in a demo about German, French and Italian output and a quote in Swiss francs or euros. Its published scope states neither.
Comparison Table
Listed alphabetically. This is not a ranking; pick by the situation above. Prices checked October 2026 on each vendor’s own page.
| Tool | Best for | Price | Free or paid | Decisive scope fact |
|---|---|---|---|---|
| OpenSolar | Free core app, hand-translated proposals | Core app free; API Access and connectors charged from 16 April 2026 | Free core app, paid API and connectors | Diagram templates not listed for Switzerland |
| Polysun SPT | Roof mounting, load planning, string plans | EUR 69 per month, annually in advance | Paid, 30-day free trial | Snow and wind load calculations listed |
| PV*SOL premium | Named DE, FR, IT screens, circuit diagrams | EUR 845.00 per named user per year, plus VAT | Paid, trial download | Windows 10 and 11 only |
| PVsyst | Yield evidence | CHF 700 per year (PVsyst 8 Professional) | Paid, one-month trial | P50 and P90 in help; Windows only |
| SurgePV | Roof model to BOM and proposal, per user | $1,899 per user per year (1 user); no franc or euro price stated | Paid, guided demo | BOM and proposal in scope; no diagram output stated |
Switzerland Criteria Matrix
Each cell is Documented, Partial or Not stated. It reflects the vendor pages we read in October 2026. Documented means the page states it for this task. Partial means the page lists a related feature but not the Swiss item. Not stated means we did not find it on those pages. There are no scores or weights.
| Tool | German, French, Italian | Circuit diagram or string plan | Feed-in and self-consumption | Roof load planning | Price currency |
|---|---|---|---|---|---|
| OpenSolar | Partial (13 proposal languages including all three; template translated by hand) | Partial (diagram templates for FR, DE, IT; Switzerland not listed) | Documented (custom tariffs, export rates by system size, savings from usage and battery settings) | Partial (snow and wind load help articles are labeled US or UK; the Esdec mounting article has Eurocode wind inputs; Switzerland not named) | Documented (core app free; USD for Enterprise Services) |
| Polysun SPT | Partial (11 languages, not named) | Documented (circuit diagram, string plan in 3D, CAD export of string layouts) | Documented (feed-in tariffs, self-consumption, solar coverage rate) | Documented (snow and wind loads; standard not named) | Documented (EUR) |
| PV*SOL | Documented (interface in German, French and Italian; reports in 24 languages) | Partial (circuit diagram; Swiss format not stated) | Documented (self-consumption modeling, feed-in records, 20-year analysis) | Partial (interfaces to mounting planners K2 Base and Renusol PV-Configurator) | Documented (EUR, plus VAT) |
| PVsyst | Documented (English, French, German, Italian among 12) | Partial (SLD for grid-connected systems; no storage) | Documented (feed-in tariff, hourly CSV, self-consumption economics) | Not stated | Documented (CHF) |
| SurgePV | Not stated | Not stated (electrical workflow support listed) | Partial (financial modeling listed) | Not stated | Documented (USD) |
Two things stand out. No vendor page we read mentions Pronovo or the EIV. PVsyst’s help index and OpenSolar’s help search have no match for Pronovo. The tools differ most on language, diagrams and roof load planning.
Tool Entries
OpenSolar
Best for: small installers who want a free core app with proposals, and who can translate a proposal template into German, French or Italian.
Not the right choice if: you need a diagram template that lists Switzerland, or P50 to P90 yield levels, because OpenSolar’s help search has no match for P90. It is also not right if you need a price in Swiss francs or euros.
What the vendor documents: a help article says single line diagrams are supported in AU, NZ, US, CA, UK, FR, DE, IT, ES and IN. Switzerland is not in that list. A help article on proposal language lists 13 languages, including German, French and Italian. It says a proposal needs a template that has been translated by hand. A tariff article covers custom tariffs with flat, time-of-use, tiered and demand-charge rates. A second article shows export-rate tiers by PV system size. OpenSolar’s help search has no match for Switzerland or Pronovo.
Price (checked October 2026): the core app is free for solar professionals, per the vendor. From 16 April 2026 the vendor charges for API Access (a way for other software to connect) and supported connectors. Source: its 16 February 2026 post. Optional paid Enterprise Services: Support US$500 per month, Customize US$1,350 per month, Enterprise custom.
Limitations: the pages we read give no Swiss rates, no Swiss diagram template and no Swiss franc price.
Vendor link: opensolar.com.

