A designer in Egypt ends up producing drawings for EgyptERA’s connection file as much as a yield figure, so the useful question is which tool gives you the layout, the diagram and the numbers in a form you can hand over. HelioScope prints a dollar price and reaches 5 MW DC on Pro. PVcase handles ground-mount layout and exports a single line diagram. PVsyst writes P50 to P90 yield reports. RatedPower targets utility-scale layout with single-line diagrams. SurgePV covers roof modeling through proposals but states no ground-mount, tracker or diagram output.
This is a desk comparison of vendor pages, checked October 2026, with no side-by-side runs. SurgePV publishes this page and is one of the 5 tools on it. Egypt’s grid code, tariffs and incentives are not covered; the only Egyptian source used is EgyptERA’s list of documents for a solar connection, summarised below. Single line diagram (SLD): a simple drawing of how the system is wired. P50 and P90: yields with a 50% and a 90% probability of being met or exceeded in a year. Bill of materials (BOM): a parts list.
Criteria used: single line diagram, P50 to P90 yield, languages (Arabic in particular), price and currency, operating platform.
This page compares 5 tools. Other tools are compared on the global design list.
Want to see SurgePV on your own project?
Book a guided demo and bring a real site. We walk through design, yield, finance and the proposal in one platform.
Book a Free DemoChecking cost first? See the SurgePV pricing page.
Best-For Picks for Egypt
- A dollar price you can read before calling anyone, for commercial and mid-size plants: HelioScope. Pro lists designs up to 5 MW (DC) with P90, P95 and P99 values; Enterprise reaches 30 MW (DC) with single-axis trackers. Its help article lists a single-line diagram export.
- A ground-mount site where terrain, piling and the diagram share one file: PVcase. Its Ground Mount plan page lists terrain-aware layouts, slope and collision analysis, piling analysis and single line diagram export. It sits on AutoCAD and quotes price through sales only.
- A lender wanting P50 to P90 numbers: PVsyst. Its help page documents the P50 to P90 tool and its product page lists 12 software languages. Windows only.
- A developer screening a utility-scale site in the browser: RatedPower. Its platform and pricing pages list parametric layout, interconnection design and single-line diagrams. For the lender yield report the vendor refers you to PVsyst.
- A roof job that ends in a bill of materials and a proposal, billed per user: SurgePV. Published scope: roof modeling, shading, yield, financial modeling, BOM and proposals. Diagrams, ground-mount layout and P50 to P90 yield are not stated, so ask in a demo.
Comparison Table
Listed alphabetically. This is not a ranking; pick by the situation above. Prices checked October 2026 on each vendor’s own page, in the currency the vendor publishes.
| Tool | Best for | Price | Free or paid | Decisive fact |
|---|---|---|---|---|
| HelioScope | Dollar-priced commercial and mid-size plants | $159 or $1,620 per license (Basic); $259 or $2,640 (Pro), per month or per year | Paid | Single-line diagram export; P90, P95, P99 on Pro |
| PVcase | Ground-mount plants with terrain and diagrams | Not published (sales) | Paid | Single line diagram export; built on AutoCAD |
| PVsyst | P50 to P90 yield reports | CHF 700 per year (Professional) | Paid; one-month free trial | P50 to P90 tool; Windows only |
| RatedPower | Early utility-scale layout | Not published (talk to sales) | Paid | Single-line diagrams; reconcile yield with PVsyst |
| SurgePV | Roof model to BOM and proposal, per user | $1,899 per user per year (1 user), in US dollars | Paid, guided demo | BOM and proposals in scope; no diagram or P50 to P90 item stated |
Egypt Criteria Matrix
Cells read Documented, Partial or Not stated. Documented: the vendor’s page says it outright. Partial: the page covers a related feature or only some of the item. Not stated: the pages read in October 2026 are silent. No scores or weights. Silence does not prove a gap, so ask every vendor to produce the item for one real Egyptian site.
