Back to Best Solar Software
Best ListBest-Of List5 tools compared

Solar Design Software in Denmark: Five Tools Compared (2026)

Five solar design tools compared on what each vendor publishes for work in Denmark: single line diagrams, P50 to P90 yield, languages, price and platform. Checked October 2026.

SurgePV publishes this list and sells solar design and proposal software, so we have a commercial interest in this category. This is a desk comparison of what each vendor publishes; we have not run side-by-side tests. Prices and vendor facts checked October 2026. How we evaluate software

Published Last updated
Akash Hirpara

Written by

Akash Hirpara

Co-Founder · SurgePV

Rainer Neumann

Edited by

Rainer Neumann

Editorial contributor · SurgePV

In Denmark the design file hinges on the grid companies’ positive list: plants of up to 125 kW on that list get a form of pre-approval, while plants of 50 to 125 kW still need a power quality calculation. So the tool question is whether the inverter library and the printed documents can support that. Aurora Solar prices per user in US dollars with P50 estimates. HelioScope lists a dollar price and Pro designs up to 5 MW DC. PV*SOL premium is priced in euros per named user. PVsyst documents P50 to P90 yield. SurgePV documents roof modeling through proposals but no diagram output. None of the vendor pages names the positive list.

This is a desk comparison of vendor publications read in October 2026. No side-by-side runs were made. SurgePV publishes this page and is a vendor on this list of 5 tools. Facts about each tool come from its own site. SLD is a single line diagram. P50 and P90 are yields met or exceeded in 50% and 90% of years. BOM is a bill of materials.

Criteria used: single line diagram, P50 to P90 yield, Danish-language output, price and currency, platform.

This page compares 5 tools. Other tools are compared on the global design list. HelioScope is an Aurora Inc. company, and both appear here as separate products.

Want to see SurgePV on your own project?

Book a guided demo and bring a real site. We walk through design, yield, finance and the proposal in one platform.

Book a Free Demo

Checking cost first? See the SurgePV pricing page.

Best-For Picks for Denmark

  • Per-user proposals paid in dollars: Aurora Solar. Basic is $159 per user per month, Premium $259, lower when billed annually. Its SLD editor is described as available only in Europe, and Denmark is in Europe, so ask whether it applies.
  • Dollar-priced mid-size plants: HelioScope. Pro designs run to 5 MW (DC), which covers the 125 kW positive-list ceiling many times over. It lists P90 to P99 values and a single-line diagram export.
  • Euro pricing with circuit diagrams: PV*SOL premium. EUR 845.00 plus VAT per named user for a year, with customizable circuit diagrams and a 20-year financial analysis. Its interface list leaves out Danish. Windows 10 and 11 only.
  • P50 to P90 reporting: PVsyst. The help page documents the tool; the product page lists 12 languages, Windows only.
  • Roof model to BOM and proposal, per user: SurgePV. Roof modeling, shading, yield, financial modeling, BOM and proposals are in scope. Ask a Danish demo about the diagram and the inverter library.

Comparison Table

Listed alphabetically. This is not a ranking; pick by the situation above. Prices checked October 2026 on each vendor’s own page, in the currency the vendor publishes.

Tool Best for Price Free or paid Decisive fact
Aurora Solar Design and sales proposals, per user Basic $159 per user per month; $135 billed annually Paid SLD editor “only available in Europe”; P50 only
HelioScope Dollar-priced commercial and mid-size plants $159 or $1,620 per license (Basic); $259 or $2,640 (Pro), per month or per year Paid Single-line diagram export; P90, P95, P99 on Pro
PV*SOL premium 3D shading, circuit diagrams, euro price EUR 845.00 per named user per year, plus VAT Paid, trial download Circuit diagrams; Windows 10 and 11 only
PVsyst P50 to P90 yield reports CHF 700 per year (Professional) Paid; one-month free trial P50 to P90 tool; Windows only
SurgePV Roof model to BOM and proposal, per user $1,899 per user per year (1 user), in US dollars Paid, guided demo BOM and proposals in scope; no diagram or P50 to P90 item stated

Denmark Criteria Matrix

Cells below read Documented, Partial or Not stated. Documented: the vendor’s page states it. Partial: a related feature is stated. Not stated: the October 2026 pages are silent. Nothing is scored or weighted, and silence is not proof of absence, so each vendor should produce the item on a Danish roof.