Polysun SPT
Best for: installers who want PV planning with mounting design, string plans and load calculations, priced per month in euros and paid yearly in advance. Vela Solaris AG, the vendor, gives an address in Winterthur, Switzerland.
Not the right choice if: you need a stated Pronovo output, because the pages we read do not mention Pronovo. It is also not right if you need a price in Swiss francs.
What the vendor documents: on its SPT page, roof selection from maps and roof plans, 3D building views and mounting design for seven roof types. It lists “multi-roof system planning with snow and wind load calculations” and inverter sizing with string planning. It also lists CAD export of roof plans and string layouts, a financial analysis and yield calculations based on Meteonorm data, shading and feed-in tariffs. It lists self-consumption and the solar coverage rate with batteries, heat pumps and e-mobility. The page says it is web-based, with no local installation. The price page lists a detailed circuit diagram, a string plan in 3D, a dimensioning plan and “location-specific load assumptions according to standard”. It does not name the standard. It also lists “Software interface and reports in 11 languages” without naming them.
Price (checked October 2026): EUR 69 per month, annually in advance, with a 30-day free trial. The page does not say whether VAT is included.
Limitations: the price and product pages we read do not mention Pronovo, the EIV or ZEV groups. They do not name the load standard.
Vendor link: velasolaris.com.

PV*SOL premium
Best for: designers who want German, French or Italian screens, project reports in 24 languages and a euro-priced named-user license. The vendor’s sales partner page lists ASETIS Energie GmbH under Switzerland.
Not the right choice if: you work on a Mac or in a browser, because the system requirements list Windows 10 and 11. It is also not right if you need a stated Pronovo output.
What the vendor documents: on the product page, 3D visualization and shading analysis, and self-consumption, battery and electric vehicle modeling. It lists “fully customizable circuit diagrams, including safety components” and a 20-year financial analysis that uses a feed-in tariff database. The interface comes in German, English, Spanish, French, Italian, Polish, Czech, Portuguese and Turkish. It lists interfaces to planning tools such as K2 Base and the Renusol PV-Configurator. A help page on feed-in tariffs lets you enter a country, a start date, a payout period and tariff limits by power. The sales partner page lists ASETIS Energie GmbH under Switzerland.
Price (checked October 2026): EUR 845.00 plus VAT for a named-user license, one year. A free trial version is offered for download.
Limitations: the pages we read do not mention Pronovo or any Swiss form. The tariff database page does not say which countries it covers.
Vendor link: valentin-software.com.

PVsyst
Best for: yield evidence on larger projects, where a funder or investor wants a simulation report. PVsyst SA, the vendor, gives an address in Satigny, Switzerland.
Not the right choice if: you need quotes and proposals from the same tool, because the pages we read describe none. It is also not right if you work on a Mac or in a browser. The requirements page says it runs only under Windows.
What the vendor documents: its P50 to P90 help page says the annual production has a 50% probability of exceeding the P50 value and a 90% probability of exceeding the P90 value. Its single line diagram page describes an editor and viewer for strings, inverters and transformers. It covers grid-connected systems only and leaves out storage. The page says the feature is “still work in progress”. Its economic evaluation page covers a fixed feed-in tariff, an hourly tariff in a CSV file, and self-consumption economics. The product page lists 12 interface languages, including French, German and Italian, and weather sources including Meteonorm 9.
Price (checked October 2026): CHF 700 per year for PVsyst 8 Professional, with grouped-order discounts of 5% for 2 to 4 licenses, 15% for 5 to 9 and 20% for 10 or more. The product page offers a one-month free trial.
Limitations: PVsyst’s help search index has no match for Pronovo, Einmalvergütung or snow load. The pages we read describe no Swiss forms or tariffs.
Vendor link: pvsyst.com.

SurgePV
SurgePV is our product.
Best for: teams that want roof modeling, shading, yield, financial modeling, bill of materials and proposals in one product, priced per user. Confirm the Swiss outputs in a demo.
Not the right choice if: you want a self-serve trial, because SurgePV offers a guided demo. It is also not right if you need a quote in Swiss francs or euros, or German, French and Italian output in writing before talking to sales. Outputs support design and documentation but do not replace approval by the responsible engineer, authority, lender, insurer or utility. SurgePV’s published product scope does not list a CRM (customer tracking tool), monitoring or ERP (business management software).
What the vendor documents: 3D roof modeling, array layout and shading analysis. It also lists energy-yield modeling, financial modeling, electrical workflow support, bill-of-materials output and proposal generation. See solar design software for the product page.