| Tool | Single line diagram | P50 to P90 yield | Languages listed | Price and currency | Runs in |
|---|---|---|---|---|---|
| HelioScope | Documented (help article) | Documented (P90, P95, P99 on Pro) | Not stated | Documented (USD, per license) | Browser (help article recommends Chrome or Firefox) |
| PVcase | Documented (Ground Mount plans) | Partial (PVcase Yield plans list P50, P90) | Not stated | Not published | AutoCAD (Ground Mount) |
| PVsyst | Partial (grid-connected only, no storage, work in progress) | Documented | Documented (12 languages; English is the reference) | Documented (CHF) | Windows only |
| RatedPower | Documented (platform page) | Partial (vendor points to PVsyst for P50, P90, P99) | Partial (support team languages; interface not stated) | Not published | Cloud-based (customer quote) |
| SurgePV | Not stated (electrical workflow support listed) | Not stated (energy-yield modeling listed) | Not stated | Documented (USD) | Web |
Tool Entries
HelioScope
Best for: Egyptian teams drawing commercial and mid-size plants who want a posted dollar price and a single-line diagram export alongside the layout.
Not the right choice if: the plant exceeds the plan caps (1.25 MW DC Basic, 5 MW DC Pro, 30 MW DC Enterprise per the pricing page) or you need an Arabic interface, since no interface language list appears on the pages read.
What the vendor documents: Basic lists rooftop, carport and ground mount on all projects and storage design. Pro adds LIDAR-assisted modeling, financial modeling and sales proposals, and P90, P95 and P99 values. Enterprise adds unlimited users, single-axis trackers, export to PVsyst, API access and SSO (single sign-on). The export article says you can export a .dxf CAD file and a single-line diagram, “a simple electrical schematic”. HelioScope is “an Aurora Inc. Company”. A help article recommends Google Chrome or Firefox for the design tool.
Price (checked October 2026): Basic $159 USD per license per month or $1,620 USD per license per year, including 1 user. Pro $259 USD per license per month or $2,640 USD per license per year, including 1 user. Enterprise is custom per-project pricing. All from the pricing page.
Limitations: nothing on the pages read concerns Egypt. Run one real Egyptian site through it first.
Vendor link: helioscope.aurorasolar.com.

PVcase
Best for: engineering teams in Egypt designing ground-mount plants who want terrain, piling and diagram export inside one AutoCAD-based workflow.
Not the right choice if: you need a posted price or a tool outside AutoCAD. Its home page says Ground Mount is “built on AutoCAD”, so ask whether a separate AutoCAD licence is needed.
What the vendor documents: the Ground Mount plan page lists terrain-aware layouts, slope analysis, collision analysis, piling analysis and ground grading. It also lists stringing, cable sizing and voltage drop, single line diagram export, bill of materials exports, BESS (battery storage) design and a QuickYield estimate. A vendor blog post describes terrain-following tracker optimization. The PVcase Yield page lists “built-in probability scenarios (P50, P90)”.
Price (checked October 2026): not published. The home page says, “We don’t offer a complete price list online”. The plan pages say to talk to sales.
Limitations: the pages read are silent on Egypt. Test it on one Egyptian site before committing.
Vendor link: pvcase.com.

PVsyst
Best for: a P50 to P90 yield report that an Egyptian lender or investor can read, particularly for plants in EgyptERA’s larger 500 kW to 20 MW route.
Not the right choice if: you want a browser tool or automatic ground-mount rows. The pages read describe a 3D scene you build yourself, and the product page says Windows only with one licence per computer.
What the vendor documents: system design for grid-connected, standalone and pumping systems, a 3D scene you model, unlimited orientations, and single or dual-axis trackers with backtracking. It lists weather databases including Meteonorm 9, NASA-Power and PVGIS-TMY, and an economic assessment with NPV, LCOE and ROI. Its P50 to P90 help page says the annual production has a 50% probability of exceeding the P50 value and a 90% probability of exceeding the P90 value. Its single line diagram page says the feature is only for grid-connected systems, does not include storage and is “still work in progress”. The product page lists 12 software languages, including French.