Tool Single line diagram P50 to P90 yield Languages listed Price and currency Runs in
Aurora Solar Partial (editor listed for Europe; ask whether it covers Denmark) Partial (P50 only; no native P90) Partial (French help centre and Europe site; app language not stated) Documented (USD, per user) Not stated
HelioScope Documented (help article) Documented (P90, P95, P99 on Pro) Not stated Documented (USD, per license) Browser (help article recommends Chrome or Firefox)
PV*SOL premium Documented (circuit diagrams) Partial (P50 and P90 in the Bankability topic; full feed-in only) Documented (9 interface languages; reports in 24) Documented (EUR, plus VAT) Windows 10 and 11 only
PVsyst Partial (grid-connected only, no storage, work in progress) Documented Documented (12 languages; English is the reference) Documented (CHF) Windows only
SurgePV Not stated (electrical workflow support listed) Not stated (energy-yield modeling listed) Not stated Documented (USD) Web

Tool Entries

Aurora Solar

Best for: teams that quote rooftops per user and accept US-dollar billing for a Danish market.

Not the right choice if: you need a P90 yield (Aurora does not natively output P90 for solar energy production), or a single line diagram outside the area its editor covers. The vendor lists prices in US dollars.

What the vendor documents: the single line diagram editor page says the editor is only available in Europe. The help article on P-values says Aurora’s estimates are P50 values from typical-year weather data. The help article on utility rates lets you set an export rate in dollars per kWh and a compensation policy. Aurora’s help centre and Europe site offer French. The pages we read do not state the language of the app or the proposals.

Price (checked October 2026): on the pricing page, Basic is $159 per user per month, or $135 per user per month billed annually ($1,620 billed annually). Premium is $259 per user per month, or $220 per user per month billed annually ($2,640 billed annually). The page uses a $ sign without naming the currency. It shows North America as the selected region.

Limitations: billing in dollars suits a euro-based business poorly, no Danish language is stated, and the positive list is not named. Check the European diagram editor on one Danish roof.

Vendor link: aurorasolar.com.

Aurora Solar public website page, captured 29 October 2026
Aurora Solar public website capture, captured 29 October 2026. This shows the vendor's website, not a test inside the software.

HelioScope

Best for: commercial designers who want a published dollar price, with project sizes well beyond the 125 kW positive-list limit covered by the Pro cap.

Not the right choice if: your plant is bigger than the size caps, or you need an interface language list. The pricing page lists designs up to 1.25 MW (DC) on Basic, up to 5 MW (DC) on Pro and up to 30 MW (DC) on Enterprise. The pages we read do not list interface languages.

What the vendor documents: Basic lists rooftop, carport and ground mount on all projects and storage design. Pro adds LIDAR-assisted modeling, financial modeling and sales proposals, and P90, P95 and P99 values. Enterprise adds unlimited users, single-axis trackers, export to PVsyst, API access and SSO (single sign-on). The export article says you can export a .dxf CAD file and a single-line diagram, “a simple electrical schematic”. HelioScope is “an Aurora Inc. Company”. A help article recommends Google Chrome or Firefox for the design tool.

Price (checked October 2026): Basic $159 USD per license per month or $1,620 USD per license per year, including 1 user. Pro $259 USD per license per month or $2,640 USD per license per year, including 1 user. Enterprise is custom per-project pricing. All from the pricing page.