Price (checked October 2026): $1,899 per user per year for 1 user, $1,499 per user for 3 seats, $1,299 per user for 5 seats, in US dollars.
Limitations: results depend on source data, assumptions and equipment models. The pricing page and published scope do not state a diagram output, Swiss rates, a Pronovo amount, language support or a Swiss franc price.
Vendor link: surgepv.com.

Swiss Rules That Shape the Choice
Who does what. Pronovo says it handles the federal funding programs for new renewable power, including the one-time payments for PV plants, and issues the decisions on them (Pronovo, Auftrag). Its site comes in German, French and Italian. The federal texts used here are the Energy Act (EnG), the Energy Ordinance (EnV), the Energy Funding Ordinance (EnFV), the low-voltage installation ordinance (NIV) and the spatial planning act (RPG). All are on Fedlex, and we read the German texts. ESTI is the Eidgenössisches Starkstrominspektorat, the federal heavy-current inspectorate. Its site describes tasks in the supervision and checking of electrical installations (ESTI).
The one-time payment (EIV). Pronovo lists three programs. KLEIV is for plants under 100 kW and GREIV for 100 kW and up. HEIV is for plants from 2 kW to 149.99 kW that sell all their power (Pronovo, Einmalvergütung). A plant needs at least 2 kW. The amount is a base amount plus a per-kW amount. Since 1 April 2024 the base amount is CHF 0 (Pronovo guideline, version 4.2, October 2026). The per-kW rates sit in Annex 2.1 of the EnFV (state of 1 July 2026). For plants commissioned from 1 April 2025, attached and free-standing plants get CHF 360 per kW under 30 kW, CHF 300 from 30 to under 100 kW and CHF 250 from 100 kW. Integrated plants get CHF 400, CHF 330 and CHF 250. Above 30 kW the amount is worked out in parts across these classes. A plant with a tilt of at least 75 degrees gets a bonus of CHF 400 per kW if integrated and CHF 200 if attached or free-standing. The EnFV says the federal department checks the rates each year. Pronovo’s Tarifrechner gives a non-binding result.
Applying for the EIV. You apply after the plant is running. The EnFV lists what a small-plant application holds: the plant category, its power, the expected yearly production, the owner’s consent, the commissioning date and the acceptance record or safety certificate. Pronovo’s FAQ says the law has required at least 20 years of operation since 1 January 2025. A design tool can supply the expected yearly production. It does not apply for you.
Selling the power and using it yourself. An owner may use the power made on site, or sell it on site, and both count as self-consumption (EnG Art. 16). Owners at one site may form a ZEV (Zusammenschluss zum Eigenverbrauch), a group that shares the power made on site. The EnV sets the bar at plant output of at least 10 percent of the group’s connection capacity (EnV Art. 15). For power sent to the grid, the grid operator pays a price based on the quarterly average market price (EnG Art. 15, in force since 1 January 2026). For plants under 150 kW the Federal Council sets minimums (EnV Art. 12). PV under 30 kW gets 6 Rp. per kWh, where Rp. means Rappen, a hundredth of a franc. PV with self-consumption from 30 kW gets 6 Rp. for the first 30 kW and 0 Rp. above. PV without self-consumption from 30 kW gets 6.2 Rp. A proposal tool needs an editable export rate.
Grid operator and safety certificate. Installers with a general installation license must tell the grid operator before the work starts (NIV Art. 23, state of 31 October 2025). A final check comes before handover. The person who does it records the result in a Sicherheitsnachweis, the safety certificate. The owner then tells the grid operator that the work is finished and sends the certificate (NIV Art. 24). The producer and the grid operator also set the connection terms in a contract (EnV Art. 10). It covers the connection cost, the maximum feed-in power, any own use on site and the payment.
Building permits. In building and farm zones, well-adapted solar systems on roofs or facades need no building permit and are only reported to the authority. Cantons may require a permit in clearly defined protection zones. Solar systems on cultural or natural monuments of cantonal or national significance always need one (RPG Art. 18a, state of 1 July 2026). Pronovo’s advice is to ask your municipality’s building office.
Language, currency and units. Pronovo’s site comes in German, French and Italian, and we read the German texts of the federal laws. The EIV rates are in Swiss francs (CHF). Vendor prices on this page stay in the currency each vendor publishes.
Where to look. Use Pronovo for the EIV, ESTI for installation rules and your grid operator for connection steps.