Price (checked October 2026): PVsyst 8 Professional is CHF 700 per year, updates included. Group discounts are 5% for 2 to 4 licences, 15% for 5 to 9 and 20% for 10 or more. The product page lists a one-month free trial. The price is in Swiss francs.
Limitations: nothing on the pages read concerns Egypt, and Arabic is not among the 12 software languages. Try it on one Egyptian site first.
Vendor link: pvsyst.com.

RatedPower
Best for: developers who screen and lay out utility-scale sites quickly and want support in English, Spanish, French, German, Chinese, Italian or Portuguese.
Not the right choice if: this tool must produce the final yield report. Its platform page says to design in RatedPower, “then reconcile with PVsyst for the P50, P90 and P99 report your lenders expect”. No price is published either.
What the vendor documents: the platform page lists parametric layout, energy yield, electrical design, string sizing, inverter and transformer selection, medium-voltage routing, single-line diagrams, storage design and CAPEX (build cost) estimates. You can move trackers in the layout editor and export a .dwg file. A customer quote on the page calls the platform cloud-based. The pricing page says every plan has unlimited users and projects, and that the support team speaks English, Spanish, French, German, Chinese, Italian and Portuguese. The vendor is now named Enverus RatedPower on that page.
Price (checked October 2026): Basic, Advanced and Enterprise all say “Talk to sales”. No figure or currency is published. The pricing page says the subscription is per company.
Limitations: the pages read are silent on Egypt, and Arabic is not among the support languages. Try it on one Egyptian site first.
Vendor link: ratedpower.com.

SurgePV
SurgePV is our product.
Best for: roof-scale Egyptian work that runs from modeling, shading, yield and financial modeling to a bill of materials and a proposal, billed per user. Which Egypt outputs you get is a demo question.
Not the right choice if: you want a self-serve trial (SurgePV offers a guided demo). It is also not right if you design ground-mount plants with terrain and tracker layout, or need a single line diagram or P50 to P90 yield in writing. Its published scope lists roof modeling and array layout, not those items. Outputs support design and documentation. They do not replace approval by the responsible engineer, authority, lender or utility. SurgePV’s published product scope does not list a CRM (customer tracking tool). Monitoring and ERP (business management software) are outside its published scope.
What the vendor documents: 3D roof modeling, array layout, shading analysis, energy-yield modeling, financial modeling, electrical workflow support, bill-of-materials output and proposal generation. See solar design software for the product page.
Price (checked October 2026): $1,899 per user per year for 1 user, $1,499 per user for 3 seats, $1,299 per user for 5 seats, in US dollars.
Limitations: results depend on source data, assumptions and equipment models. The scope names no single line diagram, ground-mount or tracker layout, P50 to P90 yield or interface language list, and says nothing about Egyptian outputs.
Vendor link: surgepv.com.

What EgyptERA’s Connection Lists Ask a Designer For
EgyptERA publishes a document list for plants under 500 kW and another for 500 kW up to 20 MW, read in November 2026. The smaller list has 11 items. Three of them land on the designer: a schematic drawing of the solar cell layout at the site approved by a union engineer, technical specifications with product catalogues, and an electrical diagram of the project and the proposed connection point. Test certificates for the components are also on the list. The page names no fees, timelines or filing steps, and it says nothing about file formats, so none of the tools here can be called compliant on that basis. A tool that outputs layout, diagram and parts list from one model saves re-drawing, but the union engineer’s approval and the contractor’s qualification certificate from the New and Renewable Energy Authority stay outside the software.
Language Check for Egypt
Clients in Egypt may expect Arabic. PVsyst lists French among 12 software languages and says English is the reference language. Its help pages are in English. RatedPower says its support team speaks English, Spanish, French, German, Chinese, Italian and Portuguese, but the pages we read do not list its interface languages. The HelioScope, PVcase and SurgePV pages we read do not list interface languages. Vendor lists change, so ask for a sample proposal in Arabic before you buy.