Limitations: no languages listed and no mention of the Danish positive list. Ask it to print inverter model, quantity and layout on one sheet for a grid company.

Vendor link: helioscope.aurorasolar.com.

HelioScope public website page, captured 29 October 2026
HelioScope public website capture, captured 29 October 2026. This shows the vendor's website, not a test inside the software.

PV*SOL premium

Best for: Danish designers who prefer euro pricing, 3D shading and circuit diagrams; its reports come in 24 languages.

Not the right choice if: you work on a Mac or in a browser (the system requirements list Windows 10 and 11), or you need a price in a currency other than euros. The product page prices in euros.

What the vendor documents: on the product page, the interface is available in German, English, Spanish, French, Italian, Polish, Czech, Portuguese and Turkish. Project reports come in 24 languages. The page lists “fully customizable circuit diagrams, including safety components” and a 20-year financial analysis that uses a feed-in tariff database. The help centre has a net-metering tariffs page and a Bankability (P50, P90) topic. That topic gives P50 by default, with P90 or a P-value you choose, and says it relates only to full feed-in.

Price (checked October 2026): EUR 845.00 plus VAT for a named-user licence, one year. A free trial version is offered for download.

Limitations: Danish is missing from its nine interface languages, so reports may be a workaround. Whether its library carries inverters on the Danish positive list is not stated on the pages we read.

Vendor link: valentin-software.com.

PV*SOL premium public website page, captured 29 October 2026
PV*SOL premium public website capture, captured 29 October 2026. This shows the vendor's website, not a test inside the software.

PVsyst

Best for: a lender-facing P50 to P90 report on a larger Danish plant, where the grid-connected diagram may be enough.

Not the right choice if: you need a browser tool, or a tool that lays out ground-mount rows for you. The pages we read describe a 3D scene you model yourself. Its product page says PVsyst only runs on Windows and needs one license per computer.

What the vendor documents: system design for grid-connected, standalone and pumping systems, a 3D scene you model, unlimited orientations, and single or dual-axis trackers with backtracking. It lists weather databases including Meteonorm 9, NASA-Power and PVGIS-TMY, and an economic assessment with NPV, LCOE and ROI. Its P50 to P90 help page says the annual production has a 50% probability of exceeding the P50 value and a 90% probability of exceeding the P90 value. Its single line diagram page says the feature is only for grid-connected systems, does not include storage and is “still work in progress”. The product page lists 12 software languages, including French.

Price (checked October 2026): PVsyst 8 Professional is CHF 700 per year, updates included. Group discounts are 5% for 2 to 4 licences, 15% for 5 to 9 and 20% for 10 or more. The product page lists a one-month free trial. The price is in Swiss francs.

Limitations: its diagram tool excludes storage and is described as work in progress, and the 50 to 125 kW power quality calculation is not something it names. Windows only.

Vendor link: pvsyst.com.

PVsyst public website page, captured 29 October 2026
PVsyst public website capture, captured 29 October 2026. This shows the vendor's website, not a test inside the software.

SurgePV

SurgePV is our product.

Best for: Danish rooftop teams that want model, BOM and proposal together, billed per user.

Not the right choice if: you want a self-serve trial (SurgePV offers a guided demo). It is also not right if you design ground-mount plants with terrain and tracker layout, or need a single line diagram or P50 to P90 yield in writing. Its published scope lists roof modeling and array layout, not those items. Outputs support design and documentation. They do not replace approval by the responsible engineer, authority, lender or utility. SurgePV’s published product scope does not list a CRM (customer tracking tool). Monitoring and ERP (business management software) are outside its published scope.

What the vendor documents: 3D roof modeling, array layout, shading analysis, energy-yield modeling, financial modeling, electrical workflow support, bill-of-materials output and proposal generation. See solar design software for the product page.

Price (checked October 2026): $1,899 per user per year for 1 user, $1,499 per user for 3 seats, $1,299 per user for 5 seats, in US dollars.