What to Ask a Vendor Before Buying
Ask each vendor for one sample project. Then look for these items. First, screens and reports in the language your customer reads. Second, the circuit diagram or string plan you would hand to your grid operator. Third, a way to enter your grid operator’s feed-in rate and the customer’s own power use. Fourth, how the tool handles snow and wind load on your roof. Fifth, the expected yearly production for the Pronovo file. Sixth, a price in the currency you will be invoiced in. Where a vendor does not publish a feature on the pages we read, the matrix says so. A demo or trial is the place to confirm it.
How We Ordered These Tools
SurgePV publishes this page and is a vendor on this list. Its entry uses the same vendor-page sources and template as every other tool here.
We did not rank these tools. They are listed alphabetically, and the best-for picks come from the matrix above.
- German, French, Italian: Pronovo’s site comes in these three languages, so files may need all of them. We did not assess translation quality in any tool.
- Circuit diagram or string plan: a grid operator may want a diagram, and the safety certificate lists the installation. We did not assess whether any tool’s diagram meets a grid operator’s format.
- Feed-in and self-consumption: the payment for exported power and the value of own use drive the proposal. We did not assess whether any calculation is correct.
- Roof load planning: mounting design depends on the load rules for the site. We did not assess any tool’s load calculation.
- Price currency: the currency shows what a Swiss buyer will pay and whether VAT is added. We did not assess discounts or negotiated quotes.
Sources and Dates
Vendor pages were read in October 2026. OpenSolar (free, languages). Polysun SPT (pricing, product). PV*SOL (premium, partners). PVsyst (shop, languages). SurgePV (pricing). Swiss sources are the Pronovo pages and guideline linked above, and the Fedlex texts of the EnG (state of 1 April 2026), EnV, EnFV, NIV and RPG. All were read in October 2026. Fedlex pages need a rendering browser, so we read them in one.
See SurgePV on a Swiss project
Book a guided demo and ask for the Swiss outputs you need.
Book a Free DemoRelated Solar Software Lists
- Solar software in Switzerland, all categories
- Proposal software for Swiss installers
- Solar design software in Germany and in Austria, the neighboring markets
- Best solar design software, all markets
Frequently Asked Questions
What is the best solar design software for Swiss installers?
It depends on the job. From what the vendors publish, Polysun SPT lists snow and wind load calculations, string plans and CAD export of roof plans, at EUR 69 per month. PVsyst and PV*SOL name German, French and Italian among their interface languages. PVsyst describes P50 and P90 yield levels. OpenSolar’s core app is free. SurgePV covers roof modeling, bill of materials and proposals in one product, priced per user in US dollars. None of the vendor pages we read mentions Pronovo.
Does any design tool calculate the Pronovo one-time payment (EIV)?
None of the vendor pages we read mention Pronovo or the Einmalvergütung (EIV, a one-time federal payment for a solar plant). PVsyst’s help index and OpenSolar’s help search have no match for Pronovo. Pronovo offers its own Tarifrechner (rate calculator) for the amount. Use it, and add the result to your proposal by hand.
How much is the EIV for a 10 kW roof system?
For an attached or free-standing plant commissioned from 1 April 2025, the Energy Funding Ordinance lists CHF 360 per kW for plants under 30 kW. The base amount is CHF 0. A 10 kW plant gets 10 x 360 = CHF 3,600. An integrated plant gets CHF 400 per kW, so 10 x 400 = CHF 4,000. The rates are checked each year, so check Pronovo’s Tarifrechner for your commissioning date.
What must I send the grid operator when the work is done?
Under the low-voltage installation ordinance (NIV), the owner tells the grid operator that the work is finished and sends the Sicherheitsnachweis, the safety certificate. The person who does the final check records the result in it. An installer with a general installation license must also tell the grid operator before the work starts. A design tool does not make this certificate.
Do I need a building permit for a rooftop solar system in Switzerland?
Often not. Under Article 18a of the spatial planning act, well-adapted solar systems on roofs or facades in building and farm zones need no building permit. You only report them to the authority. Systems on cultural or natural monuments of cantonal or national significance always need a permit. Cantonal law can add rules in protection zones, so ask your municipality.
How much does solar design software cost in Switzerland?
Prices come in different currencies. OpenSolar’s core app is free, but the vendor charges for API Access and supported connectors from 16 April 2026. Polysun SPT is EUR 69 per month, paid yearly in advance. PV*SOL premium is EUR 845.00 plus VAT per named user per year. PVsyst Professional is CHF 700 per year. SurgePV lists 1,899 US dollars per user per year for one user. Of these five, only PVsyst shows a Swiss franc price.