What to Ask a Vendor Before Buying
Put one real Egyptian project in front of each vendor and watch four things appear. A single line diagram you could attach to the file EgyptERA reads. A P50 to P90 report if a lender is involved. Output in Arabic if your client expects it. A price in the currency that will appear on your invoice. Where the pages read are silent, the matrix says Not stated, and a demo or trial is where to settle it.
How We Ordered These Tools
The tools are alphabetical, unranked, and the best-for picks come from the matrix.
- Single line diagram: EgyptERA’s lists ask for an electrical diagram. Not assessed: whether any tool’s diagram suits a given utility.
- P50 to P90 yield: lenders and investors read these. Not assessed: lender acceptance.
- Languages: only the lists vendors publish. Not assessed: translation quality or Arabic reports.
- Price and currency: a posted price lets you plan before a call. Not assessed: discounts or quotes.
- Runs in: Windows-only or CAD-based tools limit who can open a file. Not assessed: speed or file size.
Sources and Dates
Vendor pages were read in October 2026. They are HelioScope (pricing and help articles), PVcase (Ground Mount plans, Yield plans, home page and a blog post), PVsyst (product, shop and help pages), RatedPower (pricing and platform pages) and SurgePV (pricing). Help-centre articles were read in a browser. SurgePV publishes this page and is a vendor on the list. The only Egyptian regulator pages used are the two EgyptERA connection lists linked above, read in November 2026.
See SurgePV on your own project
Book a guided demo and ask which of the outputs you need for a Egypt project it can produce.
Book a Free DemoGo Deeper on a Category
- Best solar software in Egypt
- Solar proposal software for Egypt
- Solar design software for Jordan, a nearby country list
- Solar design software for Morocco, a nearby country list
- Solar design software for Saudi Arabia, a nearby country list
- Solar single line diagram software and solar plant design software
- Best solar design software, all markets
Frequently Asked Questions
What is the best solar design software for Egypt?
It depends on the job. HelioScope lists a dollar price and designs up to 5 MW DC on its Pro plan. PVcase documents ground-mount layout and single line diagram export. PVsyst documents P50 to P90 yield. RatedPower documents utility-scale layout and single-line diagrams. SurgePV documents roof modeling through proposals but states no ground-mount, tracker or diagram output. This page makes no claim about Egypt’s grid code, tariffs or incentives, so test each tool on one real Egypt site.
Which solar design tools make a single line diagram for Egypt?
HelioScope lists a single-line diagram among its exports. PVcase lists single line diagram export on its Ground Mount plan page. PVsyst has a single line diagram editor for grid-connected systems, which it calls work in progress and which does not include storage. RatedPower says it produces single-line diagrams. SurgePV’s published scope lists electrical workflow support but no diagram output. Ask each vendor to produce the diagram for one real Egypt project.
Which solar design tools document P50 to P90 yield?
HelioScope Pro lists P90, P95 and P99 values. PVcase Yield plans list built-in P50 and P90 scenarios. PVsyst documents a P50 to P90 evaluation tool. RatedPower points to PVsyst for the P50, P90 and P99 report. SurgePV’s published scope lists energy-yield modeling but no P50 to P90 results. P90 is a yield expected to be met or exceeded in 90% of years, and P50 in 50% of years.
Does solar design software work in Arabic for Egypt?
PVsyst lists French among 12 software languages and says English is the reference language. Its help pages are in English. RatedPower says its support team speaks English, Spanish, French, German, Chinese, Italian and Portuguese, but the pages we read do not list its interface languages. The HelioScope, PVcase and SurgePV pages we read do not list interface languages. Ask each vendor to show output in Arabic before you buy.
How much does solar design software cost for a team in Egypt?
HelioScope lists $159 per month or $1,620 per year for Basic and $259 per month or $2,640 per year for Pro, per license. PVcase publishes no price. PVsyst 8 Professional is 700 Swiss francs per year. RatedPower says to talk to sales. SurgePV lists $1,899 per user per year for one user. Prices were checked in October 2026 on each vendor’s own page, in the currency the vendor publishes.
Is there free solar design software for Egypt?
None of the vendors on this list states a free plan on the pages we read. PVsyst offers a one-month free trial. SurgePV offers a guided demo.