Limitations: results depend on source data, assumptions and equipment models. For Denmark: the published scope names no diagram output or Danish interface, and its equipment library versus the positive list is something to ask in a demo.

Vendor link: surgepv.com.

SurgePV public website page, captured 29 October 2026
SurgePV public website capture, captured 29 October 2026. This shows the vendor's website, not a test inside the software.

Language Check for Denmark

Danish is the language a Danish client or grid company will expect. PV*SOL premium’s interface language list does not include Danish. PVsyst lists French among 12 software languages and says English is the reference language. Its help pages are in English. Aurora’s help centre and Europe site offer French; the pages we read do not state the language of the app. The HelioScope and SurgePV pages we read do not list interface languages. Vendor lists change, so get a sample Danish proposal before you commit.

Danish Connection Rules That Shape a Design

In Denmark the practical design question is whether the inverter is on the grid companies’ positive list and how large the plant is. The facts below are as of the dates given per the sources named, and the list moves, so check it again before you fix a design.

A positive list speeds approval. The TEKNIQ article of 26 October 2022 reports that the positive list, administered by Green Power Denmark (formerly Dansk Energi), was widened from plants of 50 kW to plants of up to 125 kW, which the article compares to about 20 single-family roofs. Plants on the list meet a set of technical conditions and get a form of pre-approval for connection. The article gives the list as of October 2022 as 690 solar inverters, 213 batteries and other storage units, 21 wind turbines, 1 bidirectional charger and 12 other plants. Those counts are dated, so treat them as a sense of scale only.

Between 50 and 125 kW a calculation is still needed. The same article says plants of 50 to 125 kW still need a concrete calculation of power quality (elkvalitet) before they can be connected. For a design file that means the inverter model, the number of units and the connection point should be stated clearly enough for a grid company to run that calculation.

Registration takes installer time. The article quotes an installer saying one grid registration can take over an hour, and that the company sold 15 plants in a week. Software that exports the inverter and array data in one place saves retyping.

Reporting to the energy agency. The Energistyrelsen page on solar plants and household wind turbines covers what an owner must report to Energistyrelsen and what happens to a plant that was installed and connected without a prior commitment (tilsagn). It also says new plants cannot get a price supplement (pristillæg). A design that assumes a supplement is therefore out of date.

What it means for tool choice. None of the vendor pages read for this list names the positive list. Ask each vendor whether its equipment library includes the inverter you plan to use and whether it can print a single document with model, quantity, AC output and layout. See the solar design workflow for SurgePV’s published scope, or book a demo with a Danish sample roof. For tariff and tax questions, see the Denmark proposal list.

What to Ask a Vendor Before Buying

Take one Danish roof to every demo. Ask whether the inverter you plan to use is in the equipment library, since the grid companies keep a positive list. Ask for one document with model, quantity, AC output and layout, because a 50 to 125 kW plant needs a power quality calculation. Ask for Danish-language output. Ask for the invoice currency. Where the matrix shows Not stated, a trial or demo settles it.

How We Ordered These Tools

The tools below are in alphabetical order, not ranked. The picks come from what each vendor publishes.

  • Single line diagram: a grid company registration needs a drawing. We did not compare tool output with any Danish format.
  • P50 to P90 yield: lenders read these values for larger plants. Acceptance in Denmark was not assessed.
  • Languages: vendor-listed languages only; Danish translation quality was not assessed.
  • Price and currency: euro, dollar and franc prices appear side by side. Discounts and VAT handling were not assessed beyond what vendors print.
  • Runs in: two of the five tools run only on Windows. Speed and file size were not assessed.

Sources and Dates

Danish connection facts were read in November 2026 from the TEKNIQ article of 26 October 2022 and the Energistyrelsen page on solar plants and household wind turbines.

Vendor pages were read in October 2026. They are Aurora Solar (pricing and three help articles), HelioScope (pricing and help articles), PV*SOL premium (product page and help centre), PVsyst (product, shop and help pages) and SurgePV (pricing). Help-centre articles were read in a browser. SurgePV publishes this page and is a vendor on the list. No government or regulator page is used on this page.

See SurgePV on your own project

Book a guided demo and ask which of the outputs you need for a Denmark project it can produce.

Book a Free Demo

Go Deeper on a Category

Frequently Asked Questions

What is the best solar design software for Denmark?

It depends on the job. Aurora Solar prices per user in US dollars and describes its estimates as P50 values. HelioScope lists a dollar price and designs up to 5 MW DC on its Pro plan. PV*SOL premium lists circuit diagrams and 3D shading on Windows, priced in euros. PVsyst documents P50 to P90 yield. SurgePV documents roof modeling through proposals but states no ground-mount, tracker or diagram output. This page makes no claim about Denmark’s grid code, tariffs or incentives, so test each tool on one real Denmark site.

Which solar design tools make a single line diagram for Denmark?

Aurora’s help page says its single line diagram editor is only available in Europe. HelioScope lists a single-line diagram among its exports. PV*SOL premium lists customizable circuit diagrams. PVsyst has a single line diagram editor for grid-connected systems, which it calls work in progress and which does not include storage. SurgePV’s published scope lists electrical workflow support but no diagram output. Ask each vendor to produce the diagram for one real Denmark project.

Which solar design tools document P50 to P90 yield?

Aurora’s estimates are P50 values and it does not natively output P90. HelioScope Pro lists P90, P95 and P99 values. PV*SOL premium’s Bankability topic gives P50 by default, with P90 or a P-value you choose, and relates only to full feed-in. PVsyst documents a P50 to P90 evaluation tool. SurgePV’s published scope lists energy-yield modeling but no P50 to P90 results. P90 is a yield expected to be met or exceeded in 90% of years, and P50 in 50% of years.

Does solar design software work in Danish for Denmark?

PV*SOL premium’s interface language list does not include Danish. PVsyst lists French among 12 software languages and says English is the reference language. Its help pages are in English. Aurora’s help centre and Europe site offer French; the pages we read do not state the language of the app. The HelioScope and SurgePV pages we read do not list interface languages. Ask each vendor to show output in Danish before you buy.

How much does solar design software cost for a team in Denmark?

Aurora Basic is $159 per user per month, or $135 per user per month billed annually. HelioScope lists $159 per month or $1,620 per year for Basic and $259 per month or $2,640 per year for Pro, per license. PV*SOL premium is 845.00 euros plus VAT per named user per year. PVsyst 8 Professional is 700 Swiss francs per year. SurgePV lists $1,899 per user per year for one user. Prices were checked in October 2026 on each vendor’s own page, in the currency the vendor publishes.

Is there free solar design software for Denmark?

None of the vendors on this list states a free plan on the pages we read. PVsyst offers a one-month free trial. PV*SOL premium offers a free trial download. SurgePV offers a guided demo.

About the Contributors

Author
Akash Hirpara
Akash Hirpara

Co-Founder · SurgePV

Akash Hirpara is identified by SurgePV as a company co-founder. His SurgePV author page lists only role information that can be tied to the public profile below; education, certifications, project totals, financial results, speaking engagements, and media appearances are not asserted without retained evidence.

Editor
Rainer Neumann
Rainer Neumann

Editorial contributor · SurgePV

Rainer Neumann is credited as an editorial contributor on SurgePV content. This profile does not assert engineering credentials, project totals, software-testing experience, education, speaking engagements, or media citations because independent verification evidence is not retained in the publication record.

Ready to Design and Propose Faster?

SurgePV covers solar design, energy-yield modeling, financial modeling, and proposals in one platform. Book a guided demo to see it on a project like yours.

Choose which optional technologies SurgePV may use. Essential storage remains active for security and requested features.